0% found this document useful (0 votes)
70 views9 pages

Design of Mat Foundation

1. The document describes the design of a mat foundation for a structure with 48 columns. Key steps included calculating load values, checking bearing capacity, and sizing an initial square footing. 2. It was determined that a mat foundation was required due to the high ratio of required footing area to plinth area. Design of the mat foundation included calculating load values and locations, sizing the mat, and checking soil pressure at each column. 3. The mat design had dimensions of 46.178m x 14.174m, an area of 654.527m2. Soil pressure was calculated at each column and found to be below the allowable bearing capacity of 225kN/m2, so the

Uploaded by

Amit Tharu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views9 pages

Design of Mat Foundation

1. The document describes the design of a mat foundation for a structure with 48 columns. Key steps included calculating load values, checking bearing capacity, and sizing an initial square footing. 2. It was determined that a mat foundation was required due to the high ratio of required footing area to plinth area. Design of the mat foundation included calculating load values and locations, sizing the mat, and checking soil pressure at each column. 3. The mat design had dimensions of 46.178m x 14.174m, an area of 654.527m2. Soil pressure was calculated at each column and found to be below the allowable bearing capacity of 225kN/m2, so the

Uploaded by

Amit Tharu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

DESIGN OF MAT FOUNDATION

Check for isolated footing

design load from etabs= 1.5(DL+LL)


maximum base reaction at column position c21 = 3996.996 KN
Unfactored load= 2664.664 i.e P/1.5
Increasing 10% extra load for self - weight of footing including imposed soil
total load = 2931.1304 KN
bearing capacity of a soil = 180 KN/m^2
As per IS 1893 : 6.3.5.2 allowable bearing capacity of soil , soil bearing capacity = 225
KN/m^2
size of square footing on the basis of limit state serviceability
A = unfactored load /SBCS = 11.84295111 m^2
Total column number= 48
Total footing area required= 568.4616533 m^2
Plinth area= 682.1928 m^2
Ratio of footing area to plinth area= 0.833285918 >0.5, so mat foundation is required
now, let us design mat foundation
Concrete grade = M25
Steel Grade = Fe500
Geometrical CG:
X= 23.317 m
Y= 7.315 m from left edge of the plinth

CG of load:
X'= Σ(Pi*Xi)/Σ(Pi)
Y'= Σ(Pi*Yi)/Σ(Pi)
Eccentricity,
ex=X-X'
ey= Y-Y'

SN column Pi (KN) xi (m) , about yi(m) , Pi*xi(KNm) Pi*yi(KNm)


position A-A about 4-
4

1 c1 1897.0296 0 0 0.000 0.000


2 c2 2476.2144 0 6.02 0.000 14906.811
3 c3 2216.102 0 8.992 0.000 19927.189
4 c4 1542.6176 0 14.174 0.000 21865.062
5 c5 3177.159 5.944 0 18885.033 0.000
6 c6 3671.6993 5.944 6.02 21824.581 22103.630
7 c7 3271.4887 5.944 8.992 19445.729 29417.226
8 c8 2516.4948 5.944 14.174 14958.045 35668.797
9 c9 2524.3924 11.888 0 30009.977 0.000
10 c10 3195.0886 11.888 6.02 37983.213 19234.433
11 c11 2701.3233 11.888 8.992 32113.331 24290.299
12 c12 1944.5747 11.888 14.174 23117.104 27562.402
13 c13 2311.89 15.698 0 36292.049 0.000
14 c14 387.404 15.698 6.02 6081.468 2332.172
15 c15 2257.92 15.698 8.992 35444.828 20303.217
16 c16 1340.357 15.698 14.174 21040.924 18998.220
17 c17 2398.15 19.508 0 46783.110 0.000
18 c18 3996.996 19.508 6.02 77973.398 24061.916
19 c19 2390.2634 19.508 8.992 46629.258 21493.248
20 c20 1944.9687 19.508 14.174 37942.449 27567.986
21 c21 35.5965 23.318 0 830.039 0.000
22 c22 3850.972 23.318 6.02 89796.965 23182.851
23 c23 2373.6052 23.318 8.992 55347.726 21343.458
24 c24 1959.53 23.318 14.174 45692.321 27774.378
25 c25 2321.94 27.128 0 62989.588 0.000
26 c26 331.0014 27.128 6.02 8979.406 1992.628
27 c27 2314.5442 27.128 8.992 62788.955 20812.381
28 c28 2004.17001 27.128 14.174 54369.124 28407.106
29 c29 2136.981 30.938 0 66113.918 0.000
30 c30 2635.8544 30.938 6.02 81548.063 15867.843
31 c31 2283.2374 30.938 8.992 70638.799 20530.871
32 c32 1749.5747 30.938 14.174 54128.342 24798.472
33 c33 2134.5359 34.748 0 74170.853 0.000
34 c34 2642.8877 34.748 6.02 91835.062 15910.184
35 c35 2309.992 34.748 8.992 80267.602 20771.448
36 c36 1754.04 34.748 14.174 60949.382 24861.763
37 c37 2147.708 38.558 0 82811.325 0.000
38 c38 2658.02 38.558 6.02 102487.935 16001.280
39 c39 2321.635 38.558 8.992 89517.602 20876.142
40 c40 1762.84 38.558 14.174 67971.585 24986.494
41 c41 2201.4425 42.368 0 93270.716 0.000
42 c42 2668.4895 42.368 6.02 113058.563 16064.307
43 c43 2355.303 42.368 8.992 99789.478 21178.885
44 c44 1808.3825 42.368 14.174 76617.550 25632.014
45 c45 632.9446 46.178 0 29228.116 0.000
46 c46 2122.0157 46.178 6.02 97990.441 12774.535
47 c47 1914.552 46.178 8.992 88410.182 17215.652
48 c48 466.7717 46.178 14.174 21554.584 6616.022
TOTAL 104060.7004 2429678.721 737331.323

So,
X'= 23.349
Y'= 7.086
and,
ex=0.032
ey= 0.229
Lx(b)= 46.178
Ly(d)= 14.174
A= 654.527 m2
Mxx= ΣP*ey 23872.70065 KNm
Myy= ΣP*ex 3295.369159 KNm
Calculation of moment of inertia
Ixx = bd^3/12= 10957.99653
Iyy = db^3/12= 116309.862
Mxx/Ixx = 2.178564355
Myy/Iyy = 0.028332672
Soil pressure at different points can be calculated as below:
Stress = ΣP/A +-Mxx*X/Ixx+-Myy*Y/Iyy

Colum X(m) Y(m) ΣP/A Mxx*X/Ixx Myy*Y/Iyy Factored Factored remarks


n stress(KN/m^2) (SBC)

C1 -23.08 -7.086 158.986115 -50.26824 -0.201 108.517 225 SAFE


C2 -23.08 -1.067 158.986115 -50.26824 -0.030 108.688 225 SAFE
C3 -23.08 1.904 158.986115 -50.26824 0.054 108.772 225 SAFE
C4 -23.08 7.086 158.986115 -50.26824 0.201 108.918 225 SAFE
C5 - -7.086 158.986115 -37.339632 -0.201 121.446 225 SAFE
17.14
4
C6 - -1.067 158.986115 -37.339632 -0.030 121.616 225 SAFE
17.14
4
C7 - 1.904 158.986115 -37.339632 0.054 121.700 225 SAFE
17.14
4
C8 - 7.086 158.986115 -37.339632 0.201 121.847 225 SAFE
17.14
4
C9 - -7.086 158.986115 -24.395778 -0.201 134.390 225 SAFE
11.20
1
C10 - -1.067 158.986115 -24.395778 -0.030 134.560 225 SAFE
11.20
1
C11 - 1.904 158.986115 -24.395778 0.054 134.644 225 SAFE
11.20
1
C12 - 7.086 158.986115 -24.395778 0.201 134.791 225 SAFE
11.20
1
C13 -7.391 -7.086 158.986115 -16.097598 -0.201 142.688 225 SAFE
C14 -7.391 -1.067 158.986115 -16.097598 -0.030 142.858 225 SAFE
C15 -7.391 1.904 158.986115 -16.097598 0.054 142.942 225 SAFE
C16 -7.391 7.086 158.986115 -16.097598 0.201 143.089 225 SAFE
C17 -3.581 -7.086 158.986115 -7.799418 -0.201 150.986 225 SAFE
C18 -3.581 -1.067 158.986115 -7.799418 -0.030 151.157 225 SAFE
C19 -3.581 1.904 158.986115 -7.799418 0.054 151.241 225 SAFE
C20 -3.581 7.086 158.986115 -7.799418 0.201 151.387 225 SAFE
C21 0.228 -7.086 158.986115 0.496584 -0.201 159.282 225 SAFE
C22 0.228 -1.067 158.986115 0.496584 -0.030 159.453 225 SAFE
C23 0.228 1.904 158.986115 0.496584 0.054 159.537 225 SAFE
C24 0.228 7.086 158.986115 0.496584 0.201 159.683 225 SAFE
C25 4.03 -7.086 158.986115 8.77734 -0.201 167.563 225 SAFE
C26 4.03 -1.067 158.986115 8.77734 -0.030 167.733 225 SAFE
C27 4.03 1.904 158.986115 8.77734 0.054 167.817 225 SAFE
C28 4.03 7.086 158.986115 8.77734 0.201 167.964 225 SAFE
C29 7.84 -7.086 158.986115 17.07552 -0.201 175.861 225 SAFE
C30 7.84 -1.067 158.986115 17.07552 -0.030 176.031 225 SAFE
C31 7.84 1.904 158.986115 17.07552 0.054 176.116 225 SAFE
C32 7.84 7.086 158.986115 17.07552 0.201 176.262 225 SAFE
C33 11.65 -7.086 158.986115 25.391124 -0.201 184.177 225 SAFE
8
C34 11.65 -1.067 158.986115 25.391124 -0.030 184.347 225 SAFE
8
C35 11.65 1.904 158.986115 25.391124 0.054 184.431 225 SAFE
8
C36 11.65 7.086 158.986115 25.391124 0.201 184.578 225 SAFE
8
C37 15.46 -7.086 158.986115 33.689304 -0.201 192.475 225 SAFE
8
C38 15.46 -1.067 158.986115 33.689304 -0.030 192.645 225 SAFE
8
C39 15.46 1.904 158.986115 33.689304 0.054 192.729 225 SAFE
8
C40 15.46 7.086 158.986115 33.689304 0.201 192.876 225 SAFE
8
C41 19.27 -7.086 158.986115 41.987484 -0.201 200.773 225 SAFE
8
C42 19.27 -1.067 158.986115 41.987484 -0.030 200.943 225 SAFE
8
C43 19.27 1.904 158.986115 41.987484 0.054 201.027 225 SAFE
8
C44 19.27 7.086 158.986115 41.987484 0.201 201.174 225 SAFE
8
C45 23.08 -7.086 158.986115 50.285664 -0.201 209.071 225 SAFE
8
C46 23.08 -1.067 158.986115 50.285664 -0.030 209.242 225 SAFE
8
C47 23.08 1.904 158.986115 50.285664 0.054 209.326 225 SAFE
8
C48 23.08 7.086 158.986115 50.285664 0.201 209.472 225 SAFE
8

In the X direction , the raft is divided in 11 strips,


i.e 12 eqvt beams

Name Length Soil Pressure (w)


in (m) (KN/m2)
1.Beam A-A 6.02 108.724
2.Beam B-B 6.02 121.652
3.Beam C-C 6.02 134.596
4.Beam D-D 6.02 142.894
5. Beam E-E 6.02 151.193
6. Beam F-F 6.02 159.489
7. Beam G-G 6.02 167.769
8. Beam H-H 6.02 176.068
9. Beam I-I 6.02 184.383
10. Beam J-J 6.02 192.681
11. Beam K-K 6.02 200.98
12. Beam L-L 6.02 209.278

Bending moment is obtained by coefficient 1/10 and L as distance between column centre

MAX B M Value Unit


1.Beam A-A 394.0193883 kNm
2.Beam B-B 440.8731808 kNm
3.Beam C-C 487.7822255 kNm
4.Beam D-D 517.8551617 kNm
5. Beam E-E 547.928098 kNm
6. Beam F-F 577.9945156 kNm
7. Beam G-G 608.0015668 kNm
8. Beam H-H 638.0774747 kNm
9. Beam I-I 668.2113673 kNm
10. Beam J-J 698.2836512 kNm
11. Beam K-K 728.3595592 kNm
12. Beam L-L 758.4318431 kNm

In the Y direction , the raft is divided in 3 strips,


i.e 4 eqvt beams
Name Length soil pressure
in( m) w (kN/m^2)
1.Beam 1-1 5.486 165.293
2.Beam 2-2 5.486 165.401
3.Beam 3-3 5.486 164.201
4.Beam 4-4 5.486 165.205

Bending moment is obtained by coefficient 1/10 and L as distance between column centre
MAX B M Value Unit
1.Beam 1-1 497.4690525 kNm
2.Beam 2-2 497.7940915 kNm
3.Beam 3-3 494.1825479 kNm
4.Beam 4-4 497.204206 kNm
So we get maximum factored BM for strip L-L
i.e Max BM = 758.431 kNm
from Bending Moment criteria
Limiting moment of resistance for M25 grade concrete = 0.138fck bd²
Therefore,
depth required = 605.3030542 mm
Adopt d= 800 mm

Two way shear check


For corner column C-1
Let,
distance of column face from preperty line be 150 mm
(since ks =1 for square column)
shear strength of concrete τc'=τc = 0.25√fck = 1.25N/mm²
Factored load on the column, Pu = 1897029.6 N
perimeter (Po) = (d/2+750)mm + (d/2+750)mm = d+1500

from IS 456: 2000, clause31.6.2.1


τv = Pu/Pod = 1897029.6/Po*d
or, 1.25 = 1897029.6/ (d+1500)*d
on solving, we get
d = 692.26 mm
For side columnc-21,
(since ks =1 for square column)
shear strength of concrete τc'=τc = 0.25√fck = 1.25N/mm²
Factored load on the column, (Pu) = 3177159N
perimeter (Po) = 2*(650+0.5d) + 600+d
= 1800+2d
τv = Pu/Pod
= Pu/(1800+2d)d
Or, 1.25 = 3177159/(1800+2d)d
On solving, we get
d = 577.7757674 mm

For centre column C-8 ,


(since ks =1 for square column)
shear strength of concrete τc'=τc = 0.25√fck = 1.25 N/mm²
Factored load on the column, (Pu) = 3996996 N
perimeter (Po) = 2*(600+d) + 2*(600+d)
= 2400+ 4d
τv = Pu/Pod
= Pu/(1432+d)d
Or, 1.25 = 3996996/(1432+d)d
On solving , we get
d = 743.67 mm

Depth Provided is sufficient against bending and two way shear consideration.

Calculation of reinforcement
maximum moment = 758.431 KNm
Minimum Ast = 0.15%of area
= 0.15/100*5684616.533
= 8526.92 mm2
From IS 456:2000

BM = 0.87*fy*Ast *(d-Ast*fy/fck*B)
Area of Steel req. = 2271.53 mm2
providing 16mm dia bar,
Area of 1 bar = 201.056 mm2
Spacing = 123.9157748 mm

CHECK
spacing should be <= 3d and <=300 , 3d= 3*800 = 2400 mm

hence, provide a spacing of 125 mm C/C .

Ast provided = 2271.53 mm2

summary
Dimension of footing = 4 m* 4 m
effective depth of footing = 800 mm
overall depth of footing = 800+65 = 865 mm
Reinforcement Along Depth and Breadth = 16 mm dia bar @ 125 mm C/C