Germania Selected Working Drawings
Germania Selected Working Drawings
Germania Selected Working Drawings
GWB/PLASTER/GROUT
101A DOOR NUMBER Architecture & Engineering
CL
# WORK NOTE
CONCRETE
101 ROOM NUMBER
1 2 3 4 5 6 7 8 9 10
ACOUSTICAL TILE
SLOPE DIRECTION
UP UP
A1 PARTIAL
FINISHED WOOD A101
SECTION 3.9
4.9 6.1
7.1
J
SHEET WHERE SHOWN
2.7 8.1
2.2 8.9
CERAMIC TILE 2.1 9.1
SECTION NUMBER
CARPET A1
SIM
BUILDING
A101
SECTION
341'-8"
SHEET WHERE SHOWN
ABBREVIATIONS LEGEND
ELEVATION NUMBER
A1
& AND
A4 AE101 A2
INTERIOR
B/B.O. BOTTOM OF ELEVATION
CFCI CONTRACTOR FURNISHED CONTRACTOR A3 SHEET WHERE SHOWN
INSTALLED
CL CENTER LINE 27'-5 3/4"
TRUE NORTH INDICATOR
20'-5"
CLG CEILING
PLAN NORTH ARROW 12'-8 1/2"
CONT CONTINUOUS
4'-6 1/2" WP3
COL COLUMN
WALL/PARTITION
CMU CONCRETE MASONRY UNIT WP4
CONC CONCRETE
55'-4"
DOOR, FRAME & HARDWARE WP5
41'-4 1/4"
D DISHWASHER
WP2
28'-0 1/2"
25'-5 1/2"
DIA DIAMETER
WP6
12'-2 1/2"
DN DOWN
MECHANICAL DIFFUSER AND EQUIPMENT
E/EXIST EXISTING
ELEC ELECTRICAL WP1
115'-11" 30'-2 1/2"
ELEV/EL ELEVATION
ACCOUSTIC PANEL CEILING
EQUIP EQUIPMENT
C
F/F.O.
FD
FACE OF
FLOOR DRAIN
LUMINAIRES
WORKPOINT PLAN
1/32" = 1'-0"
FLR FLOOR
FRT FIRE RETARDANT TREATED EMERGENCY LUMINAIRES
GALV. GALVANIZED
GWB GWB
HM HOLLOW METAL
HORIZ HORIZONTAL
SPRINKLER HEADS
HP HIGH POINT
PC#: 260-17701-000
R RADIUS / RISER / REFRIGERATOR
RCP REFLECTED CEILING PLAN
REF REFERENCE
B
RM ROOM
RO ROUGH OPENING
SCW SOLID CORE WOOD
SIM SIMILAR
SS STAINLESS STEEL
T/T.O. TOP OF
T TREAD
TOC TOP OF CONCRETE
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
VERT VERTICAL
CN NO: 3143
VIF VERIFY IN FIELD
DATE: 11-12-2010
WD WOOD DESIGN: AHL
XPS EXPANDED POLYSTYRENE DRAWN: SVG
REVIEW:DRH
REVISIONS
No. Date Description
ARCHITECTURAL
A
ABBREVIATIONS,
LEGEND,
WORKPOINT
A-001
31/10/2020 10:54:41
PLAN
SHEET 26 OF 155
1/32" = 1' - 0"
0 10' 20' 40' 60' 120'
GRAPHIC SCALE(S)
1 2 3 4 5 6
MATERIAL LEGEND SYMBOLS LEGEND ARCHITECTURAL SPECIFICATIONS
05811 METAL PANEL WALL SYSTEM GENERAL NOTES
DESIGN CRITERIA BASED ON THE 30" CENTRIA FORMAWALL DIMENSION SERIES METAL PANEL WALL SYSTEM. INSTALL
PER MANUFACTURER'S SPECIFICATIONS. 1. ALL MATERIALS SHALL BE NEW AND PROVIDED BY THE CONTRACTOR UNLESS SPECIFICALLY NOTED AS EXISTING OR TO BE PROVIDED BY OTHERS. Architecture & Engineering
2. UNLESS A NOTE IS INDICATED TO BE LIMITED TO A SPECIFIC ITEM OF WORK, IT SHALL BE ASSUMED THAT THE NOTE APPLIES TO THE ENTIRE AREA.
08211 FLUSH WOOD DOORS
3. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS. CIVIL DRAWINGS ARE AVAILABLE FROM JEHLE-HALSTEAD, INC. @
WOOD DOORS: PROVIDE INTERIOR FLUSH; 1 3/4 INCH THICK SOLID CORE CONSTRUCTION. CORE SHALL BE SOLID, NON 1-850-434-0059.
RATED, COMPLYING WITH AWI SECTION 1300 "TYPICAL PC-PARTICLEBOARD. PLAIN- SLICED WHITE BIRCH-VENEER, 4.
STAINED COLOR TO MATCH CUSTOM COLOR 140351C BY MARSHFIELD DOOR SYSTEMS. REFER TO 08211 OF THE IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITION
SPECIFICATIONS. OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND IS NOT
LIMITED TO NORMAL WORKING HOURS.
1331 L STREET, NW
WASHINGTON, DC 20005
09310 PORCELAIN TILE 202·461·3260 FAX 202·461·3266
WWW.CLARKNEXSEN.COM
SEE FINISH SCHEDULE FOR PRODUCT. INSTALL PER MANUFACTURER'S SPECIFICATIONS.
E
09512 ACOUSTICAL TILE CEILINGS
ARCHITECTURAL NOTES
SEE FINISH SCHEDULE FOR PRODUCT. INSTALL PER MANUFACTURER'S SPECIFICATIONS.
MICROWAVE
PROVIDE GE 1.8 CUBIC FOOT, 120 VOLT, 1550 WATTS, FULL SIZE IN BISQUE - MODEL #JE1860 CH. DIMENSIONS: 13.5H X
18.75D X 24W.
REFRIGERATOR
PROVIDE GE TOP MOUNT WITH ICEMAKER IN BISQUE - MODEL #GTS18KHPCC. DIMENSIONS 66-5/8H X 32-1/8D X 29-1/2W.
DISHWASHER
ASKO D3251FI - BISQUE FINISH ON FRONT PANEL.
ABBREVIATIONS LEGEND PROVIDE MECHOSHADE SHADE CLOTH, 1000 SERIES, BEIGE (1002) WHERE NOTED ON SHEET AE101. C.F.CI. PER
D MANUFACTURER'S SPECIFICATIONS.
PC#: 260-17701-000
B
CN NO: 3143
DATE: 11-12-2010
DESIGN: Designer
DRAWN: Author
REVIEW:Checker
REVISIONS
No. Date Description
ARCHITECTURAL
A
LEGENDS AND
NOTES COPY
A-002
31/10/2020 10:54:45
SHEET OF 155
1 2 3 4 5 6
PC#: 260-17701-000
B
CN NO: 3143
DATE: 11-12-2010
DESIGN: Designer
DRAWN: Author
REVIEW:Checker
REVISIONS
No. Date Description
ROOM SCHEDULE
A
WITH AREAS
A-003
31/10/2020 10:54:51
SHEET OF 155
1 2 3 4 5 6
AE202
Architecture & Engineering
D1
AE301
1 2 3 4 5 B1 6 7 8 9 10
234'-0"
1'-1" 15'-0" 28'-10" 28'-10" 28'-10" 23'-1 1/2" 34'-6 1/2" 28'-10" 28'-10" 15'-0" 1'-1"
4'-0" 3'-4" 10'-0" 6'-4" 29'-8" 3'-4" 49'-8" 6'-4" 2'-4" 3'-4" 9'-10" 4'-4" 4'-4" 3'-4" 12'-0" 6'-4" 18'-8" 1331 L STREET, NW
5'-6" D5
WASHINGTON, DC 20005
2'-5" 25'-7" 6 RISERS @ 11" 1'-0" 1'-0" 202·461·3260 FAX 202·461·3266
7'-6" 4'-0" 19'-0" AE202 6'-0" WWW.CLARKNEXSEN.COM
E 21'-11" A1
E1 3'-8" AE302
AE411 C5 12'-0" 12'-0"
4'-0"
4 TREADS @ 11" SIM. 8'-0"
6'-0" 6'-0" 8'-0" 6'-0" 7'-10"
AE202 L1 ABOVE L1 ABOVE W1 ABOVE
8'-0"
8'-0"
E1 A4
2'-0 5/8"
8'-0" 30'-0"
5'-0"
A4 AE504
121B
1'-1"
4'-0"
105B
2 34 34
101C2
105A
AE202 W1 ABOVE W1 ABOVE W1 ABOVE
123B
0'-7 3/8"
119C
119B
127B
AE504 34 8'-8" 5'-4"
O.H. SIM
123C
A
WATER 1'-9 5/8" TV TV
S6N S6N.4 4'-7 7/8" 8'-9 7/8" 0'-8"4'-8 1/8" S4C 0'-4" EL. = 207.5 14'-5 1/4" SE4
0'-4"
HEAD-IN S6C 0'-6 5/8" 1'-1 3/8"
S6
2'-10 3/4"
1'-7 3/4" S6C S6N.3 1'-7 3/4"
8'-3 5/8"
11'-3 3/8" 105B 14'-0 7/8" 10'-10 3/4" 1'-7" 12'-5 1/2" S6 7'-8" 18'-9 7/8" 24'-8 5/8" 22'-10 7/8" 8'-6 1/4" 53'-4 7/8" 13'-11" 30'-5 5/8"
D5 AE421
STORAGE S4C CORRIDOR E5 D5 CONTROL ENGINEERING
S6N.4 MECHANICAL S8N ELEC B3 37 2'-0 5/8"
3'-1 7/8" ROOM STORAGE
15'-6 3/8"
MEN'S WOMEN'S 101C
15'-7 1/8"
105A 119 121 3
S6N.3 TOILET TOILET 39 115 26 S6N.3 125 2
E4 AE403 E1 AE403 138
107 109 D4 D1 ENGINEERING AE422 ENGINEERING
FD EL.= 207.5 EL.= 207.5
6'-4"
FD LAB S6N.3 LAB
AE604 FD B4 AE422
S6N.3 123 SIM. FD 5'-0" 37 127 MECHANICAL
E2 D2 2
3'-9 1/8
D5
125
RECORDING S6N.3 138
115
S6 UTILITY YARD
101C1
S6 26
13'-1 3/8"
S6N.4 R STUDIO 6'-8 5/8" S4C AE501 2
30'-2"
IT STAFF S6N.4 5 EL. = 207.5
123A 127A
"
1'-8"
113
168.31°
103 107 S6N.4 109 U 17'-3 1/8" 2 EL.=207.5
0'-9 7/8"
121A CORRIDOR EL. = 207.5
A5 AE422 EL. = 207.5
133 C5
11'-7"
S6N.4 A4 S4RIN
S6N.4 8" AE403
2'-0 5/8"
2'-6 7/ AE604 AE301
15'-5 1/8"
14 FD B2
4'-7 1/4"
CORRIDOR S4C 117 117 EMERGENCY C5 3'-3 3/8"
SERVER S6N.3 S6N.3 28
S4RIN ELECTRICAL 121A1
103A
CORRIDOR
1'-1" 101E AE604 AE401 31'-8 5/8" S6N.3 FD
8" V UP
7'-7 3/8"
103 1'-4 5/
9'-10 3/8"
1'-8 1/8"
S6N.3 103A 108A UP 121A D3
FACULTY
4'-10 7/8"
A4 S6N.3 E1 EL.= 207.5 28 19'-2 5/8"
0'-9"
CORRIDOR RAMP SE3 0'-6 3/4"
5'-1 5/8"
OFFICE AE604 14 7 DN AE303
AE415 DN
10 '-5 3/
AE504 19'-4 1/2" 13'-4" S6N.7 U 101D DN 7'-3"
134
24
101D
111 111 EL=209.75 S6N.7
119A
O.H. 10 DN 0'-4" EL=
B 212.0
8"
2'-2 3/8" S DN
5'-2" 25'-10 3/4" 2'-1 5/8" 25'-11 3/4" 2'-0 5/8" 12'-1 5/8" 16'-0 3/8"
1'-1"
E1
1'-1"
S6N.7 35 T S6R1N.7 0'-8"
B2 AE504 E4 4 10 E5 1'-1"
16'-1" 18'-3 1/4" 1'-5 1/4" 6'-11 3/8" 11'-4 1/2" 6'-6 3/4" 6'-9 5/8" 6'-3 1/4" 10 43'-4"
100B CORRIDOR 2'-1 3/4" AE504 C2 101G
AE604 AE401 D4 AE504
101B HOUSEKEEPING AE604 101 D6 E2 AE603 101E 0'-1"
A5
D A1 E3 E3
7'-2"
LOBBY AE413 AE504 AE604 AE413 A1 B1
AE602 AE501 104 S6N.3 AE401 C6
AE504 AE602
106A
100 B1 AE601 AE301
104
AE403 A1
0'-8 5/8"
EL.= 212.00
0'-9 3/8"
SOUTH AE403 A B3 NORTH A6
112
110
VESTIBULE 100A 114 AE401 101H VESTIBULE AE302
R LRC D AE604
101A D1 41 S6N DEAN 14 B1 101B
116
C1 WORKROOM AE604 S6N.3
AE202 D1 D
5'-9
AE602 101A AE412 S4N BREAK 110 1'-6" AE401 101F
130
FD 108 8 D1 AE201
AREA CLERICAL S4N EL. = 212.00
118A
1/
16 '-11
4" CONFERENCE
D 106 CORRIDOR 112 DEAN
8 CIRCULATION D4 114 116
D3
"
S6N 130B S4N
14 '-2 7/8
B1 MANAGER SE3
1/8"
122A
102A AE504 COPY C1
106'-2 1/8"
39'-11"
1"
UP AE504 AE401 D4 118 UP
15
36 '-1
15 106B AE504
132
UP UP
15 8'-7 7/8" 9'-8 1/4" 8'-7 7/8"
A6 A3 8'-7 7/8" S4N S4N STAIR B
STAIR A 0'-6" 38
C4 9'-8 1/4"
A3
AE601 S6N.8 AE401 8'-7 7/8" CORRIDOR 122
102B 102 S6N.8 122B
4'-0"
100C 14 AE422 8'-7 7/8 118B 130A
INFO. DESK " A4
63'-1 1/2"
2 1 AE422 38
101F 9 38 9'-8 1/4
9 29 SIM. " 2'-11"
1 29 AE422
39 B2
25 2 9 124
C
8"
2 1 AE504
3'-6 5/
M IN.
39 GROUP
22
3/4"
B1 22 STUDY
AE604
1 1/4"
AE412 D3 22 TYP. B
12 '-2
D1 2 B5 124 7'-9
AE401 1/4"
AE401 C6
28
11 '-1
LIBRARY AE601
A3 22 S6N
11'-1 C
AE422 130 2 0 1/2" C1
AE401 °
1 .31 AE412
92
EL. = 212.00 126
5/8"
S6N
C ABOVE
12 '-6
E2 28
1/8"
S6N
33'-11 1/8"
A4 9 AE401 11'-4
1/8" D
39 '-1
AE303 C5
.3 1° AE602
9'-10 21'-5
3/8" 92
7/8"
AE604 C S6N
6.1 5'-0"
4.9
3.9 J
7.1
PC#: 260-17701-000
2.7
8.1
2.2 8.9
B 2.1 9.1
16'-1" 5'-6 1/2" 21'-10 1/2" 147'-0" 21'-10 1/2" 5'-6 1/2" 16'-1"
234'-0"
23 GLASS RAILING
10 THIN BRICK RETURN. SEE A5/AE501 35 COLUMN ENCLOSURE, SEE DETAIL B5/AE504
AE101
31/10/2020 10:54:52
AE202
Architecture & Engineering
D1
AE301
1 2 3 4 5 B1 6 7 8 9 10
34 34 34 34 31
A4 A3
1'-1"
AE504 AE503
W1 W1 W1 W1 W1A W1A L1 W1 W1 W1 W1 W1
4'-9 5/8"
4'-9 5/8"
I I I
I I I
10'-11" S3CR1N
I I I
S6N.3
I I I
I
S3CR1N SE2
I I I
8'-6 1/8"
I I
25'-7 5/8" S6 10'-10 3/4" 1'-7" 12'-5 1/2" S6 28'-9 1/8" 14'-6 3/4" 31'-2 3/8" 16'-7 7/8" 34'-4 3/4" 17'-9 1/4" INSTRUMENT 221 37'-2 3/4"
213B 213C S3CR1N 219C
2 ROOM SE2 A2
S4C 26
0'-9" 6 26
5'-5 1/4"
28 S6N.4 7'-3 7/8" 17'-1 5/8" 221 6'-2 3/8" AE503
I I
TOILET TOILET
I
MECHANICAL
I I I
2 26 AE503 31
AE421 A4 207 209 CHEMISTRY S4.3
29'-0 7/8"
29'-0 3/8"
I I I
10'-3 1/4"
S4 I I I I I I
ROOM
30'-6 7/8"
GENERAL CHEMISTRY S6N.3
30'-2"
32'-4"
30'-2"
15'-0 1/4"
PHYSICS 217 STORAGE/PREP 6
PURPOSE 6 LAB PHYSICS 6 PHYSICS LAB
207 S6N.4 209 STORAGE/PREP 6 223 6 2
CLASSROOM 211 LAB 219 S4.3 I I I 32
F
I I I
4'-6"
E1 S6N.4 6 2
S6N.4 S6C
AE411 4'-9 1/8"
5'-7 1/4"
4'-7 1/4"
S6N.4 205 I I I
I I
11'-6 7/8" 7'-0 1/2" F
6'-10 5/8"
S6N.3
I
14 14 D CHEMISTRY SE2 1
6'-10 5/8"
IT S6 F
3'-10"
1 35 B5 F 6 LAB 26 31
S6N F
8'-6 1/2"
8'-6 1/2"
205 F D 26 S3CR1N
1'-0 1/2"
AE504 D 225 S6N.7
5'-0 7/8"
S6N.3 D 219B 2 223B
4'-8 7/8"
D S6N.7 S3CR1N
SE2
I I I
I I I
I I I
S6N.7
I I I
I I I
I I I
S3CR1N S3CR1N S6N.3 B
I I I
I I I
I I I
203
I I I
I I I
I I I
S6N.7 10 35 S3CR1N
9'-10" 8'-9" 10'-5 7/8" 20'-7" 27'-7 1/4" 20'-7" S6N.7 33'-11 1/2" 20'-7" 10'-4 1/2"
1'-1"
S6N.7
1'-1"
210
212
B1 B3 A1 B1
214
B4
208
AE401 AE403 TYP. AE401 STUDY
AE403 24 AE401
218
AE604 AREA
AE202 D1 S4N MEETING MEETING 24
206
24 FACULTY ROOM 1'-6" 201A
234A
A1 FACULTY ROOM D1 AE201
OFFICES S4N 214
220
14'-8 7/8"
E OFFICES 210 FACULTY 24
AE403 FACULTY 212 12 33
AE604 208 S4N B4 OFFICES
S4N S6N.3 1'-6
204
OFFICES "
L AE504 218
106'-2 1/8"
39'-11"
ENTRY
202
222
33 12 206 S4N TYP. FACULTY
DN
DN W 200B S6N.8 S6N.8 S6N.8 S4N OFFICES DN
DN
15 S6N.8 W2 W2 W2 220 S4N
UP W2 W2 BREAK UP
UP MEETING 24 S6N.8 W2 W2 UP
AREA
ROOM W2 W2 D
STAIR A OPEN TO 234A
204 W2 W2 S6N.8 STAIR B
OPEN TO
202 OPEN TO BELOW
234 BELOW BELOW W2 S6N.8 222
23 R C5
D2 B1 23
14 27 D4 40 15 AE303
AE412 40 AE402
AE401 40 23 14
TYP. 27
" 228
0
5'-1
27
EL. = 227.00 AE604 AE604 H S6N
S6N
ABOVE
2'-7
GROUP 2 ABOVE
STUDY 22 22 22 22
3/4"
D2 K LIBRARY
13'-6
ROOM S6N
228 ABOVE AE401 0° COORDINATOR C2
.0 0° C
"
236
S6N.3 28
/4"
226
90
03
A1 .0 0° 230
87
STUDY AE604
.7
23
ROOM
0°
C J
0 3/8"
230
13'-1
0.25°
20 '-1
33'-11 1/8"
A4 LIBRARIAN D
"
28
1 3/4"
AE303 D5 S6N OFFICES LIBRARY
S6N.3 AE504 ABOVE 236 S6N.3 INSTRUCTION
90
24 '-1
39 '-0
.0 0° TYP.
232 226
"
STUDY
236A
7/
ROOM C4
8"
232 AE414 B1
A5
A5
AE604
5.83° 5. 83°
4.9 6.1
2. 31°
2. 31
° J
3.9 7.1
5'-0"
5'-0"
PC#: 260-17701-000
2.7
8.1
2.2 8.9
B 2.1 9.1
16'-1" 5'-6 1/2" 21'-10 1/2" 147'-0" 21'-10 1/2" 5'-6 1/2" 16'-1"
234'-0"
CN NO: 3143
DATE: 11-12-2010
DESIGN: AHL
DRAWN: SVG
REVIEW:DRH
REVISIONS
No. Date Description
1 12-10-2010 Bid Addendum #1
2 01-14-2011 BCOM Review
Comments
SECOND FLOOR
A
PLAN
AE102
31/10/2020 10:55:03
SHEET 28 OF 155
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
1 2 3 4 5 6
1331 L STREET, NW
WASHINGTON, DC 20005
202·461·3260 FAX 202·461·3266
WWW.CLARKNEXSEN.COM
E
C1 A3
1
AE801 AE503
15 14
2'-8"
STORAGE MEN'S E4 7 E4
7'-5 3/8"
105A WATER TOILET
1 AE801 AE801
HEAD-IN 107 CORRIDOR 7'-0" A2
105B 1 2'-8"
101C CONTROL AE503
WOMEN'S 14'-1 5/8" 5'-10 3/4"
E4 ROOM ENGINEERING 10'-8"
TOILET ENGINEERING
115 1 STORAGE
5'-10 3/4"
AE801 109 ELEC LAB
7'-6" MEZZANINE 1 125
9'-0" 9'-0" 121 123 10 10 7 ENGINEERING A1
9'-0" 1
7'-6" 10 LAB AE503
IT STAFF
127
9'-0" 103 RECORDING
STUDIO 1 CORRIDOR MECHANICAL
113 9'-0" 133
9'-0" 138
EDITING C5
9'-0"
117 AE301 1
13
CORRIDORA4
9'-0" 101E AE403 10'-0"
9'-0" 1 9 9
CORRIDOR 9'-0" MECHANICAL
SERVER 2
108A 119 10'-0"
103A FACULTY EMERGENCY B3 RAMP
1 E4 E4 2" OFFICE CORRIDOR 134 9
1'-2 1/ ELECTRICAL
1'-10 1/2"
111 101D AE801
AE801 AE801 121A SIM. 10'-0"
B
1'-5"
CORRIDOR 10'-3"
2" 101 10'-0"
E1 0'-10 1/
AE801
D SOUTH E3
9'-6"
HOUSEKEEPING
E3
VESTIBULE 104 AE801
AE801
101A LOBBY D1
100 BREAK D1 NORTH
10'-3" 7'-6" AE801 VESTIBULE
AREA SIM.
1 LRC AE801 DEAN A6
106 101B
WORKROOM 9'-0" CLERICAL 114 AE302
4 9'-0" 9'-0"
108 112
10'-6"
SECURITY CIRCULATION E4 CORRIDOR
116A MANAGER CONFERENCE 9'-0"
AE801 7'-6" DEAN 130A
ENTRY 132 COPY 7'-0"
110 116 CENTER
100B 9'-0"
118 E4
A6 11 9'-0" 11
AE302 10'-6" AE801
OPEN 0'-9" OPEN C1 10'-6" OPEN
ABOVE 3 OPEN ABOVE AE505 OPEN ABOVE
ABOVE 9'-0" 1
STAIR A 10'-6" ABOVE
0'-9"
102 STAIR B
2 10'-6"
1 B3 122
INFO. DESK A2 12'-3"
AE801
101F AE401 4
E4
A6
AE801
AE601 D2
10'-6"
AE801 10'-6" GROUP
C
TYP STUDY
2
2 2 124
C4
10'-6"
10'-3" AE801
2 2
TYP 11'-6"
1/8"
SIM.
3'-9
2'-7
E4
AE801
2
WP WP WP WP WP WP
4.9 6.1
7.1
3.9 J
8.1
2.7
PC#: 260-17701-000
8.9
2.2
2.1 9.1
B
AE111
31/10/2020 10:55:16
1331 L STREET, NW
WASHINGTON, DC 20005
202·461·3260 FAX 202·461·3266
WWW.CLARKNEXSEN.COM
E
C1
CORRIDOR
200A AE801
A
INSTRUMENT
9'-0" ROOM
E4 7
7'-8"
7'-6" 7 5'-10 3/4" 10'-2 1/2" 221
AE801 11'-10 3/4" 0'-2 7/8"
9 4'-6 5/8" 5'-0 3/4" 4'-5 3/8" 9'-0"
8'-1 1/4"
9'-0" 1
12 CHEMISTRY
MECHANICAL LAB
9 C3 ROOM
MEN'S WOMEN'S E4 2'-11" 8 219 CHEMISTRY
10 10 1 2'-11" 1 10 1 7 7 1
TOILET TOILET AE801 217 STORAGE/PREP
7'-6" 10
5'-10 3/4"
11'-0 3/4"
14'-10 3/4"
AE801 223
10'-0" 207 209
5'-10 3/4"
5'-10 3/4"
3'-11 7/8"
CORRIDOR
GENERAL 7'-0"
200A 10
PURPOSE 9'-0"
CLASSROOM PHYSICS CHEMISTRY
9 PHYSICS 12 9 9 7
203 LAB LAB
LAB 7
7 PHYSICS 9 225
211 215
9'-10 5/8"
9'-10 1/8"
STORAGE/PREP 7
1 7 7
9'-0" 213
9'-1 1/4" 3'-10 5/8"
9'-0" 15'-11 1/2" 17'-10 1/2" 2'-0 5/8"
IT 10'-7" 5'-10 3/4"1'-4 1/8" 11'-10 1/2" 4'-2 1/2"
B3
205
AE801
B
0'-5"
MEETING
2" 9'-0" D1 MEETING
0'-10 1/ ROOM
ROOM
7'-7 1/8
210 201 AE801 9'-0"
D 9'-0"
B3
E3
214
AE801 8'-6"
"
AE801
A6 STUDENT BREAK
9'-0" B3 STUDENT A6
AE302 STUDY AREA
SIM. OH AREA AE801 STUDY AE302
234A
200 AREA
FACULTY FACULTY 201A
OFFICES 9'-0" OFFICES
208 212 9'-0"
FACULTY FACULTY
OFFICES 9'-0" OFFICES 9'-0"
9'-0" C2
MEETING 9'-0" 206 218
8" 9'-0"
ROOM 1'-5 5/ AE801 9'-0" FACULTY
11 204 OFFICES
ENTRY 11
9'-0" E1 220
STAIR A 200B 2'-1" 2'-1"
202 OPEN AE505
10'-0" ABOVE 10'-0"
OPEN OPEN B3
ABOVE 7'-6"
0'-9" ABOVE AE801
9'-0" OPEN
0'-9"
OPEN STAIR B
CL TYP. ABOVE
ABOVE 1 3 CL TYP. E1 222 1
B3
AE801
9'-0" AE801
9'-9"
9'-0" 8'-9"
9'-0"
D3 0'-9"
E4 AE801 E3 9'-0"
2 AE801
AE801 LIBRARY
EQ . EQ
. 2 C
COORDINATOR
9'-0"
8'-9" 2 9'-0" 224
GROUP 2 9
. 2
EQ . EQ
R 251'-1"
10
R 218'-3 3/8"
AE801
A4
8'-9" 9 LIBRARY D
R 225'-9 7/8"
AE303 INSTRUCTION
226 1'-1"
2'-7"
GROUP
R 233'-0 3/8"
9'-0" 8'-9"
STUDY
R 243'-1 3/8"
2'-7"
230 E4
2'-2 3/8"
"
0'-8
R 252'-6"
AE801
"
4'-1 7/8
1/4" C2
GROUP 0'-11 8'-9"
AE801
STUDY 8'-9" SIM.
WP WP WP WP WP WP
4.9 6.1
J
3.9 7.1
PC#: 260-17701-000
2.7
8.1
2.2 8.9
B 2.1 9.1
CN NO: 3143
DATE: 11-12-2010
DESIGN: AHL
DRAWN: SVG
REVIEW:DRH
REVISIONS
No. Date Description
SECOND FLOOR
A
REFLECTED
CEILING PLAN
AE112
31/10/2020 10:55:26
SHEET 32 OF 155
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
1 2 3 4 5 6
6'-0"
8
CONTROL JOINT REQUIRED FOR ACTUAL INSTALLATION.
3'-0"
5'-0"
9
3. REFER TO PROJECT MANUAL FOR SPECIFIC
8 TOP OF STEEL
43'-0" MOCK-UP REQUIREMENTS.
10
17
1'-0"
1
11
13
3
THIRD FLOOR
29'-0"
9
12
5'-0"
2'-0"
C5
METAL COPING RIGID INSULATION
AE301 6"
2 ALUMINUM WINDOW
SECOND FLOOR
15'-0"
1
19
MEMBRANE BARRIER
ON EXTERIOR
20
SHEATHING
D COMPOSITE
WALL PANEL
6'-0"
3'-0"
5'-0"
FIRST FLOOR
0'-0" PANEL JOINTS
LOWER LEVEL
-4'-6"
1'-0"
D1 NORTH ELEVATION D2 WALL MOCK-UP
1/8" = 1'-0" 1/2" = 1'-0"
15 15
1
21 D1 18 21
AE301
11
C 4
2
9 1 TOP OF STEEL
43'-0"
11 3
8
13
3 SECOND FLOOR
15'-0"
PC#: 260-17701-000
BUILDING BUILDING
B
FIRST FLOOR
0'-
0'-0"
4
AG601
B1
EAST ELEVATION
1/8" = 1'-0"
AE201
31/10/2020 10:55:42
3'-6"
SLAB
202·461·3260 FAX 202·461·3266
2'-10"
BALUSTER, PAINTED. TYP. 0'-1 1/2"
3'-6"
WWW.CLARKNEXSEN.COM
2'-10"
RETURN HANDRAIL, TYPICAL
E 0'-3" 1 1/2" x 1/2" GALVANIZED STEEL
BAR, PAINTED
0'-3"
0'-4"
1 1/2" DIA. SCHEDULE 40 POSTS AT 0'-3"
0'-4"
0'-8"
4'-6" O.C. MAX VERTICAL SPACING
2'-11"
1'-0" 4'-0" 4'-0"
2'-3"
0'-1"
E1
STAIR SECTION AT SERVICE ENTRANCE D5
RAMP SECTION AT ACCESSIBLE ENTRANCE
1/2" = 1'-0" 1/2" = 1'-0"
15
D
A B 23
11
11
1
B1 8
2
AE301 10
3
1'-0"
0'-4" MAX.
3'-6"
2'-10"
10 RETURN HANDRAIL, TYPICAL
17
0'-3"
11
0'-4"
THIRD FLOOR
0'-8"
29'-0"
4'-1"
BRICK MASONRY 1'-0"
1
SECOND FLOOR
15'-0"
C
10
E1
AE202
CONCRETE WALL
C5
AE202
11 6
10
A1 D1 23
PC#: 260-17701-000
2 AE302 AE301
3
B 2
TOP OF STEEL
43'-0"
4
13
W1 W1 W1 W1 W1 L1 W1A W1A W1 W1 W1 W1
17
THIRD FLOOR
29'-0"
CN NO: 3143
DATE: 11-12-2010
DESIGN: AHL
19 DRAWN: RRI
2
REVIEW:DRH
24 W1 W1 W1 W1 W1 L1 W1A W1A W1 W1 W1 W1
REVISIONS
SECOND FLOOR
15'-0" No. Date Description
1 12-10-2010 Bid Addendum #1
W1 W1 W1 W1 L1 L1 2 01-14-2011 BCOM Review
5 TYP. Comments
D5
AE202
BUILDING
A FIRST FLOOR
0'-0"
ELEVATIONS
LOWER LEVEL
-4'-6"
20 20 20 20 10 21 20 20
AE202
31/10/2020 10:55:54
25
TOP OF BRICK
A B 12'-8"
8 A2
AE503
C D J
3/4" FRT
PLYWOOD
5 SHEATHING OVER
8" METAL STUDS
R-19 GLASS FIBER
2 A3 0'-3 5/8" BLANKET INSULATION
A1
AE302 1 0'-4 1/8" 0'-1"
AE303 0'-8"
A2 0'-5 1/4" 6'-0 1/4" 1'-3 3/4" BRICK VENEER
AE303
GYPSUM SHEATHING
TOP OF STEEL TOP OF STEEL 2" AIR SPACE
43'-0" 6 43'-0"
A4 FOAM-PLASTIC
4 AE302 BOARD INSULATION, R5
3
14'-0"
14'-0"
15'-2"
WALL BEYOND
FACULTY
MECHANICAL
9'-0"
9'-0"
CORRIDOR OFFICES
ROOM
301 312
317 GATE BEYOND
MECHANICAL
THIRD FLOOR TOP OF LOWER ROOF 138
29'-0" DECK
27'-10"
14'-0"
BLANKET INSULATION
9'-9"
12'-10"
9'-0"
MECHANICAL C5 FACULTY
MEMBRANE AIR BARRIER
9'-0"
9'-0"
8'-9"
ROOM CORRIDOR OFFICES
AE301 ON WALL SHEATHING
217 201 212
FOAM-PLASTIC
SECOND FLOOR SECOND FLOOR BOARD INSULATION, R5
FIRST FLOOR
15'-0" 15'-0" 0'-0"
2" AIR SPACE
15'-0"
15'-0"
3/4" FRT PLYWOOD THRU-WALL FLASHING
10'-0"
10'-9"
SHEATHING OVER
10'-6"
10'-6"
10'-3"
8" METAL STUDS FULL GROUT BELOW
9'-0"
9'-0"
ELEC CORRIDOR CLERICAL
LIBRARY FLASHING
121 101 112
130 FIRST CMU FINISH GRADE. REFER TO
FIRST FLOOR FIRST FLOOR COURSE IS CUT TO CIVIL DRAWINGS
0'-0" 0'-0" ADJUST FOR
COURSING
4'-6"
CROSS SECTION
PERIMETER, TYP.
D1 1/8" = 1'-0"
C
2 12 TYP. 10
14'-0"
STUDENT
D:\tmg\COURSES\source-CourseContent\Computer Graphics I\REVIT\revit Libraries and examples\3143_Germanna Phase III A11.rvt
STUDENT 3 3 3 3 3 3 3
STUDY 1 1 1 1 1 2 2 STUDY 9
9'-0"
9'-0"
1 3 5 CORRIDOR 7 9 1 3
AREA AREA
301 301A
300
0'-3 7/8"
THIRD FLOOR
29'-0"
N
PC#: 260-17701-000
AE604
14'-0"
STUDENT
B STUDY 2
1
2
1
2
1
2
1
2
1
2
2
2
2
STUDENT
13
9'-0"
9'-0"
AREA 1 3 5 CORRIDOR 7 9 1 3 STUDY
200 201 AREA
201A
SECOND FLOOR
15'-0"
C5
15'-0"
7
SOUTH CORRIDOR AE401
10'-6"
MULTI
10'-3"
10'-3"
NORTH
10'-0"
10'-0"
VESTIBULE LOBBY MEDIA 101
LAB VESTIBULE
101A 100
101B
FIRST FLOOR
0'-0"
CN NO: 3143
DATE: 11-12-2010
LOWER LEVEL
-4'-6" DESIGN: AHL
14
DRAWN: SVG
REVIEW:DRH
REVISIONS
AE301
31/10/2020 10:56:11
MEMBRANE ROOFING
PRECAST CONCRETE D
2.1
0'-11"
STEEL BEAM 9.1
1331 L STREET, NW
GRAVEL STOP
WASHINGTON, DC 20005
0'-6"
PT WOOD BLOCKING D5 202·461·3260 FAX 202·461·3266
4'-0"
GLASS FIBER BLANKET WWW.CLARKNEXSEN.COM
B1 AE503
E INSULATION, R-19 AE502
MEMBRANE ROOFING
3'-6"
5/8" GWB ON 6" METAL STUDS MEMBRANE ROOF
0'-6"
FLASHING
R-30 ISO
GWB WALL ON BOARD
METAL STUDS TOP OF STEEL INSULATION
GALV. ANGLE LINTEL
43'-0"
R-30 ISO BOARD INSULATION STRUCTURAL METAL
ALUMINUM-FRAMED DECK
WINDOW STRUCTURAL METAL STEEL BEAM
DECK D1
5'-10"
AE505 BENT STEEL PLATE
ONE HOUR RATED SPRAYED-
6'-0"
5'-0"
5'-0"
EXTERIOR WALL ALONG COL. LINE D BETWEEN COLUMN LINES 2.7 AND 8.1 SHALL
GWB ON METAL STUDS
R-19 GLASS FIBER
BLANKET INSULATION
EPOXY RESIN SILL COLUMN BEYOND GLASS FIBER BOARD
AND BACKSPLASH INSULATION R-13
ACOUSTIC PANEL
EPOXY RESIN COUNTERTOP CEILING
GWB CEILING
5'-6"
MEMBRANE AIR
5'-6"
BARRIER ON WALL
SHEATHING
GWB. COLUMN
CLADDING SUNSHADE
9'-0"
D J
B3
GLAZED
SOLID SURFACE SILL ALUMINUM
D1 AE503
CURTAINWALL
AE503 STUDENT
STEEL BEAM
STUDY
AREA
4'-4"
3'-6"
2
3'-6"
CARPET TILE ON RESINOUS MATRIX
COMPOSITE DECK SLAB TERRAZZO ON
COMPOSITE DECK
S6R1N.8 SLAB
THIRD FLOOR
THIRD FLOOR 29'-0"
ALUMINUM-FRAMED 29'-0"
WINDOW C1 TOP OF LOWER ROOF
AE801 DECK
27'-10"
5'-6"
SOUND ATTENUATION
5'-0"
6'-0"
5'-0"
BLANKET 5/8" GWB ON 1 5/8" STUD
WALL SHEATHING
5'-6"
5'-6"
GLAZED ALUMINUM
ALUMINUM-FRAMED CURTAINWALL
FLOOR FINISH ON COMPOSITE 1'-1 3/4"
DECK SLAB. WINDOW
1'-6 1/8"
SOUND ATTENUATION
BLANKET GLASS RAILING
FIRE SAFING
STEEL BEAM B5
FACULTY
STUDENT AE303
R-19 GLASS FIBER OFFICES
BUILT-IN WOOD SHELVING CARPET TILE ON
4'-4"
3'-6"
3'-6"
RESINOUS MATRIX
3'-6"
13'-4"
4'-9"
BRICK MASONRY 1'-1" 5/8" GWB ON 6"
6'-0"
2'-9"
AE303
GLASS FIBER BOARD
1'-0"
INSULATION R-13
PC#: 260-17701-000
MECHANICAL
DIFFUSER
SOLID SURFACE SILL COMPOSITE WALL GWB SOFFIT
B PANEL
5/8" GWB
5/8" GWB ON 3 5/8" AND CEILING ON LINEAR DIFFUSER GWB CEILING
METAL STUDS @ 16" O.C. METAL STUDS
3'-3"
ROLLER WINDOW SHADE
HARDWOOD REVEAL GLAZED ALUMINUM
2" AIR SPACE
CURTAINWALL
0'-0 3/8"
6'-9"
SHELVES
(ADJUSTABLE) GLAZED
1'-3 3/4" GWB COLUMN ALUMINUM
0'-3"
SOUND ATTENUATION
CLADDING CURTAINWALL
BLANKET
9'-1 7/8"
9'-0"
CN NO: 3143
DATE: 11-12-2010
7'-0"
1'-4"
7'-0"
3'-6"
ON GRADE CARPET TILE ON REVISIONS
THRU-WALL FLASHING SLAB ON GRADE CARPET TILE ON
SLAB ON GRADE RESINOUS MATRIX No. Date Description
TERRAZZO ON SLAB 2 01-14-2011 BCOM Review
0'-4"
ON GRADE Comments
LOWER LEVEL FIRST FLOOR
-4'-6" FIRST FLOOR
FIRST FLOOR 0'-0" 0'-0"
0'-0"
FINISH GRADE. REFER TO
CIVIL DRAWINGS VAPOR RETARDER VAPOR
VAPOR
WALL SECTIONS
RETARDER
RETARDER
FULL GROUT BELOW
A FLASHING R-13 FOAM-PLASTIC
BOARD INSULATION AT
R-13 FOAM PLASTIC SLAB-ON-GRADE
BOARD INSULATION AT R-13 FOAM PLASTIC
BOARD INSULATION AT PERIMETER, TYP.
SLAB-ON-GRADE
PERIMETER, TYP. SLAB-ON-GRADE
PERIMETER, TYP.
A
AE302
31/10/2020 10:56:24
SHEET 37 OF 155
1/2" = 1' - 0"
0 6" 1' 2' 3' 4' 5'
GRAPHIC SCALE(S)
1 2 3 4 5 6
C4
E4
6 7 8 AE413 Architecture & Engineering
7'-2" 25'-0" 5'-5 1/4" 28'-0"
AE422
7'-3" 3'-0"
C5
D5
2'-6 1/8"
AE422
0'-3" 1'-9" AE422 AE401
0'-3"
AE422
C 7'-0"D4
1331 L STREET, NW
90 E1 WASHINGTON, DC 20005
.0 90 2'-0"
0° .0
0° 202·461·3260 FAX 202·461·3266
2'-6"
WWW.CLARKNEXSEN.COM
4'-11 1/2"
4'-2"
E
2'-0"
C1 DN DN
FILE
0°
CABINET AE422
.0
90
CLEAR
D2 WD3
3'-0"
DP1
8'-3"
B
8'-6"
AE422 AE422 TOP DRAWER
D3 WITH CABINET
BELOW
2X2 METAL RAIL AND POST A1
TOP DRAWER QS2 2 1/2" DIA. GROMMETS SOLID SURFACE SILL PLASTIC LAMINATE SEAT BACK
WITH CABINET W/METAL COVER,
BELOW TYP.
TOP DRAWER AE421 SOLID SURFACE SEAT
WD3 WITH CABINET
2 1/2" DIA.
BELOW
GROMMETS
W/METAL
23'-3 5/8"
COVER,
TYP.
TOP DRAWER WITH
CABINET BELOW
D E2 FIRST FLOOR LIBRARY DESK E3 BENCH AND RAMP AT FIRST FLOOR CORRIDOR
AE422 1/4" = 1'-0" 1/4" = 1'-0"
E2
QS1 C4 WD3
D1 AE422 AE421
WD3
QS2 3.9 A1
QS2 AE422
B
CLEAR
AE401
BOO 2'-0"
3'-0"
3'-6"
P 23'-6" (TYPICAL OF TWO) EIGHT EQUAL SEGMENTS GLASS RAIL BOTH TUBE TOP
2'-6"
ENDS OF OPENING RAIL
2" x 2" METAL
2'-6"
0°
0° C2 POSTS
.0
6'-0"
.0 C2 AE421 OPEN B2
90
90 C5 AE421
TO AE421 1" x 1" METAL
AE422 AE422 C3 90 BELOW O.H PICKETS AT
A2
3'-0"
0'-3"
1'-4 7/8"
2'-8 3/4" 10'-7 3/8" ° B2
13'-5 3/8" CLEAR AE401 AE421 0'-2" GWB COLUMN
3'-0" 13 '-4" C1 CLADDING
D
2'-6"
E3 CLEAR GL6T GLASS
C2 B1 24'-7"
INSERT
AE421 0'-8 7/8" 1'-0 3/8"
AE422 PLASTIC
AE422 AE421 2" x 2" METAL
BOTTOM RAIL LAMINATE ON
PLYWOOD
SOLID SURFACE
5'-0"
SECURITY/INFO DESK SECOND FLOOR LIBRARY DESK LIBRARY 130 BOOKCASES LIBRARY 234 SILL
0'-4"
2x6 FRT
D1 1/4" = 1'-0"
D2 1/4" = 1'-0"
D3 1/4" = 1'-0"
D4 1/4" = 1'-0"
3/4" METAL
REVEAL,
WOOD
5 BOTH SIDES
BLOCKING
3.9 4.9 SEALANT
0'-1 1/2"
1'-0"
CL CL 0'-7 1/4"
1 1/2" DIA.
C SOLID SURFACE
0'-3" 0'-1"
HANDRAIL
C BENCH
0'-4"
FRT WOOD
1'-0" DEEP WOOD WALL SCRIBE COUNTERTOP TO BLOCKING 0'-1" LIGHT GAUGE
CABINETS AND SHELVES
1'-6"
HORIZONTAL MULLION; ANGLES
D (ADJUSTABLE) BACKSPLASH TO BE 3 LINE AE421 GWB ON 6"
PLASTIC LAMINATE
EQ
SEGMENTS WITH JOINTS POST METAL STUDS
O.H 3'-4 3/8"
CENTERED ON VERTICAL GWB ON 7/8" GWB ON 6"
E3 METAL STUDS
2'-10"
MULLIONS C3 LINE OF E5 HAT CHANNEL
BULKHEAD SCRIBE FIRST FLOOR
8'-7 7/8" COUNTERTOP TO 0'-0"
9'-8 1/4" AE421 FIVE GALLON WALL;
0'-0 3/8" WATER AE421 E6
8'-7 7/8" D DISPENSER,
D2 BACKSPLASH TO
SCHEDULED
0'-0 3/8" AE421 E4 FOLLOW WALL SCHEDULED
0'-0 3/8" 8" DIA HOLE WITH B4 N.I.C BASE
1 1/2" QUARTZ D1 RADIUS BASE
A3 EDGE SCRIBE RESINOU VAPOR BARRIER
EQ
COUNTERTOP TO E3 S
WALL; BACKSPLASH FLOORIN
AE422 A5 TO BE G
AE421
LIBRARY 130 RECESSED SH1 BOOKCASES STUDENT BREAK 304 LRC WORKROOM 108 SECTION AT BENCH
D AE421
D:\tmg\COURSES\source-CourseContent\Computer Graphics I\REVIT\revit Libraries and examples\3143_Germanna Phase III A11.rvt
C4
D3 D
C AE421 D
E2
LINE OF BULKHEAD D4
AE421 1'-6 3/8"
EXTEND END PANEL TO MEET WALL LINE OF
BULKHEAD
LINE OF
BULKHEAD
PC#: 260-17701-000
R R
D D
B D
6'-10 1/4"
7.1
B1 WASTE RECEPTACLE B2 BREAK AREA 106 B3 COPY CENTER 118 B4 BREAK AREA 234A B6 FACULTY BREAK 318
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
LBF/FT
ALUMINUM SILL
GWB
A 0'-1 3/8"
PLANS AND
0'-6"
GWB
GWB CEILING
ACOUSTIC
5'-0"
15'-0"
SECTIONS
0'-4"
CEILING TILE
AE401
31/10/2020 10:56:38
A1 LIBRARY 234 A2 GLASS RAIL SECTION A3 BUILT-IN DESK PLANS A4 BASE DETAIL A6 GLASS RAIL BASE DETAIL
1/2" = 1'-0" 1/2" = 1'-0" 1/4" = 1'-0" 1 1/2" = 1'-0" 1" = 1'-0"
SHEET 39 OF 155
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
1" = 1' - 0"
0 6" 1' 2' 3'
1/2" = 1' - 0"
0 6" 1' 2' 3' 4' 5'
1/4" = 1' - 0"
0 1' 5' 10' 15'
GRAPHIC SCALE(S)
1 2 3 4 5 6
SPRAY-APPLIED
4'-10 1/4"
SPRAY-APPLIED SPRAY-APPLIED SPRAY-APPLIED Architecture & Engineering
ACOUSTIC ACOUSTIC ACOUSTIC ACOUSTIC
INSULATION AT INSULATION AT INSULATION AT 6'-9 5/8" INSULATION AT
COMPOSITE DECK COMPOSITE DECK COMPOSITE DECK COMPOSITE DECK
ACOUSTICAL PANEL
CEILING ACOUSTICAL PANEL
ALUMINUM-FRAMED CEILING
STOREFRONT WITH ACOUSTICAL PANEL
ACOUSTICAL PANEL CEILING
1331 L STREET, NW
INSULATING LAMINATED
CEILING ALUMINUM-FRAMED WASHINGTON, DC 20005
10'-3"
GLASS
9'-9"
STOREFRONT WITH
WOOD VENEER WALL INSULATING LAMINATED 202·461·3260 FAX 202·461·3266
10'-3"
10'-3"
WWW.CLARKNEXSEN.COM
9'-9"
9'-9"
GLASS
9'-6"
9'-6"
VIEWING WINDOW
E WITH INSULATING VIEWING WINDOW VIEWING WINDOW
FLAT PANEL
DISPLAY, N.I.C
WITH INSULATED WITH INSULATING
LAMINATED GLASS
LAMINATED GLASS LAMINATED GLASS
BASE AS SCHEDULED
3'-2"
3'-2"
2 BASE AS SCHEDULED BASE AS SCHEDULED
BASE AS SCHEDULED
FIRST FLOOR FIRST FLOOR FIRST FLOOR
0'-0" 0'-0" 0'-0"
2
E1 RECORDING STUDIO - NORTH WALL E2 RECORDING STUDIO - EAST WALL E4 RECORDING STUDIO - SOUTH WALL E5 RECORDING STUDIO - WEST WALL
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
9'-9"
4'-0"
9'-9"
9'-9"
ADJUSTABLE SHELVING
9'-3"
9'-3"
9'-3"
VIEWING WINDOW WITH FLAT PANEL DISPLAY
8'-5"
8'-5"
8'-5"
INSULATING LAMINATED (N.I.C.)
8'-5"
2
29" DEEP PLASTIC LAMINATE GLASS
CABINETS AND COUNTERTOP
BASE AS SCHEDULED
3'-2"
3'-0"
D1
CONTROL ROOM - NORTH WALL D2
CONTROL ROOM - EAST WALL D4
CONTROL ROOM - SOUTH WALL D5
CONTROL ROOM - WEST WALL
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
A1
BULKHEAD
C AE403 6" ALUMINUM STRIP
C D
0'-8" 1'-10" 1'-0"
LED TICKER
2'-0"
6" ALUMINUM STRIP
2'-0"
BOARD
6" ALUMINUM STRIP
WOOD PANELING
3'-6"
3'-6"
3'-6"
OPEN WOOD PANELING
1/4" ALUMINUM STRIP
9'-6"
9'-0"
OPEN 1/4" ALUMINUM STRIP
INFO DESK OPEN
1/4" ALUMINUM STRIP
COMPOSITE MTL.
3'-6"
3'-6"
B5/AE505 TERRAZO BASE
TERRAZZO BASE TERRAZZO BASE
THIRD FLOOR
5'-3 1/2" 7'-7" 8'-9" 29'-0"
SECOND FLOOR
PC#: 260-17701-000
15'-0"
B S4N
SPRAY-APPLIED
ACOUSTIC
INSULATION AT
COMPOSITE DECK
LOCATION OF STOREFRONT
WOOD VENEER SOUND ATTENUATION HEAD
ON PLYWOOD BLANKET AT GWB CEILING, SEE DETAIL
A4/AE403
SOLID WOOD EXPOSED PANEL EDGE
GWB BOTH SIDES
TYP CONDITION AT ENDS OF WOOD WALLS
1 1/2" SPACE FOR
0'-6"
BLOCKING AND
PANEL CLIP SYSTEM 2"
ACOUSTIC PANEL CEILING 0'-10 1/
LAMINATE AT REVEAL WOOD VENEER ON 3/4"
ALUMINUM BAND ON GWB ACOUSTICAL PANEL
CEILING PLYWOOD
METAL BRACKET
VERTICAL REVEAL 1 1/2" SPACE FOR BLOCKING
0'-2 1/4
LED TICKER 5/8" GWB ON METAL
1'-1 3/4
AND CLIP ATTACHMENT SYSTEM CN NO: 3143
1 1/2" WOOD BLOCKING STUD FRAMING
0'-9 3/4"
2'-0"
DATE: 11-12-2010
"
1/4" METAL DIVIDER STRIP
"
PROVIDE ACOUSTICAL ALUMINUM FRAMED STOREFRONT DESIGN: AHL
SEALANT AT ALL WITH INSULATING LAMINATED
TERMINATIONS GLASS DRAWN: RRI
REVIEW:DRH
REVISIONS
3'-5 3/4"
ALUMINUM-FRAMED
STOREFRONT WITH No. Date Description
0'-0 3/4"
0'-1 1/2"
1'-10
INSULATING LAMINATED TEMPERED 1 12-10-2010 Bid Addendum #1
A2 VENEER PANEL GLASS
2 01-14-2011 BCOM Review
3/8"
AE403
1 1/2" SPACE FOR Comments
BLOCKING AND RECORDING
0'-0 1/4"
0'-0 1/8"
0'-10
STUDIO
PANEL CLIP SYSTEM 5/8" GWB ON 6" MTL.
6.00° 113 STUDS @ 16" O.C.
0'-0 1/4"
1/2"
SOUND ATTENUATION
BLANKET SOUND ATTENUATION
BLANKET MULTI MEDIA
3'-1 3/8"
FIRST FLOOR
FIRST FLOOR
0'-0" HORIZONTAL REVEAL 0'-0"
AE403
31/10/2020 10:56:50
A1 WOOD WALL WITH LED TICKER A2 REVEALS AT WOOD WALL A4 SOUND ATTENUATION GLASS WALL A5 RECORDING STUDIO STOREFRONT
1/2" = 1'-0" 3" = 1'-0" 1/2" = 1'-0" 1 1/2" = 1'-0"
SHEET 41 OF 155
3" = 1' - 0"
0 3" 6" 1'
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
1/2" = 1' - 0"
0 6" 1' 2' 3' 4' 5'
1/4" = 1' - 0"
0 1' 5' 10' 15'
GRAPHIC SCALE(S)
1 2 3 4 5 6
3
25'-5 1/4"
F G 5/8" GWB ON 2 1/2"
10'-10 3/4" 1'-7" 11'-11 1/2" METAL STUDS @ 16" O.C
C CL CL CL CL
TYP.
CL
TYP. SOFFIT J Architecture & Engineering
CLEAR
CLEAR
0'-0 3/4"
1'-6"
TYP.
1'-6"
2
0'-5"
1'-6"
1'-10" 2'-11"
A
2'-0 3/8"
5/8" GWB ON 2 1/2"
S6N.4 S6N.4 METAL STUDS @
H H H C5
C 1/2" METAL H 16" O.C SOFFIT TYP.
CLEAR
1331 L STREET, NW
CLEAR
REVEAL
5'-2 7/8"
5'-2 7/8"
2 AE411 D
C
5'-0"
5'-0"
STEEL
9'-0"
9'-0"
WASHINGTON, DC 20005
BRACING
5'-1 3/8"
2 202·461·3260 FAX 202·461·3266
2'-1" UNDER D 2'-1" B
EACH D 2 A WWW.CLARKNEXSEN.COM
E VANITY
2'-10"
1'-9 3/4"
1'-9 3/4"
S4C B
CLEAR
CLEAR
J L
3'-0"
3'-0"
MAX
1'-5"
J TYP.
1'-7" MAX
D5
1'-5" MIN
3'-1"
6'-1 3/4"
2'-8"
2'-8"
FD
FD 5'-0" 5'-0" D4 AE411 D2 2
8'-11 1/2"
8'-11 1/2"
E3 CLEAR CLEAR
B
MEN'S TOILET MEN'S TOILET MEN'S TOILET
CLEAR
CLEAR
20'-5"
3'-0"
3'-0"
0'-11"
TYP.
D3 E2 E3 E4
2'-8"
2'-8"
AE411
3'-0"
E2 E4 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
C1 AE411
2'-10 3/4"
2'-10 3/4"
J F G 5/8" GWB ON 2 1/2" METAL
CLEAR
CLEAR
STUDS @ 16" OC SOFFIT
1'-9 3/4"
1'-9 3/4"
2 5/8" GWB ON 2 1/2" TYP. TYP. 5/8" GWB ON 2 1/2" METAL
ALIGN ALIGN 2'-0 3/8" CL CL CL CL CL CL 0'-10 3/8"
2'-1" METAL STUDS @ 16" O.C STUDS @ 16" O.C SOFFIT
A SOFFIT
A 0'-10 1/8" J
1'-6"
1'-6 1/2"
1'-6"
L 4'-2 7/8" 1'-7 3/8" TYP.
2'-5 3/4" S6N.4 E L A
TYP. 2'-0 3/8" A H
H C5 H
6'-2"
B C2 H TYP.
S4 H
MEN'S AE411 WOMEN'S AE411 J
TOILET TOILET G D
9'-0"
9'-0"
9'-0"
I
9'-0"
S4 107 109 I C
E
B B
L B
2'-1" TYP.
8'-10 3/8" 5'-0" E 2
2'-10"
1'-7" MAX
1'-5" MIN
E1 ENLARGED TOILET PLANS (TYPICAL FLOORS 1, 2, AND 3) D2 WOMEN'S TOILET D3 WOMEN'S TOILET D4 WOMEN'S TOILET D5 WOMEN'S TOILET
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
3'-11"
J
9'-0"
D 1/4" ALUMINUM
CORNER
4'-7"
GLASS MIRROR
2
1'-7" MAX
1'-5" MIN
3/4" SOLID
SURFACE 2'-1"
1'-0"
COUNTER TOP,
2
BACKSPLASH AND
END SPLASH
3/4" PLYWOOD
BRACKET WITH
C1
WOMEN'S TOILET C2
TOILET PARTITION DETAIL PLASTIC LAMINATE
ALL SIDES @ 16" 3"x2"x1/4" STEEL
1/4" = 1'-0" 1 1/2" = 1'-0" O.C. TUBING SUPPORT
2 1/2" X 2 1/2" X 6"
LONG STEEL 3/4" WOOD
2'-10"
1'-6"
CONTINUOUS
3'-6"
B SURFACE MOUNTED BATHROOM TISSUE CLEATS LAMINATE ON
2X BLOCKING
0'-0 3/8"
TO REFLECTIVE SURFACE
DISPENSER - OWNER FURNISHED ALL EXPOSED
7"-9" SECURE TO WALL SURFACE
CONTRACTOR INSTALLED 16" O.C. WITH 3/8"
4'-7"
0'-8 1/2"
MAX.
48" MAX
DISPENSIN
C 42" SIDE GRAB BAR - INSTALL PER ADAAG
3'-4" MAX
FLOORING AS
G HEIGHT
TOGGLE BOLT
4'-0"
1'-7" MAX
1'-7" MAX
REQUIREMENTS
1'-5" MIN
3'-6"
1'-5" MIN
SPECIFIED
3'-4"
2'-10"
3'-1"
BASE AS
1'-0"
SCHEDULED
1'-3"
PAPER TOWEL BATHROOM TISSUE 42" SIDE 36" REAR SANITARY NAPKIN MIRROR SOAP SEAT COVER SANITARY NAPKIN/TAMPON SOLID PLASTIC NOT USED WASTE RECEPTACLE - E SANITARY NAPKIN DISPOSAL - OWNER
VANITY
PC#: 260-17701-000
INSTALLED
CN NO: 3143
DATE: 11-12-2010
DESIGN: AHL
DRAWN: CMM
REVIEW:DRH
REVISIONS
No. Date Description
1 12-10-2010 Bid Addendum #1
2 01-14-2011 BCOM Review
Comments
ENLARGED
A
TOILET PLAN AND
DETAILS
AE411
31/10/2020 10:57:00
SHEET 42 OF 155
1/4" = 1' - 0"
0 1' 5' 10' 15'
3/4" = 1' - 0"
0 6" 1' 2' 3' 4' 5'
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
GRAPHIC SCALE(S)
1 2 3 4 5 6
10'-11 1/4"
9'-8" Architecture & Engineering
ELEVATOR 7'-5 7/8" 1'-2"
SUMP PIT CLEAR
FM1R1.2
BELOW, SEE PARTITION TYPE
D3/AE415 3
M8R1
B1 SEE PLAN LINTEL, SEE
AE415 STRUCTURAL
DRAWING
1331 L STREET, NW
WASHINGTON, DC 20005
2'-0"
ELECTRIC TRACTION 202·461·3260 FAX 202·461·3266
0'-2"
ELEVATOR + 7' - 0" C5
WWW.CLARKNEXSEN.COM
PARTITION TYPE AE415
E 2'-0" 1" DEEP GALVANIZED STEEL
8'-2 1/4"
ELEVATOR HEAD
CLEAR
GRATING SUMP PIT COVER SEE PLAN
6'-11"
5'-6 1/4"
M8S4R1.2
CLEAR
MOUNTED BY FLOOR SLAB, SEE
FM1R1.2 STRUCTURAL DRAWINGS
MANUFACTURER CONCRETE WALL,
SEE STRUCTURAL 1 1/4" X 1 1/4" GALVANIZED
PIT ACCESS LADDER
M8R1
ELEVATOR DOOR 2'-0" STEEL CURB ANGLE WITH
SEE DETAIL B2/AE415 DRAWINGS
BY WELDED ANCHORS AT 12" OC CONCRETE
MANUFACTURER WALLS, SEE PROTECTION BOARD
B
ELEVATOR PIT FLOOR STRUCTURAL
DRAWINGS
HEA SHEET WATERPROOFING
"
MEMBRANE
2'-3 3/8
C3
D AE415
SE4.2
SE4.2
4'-0" 1'-2"
CLEAR 0'-4"
5'-1 1/4"
2'-0"
CONCRETE
ALIGN WITH SLAB SEE
0'-2"
BOARD
1/4" = 1'-0" DRAWINGS.
SUMP PUMP, SEE 2" CONCRETE
B4 MECHANICAL WORKING SLAB
ELEVATOR JAMB
AE415 DRAWINGS
MOUNTED BY *COLOR OF ALL
TOP OF CMU MANUFACTURER SHEET COMPONENTS OF LADDER
46'-0" WATERPROOFING AND ELEVATOR PIT COVER
ELEVATOR MEMBRANE SHALL BE SAFETY YELLOW
B3 DOOR BY
AE415 MANUFACTURER
JAM
STEEL HOIST BEAM,
B
SEE STRUCTURAL
D DRAWINGS
D2 HEAD AND JAMB DETAIL D3 SECTION ELEVATOR SUMP PIT D4 SECTION ELEVATOR PIT
CLEAR OVERHEAD
9'-0"
0'-4"
SLAB, SEE 3/8" GALVANIZED STEEL ANGLE WITH 1/2" DIAM
STRUCTURAL ANGLE WITH 1/2" DIAM EXPANSION BOLTS @ 24"
ALIGN
DRAWINGS EXPANSION BOLTS @ 24" OC; VERIFY ANGLE
6" x 4" x 3/8" x 0'- 5" OC; VERIFY ANGLE LENGTH, SIZE & ELEVATION
STEEL STANDOFF LENGTH. SIZE & WITH ELEVATOR
BRACKET TYPICAL ELEVATION WITH MANUFACTURER
WELD TO EACH ELEVATOR
CMU BOND BEAM
MANUFACTURER
STRINGER
WATERPROOFING CODE APPROVED TOE GUARD
MEMBRANE AND CODE APPROVED TOE
PROTECTION BOARD GUARD
14'-0"
PARTITION TYPE
ON ALL EXTERIOR WATERPROOFING
2 1/2" x 3/8" FLAT SURFACES OF SEE PLAN MEMBRANE AND
BAR STRINGERS ELEVATOR PIT PROTECTION BOARD ON
18" APART. 1" ALL EXTERIOR SURFACES
9'-0"
9'-0"
RUNG.
SHEET
WATERPROOFING
0' - 0" SYSTEM.
COUNTER FLASHING
CONCRETE ELEVATOR
MEMBRANE
PIT WALLS AND
15'-0"
DRAWINGS. SEALANT
10'-6"
9'-0"
CONTINUOUS
0'-8"
MEMBRANE CAP
FLASHING
D4 0'-5"
AE415 CONCRETE ROOF DECK,
MEMBRANE ROOF
1'-0"
EXTENDED UP WALL
5'-0"
B.O. CMU
PIT FLOOR 45'-4"
PC#: 260-17701-000
B
B1 ELEVATOR SECTION B2 ELEVATOR PIT ACCESS LADDER B3 ROOF TERMINATION AT ELEVATOR SHAFT B4 ROOF OF ELEVATOR SHAFT
1/4" = 1'-0" 1" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
CN NO: 3143
DATE: 11-12-2010
DESIGN: AHL
DRAWN: SVG
REVIEW:DRH
REVISIONS
No. Date Description
2 01-14-2011 BCOM Review
Comments
ELEVATOR
A
DETAILS
AE415
31/10/2020 10:57:03
SHEET 46 OF 155
1/4" = 1' - 0"
0 1' 5' 10' 15'
1" = 1' - 0"
0 6" 1' 2' 3'
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
3" = 1' - 0"
0 3" 6" 1'
GRAPHIC SCALE(S)
1 2 3 4 5 6
27 30 8 2'-3" 3'-0" 3'-0" 2'-3"
CL 5
5
3'-2" 1'-6 3/8" 3'-0" 3'-0" 3'-0" 3'-0" Architecture & Engineering
1'-6"
1'-6"
5 1
16 1
3'-6"
0'-8" 1
1'-6"
2'-0"
6 27
2'-10"
2'-10"
7 25 27
25
9
CL
A1 2' - 6" 25 25
22
9'-0"
9'-0"
9'-0"
9'-0"
7'-5" 3
6'-0" CLEAR
AE422 2 25
1'-10"
1'-10"
20 7 1331 L STREET, NW
CL CL 1
10 TYP. WASHINGTON, DC 20005
5' - 6"
1
4 4 3 7 202·461·3260 FAX 202·461·3266
3'-6"
3'-6"
2'-10"
2'-10"
4
2' - 6"
WWW.CLARKNEXSEN.COM
2'-6"
11
E SECOND FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR
2' - 6" 2' - 6" 2' - 6" 15'-0" 0'-0" 0'-0" 0'-0" 0'-0" 0'-0"
7 1'-3" 3'-0" 3'-0" 2'-0" 3'-0" 3'-1 3/8" 1'-6" 3'-0" 3'-0" 2'-0" 1'-3" 3'-0" 3'-0" 1'-3"
CLEAR, MIN. 12 3'-0"
3'-6" CLEAR
E1 WASTE RECEPTACLE E2 BREAK AREA 106 E3 LRC TABLE E4 LRC TABLE E5 LRC WORKROOM 108 E6 LRC WORKROOM 108
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
1
18
5 5
5 5
1'-6"
1'-6"
1'-6"
1'-4" 1'-8"
27
1
31 1
1 4
27
2'-10"
2'-10"
2'-10"
7
25 28
33 4
9'-0"
9'-0"
9'-0"
9'-0"
25 25
1'-10"
1'-10"
1'-10"
32 4 20
4'-9"
7
0'-4"
7 4 19
33 18
1 4
1'-6 1/4" 1
2'-10"
2'-10"
2'-10"
7
8 1
1'-3"
FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR LOWER LEVEL
0'-0" 0'-0" 1'-6" CLEAR MIN. 1'-0" CLEAR 0'-0" 0'-0" -4'-6"
1'-9" 3'-0" 1'-4 1/8"
3'-2 1/8" EQ EQ EQ 1'-9" TYP. 7 2'-2" 3'-0" 2'-3"
1'-7 3/4" 4'-6"
4'-5" CLEAR
14'-2 1/4"
D
D1
LRC WORKROOM 108 D2
LRC WORKROOM 108 D3
COPY CENTER 118 D4
COPY CENTER 118 D5
ENGINEERING LAB ROOM 127
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
5
23'-6" (TYPICAL OF TWO, SH2)
20'-6 3/4" (TYPICAL OF TWO, SH3)
EQ. EQ. EQ. EQ. EQ. 0'-3"
1'-6"
30 11
1'-6"
17
2'-0"
17 @ 24" O.C. COUNTER SUNK
2'-10"
A2 27 AND PLUGGED
7'-0"
7'-0"
9'-0"
AE422
14 6 3/4" PLYWOOD
1'-10"
7 1 20
15 12
0'-4"
2'-10"
1 2 X BLOCKING; SECURELY
FIRST FLOOR FIRST FLOOR ATTACH TO CONCRETE
0'-3" EQ. EQ. EQ. EQ. EQ. EQ. EQ. EQ. 0'-3" 0'-0" 2'-6" 0'-0" BLOCK
THIRD FLOOR SECOND FLOOR
24'-0" 29'-0" 15'-0"
3'-6" 1'-7 3/4" 2'-0" 3'-0" 4'-0"
7
CLEAR CLEAR, MIN.
C5
AE421
C1
SH2, SH3 BOOKSHELVES 2
C2
SH2 BOOKSHELVES C3 STUDENT BREAK 304 C4 BREAK AREA 234A C5 BOOKCASE BASE DETAIL
1'-6"
30
9 1
1'-6"
2'-0"
36" x 36" ACCESS PANEL
5'-10"
2'-10"
9'-0"
9'-0"
GWB ENCLOSURE
0'-3" 4
1'-0"
CL
1'-10"
22
0'-3"
7 12 20
BY FUME HOOD SUPPLIER
2'-10" 0'-4"
EQ EQ EQ
17 1
2'-10"
7
(VERIFY)
0'-4"
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
SEE PLAN
GWB
PC#: 260-17701-000
PRESENTATION TRIM
4'-0"
1" X 1" STEEL TUBULAR
INFILL ALUMINUM TRAY
SOLID SURFACE BENCH AND SILL
3'-0"
2'-6"
FINISH FLOOR
FIRST FLOOR
0'-0" NOTE: AT GROUP STUDY, MOUNT FLAT PANEL DISPLAY TO ALIGN WITH TOP OF MARKERWALL SHEET.
EQ EQ EQ EQ EQ EQ 2'-2 7/8" EQ EQ EQ EQ EQ EQ 2'-1 7/8"
7.
8.
2'-0" DEEP PLASTIC LAMINATE CABINET AND 14"D SHELVES (ADJUSTABLE)
23.
SOLID SURFACE COUNTERTOP AND BACKSPLASH (4")
AE421
31/10/2020 10:57:17
12. 27. 1'-0" DEEP PLASTIC LAMINATE WALL CABINETS AND SHELVES (ADJUSTABLE)
DISHWASHER, N.I.C.
13. 28. EPOXY RESIN TOP
ALUMINUM FRAMED STOREFRONT
14. 29. NOT USED
QUARTZ SURFACE TOP AND 2" BACKSPLASH
15. 30. 2'-0" DEEP PLASTIC LAMINATE WALL CABINETS
SHEET 47 OF 155
GRAPHIC SCALE(S)
3" DIA. POLISHED ALUMINUM POST, ALIGN WITH CENTER OF MULLIONS 0 1' 5' 10' 15'
31. 1'-0" DEEP PLASTIC LAMINATE SHELF CABINET AND SHELVES (ADJUSTABLE) 1/4" = 1' - 0"
1 2 3 4 5 6
SURFACE MOUNTED
SEE AF601 FOR FINISH SCHEDULE POLISHED ALUMINUM
LEGEND FOR MATERIAL AND FINISH
INFORMATION.
LETTERS 3" TALL Architecture & Engineering
BOOK RETURN SLOT WD3
BOOK RETURN SLOT
4" x 24" BOOK RETURN CART NIC
0'-3"
2'-6" 3'-0" 3'-0" 1'-6" 1'-6" 1'-6" 1'-6" 3'-0" 1'-6" 1'-6" 2'-6"
0'-3"
2'-10" 0'-3"
book
2'-6"
2'-10"
3'-1"
3'-1"
2'-10"
drop 1331 L STREET, NW
2'-10"
WASHINGTON, DC 20005
FIRST FLOOR
0'-0" FIRST FLOOR FIRST FLOOR 202·461·3260 FAX 202·461·3266
QS1
0'-4"
DP3 DP3 0'-0" 0'-0" WWW.CLARKNEXSEN.COM
T2 T2
E DP1
QS1
DP1
WD3
QS1 QS2 ADJUSTABLE SHELF
WD3 NOTE: PROVIDE LOCKS ON
T2 T2 QS1 ALL DRAWERS AND DOORS
E1 SECURITY/INFO DESK ELEVATION E2 SECURITY/INFO DESK ELEVATION E3 SECURITY/INFO DESK ELEVATION E4 SECURITY/INFO DESK SECTION
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
0'-3"
0'-3"
0'-3"
3'-8 1/8" 3'-0" 3'-8 1/8"
ALIGN FACE OF
DESK WITH WALL
2'-10"
2'-10"
2'-10"
ADJACENT
2'-6"
2'-10"
FIRST FLOOR FIRST FLOOR FIRST FLOOR
FIRST FLOOR 0'-0" 0'-0" 0'-0"
RB3 RB3
0'-4"
0'-4"
0'-0"
0'-4"
WD3 WD3 WD3
WD3 QS2 QS2 QS2
D1 SECURITY/INFO DESK SECTION D2 SECURITY/INFO DESK SECTION D3 FIRST FLOOR LIBRARY DESK D4 FIRST FLOOR LIBRARY DESK D5 FIRST FLOOR LIBRARY DESK SECTION
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
D
0'-3"
WD3
WD3
T2 T2
0'-3"
2'-10"
2'-10"
2'-10"
0'-4"
FIRST FLOOR SECOND FLOOR SECOND FLOOR SECOND FLOOR SECOND FLOOR
0'-0" 15'-0" 15'-0" 15'-0" 15'-0"
0'-4"
4 20
1'-4"
D:\tmg\COURSES\source-CourseContent\Computer Graphics I\REVIT\revit Libraries and examples\3143_Germanna Phase III A11.rvt
0'-0" 0'-0"
28
7'-0"
4 19
1'-4"
2'-7" 0'-3"
19
2'-10"
OPE
2'-10"
N
THIRD FLOOR LOWER LEVEL LOWER LEVEL LOWER LEVEL
PC#: 260-17701-000
29'-0" -4'-6" -4'-6" EQ EQ EQ EQ -4'-6"
3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 3'-0" 1'-6" 3'-0" 3'-0" 2'-6" 12'-10 7/8"
24'-2"
B
B1 BOOK STORAGE 318A B2 ENGINEERING LAB ROOM 123 B3 ENGINEERING LAB 123 WEST WALL B4 ENGINEERING STORAGE 125 B5 BUILT-IN DESKS
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
CL
0'-0 1/2"
1'-6"
CL 4.9 6.1
0'-2"
MIN.
0'-8" MIN. 7.1
QUARTZ
0'-3"
0'-0 3/8"
0'-1 1/2"
0'-4"
PLASTIC LAMINATE
CABINET
8'-7 7/8" 9'-8 1/4" 8'-7 7/8" 8'-7 7/8" 9'-8 1/4" 2'-11"
2'-10"
3" DIA.
POLISHED 0'-0 3/8" 0'-0 3/8"
ALUMINUM 0'-0 3/8"
0'-0 3/8" 0'-0 3/8" 0'-0 3/8" 0'-0 3/8" 0'-0 3/8"
POST
NOTE: CENTER 3/8" VERTICAL REVEALS WITH COMPOSITE WALL PANEL
JOINTS
NOTE: CENTER 3/8" VERTICAL REVEALS WITH COMPOSITE WALL PANEL
JOINTS INTERIOR
A
RECESSED SH1 BOOKCASES RECESSED SH1 BOOKCASES ELEVATIONS AND
A3 A4
BASE AS
SCHEDULED
1/4" = 1'-0" 1/4" = 1'-0"
SECTIONS
MILLWORK NOTES
1 1
#
AE422
31/10/2020 10:57:27
A1 WASTE RECEPTACLE A2 BAR SECTION SEE SHEET AE421 FOR MILLWORK NOTES
1 1/2" = 1'-0" 1 1/2" = 1'-0"
SHEET 48 OF 155
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
1/4" = 1' - 0"
0 1' 5' 10' 15'
GRAPHIC SCALE(S)
1 2 3 4 5 6
THIN BRICK ON THE BACKING PANELS
PARTITION TYPES PARTITION TYPES PARTITION TYPE SPECIFIC NOTES
TAG SYMBOL TYPE DESCRIPTION NOTES TAG SYMBOL TYPE DESCRIPTION NOTES TERRAZZO BASE
0'-4 1/4"
.6 - NOT USED. RESINOUS MATRIX ACOUSTIC SEALANT, 115 119
S4 3 5/8" STL STUDS @ 16" OC WITH MASONRY CHANNELS 1331 L STREET, NW
S TERRAZZO FLOORING BOTH SIDES
5/8" GWB EACH SIDE STEEL 16" OC ON WALL, WITH 5/8" GWB ONE .7 - THIN BRICK ON ONE SIDE TO TERMINATE 6" MIN ABOVE CEILING. WASHINGTON, DC 20005
STEEL S6 6" STL STUDS @ 16" OC WITH STUDS SIDE, 1 HOUR RATED UL DESIGN #
STUDS 5/8" GWB EACH SIDE U905 (CMU) 202·461·3260 FAX 202·461·3266
.8 - COMPOSITE WALL PANEL ON ONE SIDE TO TERMINATE AT CEILING WHERE SHOWN. WWW.CLARKNEXSEN.COM
FIRST FLOOR
E 0'-0"
GENERAL NOTES 2
WALL BASE AT THIN BRICK
S4N
S4N 3 5/8" STL STUDS @ 16" OC WITH
5/8 GWB EACH SIDE AND SOUND
STC: 45 E4 1 1/2" = 1'-0"
1. ALL GWB TO BE TYPE X GYPSUM BOARD UNLESS NOTED OTHERWISE.
ATTENUATION BLANKET
STEEL 2. REFER TO LIFE SAFETY PLANS FOR LOCATIONS OF WALLS WITH HOURLY VAPOR RETARDER
S6N 6" STL STUDS @ 16" OC WITH STC: 45
STUD RATINGS.
5/8" GWB EACH SIDE AND SOUND
INSULATED
ATTENUATION BLANKET 1/2" DEFLECTION SPACE
3. ALL PARTITIONS TO RUN FROM FINISH FLOOR TO UNDERSIDE OF DECK UNLESS DAMPPROOFING
S8N 8" STL STUDS @ 16" OC WITH STC: 45 NOTED OTHERWISE. MEMBRANE
5/8" GWB EACH SIDE AND SOUND CONTINUOUS TOP
ATTENUATION BLANKET 4. PROVIDE MOISTURE AND MOLD-RESISTANT TYPE GWB AT TOILET WALLS, DEEP LEG TRACK
URINAL WALLS, JANITOR CLOSET WALLS, AND WALLS BEHIND SINKS AND
DRINKING FOUNTAINS. BOTTOM OF STRUCTURE
FILL FLUTES OF METAL DECK WITH
METAL STUDS INSULATION AT ACOUSTICAL
S4R1N 3 5/8" STUDS @ 16" OC WITH 5. PROVIDE TILE BACKING PANELS IN LIEU OF GWB ON ALL WALLS SCHEDULED TO PARTITIONS. FILL FLUTES OF
5/8" TYPE X GWB EACH SIDE WITH SOUND ATTENUATION
RECEIVE CERAMIC TILE OR THIN BRICK. SEE INTERIORS "AF SERIES" DWGS, METAL DECK WITH THERMAFIBER
SRN SOUND ATTENUATION BLANKET BLANKET OVER TOP OF
INCLUDING FINISH SCHEDULES, FINISH LEGENDS, AND CERAMIC TILE FLOOR & FIRESAFING INSULATION AT FIRE-
1 HOUR RATING UL DESIGN# U465. PARTITION EXTEND
STL. STUDS WALL PATTERNS FOR LOCATIONS OF WALLS WITH CERAMIC TILE OR THIN RATED PARTITIONS
6" STEEL STUDS @ 16" OC WITH INSULATION 4'-0" MIN
RATED WITH S6R1N STC: 45 BRICK.
5/8" TYPE X GWB EACH SIDE AND BEYOND EACH SIDE OF
INSULATION PARTITION. PROVIDE AT
SOUND ATTENUATION BLANKET 6. INSTALL ALL FIRE RATED WALL ASSEMBLES IN STRICT ACCORDANCE WITH
ALL PARTITIONS
0'-6"
1 HOUR RATING UL DESIGN# U465. APPLICABLE CODES, ORDINANCES, OR LAWS AND U.L. DESIGN.
SCHEDULED TO RECEIVE
0'-1"
SOUND ATTENUATION
1" UNO 7. UNLESS OTHERWISE NOTED, PARTITION STUD GAUGE SHALL BE DESIGNED TO
0'-2"
SCN S4C 2 ROWS OF 3 5/8" STEEL STUDS EACH BLANKETS
AN L/120 DEFLECTION AS REQUIRED BY CODE. BOTTOM OF
STL. STUD @ 16" OC WITH 5/8" GWB WITH SOUND ROOF/FLOOR
CHASE ATTENUATION BLANKET 8. ON PARTITIONS TO RECEIVE TILE, STUD GAUGE SHALL BE DESIGNED TO AN CONSTRUCTION
S6C 2 ROWS OF 6" STEEL STUDS EACH @ L/360 DEFLECTION OR LESS AS RECOMMENDED TILE COUNCIL OF AMERICA 2 CEILING AS SCHEDULED CEILING AS SCHEDULED ABOVE
16" OC WITH 5/8" GWB WITH SOUND
ATTENUATION BLANKET 9. ALL PENETRATIONS IN RATED WALL ASSEMBLIES SHALL BE PROTECTED BY U.L. PARTITION TYPE
APPROVED FIRE RATED ASSEMBLIES. ACOUSTICAL SEALANT DEEP LEG
SEE PLAN
2 TRACK
2 1/2" x 1 1/2" C-H STUD WITH 1" THICK 10. ALL FIRE RATED AND INCIDENTAL USE PARTITIONS SHALL BE LABELED ABOVE PARTITION TYPE PARTITION TYPE
SRC S3CR1N
GWB LINER ON SHAFT SIDE AND 5/8" CEILING WITH 1" MIN TALL LETTERS AT NOT MORE THAN 8' - 0" OC, AN EXAMPLE
WALL BASE AS SEE PLAN INSULATION SEE PLAN
STL. STUD THICK TYPE 'X' GWB ON FINISH SIDE LABEL IS AS FOLLOWS "ONE HOUR FIRE PARTITION"
SCHEDULED, TYP.
RATED WITH SOUND ATTENUATION BLANKET.
CHASE PROVIDE PER UL DESIGN U499 11. PROVIDE ABUSE-RESISTANT GYPSUM BOARD WHERE EXPOSED ALONG
5
D CORRIDORS, INTERIOR RAMPS, STAIRWELLS.
SE SE2 1 5/8" STEEL STUDS @ 16" OC WITH
5/8" GWB ON ONE SIDE
STL. STUD SE3 2 1/2" STEEL STUDS @ 16" OC WITH
ENCLOSURE
STC RATED PARTITION SOUND PARTITION SEALED AT STRUCTURE WALL AT LEVEL CHANGE
5/8" GWB ON ONE SIDE
SE4 3 5/8" STEEL STUDS @ 16" OC WITH
5/8" GWB ON ONE SIDE D3 1 1/2" = 1'-0"
D4 1 1/2" = 1'-0"
D5 3/4" = 1'-0"
SE6 6" STEEL STUDS @ 16" OC WITH
5/8" GWB ON ONE SIDE
FIRE DAMPER 2
CONNECTION AND DUCT,
SEE MECH. DRAWINGS
PARTITION TYPE
CEILING AS
SCHEDULED
GWB BETWEEN FIRE
DAMPER SLEEVE AND
SEE PLAN
TYPICAL PARTITION CORNER FURRED WALL ABOVE CEILING PENETRATION @ RATED WALLS RATED WALL & EXTERIOR STUD WALL
INSULATION
PARTITION TYPE
INSULATION
PARTITION TYPE FIRE TRACK CORP. SHADOW LINE RUNNER OR 2
APPROVED EQUAL PARTITION TYPE
SEE PLAN FIRE EXTINGUISHER
FIRE STOPPING COMPOUND, CABINET SEE PLAN CONTINUOUS ACOUSTICAL
ALL AROUND (BOTH SIDES) SEALANT, BOTH SIDES
PC#: 260-17701-000
5/8" GWB, (2) LAYERS AT 2 HOUR
PARTITION TYPE
PARTITION TYPE
SEE PLAN
B1 PENETRATION THROUGH RATED CMU B2 RATED WALL & DISSIMILAR PARTITION B3 RECESSED F.E.C. IN STUD WALL B4 RATED PARTITION @ STRUCTURE ABOVE B5 STC RATED PARTITION
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
SEE PLAN
INSIDE CORNER R5 FOAM PLASTIC COMPRESSIBLE FILLER
REINFORCEMENT BOARD 6" METAL STUD REVISIONS
0'-8"
INSULATION SEALANT AND BACKER No. Date Description
ROD THIN BRICK
5/8" GWB MEMBRANE BARRIER 2 01-14-2011 BCOM Review
SHEET METAL SCREW 0'-2" INSULATION Comments
MAX. OVER HEAD JOINT
R19 INSULATION
CEILING AS CAVITY VENT STAGGER
FROM WEEPS ABOVE GWB
SCHEDULED METAL STUDS GYPSUM
SHELF ANGLE SEALANT
SHEATHING THIN BRICK
MEMBRANE
GWB GUSSETS @ 6" METAL STUD
PARTITION TYPE
QUARTER AND
CENTER POINTS
INSIDE CORNER
REINFORCEMENT METAL STUD PER
AIR BARRIER FOAM PLASTIC
R5 SEE EXTERIOR BRICK MASONRY
PARTITION TYPES
A MASONRY
SEE PLAN
PARTITION TYPE
BRICK
WALL ASSEMBLY
AIR SPACE & DETAILS
NOTE: AIR SPACE NOTE: REFER TO
SEE FINISH SCHEDULE FOR DRAWINGS FOR
WALL, BASE AND FLOOR FINISH WALL TIE LOCATION OF CONTROL
JOINTS.
AE501
31/10/2020 10:57:35
U-VALUE 0.049
A1 CHASE WALL BRACING A2 SOUND- ISOLATING INTERSECTION A3 EXT. BRICK VENEER/ METAL STUD WALL A4 CONTROL JOINT DETAIL @ BRICK VENEER A5 BRICK RETURN TYP. DETAILS
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
SHEET 49 OF 155
3/4" = 1' - 0"
0 6" 1' 2' 3' 4' 5'
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
GRAPHIC SCALE(S)
1 2 3 4 5 6
STAINLESS STEEL
CLAMP RING
Architecture & Engineering
SEALANT
HOOD
VENT STACK
COLLAR STAINLESS STEEL
CLAMP RING
SEALANT
MEMBRANE
BONDING ADHESIVE 1331 L STREET, NW
WASHINGTON, DC 20005
0'-0 3/4"
FORMED FLASH
202·461·3260 FAX 202·461·3266
0'-8" MIN
SPLICED ADHESIVE WWW.CLARKNEXSEN.COM
E 2" MIN. MEMBRANE
RIGID INSULATION
INSULATED AND
GASKETED
ROOF HATCH
MECHANICAL EQUIPMENT SEALANT SHEET METAL
COUNTER FLASHING
MEMBRANE FLASHING
ROOF
MANUFACTURERS SEALANT OVER
FACE OF PARAPET
APPROVED FASTENERS 12" OC (MAX)
BONDING ADHESIVE FASTENERS
INSULATED METAL LAP SPLICE
MEMBRANE FLASHING CURB
INSULATED
BONDING ADHESIVE MEMBRANE
METAL CURB FLASHING
MEMBRANE
SEAM EDGE TREATMENT SEAM EDGE TREATMENT SEAM EDGE ROOF HATCH
ROOF INSULATION TREATMENT MANUFACTURERS
MEMBRANE ROOFING
8" MIN.
INSULATED CURB
D PT WOOD BLOCKING
INSULATION WITH RUBBERIZED
ASPHALTIC MEMBRANE
MEMBRAN
BELOW
E ROOFING
WATER BLOCK
PT WOOD STEEL FRAMING SEE
BLOCKING WITH STRUCTURAL
RUBBERIZED METAL ROOF DECK RIGID INSULATION
ASPHALTIC METAL ROOF DECK
MEMBRANE
BELOW EQUIPMENT SUPPORT
SEE STRUCTURAL
METAL COPING
0'-4"
B1 1 1/2" = 1'-0"
B2 1 1/2" = 1'-0"
B3 3/4" = 1'-0"
B4 1 1/2" = 1'-0"
PC#: 260-17701-000
COMPOSITE WALL PANELS
B
VEGETATED ROOF ASSEMBLY; SEE
TYPICAL DETAIL FOR NOTES
SECOND FLOOR
FORMED STAINLESS STEEL EDGING 15'-0"
0'-7 1/4"
COUNTERFLASHING
0'-8 3/4"
BONDING ADHESIVE
0'-4"
B.O. BEAM
2'-6" 13'-4"
MEMBRANE FLASHING UP
0'-1 1/2"
3'-1" AND OVER TOP OF CURB
0'-8" MIN.
0'-1 1/2"
SEAM EDGE TREATMENT CN NO: 3143
5'-1"
4'-6"
0'-3"
SEALANT REVIEW:DRH
C4
PT WOOD REVISIONS
AE502 No. Date Description
GUTTER DRAIN AND
DOWNSPOUT, SEE PLUMBING
ROOF INSULATION
GUIDE ARM
PROTECTION MAT ROOF METAL DECK
DECK SUPPORT SEE STRUCTURAL
FULLY ADHERED MEMBRANE
ROOFING METAL DUCT
ROOF DETAILS
A
A1
VEGETATED ROOF EDGE AT PAVERS A2
ROOF HATCH PLAN A3
METAL PANEL WALL WITH DOWNSPOUT A4
DUCT PENETRATION DETAIL
1 1/2" = 1'-0" 1/2" = 1'-0" 1" = 1'-0" 1 1/2" = 1'-0"
AE502
31/10/2020 10:57:43
SHEET 50 OF 155
3/4" = 1' - 0"
0 6" 1' 2' 3' 4' 5'
1" = 1' - 0"
0 6" 1' 2' 3'
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
GRAPHIC SCALE(S)
1 2 3 4 5 6
6
1'-1"
0'-6 5/8"
0'-0 7/8"
Architecture & Engineering
0'-0 7/8"
EDGE OF RAMP 9
7'-2" 1'-4"
TO COL. 6 1 1/2" O.D. HANDRAIL 7
0'-1 1/2"
S6C LINE OF
CONCRETE 0'-4" 1331 L STREET, NW
0'-0 7/8"
PEDESTAL BELOW, 1 1/2" O.D.
FURR OUT TO HANDRAIL 5/8" GWB 2
WASHINGTON, DC 20005
Z-CLIPS @16" O.C.
1'-11 7/8"
RECEIVE 7/8" HAT ON 2 1/2" 202·461·3260 FAX 202·461·3266
1'-2 1/2"
SE3
0'-0 7/8"
VERICALLY SE3 METAL
CHANNEL AND EDGE OF WWW.CLARKNEXSEN.COM
SOLID SURFACE SOLID SURFACE STUDS
E GWB BELOW DOUBLE LAYER 1 HOUR SPRAYED
0'-8 7/8"
0'-8 7/8"
TOP TOP CONCRETE SLAB
1 HOUR SPRAYED-ON 5/8" GWB ON 1 5/8" BELOW
FIREPROOFING STEEL CLIP
METAL STUDS @ 2" x 2" METAL POSTS 5/8" GWB ON 6"
16" O.C. METAL STUDS
SE6 2" x 2" METAL
B B POSTS B B
1'-9 1/4"
0'-5 5/8"
0'-5 7/8"
2 1 HOUR SPRAYED -
1'-9"
ALUM. STOREFRONT ON FIREPROOFING SE4 SE4 EDGE OF
DOORWAY CONCRETE
B
1'-0 3/8"
1'-0 3/8"
SLAB BELOW
FIRE-TREATED
0'-5 7/8"
3/4" METAL
REVEAL WOOD BLOCKING
2 SOLID SURFACE SOLID SURFACE
BENCH BENCH
LINE OF BENCH
0'-1"
0'-1"
0'-8"
THIN BRICK VENEER
0'-0 1/2"
S6N.7 SE4 5/8" GWB ON I-5/8" 0'-8" 5/8" GWB ON ON 5/8" TILE BACKING
2'-1 3/4" METAL STUDS 3 5/8" METAL PANELS OVER 3 5/8"
2'-1 3/4" METAL STUDS
STUDS
5 THIN BRICK ON
GLAZED ALUMINUM
S6R1N.7 CURTAIN
5/8" TILE BACKING
WALL, SEE ENLARGED
PANEL
DETAIL
E1 COLUMN DETAIL E2 COLUMN DETAIL E3 COLUMN DETAIL E4 COLUMN DETAIL ON AE603 FOR NOTES
E5 COLUMN DETAIL
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
3.9
SE3 1'-4"
1'-4" 1'-4"
Z-CLIPS AT 16" SIM
O.C. VERTICALLY
ROOF DRAIN
0'-8"
LINES. SEE
WOOD PANELING PLUMBLING CL
OVER 3/4" 0'-9" 0'-9" DRAWINGS
PLYWOOD
D 1 HR SPRAYED-ON SOUND-
1 HOUR SPRAYED-
5/8" GWB ON 1 5/8"
0'-8"
3"x3" STEEL FIREPROOFING. ATTENUATION MTL. STUDS
1'-4"
ON FIREPROOFING
TUBE BLANKET
SE3
OVERHEAD
D 1 HOUR SPRAYED-
SOUND
0'-1"
ON
0'-8"
0'-9"
2'-4"
GRILLE SIDE 0'-9" ATTENUATION FIREPROOFING.
GUIDE RAIL SE2 BLANKET
ROOF DRAIN
0'-11 1/2
LINES
D
J
"
0'-0 1/2
0'-6 7/8
" 1 HOUR
"
0'-9 5/8
0'-8"
0'-8" SPRAYED-ON
FIREPROOFING Z-CLIPS AT 16" O.C.
"
S4N SEALANT VERTICALLY
OVERHEA D SE3
D COILING COMPOSITE WALL
PANEL
GRILLE 0'-9 1/8" 0'-9 1/8"
1'-4 5/8"
1'-6" 180.00°
WALL PANEL 1'-0 1/4"
0'-0 3/8"
0'-0 3/8"
6.1
COLUMN DETAIL
1'-4"
S4N 4.9
C S4N
D3 S4N
D 1 1/2" = 1'-0"
SE2
0'-4 5/8"
0'-2 1/4"
SEALANT CL
CL ROOF DRAIN LINES,
7 SEE PLUMBLING DWGS.
0'-9"
TYP
1'-1"
0'-5 1/4"
REQUIRED D WALL LOCATION
SIMILAR AT
A COLUMN B4
0'-7"
SE2
1 HOUR SPRAY-ON
0'-7" 0'-7"
D:\tmg\COURSES\source-CourseContent\Computer Graphics I\REVIT\revit Libraries and examples\3143_Germanna Phase III A11.rvt
PC#: 260-17701-000
S6N.8
S6N.7
B 7.1
0'-8" S4N
B4 COLUMN DETAIL B5 COLUMN DETAIL
6.1 0'-8" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
3.9
S4N
0'-8" 0'-8"
1
SOUND ATTENUATION
S6N
BLANKET
Z-CLIPS AT 16" O.C. SE2
5/8" GWB ON 1 5/8" METAL
VERTICALLY SE2 SIM
STUDS
1'-3 1/2"
D VERTICALLY CN NO: 3143
1'-1"
SOUND ATTENUATION
1'-3 3/4"
1 HOUR SPRAYED- 2 BLANKET DATE: 11-12-2010
ON FIREPROOFING DESIGN: AHL
1'-7 3/4"
0'-8"
Z-CLIPS AT 16" O.C.
SE2 1 HOUR SPRAYED-ON VERTICALLY DRAWN: RRI
3'-0"
0'-11 1/2"
D 1 HOUR SPRAYED- Comments
B ON
SE2 SE2 FIREPROOFING.
SIM SIM
SE2
SIM COMPOSITE WALL 0'-2 3/4" 0'-4"
PANEL 5/8" GWB ON 1 5/8"
COLUMN DETAILS
METAL STUDS
(BRACE BACK TO
EXTERIOR WALL
A S6N.8
STUDS @ EVERY
1'-3 3/4" OTHER STUD)
S6N.7
AE504
31/10/2020 10:57:54
0'-2"
AE601 2
0'-2"
12'-0" AE601
TTL FIRE AE601 LOUVER
Architecture & Engineering
0'-2"
AE505
0'-2"
0'-2"
DOO TYP MATERIA WIDT HEIGH DEPT MATERIA RATIN HARDWAR D4
R NO. E L H T H TYPE L HEAD JAMB SILL G E COMMENTS B3 9'-0" SOLID SURFACE SILL
0'-2"
AE601
1'-6"
FIRST FLOOR
AE601 SEALANT ALUMINUM SILL
100A D ALM./GL 6'-2 1/2" 7'-0" 3/4" A1/AE602 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 4
5'-2 1/8"
5'-8"
5'-8"
5'-8"
1 1 0'-0 1/2"
6'-0"
100B D ALM./GL 6'-2 1/2" 7'-0" 3/4" A1/AE602 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 5
B3 B3 A4 2x PT WOOD BLOCKING
4'-0"
1 1
4'-0"
B6 GL3 1331 L STREET, NW
AE601 D5
100C J HM. 26'-0" 10'-6" 2" F1 HM. A6/AE60 - OVERHEAD GRILLE AE601 AE601 SHIM
AE601 R19 BATT INSULATION WASHINGTON, DC 20005
0'-2"
1 AE505
0'-2"
0'-2"
202·461·3260 FAX 202·461·3266
0'-2"
0'-2"
101A D ALM./GL 6'-2 1/2" 7'-0" 3/4" C1/AE602 ALM. A4/AE60 B5/AE602 A5/AE60 - SET 1 BOTTOM OF OPENING A4 A4 WALL SHEATHING
D3 WWW.CLARKNEXSEN.COM
2 1 +3'-8" A.F.F. @ 2ND AND 3RD
E 101B D ALM./GL 6'-2 1/2" 7'-0" 3/4" C1/AE602 ALM. A4/AE60 B5/AE602 A5/AE60 - SET 2 EQ EQ EQ EQ +9'-2" A.F.F. @ LOWER LEVEL
AE601 AE601 AE505 NOTE: R5 RIGID INSULATION
3'-2"
W1 GL1 AT EXTERIOR 39
2 1 0'-2" 0'-2" 0'-2" 0'-2" E5 0'-2" W1 W2 W3
A GL6 AT INTERIOR MEMBRANE BARRIER, RUN THRU WALL FLASHING WITH
101C1 B ALM./GL 3'-0" 7'-0" 1 3/4" R/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 35 L1 WEEPS AT 24" OC
AE601 F.F. OVER FACE OF WOOD
1 1
BLOCKING
WINDOW AND LOUVER TYPES
101C2 B ALM./GL 3'-0" 7'-0" 1 3/4" F1 ALM. B2/AE60 B3/AE602 A2/AE60 - SET 8 BRICK VENEER
2 2
SEE SCHEDULE
0'-2" 0'-2" 0'-2" 0'-2" 0'-5" 0'-5" 0'-5" 0'-6"
102B B ALM./GL 3'-0" 7'-0" 1 3/4" C1/AE602 ALM. A4/AE60 B5/AE602 A5/AE60 - SET 12 0'-5" 0'-5" 0'-5" 0'-5"
2 1
103 H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 18A
2'-1"0'-6"
0'-2"
0'-4"
SEE SCHEDULE
SEE SCHEDULE
0'-5"
0'-5"
0'-6"
1
2'-1"
SEE SCHEDULE
SEE SCHEDULE
103A A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 21
SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
SEE SCHEDULE
1
104 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 21
1
105A A HM. 3'-0" 7'-0" 1 3/4" F2 HM. D3/AE60 C5/AE60 A3/AE60 SET 11
1 1 1 0'-4"
0'-6"
0'-10"
0'-10"
0'-10"
105B A HM. 6'-0" 7'-0" 1 3/4" F2 HM. D3/AE60 C5/AE60 A3/AE60 - SET 9
1 1 1
106A A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 39
2
1
VOID SPACE FOR
106B H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60
1
B4/AE601 SET 17
F1 F2 A B C D E F G H 1/4" WIRED GLASS -
1 HOUR RATING, J CASEWORK AT
1 HR WHERE REQUIRED DOOR 100C ONLY.
2 107 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 29 FOR FIRE RATING SEE D1/AE401 FOR
D 108B H WOOD 3'-0" 7'-0" 1 3/4" F1 HM.
1
D5/AE60 B4/AE601 SET 31 FRAME TYPES
1/4" = 1'-0"
DOOR TYPES
1/4" = 1'-0"
LOCATION
1
2 0'-4 1/2"
109 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 29
1
110 B ALM./GL 3'-0" 7'-0" 1 3/4" D/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 22 2
1 1 WALL SHEATHING
SEE PARTITION GLASS AS SCHEDULED
111 A WOOD 3'-0" 7'-0" 1 3/4" U/AE604 ALM. B4/AE60 A3/AE602 - SET 30 TYPES
0'-2"
2 R5 RIGID INSULATION
MEMBRANE AIR BARRIER TYPES INSULATION WHERE
112 B ALM./GL 3'-4" 7'-0" 1 3/4" A/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23 FRAME AS SCHEDULE
1 1 OVERLAP FLASHING REQUIRED
113 A WOOD 3'-0" 7'-0" 1 3/4" U/AE604 ALM. B4/AE60 A3/AE602 B1/AE60 - SET 30 STC 32, RESIST SMOKE METAL STUDS
2 R19 INSULATION ACOUSTICAL SEAL AS
2 1 PASSAGE DOUBLE STUD BOX
114 B ALM./GL 3'-0" 7'-0" 1 3/4" D/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 22 FULL HEAD JOINT WEEP 24" OC HEADER WITH TRACK REQIRED
METAL STUD RUNNER TRACK
1 1 MAX MUD BEAD ALL ON TOP AND SCREWED DOOR AS SCHEDULE
0'-0 1/4"
115 A WOOD 3'-0" 7'-0" 1 3/4" U/AE604 ALM. B4/AE60 A3/AE602 B1/AE60 - SET 30 STC 32, RESIST SMOKE AROUND, BOTH PROVIDE DOUBLE TO JAMB STUDS
2 1 PASSAGE THRU-WALL FLASHING SIDES METAL STUDS @ SIMILAR 0'-0 1/2" TYP.
(JAMB)
116 B ALM./GL 3'-0" 7'-0" 1 3/4" A/AE604 ALM. D6/AE60
1
B5/AE601 A1/AE60
1
- SET 26 5/8" GYPSUM WALLBOARD
BOX BEAM HEADER WITH TRACK
SHIM AS REQUIRED
SEALANT BOTH SIDES
E6 HEAD/TRANSOM DETAIL
0'-2"
117 A WOOD 3'-0" 7'-0" 1 3/4" V/AE604 ALM. D6/AE60 B5/AE601 B1/AE60 - SET 30 STC 32, RESIST SMOKE 1 1/2" = 1'-0"
0'-4"
1 1 PASSAGE ALUM. WINDOW FRAME
2 MUD J BEAD
118A A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 17
1 SEALANT, BOTH SIDES VARIES FRAME AS SCHEDULED
SEALANT, BOTH SIDES 0'-4 1/2"
118B H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 28 BRICK BEYOND
1 FRAME AS SCHEDULED GLAZING, SEE SCHEDULE
0'-3" 0'-6 1/4"
119A A ALM./GL 3'-0" 7'-0" 1 3/4" T/AE604 HM. B4/AE60
2
A3/AE602 B1/AE60
1
SET 30 STC 32 GROUT
SOLID
DRIP EDGE
HEAD DETAIL @ GLASS AS SCHEDULED
0'-1 3/4"
119B
119C
E
H
HM.
HM.
6'-0"
3'-0"
7'-0"
7'-0"
1 3/4"
1 3/4"
F1
F1
HM.
HM.
A2/AE60
1
A2/AE60
C5/AE60 A3/AE60 -
1 1
C5/AE60 A3/AE60
SET 10
SET 6 D3 HEAD DETAIL @ BRICK VENEER D4 HEAD DETAIL (JAMB SIMILAR) D5 INTERIOR PARTITION FRAME AS SCHEDULE
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
1 1 1
121A H HM. 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 32
0'-0 1/4"
1 1 1 GALV. STEEL LINTEL
THRU-WALL FLASHING GROUT SOLID
123C F HM. 12'-0" 15'-2" 2" F1 HM. - OVERHEAD COILING THRU-WALL FLASHING
DOOR 5/8" GYPSUM WALLBOARD DOOR AS SCHEDULED
2 5/8" GYPSUM WALLBOARD
124 B ALM./GL 3'-0" 7'-0" 1 3/4" B/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 25 BOX BEAM HEADER WITH TRACK ALUMINUM BREAK METAL
0'-2"
1 1 BOX BEAM HEADER WITH TRACK
2 CLOSURE, MATCH ALUMINUM
0'-4 1/2"
INSTALL FELT BEHIND FRAME
1 1 R19 BATT INSULATION
OVER MOISTURE BARRIER
BRICK BEYOND LOUVER
127A C ALM./GL 4'-6" 7'-0" 1 3/4" F1 ALM. B4/AE60 B5/AE601 - - SET 19 BRICK BEYOND R5 RIGID INSULATION 0'-0 1/4" SEALANT, BOTH SIDES
PC#: 260-17701-000
INSULATION 2x PT WOOD BLOCKING
203 B ALM./GL 3'-0" 7'-0" 1 3/4" P/AE604 ALM. D6/AE60 A5/AE602 A1/AE60 - SET 19A MUD 'J' BEAD
1 1 WHERE REQUIRED
INSULATION WHERE REQUIRED MUD 'J' BEAD
204 B ALM./GL 3'-0" 7'-0" 1 3/4" E/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 24 METAL STUDS
SEALANT
B 205 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM.
1
D5/AE60 B4/AE601 -
1
SET 17
DOUBLE STEEL STUDS 5/8" GYPSUM WALLBOARD
DOUBLE STEEL STUDS
SEALANT
ALUMINUM FRAME AS
WALL ASSEMBLY
0'-2" FRAME AS SCHEDULED
SEE EXTERIOR
1 SCHEDULED ALUMINUM CLIP
WALL ASSEMBLY
0'-0 1/4" 0'-1 3/4"
DOOR AS SCHEDULED
SEE EXTERIOR
206 B ALM./GL 3'-0" 7'-0" 1 3/4" F/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23 ANCHOR, 3 PER JAMB ANGLES @ 24" O.C.
VARIES
0'-1 3/4"
1 1
VARIES
SEE PARTITION
SEE PARTITION
207 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 29 SEALANT
VARIES
1
TYPE
BOTH SIDES
0'-4 1/2"
TYPE
208 B ALM./GL 3'-0" 7'-0" 1 3/4" F/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23
1 1 SHIM
209 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 29
0'-0 1/2"
1 R19 BATT INSULATION SEALANT
1/2" MIN GWB PENETRATION 2 R19 BATT INSULATION LOUVER
210 B ALM./GL 3'-0" 7'-0" 1 3/4" F/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 24 MEMBRANE AIR BARRIER,
1 1 R5 RIGID INSULATION NOTE: JAMB SEALANT
WRAP AROUND WOOD CONDITION AT DOOR FRAME AS SCHEDULED
212 B ALM./GL 3'-0" 7'-0" 1 3/4" F/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23 R5 RIGID INSULATION MEMBRANE AIR BARRIER,
BRICK BLOCKING NEXT TO WALL,
1 1 SHIM WRAP AROUND WOOD
WALL SHEATHING BRICK
JAMB DETAIL
REFER TO PLAN BLOCKING
213B H WOOD 3'-6" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - - SET 28 1 SEALANT BOTH WALL SHEATHING
1 SIDES
GLASS AS SCHEDULED
213C H WOOD 3'-6" 7'-0" 1 3/4"
WOOD
F1 HM. D5/AE60 B4/AE601
1
1. DOOR- LOCATED
REQUIRED.
- IN INCIDENTAL
SET 28 USE PARTITION.
1 CLOSER
B3 WINDOW JAMB DETAIL B4 @ INTERIOR PARTITION B5 JAMB DETAIL B6 LOUVER JAMB DETAIL CN NO: 3143
DATE: 11-12-2010
214 B ALM./GL 3'-0" 7'-0" 1 3/4"FACE F/AE604
VENEER ALM. D6/AE60 B5/AE601 A1/AE60 - SET 24 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
1 1 DESIGN: AHL
218 B ALM./GL 3'-0" 7'-0" ACOUSTIC
1 3/4" CORE
F/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23 DRAWN: SVG
1 1 WALL SHEATHING 2
VERTICAL STIFFENERS REVIEW:DRH
219B H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - - SET 28 1 0'-3" 0'-6 1/4"
R5 RIGID INSULATION FACE OF WALL BEYOND
0'-0 1/4"
222 H WOOD. 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - 1HR SET 20 COORDINATE W/
B1
223B
ACOUSTIC DOOR
H WOOD 3'-6" 7'-0" 1 3/4" F1 HM.
1
D5/AE60 B4/AE601 - -
THRU-WALL FLASHING
SETGYPSUM
28 1
DOOR HARDWARE SCHEDULED
R19 BATT INSULATION
SHIM
THRESHOLD SET IN FULL BED
OF SEALANT
MECHANISM
DOOR, WINDOW,
5/8" WALLBOARD
3" = 1'-0" 1 SLAB FLOOR FINISH AS SCHEDULED
DOOR AS SIDEWALK / PAVERS SILL FLASHING WITH END STEEL ANGLES
0'-2"
AE601
232 B ALM./GL 3'-0" 7'-0" 1 3/4" G/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 25
TRANSITION STRIP 1 1
234
A1
234A SILL DETAIL
W
H
ALM./GL
WOOD
6'-7 7/8"
3'-0"
9'-0"
7'-0"
3/4"
1 3/4" F1 HM. A2 HEAD DETAIL @ BRICK VENEER
D5/AE60 B4/AE601 -
- SET 38
SET 16 A3 DOOR SILL @ EXTERIOR A4 SILL DETAIL A5 THRESHOLD DETAIL A6 COILING DOOR SECTION
1 1/2" = 1'-0" 11 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1/2" = 1'-0"
236 B ALM./GL 3'-0" 7'-0" 1 3/4" K/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 SET 23
1 1 SHEET 54 OF 155
GRAPHIC SCALE(S)
0 1' 5' 10' 15' 0 6" 1' 2' 3' 4' 5' 0 3" 6" 9" 1' 2' 0 3" 6" 1'
236A H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. 1/4" = 1'-- 0"
D5/AE60 B4/AE601 SET 18A 1/2" = 1' - 0" 1 1/2" = 1' - 0" 3" = 1' - 0"
1
THIRD FLOOR
302 H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - 1HR SET 20
1
303 B ALM./GL 3'-0" 7'-0" 1 3/4" P/AE604 ALM. D6/AE60 A5/AE602 A1/AE60 - SET 19A
1 1
304 B ALM./GL 3'-0" 7'-0" 1 3/4" B1/AE602 ALM. E6/AE60 A6/AE602 B6/AE60 - SET 15
1 2
305 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 17
1
306 B ALM./GL 3'-0" 7'-0" 1 3/4" M/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 27
1 1
306A A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - 1HR SET 33
1
307 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 29
1
308 B ALM./GL 3'-0" 7'-0" 1 3/4" M/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23
1 1
309 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 29
1
310 B ALM./GL 3'-0" 7'-0" 1 3/4" M/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 24
1 1
311B H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - - SET 28 1
1
312 B ALM./GL 3'-0" 7'-0" 1 3/4" M/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23
1 1
313B H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - - SET 28 1
1
314 B ALM./GL 3'-0" 7'-0" 1 3/4" M/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 24
1 1
316 B ALM./GL 3'-0" 7'-0" 1 3/4" M/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23
1 1
318A B ALM./GL 3'-0" 7'-0" 1 3/4" M/AE604 ALM. D6/AE60 B5/AE601 A1/AE60 - SET 23
1 1
318A1 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 21
1
318B B ALM./GL 3'-0" 7'-0" 1 3/4" B1/AE602 ALM. E6/AE60 A6/AE602 B6/AE60 - SET 15
1 2
319B H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - - SET 28 1
1
320 A WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - SET 37
1
321B G WOOD 4'-6" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - - SET 28 1
1
322 H WOOD 3'-0" 7'-0" 1 3/4" F1 HM. D5/AE60 B4/AE601 - 1HR SET 20
1
1 2 3 4 5 6
2.2 2.7 3.9 4.9 6.1 7.1 8.1 8.1
8.1
149'-7 5/8"
1'-8 1/4" 4'-11 1/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 5'-0 5/8" 4'-11 1/8" 1'-8 1/4"
Architecture & Engineering
1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" B3 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8"
AE503
THIRD FLOOR
29'-0"
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 1331 L STREET, NW
WASHINGTON, DC 20005
5'-2"
202·461·3260 FAX 202·461·3266
WWW.CLARKNEXSEN.COM
E
A4
5'-6"
AE603
GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 D6 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1
3'-6"
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
AE603
SECOND FLOOR
15'-0"
4'-9"
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
D4
AE603 D4
6'-9"
AE603
GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 C6 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1 GL1
3'-6"
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T
AE603
FIRST FLOOR
0"
1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8"
GLAZING SCHEDULE
D1 LIBRARY CURTAIN WALL EAST ELEVATION NOTE: THIS ELEVATION IS DRAWN AS A FLAT REPRESENTATION OF SEGMENTED WALL. DIMENSIONS ARE ALONG THE RADIUS THAT
INTERSECTS CENTER LINE AT INTERIOR SIDE OF EACH PRIMARY MULLION. SEE ENLARGED PLAN D1/AE402 FOR ADDITIONAL
INFORMATION.
GL1 LOW-E CLEAR INSULATING GLASS
3/16" = 1'-0"
GL1 LOW-E CLEAR INSULATING TEMPERED
D 1'-7 3/8" GL2
GLASS
LOW-E INSULATING SPANDREL GLASS
3'-2 1/2" 3'-2 1/2" 3'-2 1/2" 3'-2 1/2" 3'-2 1/2" 3'-2 1/2" 3'-2 1/2" 3'-2 1/2" 3'-2 1/2" 3'-2 1/2" 3'-1 3/8"
GL2 LOW-E INSULATING SPANDREL TEMPERED GLASS
D5 GL3 LAMINATED INSULATING CLEAR GLASS
AE503 ALL GLAZING TO BE 1" INSULATING GLASS UNITS (GL1 / GL1T), UNLESS OTHERWISE NOTED. GL4 NOT USED
ROOF
44'-0" GL5 LAMINATED SPANDREL GLASS
0'-2"
* * * * * * * * * * * * GL6 CLEAR GLASS
5'-10"
GL6T TEMPERED CLEAR GLASS
GL7 POLISHED WIRED GLASS
GL8 SPANDREL GLASS
GL8T TEMPERED SPANDREL GLASS
GL9 LAMINATED CLEAR GLASS
5'-6"
38'-9 1/4"
38'-9 1/4"
3'-1 1/2" 5'-0 1/2" 5'-0 1/2" 5'-0 1/2" 5'-0 1/2" 5'-0 1/2" 5'-0 1/2" 5'-4 3/4"
5'-4 3/4" 5'-0 1/2" 5'-0 1/2" 5'-0 1/2" 5'-0 1/2" 5'-0 1/2" 5'-0 1/2" 3'-1 1/2"
1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 3'-0 1/2"
B3 3'-6 1/2" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6" 1'-6"
GL1T GL1T GL1T GL1T GL1T GL1T GL1T GL1T C1 GL1T GL1T GL1T B3
3'-6"
AE503
AE603 AE503
THIRD FLOOR THIRD FLOOR
THIRD FLOOR
29'-0" 29'-0"
29'-0"
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
5'-2"
5'-2"
B2
5'-0"
C4
AE603 AE603
A2
5'-6"
5'-6"
D4
5'-6"
A2 AE603
AE603
AE603
C D6 D6
GL1T GL1T GL1T GL1T GL1T GL1T GL1T GL1T GL1T GL1T GL1T GL1T 15'-0" BOTTOM OF MULLION GL1TGL1T GL1T GL1TGL1T GL1T GL1T GL1T GL1T GL1TGL1T GL1T GL1T GL1T GL1T GL1T GL1T GL1TGL1T GL1T GL1T GL1T GL1T GL1TGL1T GL1T GL1TGL1T
3'-6"
3'-6"
3'-6"
AE603 AE603
SECOND FLOOR SECOND FLOOR
29'-2"
29'-2"
SECOND FLOOR
15'-0" 15'-0"
0'-1 1/4"
15'-0"
* * * * * * * * * * * * * * * * * * * * * * * * * * * * *
0'-1 1/4"
2'-0"
4'-9"
4'-9"
D2
AE603 C4
3'-3"
D4
C4
AE603 AE603
6'-9"
6'-9"
C6
3'-6"
3'-6"
AE603 AE603
AE603
FIRST FLOOR FIRST FLOOR FIRST FLOOR
C1 CURTAINWALL ELEVATION AT ENTRY C3 LIBRARY CURTAIN WALL SOUTH ELEVATION C5 LIBRARY CURTAIN WALL NORTH ELEVATION
3/16" = 1'-0" 3/16" = 1'-0" 3/16" = 1'-0" 0'-4 1/2"
NORTH ELEVATION SHOWN, SOUTH NOTE:ALUMINUM INTEGRAL SUNSHADE NOT SHOWN FOR CLARITY
COMPOSITE WALL
PANEL BEYOND
DOOR FRAME
ELEVATION OPPOSITE HAND AS SCHEDULED THRESHOLD SET IN
FULL BED OF SEALANT
PC#: 260-17701-000
DOOR AS SCHEDULED
DOOR SWEEP
GYPSUM SHEATHING
B SEE R5 RIGID INSULATION
5/8" GYPSUM WALLBOARD 12 GA. STAINLESS
STEEL FLASHING,
DOUBLE STEEL STUDS SEE PARTITION 1/4" PER FOOT
SCHEDULE MEMBRANE AIR BARRIER SET UNDER
OVERLAP FLASHING TYPE THRESHOLD
2x PT WOOD BLOCKING
R19 INSULATION MUD 'J' BEAD
GL6 CONCRETE PAVER
FULL HEAD JOINT WEEP 24" OC ALUMINUM FRAME AS INSULATION INSULATING GLASS
WALL ASSEMBLY
SEE EXTERIOR
WALL SHEATHING
0'-7 1/2"
SYSTEM
0'-0 1/4"
5/8" GYPSUM WALLBOARD
0'-3" 0'-4 1/2"
THRU-WALL FLASHING
0'-0 1/4"
MEMBRANE ROOFING
9'-0"
B1 DOORS 304 AND 318B B2 DOOR HEAD DETAIL B3 DOOR JAMB DETAIL B4 DOOR HEAD DETAIL B5 DOOR JAMB DETAIL B6 DOOR SILL DETAIL DRAWN: MTB
REVIEW:DRH
1/4" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
GYPSUM WALLBOARD REVISIONS
0'-3" 0'-4 1/2"
18'-4 7/8" 0'-7 1/2" No. Date Description
FACE OF WALL 5/8" GYPSUM WALLBOARD INSULATION SEALANT , BOTH SIDES
INSULATION
2'-6 3/4" 1'-6 1/2" 3/4" ALUM. REVEAL, WHERE REQUIRED ALUMINUM FRAME
3'-2 1/2" 3'-2 1/2"1'-5 5/8"3'-2 1/2" 3'-2 1/2" WHERE
DOOR FRAME SCHEDULED TYP. ALUM EDGE TRIM AS SCHEDULED
DOUBLE STEEL STUDS THIN BRICK DOUBLE STEEL STUDS
AS SCHEDULED INSIDE WALL BEYOND PIECE
SEE PARTITION
DOOR AS SCHEDULED SEALANT, BOTH SIDES
THRESHOLD SET IN 0'-1 3/4" INSULATING GLASS
3'-8 1/2" 2'-10 3/4"
DOOR SWEEP FULL BED OF SEALANT 0'-0 1/4" DOOR AS SCHEDULED FILTER FOAM TO
TYPE
ENDS OF PANEL
GL6 GL6 GL6 GL6 GL6 GL6 GL6
SEE PARTITION
FINISH FLOOR AS
0'-0 3/4"
SCHEDULED CONT FORMED ALUM
CURTAIN WALL
0'-4 1/2"
AE602
31/10/2020 10:58:22
0'-0"
SIDES
5/8" GYPSUM WALLBOARD
A1
VESTIBULE A2
DOOR SILL DETAIL A3
DOOR JAMB DETAIL A4
DOOR HEAD DETAIL A5
DOOR JAMB DETAIL A6
DOOR JAMB DOORS 304 AND 318B
3/16" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
NORTH ELEVATION SHOWN, SOUTH SHEET 55 OF 155
ELEVATION OPPOSITE HAND 1/4" = 1' - 0"
0 1' 5' 10' 15'
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
3/16" = 1' - 0"
0 5' 10' 20'
GRAPHIC SCALE(S)
1 2 3 4 5 6
1331 L STREET, NW
MEMBRANE AIR WASHINGTON, DC 20005
FLOOR FINISH AS SCHEDULED
0'-7 1/2" BARRIER ON WALL
SHEATHING ALUMINUM COVER 202·461·3260 FAX 202·461·3266
WWW.CLARKNEXSEN.COM
E GLAZED ALUMINUM CURTAINWALL
1'-1 3/4"
SYSTEM
90
CAP FOR ALUMINUM COVER
.0
0°
SEALANT AND BACKER ROD SECOND FLOOR
5/8" TILE BACKING 15'-0"
SHIM PANEL FIRESAFING MATERIAL
0'-2 1/2"
FLOOR FINISH AS SCHEDULED THIN BRICK VENEER
0'-0 1/2"
ALUMINUM 45 1/4" SPANDREL GLASS
DEGREE CORNER
MULLION
° GLASS FIBER BOARD INSULATION
.00
135
CONCRETE SLAB
SOLID BLOCKING BRICK VENEER
0'-0 1/2"
R-13 FOAM PLASTIC BOARD BACKER ROD AND SEALANT
INSULATION AT PERIMETER SEALANT .040 ALUMINUM TO
MATCH FINISH OF SEALANT
VAPOR RETARDER CURTAIN WALL BENT STEEL PLATE
0'
-2
1/
2"
D1 SILL AT ENTRY CURTAIN WALL D2 JAMB AT ENTRY CURTAIN WALL D4 CORNER DETAIL AT LIBRARY CURTAIN WALL D6 LIBRARY CURTAINWALL DETAIL AT SLAB
1 1/2" = 1'-0" 3" = 1'-0" 3" = 1'-0" 3" = 1'-0"
0'-7 1/2"
0'-2 1/2"
RESINOUS MATRIX METAL STUD
TERRAZZO FLOOR
THIRD FLOOR
SHIM SPACE
CURTAIN WALL ANCHOR 29'-0" FIRST FLOOR
0'-0 1/2"
0'-0"
1/4" SPANDREL GLASS SOLID BLOCKING
5/8" TILE BACKING
SEALANT AND
0'-0 1/2"
3/4" AIR BARRIER
STRUCTURAL BEAM PLYWOOD
.040 ALUM TO COMPOSITE WALL PANEL
MATCH FINISH OF FOAM PLASTIC
CURTAIN WALL BOARD
GLASS FIBER INSULATION SEALANT
SEALANT
BOARD COMPOSITE WALL
INTERIOR ALUMINUM
SEALANT
C1
ENTRY CURTAIN WALL DETAIL AT SLAB C2
VESTIBULE THIN BRICK/MULLION DETAIL C4
CURTAIN WALL JAMB AT METAL PANEL C6
SILL DETAIL AT LIBRARY CURTAIN WALL
0'-2 1/2"
PC#: 260-17701-000
B
CONTINUOUS
NEOPHRENE
GASKET
MATERIAL
0'-7 1/2"
CN NO: 3143
0'-2 1/2"
DATE: 11-12-2010
DESIGN: AHL
1'-0 7/8"
DRAWN: MTB
REVIEW:DRH
0'-1 3/4"
REVISIONS
No. Date Description
0'-7 1/2"
0'-3 5/8"
ALUMINUM COVER
0'-1"
A1 3" = 1'-0"
A2 3" = 1'-0"
A4 3" = 1'-0"
SHEET 56 OF 155
1 1/2" = 1' - 0"
0 3" 6" 9" 1' 2'
3" = 1' - 0"
0 3" 6" 1'
GRAPHIC SCALE(S)
1 2 3 4 5 6
8" MAX.
CHANNEL
MOLDING
METAL STUDS @16" OC GWB ON 3 5/8"
ATTACHED TO STRUCTURE METAL STUD
FRAMING @ 16" OC
ACOUSTICAL Architecture & Engineering
6" MIN
ABOVE PANEL
SUSPENDED ACOUSTIC
PANEL CEILING SEE R.C.P.
TYP
6"
6" MIN
SEE R.C.P. BRACING AS 1331 L STREET, NW
SEE R.C.P. REQUIRED
SEE R.C.P. WASHINGTON, DC 20005
SUSPENDED 202·461·3260 FAX 202·461·3266
GWB CEILING ON WWW.CLARKNEXSEN.COM
48" MAX.
GWB ACOUSTICAL SUSPENSION FRAMING
E SEE R.C.P. PANEL CEILING
WALL ANGLE
6" MIN
TRANSITION
SUSPENDED ACOUSTIC CONTINUOUS 1 1/2" X 1 CLIP
PANEL CEILING 1/2" COLD ROLLED
SEE RCP SEE RCP
STEEL ANGLE, TYPICAL
SEE RCP SEE R.C.P. VARIES
CEILING AS SCHEDULED, TYP
VERIFY
EXTERIOR CORNER SEE CEILING PLAN 3 5/8" METAL STUD GWB CEILING
GWB ON 3 5/8" METAL STUDS REINFORCEMENT BRACING @ 48" OC
@ 16" OC TYP
SEE R.C.P.
NOTE: REFER TO CEILING
NOTE: REFER TO CEILING PLANS FOR LOCATION
PLANS FOR LOCATION 0'-4 7/8" AND REQUIRED HEIGHTS
AND REQUIRED HEIGHTS SEE R.C.P.
E1
BULKHEAD DETAIL E2
BULKHEAD DETAIL E3
SOFFIT DETAIL E4
TRANSITION DETAIL
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" NOT TO SCALE
1'-4 5/8"
0'-0 1/2"
3/4" METAL REVEAL ON BOTH SIDES
0'-0 1/2"
0'-1 1/4"
LIGHT RESINOUS MATRIX
FIXTURE TERRAZZO FLOORING
0'-1 1/2"
S6N
0'-9"
0'-3 3/4"
SECOND FLOOR
10'-0" AT FIRST CHANNEL GWB WALL ON 15'-0"
MOLDING
0'-0 3/4"
FLOOR METAL STUDS
9'-0" AT SECOND LIGHT FIXTURE
GWB PANEL
RADIAL GWB WALL 1'-0" 0'-9" FLOOR
D SOFFIT ON METAL
RADIAL PERIMETER
GWB WALL ON 7/8" FURRING CHANNEL
STUDS
0'-6"
ACOUSTIC PANEL
CEILINGS LIGHT FIXTURE AND BORDER DOUBLE 2X6 BLOCKING FOR
0'-9"
GWB CEILING
0'-0 1/4"
GUARDRAIL ATTACHMENT
BORDER
GWB
0'-1 1/4"
GWB 0'-1 3/8"
9'-0"
SEALANT AND
R=251'-1" WP2 0'-2 1/2" 0'-2 1/2"
BACKERROD ACOUSTICAL
0'-3 3/4"
0'-9" 0'-9"
WOOD SHIM PANEL CEILING
R=251'-1" WP2
10'-6" LINEAR
SEGMENTAL INTERIOR DIFFUSER
ALUM STOREFRONT GWB CEILING
(REFER TO FLOOR ACOUSTICAL
0'-9" 3 5/8" METAL STUDS
PLANS FOR PARTITION PANEL CEILING
TYPE AT SIM. LINEAR DIFFUSER
CONDITION)
D1 LIGHT COVE DETAIL-CORRIDOR D2 LIBRARY COVE DETAIL FIRST FLOOR D3 LIBRARY COVE DETAIL SECOND FLOOR
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
GWB
GWB
0'-3 1/8"
CONTINUOUS
0'-5"
C BRICK BEYOND ALIGN
2'-0"
CLOSURE SCHEDULED- EXPOSED
PANEL CEILINGS AT RMS 319 AND 323
0'-3 5/8"
0'-5 1/8" 7'-0"
AFF CEILING SUSPENDED CEILING
C1
WALL-MOUNTED SHADING DEVICE C2
ROLLER WINDOW SHADE DETAIL C3
UTILITY PANEL CEILING DETAIL C4
SOFFIT DETAIL
3" = 1'-0" 3" = 1'-0" 1/2" = 1'-0" 1 1/2" = 1'-0"
MAIN TEES
2" TO 4"
PC#: 260-17701-000
SE4
CHANNEL
1/2" MOLDING ADDITIONAL DRYWALL
ACOUSTICAL DRYWALL MAIN TEE
B MAIN TEE MAIN TEE CROSS TEE
0'-6"
CONTROL JOINT GYPSUM PANEL
ACOUSTIC PANEL CEILING GWB CEILING
METAL
CLOSURE 8'-0" TO FINISH
B1
CONTROL JOINT B2
GWB CEILING PERIMETER DETAIL B3
TRANSITION DETAIL PANEL
BY FUME HOOD
FLOOR
GWB
WOOD BLOCKING
CEILING DETAILS
0'-6"
AE801
31/10/2020 10:58:38
TOILET PARTITION
1331 L STREET, NW
WASHINGTON, DC 20005
202·461·3260 FAX 202·461·3266
WWW.CLARKNEXSEN.COM
E
101C2
105B
105A
WATER
STORAGE
HEAD-IN
105A ENGINEERING
105B
STORAGE
125
CONTROL
CORRIDOR RECORDING ROOM
MEN'S WOMEN'S STUDIO 115
TOILET 101C
TOILET
113
107 109
101C1
115
125
MECHANICAL 123A 127A
107 109
119
EL. = 207.50
IT STAFF 121A ENGINEERING ENGINEERING
103 113 LAB LAB
123 127
117
103A
103
EDITING
D UP EMERGENCY 121A1
SERVER FACULTY 117 ELECTRICAL
103A OFFICE 121A
111 DN
111
101D
DN
CORRIDOR
101B 101
112
106A
NORTH 101E
110 VESTIBULE
104
SOUTH 100A
114
116
VESTIBULE 101B
LOBBY LRC
101A HOUSEKEEPING CONFERENCE
118A
101A 100 WORKROOM
104 116
130
BREAK 108
BUILT - IN AREA DEAN
CLERICAL
CIRCULATION 106 110 DEAN 101F
112
102A MANAGER 114
132 COPY
UP CENTER UP
UP 118 UP
132
STAIR B
BOOKSH ELV
BUILT - IN ES 122
118B
ES
BOOKSHELV
STAIR A
102
COMPUTERS
PC#: 260-17701-000
B
CN NO: 3143
DATE: 11-12-2010
NOTES DESIGN: EM
DRAWN: RRI
REVIEW:FJK
1. ALL OFFICES TO HAVE SYSTEMS FURNITURE REVISIONS
2. LRC BOOKSHELVES ARE BUILT - IN No. Date Description
FIRST FLOOR
A
FURNITURE
FOOTPRINT PLAN
IF101
31/10/2020 10:58:47
SHEET 0 OF 155
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
31/10/2020 10:58:55
D:\tmg\COURSES\source-CourseContent\Computer Graphics I\REVIT\revit Libraries and examples\3143_Germanna Phase III A11.rvt
A
B
E
C
D
1
2
3
4
5
6
No.
SHEET
DATE: 11-12-2010
PC#: 260-17701-000
12
WWW.CLARKNEXSEN.COM
1331 L STREET, NW
WASHINGTON, DC 20005
202·461·3260 FAX 202·461·3266
OF 155
LP101
31/10/2020 10:58:59
D:\tmg\COURSES\source-CourseContent\Computer Graphics I\REVIT\revit Libraries and examples\3143_Germanna Phase III A11.rvt
A
B
E
C
D
1
2
3
4
5
6
No.
SHEET
DATE: 11-12-2010
PC#: 260-17701-000
13
WWW.CLARKNEXSEN.COM
1331 L STREET, NW
WASHINGTON, DC 20005
202·461·3260 FAX 202·461·3266
OF 155
LP102
31/10/2020 10:59:03
D:\tmg\COURSES\source-CourseContent\Computer Graphics I\REVIT\revit Libraries and examples\3143_Germanna Phase III A11.rvt
A
B
E
C
D
1
2
3
4
5
6
No.
SHEET
DATE: 11-12-2010
PC#: 260-17701-000
65
SINK SCHEDULE
GENERAL NOTES,
Architecture & Engineering
WWW.CLARKNEXSEN.COM
1331 L STREET, NW
WASHINGTON, DC 20005
202·461·3260 FAX 202·461·3266
OF 155
QL001