Book 1
Book 1
Book 1
Contract Number
Activity #
Cementing Activity Hazard
C 3100000041
Probability Consequence
(How likely? : (How Bad?: H/M/L P A
Letter) Number)
D 4 H D4 D4
C 4 M 4
f drilling water/Shallow wells
E R
D0 D2
3
Date of original assessment
Preventative Measures (stop escalation)
Control (Barriers)
Work permit with JSA,Musta'ed (Follow 7steps) and Pre Job Safety
Meeting
Use of certified hooks, slings, shackles and in good condition and color
coded.
Proper positioning of the crane should be to prevent load swinging.
Proper use of Tag lines with the hooks.
Catwalk clear of personnel during Casing pipe pick up.
Clear view for the Driller ( CCTV )
Using certified cranes and fork lift with trained operators and Signal Man.
Ensure back up lines for make up and break out
Whip check lines for hydraulic lines of Power tong
Use of specialized equipments for premium connections and crome
casings.
Provision of anti skid mat around rotary table.
• Conduct TBT before starting the job, identify the activity steps hazards
and ensure all involved parties are involved in the TBT
• Competent supervision to be provided on-site.
• Relieve pressure in pipeline system is it’s required.
• Loading and offloading of pipes to be strictly in accordance with the
manufacturers’ recommendations (refer to manufacturer for
recommendations where necessary).
• Certified pipes with correct connection to be provided
• Use machinery to lift the pipes (Refer to Crane or forklift risk
assessment and JSA’s
• Safety Sign, in the Arabic language and English, stating “Danger -
Pressure work in Progress” to be placed in the area.
• Announcement in communication system to make everyone in work
location aware about the location and time of the pressure testing.
• Pressure Tester in charge shall ensure that all personnel involved in the
test crew are provided with appropriate PPE, and that the PPE is used
throughout the test.
• In case any leaks occurred the same shall be rectified by ensuring there
is no trapped pressure
• Communicate the lifesaving rules.
• A written schedule of inspection shall be in place for each pressure
system. And inspections shall be carried out and recorded by a
competent person.
• Provision of good quality pressure equipment.
• All pressure gauges shall be maintained and celebrated in regular basis.
• Barricade the pressure test area.
Post mitigation Risk Assessment
Mitigate Matrix (RAM) People, Assets,
Environ, Reputation (PAER)
Probabilit Conseque
y (How nce (How
Recovery likely: Bad: H/M/L
Letter) Number)
ERP, MEDEVAC, C 2 L
Medical facilities
ERP, MEDEVAC, C 2 L
Medical facilities
P A E R Reference to documents
C2 C2 C0 C1 OFSAT-HSE-PR-03& 20,SP-
1213(rev 4.1.2021^)
2 2 OFSAT-HSE-PR-03& 20,SP-
1213(rev 4.1.2021^)
OFSAT Drilling HSE Hazards & Effects Management Process Assessment (HEMP)
Contract Number
Activity #
Drilling Activity Hazard
1
*Heavy lifting/ Pressure
testing/ Mixing of
Spudding mud
* Defective equipments.
* Dropped objects.
* Electrical hazards
dealing with chemical
2 Spudding
3
1 Drilling Operation • Moving parts
• Toxic/Flammable
gases
• Slippery surface
• High Pressure
• Vibration
• Sharp objects
• Hot atmosphere
• Loose items at height
• Heavy objects
• Chemical
cess Assessment (HEMP)
C 3100000041
Probability Consequence
(How likely? : (How Bad?: H/M/L P A
Letter) Number)
D 4 H D4 D4
D 4 H D4 D4
D 3 M D3 D3
D 4 H D4 D4
D 4 H D4 D4
D 4 H 4 4
f drilling water/Shallow wells
E R
D3 D3
D3 D3
D3 D3
D0 D2
D0 D2
4 4
Date of original assessment
Preventative Measures (stop escalation)
Control (Barriers)
C 3 M
inititate the ERP
C 3 M
C 2 L
D 2 M
P A E R Reference to documents
OFSAT-HSE-PR-03(PTW)&
C3 C3 C1 C1 20(Working at height)
OFSAT-HSE-PR-03(PTW)&
20(Working at height)
C3 C3 C1 C1
C2 C0 C0 C0
OFSAT-HSE-PR-26. Camp and rig
move
C2 C2 C0 C1
OFSAT-HSE-PR-03(PTW),SP-
C2 C2 C0 C1 1213(rev 4.1.2021^)
OFSAT-HSE-PR-03(PTW),SP-
1213(rev 4.1.2021^)
2 2 2 2
Appendix 3B - HSE Hazards & Effects Management Process Assessment (HEMP) covering mob, execution, demob and site restoration
Contract Number
Health risk to
persone&injuries
C 4 M C4 C1 C1 C2
C 4 M C4 C1 C1 C2
Injuries to persons, back
pain,Impact of
scheduling
C 4 M C4 C1 C1 C2
C 4 M C4 C1 C1 C2
C 3 M C3 C0 C0 C0
mple) to be completed by the Contractor Team as part of the T3
Date of original assessment
Preventative Measures (stop escalation) Mitigate
Control (Barriers) Recovery
B 3 L B3 B0 B0 B0
B 3 L B3 B0 B0 B0
B 3 L B3 B0 B0 B0
C 3 L B3 Bo B0 B0
B 3 L B3 B0 B0 B0
OFSAT Drilling HSE Hazards & Effects Management Process Assessment (HEMP)
Contract Number
5 Damaged or corroded
ESP(Fall of equipment /
tubing with cable inside
hole)
7 Removal of cross
coupling or cable
protector
H2S
Lifting ESP to ground • Load
from Rig floor with • Sharp edges
crane • Moving
equipment’s/par ts
• Heavy wind
• Power lifting
equipment
• Lifting
accessories • Tag line
cess Assessment (HEMP)
C 3100000041
Probability Consequence
(How likely? : (How Bad?: H/M/L P A
Letter) Number)
C 3 M C3 C1
D 4 H 4 4
C 4 C4 4 4
C 4 M 4 3
f drilling water/Shallow wells
E R
C0 C2
4 4
4 4
3
Date of original assessment
Preventative Measures (stop escalation)
Control (Barriers)
Presence of mind
Driller to ensure that no load is lifted above people.
Check certifications of inspection of the lifting equipment.
Make sure that these parts don’t fell into the well bore accidentally
Cover the hole with a rubber mat to avoid dropping any object into the
hole
Impact glove must be used
Ensure the air pressure of the Pneumatic tool do not exceed allowed
pressure.
D 1 L
ERP, MEDEVAC,
Medical facilities C 2 2
ERP, MEDEVAC,
Medical facilities
C 1 L
P A E R Reference to documents
B3 B1 B0 B2
1 1 1 1
2 2 2 2
Lifting operation standard
SP2275-SP2273
1 1 1
OFSAT Drilling HSE Hazards & Effects Management Process Assessment (HEMP)
Contract Number
Activity#
Work over Activity Hazard
• Moving parts
• Toxic/Flammabl e
gases
• Slippery surface
• High Pressure
ESP Running in hole • Vibration
• Sharp objects
• Hot atmosphere
• Loose items at height
7 H2S
cess Assessment (HEMP)
C 3100000041
Probability Consequence
(How likely? : (How Bad?: H/M/L P A
Letter) Number)
C 4 M 4 3
D 4 H 4 4
C 4 M 4 4
f drilling water/Shallow wells
E R
3
4 4
4 4
Date of original assessment
Preventative Measures (stop escalation)
Control (Barriers)
• Conduct TBT before starting the job, identify the activity steps
hazards and ensure all involved parties are involved in the TBT.
• Visual inspection for correct colour coding, SWL and sign of damage
before start using the lifting gear
• Forklift operator, crane operator and Haib operator are to be
competent and authorized to carry out the job• Tag lines shall be used
to control the load.
• Never use your hands to control the load.
• Loads not to be elevated on when operating on
soft/insecure/slopping/rutted/slippery surface.
• Outriggersto be used on cranes & Haib when
loading/offloading.
• Always have the escape route in case of emergency
• Use correct PPE for the task (Hand gloves, safety helmet, safety
glasses and safety boots).
• Maintenance and certification of the equipment.
• Use of Permit to Work if required
• Use of Lifting plan whenever required
• Competent Person in Charge is responsible for lifting operations to
provide effective supervision and to be known by all involved parties.
• Clear Commination/Language.
• Only required personnel to be around the lifting operation and in safe
positions
• Ensure either operator or banks man can see the load during the lift.
• Daily checklist inspection by the operators for the crane and forklift.
• Preventive maintenance system.
• Maintain lifting Gears Register
• Barricade the area before starting the lift.
• Weather (Lighting & visibility, wind, temperature & rain) to be
considered.
Make sure that the hose and connections are in good
condition.
Never use compressed air for cleaning body.
Wear safety glasses
Clear hands from the band and the equipment.
Check the condition and serviceability of the banding
equipment.
Make sure that these parts don’t fell into the well bore
accidentally
• Conduct TBT before starting the job, identify the activity steps hazards
and ensure all involved parties are involved in the TBT
• Conduct daily visual inspection ensure all equipment used during the
activity are in good condition
• Provision of CCTV camera
• Driller to maintain good supervision at Rig floor.
• Proper PPE to be used during the job.
• Green hands should not be allowed at rig floor.
• Driller to be fully aware about the drilling program.
• Weekly Rig inspection.
• Weekly DROP inspection to ensure that there are no loose items in the
derrick.
• Ensure Drowworks breaking system is fully functional
• Highlight all the pinch point area.
• Practicing emergency drills.
• Ensure BOP is fully functional inspected, tested and certified.
• Provision of safety signs
• Ensure that Tools are not Homemade.
• Provision of anti-slippery surface.
• Provision of finger saver tool.
• Provision of High impact gloves.
• Provision of mandatory trainings
• Provision of on job training
• Empowerment to STOP
• Provision of cooling fans
Always clip H2S monitor near the breathing zone
Stop and report any abnormal levels of H2S to the tool Pusher.
Look at the wind direction flag then ensure walk upwind to avoid direct
contact
Do not lay down on the floor or ground during H2S gas presence in the
area.
Post mitigation Risk Assessment
Mitigate Matrix (RAM) People, Assets,
Environ, Reputation (PAER)
Probabilit Conseque
y (How nce (How
Recovery likely: Bad: H/M/L
Letter) Number)
ERP, MEDEVAC,
Medical facilities
C 1 L
ERP, MEDEVAC,
Medical facilities D 1 L
ERP, MEDEVAC,
Medical facilities C 2 2
P A E R Reference to documents
1 1 1
• Review OEM manual
• Drilling JSA
• Maintenance Management
manual - MNT-MS-001
• Hazard Identification Procedure-
OHS-PR-004
• DOP-PR-R74-019 Tripping
• DOP-PR-R74-012 Make-up And
Break-Out Procedures Using Rig
1 1 1 1 Tongs
• DOP-PR-R74-025 Operating Iron
Roughneck ST-80
• DOP-PR-R74-065 Working at
Monkey Board Pre Check RIH
POOH
• Manual Handling-JSA-R75-02-
214-01
2 2 2 2
OFSAT Drilling HSE Hazards & Effects Management Process Assessment (HEMP)
Contract Number
Activity#
Activity Hazard
Work over
C 3100000041
Hands comes in to
contact with sharp
sharp objects object
Poor manual handling person incorrectly lifts Injury to person
techniques object
Electricution/Fatality Electrical Work on VFD • Fire
UPS • Equipment damage
• Electrical burns
• Personnel injury
• Fatality
• Down time
• Effecting Company
reputation
• Electric shock
Contract title
Provision of drilling water/Shallow wells
Pre Mitigation Risk Assessment Matrix
(RAM) People, Assets, Environ, Reputation
Probability Consequence
(How likely? : (How Bad?: H/M/L P A
Letter) Number)
C 5 H C5 C3
C 3 M C3 D0
C 3 M C3 C1
f drilling water/Shallow wells
E R
C0 C1
D0 D0
C0 C2
Date of original assessment
Preventative Measures (stop escalation)
Control (Barriers)
Probabilit Conseque
y (How nce (How
Recovery H/M/L
likely: Bad:
Letter) Number)
B 4 M
B 3 L
P A E R Reference to documents
OFSAT HSE-PRO-026(Rig
move),OFSAT HSE-PRO-
03(PTW),OFSAT HSE-PRO-
21(Lifting & Hoisting)
B4 B3 B0 B4
B3 B1 B0 B2