Volume 3
Volume 3
BIDDING DOCUMENTS
VOLUME 3
DRAWINGS
(Part 1 : General)
JULY 2013
SHEET NO. TITLE OF DRAWING DRAWING NO. NUMBER OF SHEET
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF)
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT
Project Director
SHEET NO. TITLE OF DRAWING DRAWING NO. NUMBER OF SHEET
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF)
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT
Project Director
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PROJECT LOCATION MAP G-02-01
Project Director
PROJECT LOCATION MAP
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT MINE AND UXO STATUS MAP G-03
Project Director
ABBREVIATIONS AND SYMBOLS
LEGEND
DRILL HOLE- DH
RICE FIELD SCHOOL BUILDING CONCRETE FENCE BRIDGE DITCH FLOW AUGER HOLE- AH
PLAN PROFILE BOREHOLE - BH
LEFT SIDE
RIVER / CREEK DITCH FLOWS WOOD OR BARBED POINT OF
BOX CULVERT TRAVERSE POINT TP
WIRE FENCE INTERSECTION
RIGHT SIDE PLAN PROFILE
ROAD KILOMETER POST ORIGINAL GROUND BENCH MARK BM FILL/EMBANKMENT CUT SECTION
HOUSE
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT ABBREVIATIONS AND SYMBOLS G-04
Project Director
No Northing(Y) Easting(X) Elevation(Z) Station Side
PR314D
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF)
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT
Project Director
TYPICAL CROSS SECTION (1)
SODDING Margin Carriageway Carriageway Margin PR314D Sta. 0+500 to 7+500 325
500 1500 3500 3500 1500 500
TOP SOIL / CLAY MATERIALS
3% 3% 3%
3%
200
0
20
2 2
Existing Ground 1 1
Existing Ground
Existing Road (gravel pavement)
Bituminous Seal Coat, 12mm Sealing Aggregate
Benching Embankment
Bituminous Seal Coat, 19mm Sealing Aggregate
Bituminous Prime Coat
Aggregate Base Course CBR>80%, Compaction 98%, thk. 200mm
Cement Stabilised Sub-Base CBR>30%, Compaction 95%, thk. (VAR)
Detail A (Pavement Detail)
Embankment CBR>5%, Compaction 90%, thk. (VAR)
DBST
Carriageway Shoulder
1 2 3 4 5
6
7
8
Shoulder Total Width FINISHED GRADE Shoulder 2 - Seal coat, Bitumen 7 - Cement Stabilised Sub-Base
11000 3 - Sealing aggregate 19mm 8 - Embankment filling
Margin Carriageway Carriageway Margin 4 - Seal coat, Bitumen 9 - Benching depth 300mm
500 1500 3500 3500 1500 500 5 - Prime coat
3% 3% 3% 3%
200
200
Houses
Houses 2
Existing Ground 1 Existing Ground
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) 1:80
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TYPICAL CROSS SECTION (1) RC-01
Project Director
TYPICAL CROSS SECTION (2)
Total Width
11000
FINISHED GRADE
Manhole Manhole
Existing Road
H=0.9m
1
Sub-Grade
(min)
Rounding
1
2~3
Back Slope 1/2~3
Front Slope 1/2
0.5 ~ 1.0m
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) 1:80
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TYPICAL CROSS SECTION (2) RC-02
Project Director
TYPICAL CROSS SECTION (3)
TYPICAL SOUTH-EAST ROAD SECTION - TYPE - E (General Section, Flood Area)
(PR314D Station. 7+500 to 24+800)
See Detail A
Shoulder Total Width FINISHED GRADE
Shoulder
11000
200
200
2 2
Existing Ground 1 1 Existing Ground
Existing Road
Bituminous Seal Coat, 12mm Sealing Aggregate
Benching Embankment
Bituminous Seal Coat, 19mm Sealing Aggregate
Bituminous Prime Coat Detail A (Pavement Detail)
Aggregate Base Course CBR>80%, Compaction 98%, thk. 200mm
DBST
Cement Stabilised Sub-Base CBR>30%, Compaction 95%, thk. 275mm
Carriageway Shoulder
Sub-Grade CBR>10%, Compaction 95%, thk. 200mm 1 2 3 4 5
Embankment CBR>5%, Compaction 90%, thk. (VAR) 6
7
8
9
10
TYPICAL SOUTH-EAST ROAD SECTION - TYPE - F (Re-Alignment) 2 - Seal coat, Bitumen 7- Cement Stabilised Sub-Base
3 - Sealing aggregate 19mm 8 - Sub-Grade
(PR314D Station. 7+500 to 24+800) 4 - Seal coat, Bitumen 9 - Embankment filling
5 - Prime coat 10 - Benching depth 300mm
3% 3% 3% 3%
200
20
Houses
0
Houses 2
Existing Ground 1 Existing Ground
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) 1:80
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TYPICAL CROSS SECTION (3) RC-03
Project Director
TYPICAL CROSS SECTION (4)
TYPICAL URBAN ROAD SECTION - TYPE - G (General Section)
(PR314D Station. 15+900 to 16+150)
Total Width
11000
FINISHED GRADE
Sidewalk Shoulder Carriageway Carriageway Shoulder Sidewalk
2500 2000 3500 3500 2000 2500
Houses Houses
2%
2% 2%
2%
Existing Ground
Existing Ground
Manhole Manhole
Existing Road
Bituminous Seal Coat, 12mm Sealing Aggregate
Bituminous Seal Coat, 19mm Sealing Aggregate
Bituminous Prime Coat
Aggregate Base Course CBR>80%, Compaction 98%, thk. 200mm
Cement Stabilised Sub-Base CBR>30%, Compaction 95%, thk. 275mm
Sub-Grade CBR>10%, Compaction 95%, thk. 200mm
Embankment CBR>5%, Compaction 90%, thk. (VAR)
Total Width
FINISHED GRADE
18000
Sidewalk Shoulder Carriageway Carriageway Carriageway Shoulder Sidewalk
2500 2000 3500 3500 3500 3500 2000 2500
Houses Houses
2%
2% 2%
2%
Existing Ground
Existing Ground
Manhole Manhole
Existing Road
Bituminous Seal Coat, 12mm Sealing Aggregate
Bituminous Seal Coat, 19mm Sealing Aggregate
Bituminous Prime Coat
Aggregate Base Course CBR>80%, Compaction 98%, thk. 200mm
Cement Stabilised Sub-Base CBR>30%, Compaction 95%, thk. 275mm
Sub-Grade CBR>10%, Compaction 95%, thk. 200mm
Embankment CBR>5%, Compaction 90%, thk. (VAR)
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) 1:80
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TYPICAL CROSS SECTION (4) RC-04
Project Director
PAVEMENT DETAILS
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PAVEMENT DETAILS PD-01
Project Director
BAVIT TOWN
PLAN AND PROFILE (PR314D-1)
(STA. 0+000.00~0+700.00)
TB
M
1A
PB
M
1
-02
PC PC
-0
1
rket
Brou Sout Ma
CE
PROVIN
RIENG
il
Civ e
eab g Offic
yT
Sva ineerin
Eng
SVAY
eaet
ro D
To T ge
Villa
15
10
PVI - 02
-0.4948% PVI - 01 0.1358%
5 0.4303%
-5
Cross Section
TYPE - C TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-1)
1
Project Director (STA. 0+000.00~0+700.00 )
PLAN AND PROFILE (PR314D-2)
(STA. 0+700.00~1+400.00)
PC-02 PC-03
15
10
PVI - 03
0.1358% 0.0154%
5
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-2)
2
Project Director (STA. 0+700.00~1+400.00 )
PLAN AND PROFILE (PR314D-3)
(STA. 1+400.00~2+100.00)
PC-04
PC-03 PC-05
15
10
PVI - 04
0.0154% -0.0083%
5
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-3)
3
Project Director (STA. 1+400.00~2+100.00 )
PLAN AND PROFILE (PR314D-4)
(STA. 2+100.00~2+800.00)
TBM1
PC-05 PC-06
15
10
-0.0083%
5
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-4)
4
Project Director (STA. 2+100.00~2+800.00 )
PLAN AND PROFILE (PR314D-5)
(STA. 2+800.00~3+500.00)
To P
ech M
Pago un Trei
da
Pach Mun Trei EL.mentary School
PC-07 PC-08
15
10
PVI - 05 PVI - 06
-0.0083% -0.0724% 0.0551%
5
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-5)
5
Project Director (STA. 2+800.00~3+500.00 )
PLAN AND PROFILE (PR314D-6)
(STA. 3+500.00~4+200.00)
PC-09
TBM2
15
10
0.0551%
5
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-6)
6
Project Director (STA. 3+500.00~4+200.00 )
PLAN AND PROFILE (PR314D-7)
(STA. 4+200.00~4+900.00)
PC-10 PC-11
TBM
2
15
10
PVI - 07
0.0551% -0.0247%
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-7)
7
Project Director (STA. 4+200.00~4+900.00 )
PLAN AND PROFILE (PR314D-8)
(STA. 4+900.00~5+600.00)
PC-12
15
10
-0.0247%
5
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-8)
8
Project Director (STA. 4+900.00~5+600.00 )
PLAN AND PROFILE (PR314D-9)
(STA. 5+600.00~6+300.00)
TBM3
15
10
PVI - 08
-0.0247% -0.0550%
5
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-9)
9
Project Director (STA. 5+600.00~6+300.00 )
PLAN AND PROFILE (PR314D-10)
(STA. 6+300.00~7+000.00)
PC-15
To Krou Peang leach
15
10
PVI - 09
-0.0550% 0.0180%
5
-5
Cross Section
TYPE - A
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-10)
10
Project Director (STA. 6+300.00~7+000.00 )
PLAN AND PROFILE (PR314D-11)
(STA. 7+000.00~7+700.00)
To
SaR
ay P
ago
da
PC-16
15
10
PVI - 10
0.0180% 0.0047%
5
-5
Cross Section
TYPE - A TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-11)
11
Project Director (STA. 7+000.00~7+700.00 )
PLAN AND PROFILE (PR314D-12)
(STA. 7+700.00~8+400.00)
TBM4
Well
Well
17
PC-
Well
15
10
PVI - 11
0.0047% -0.0520%
5
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-12)
12
Project Director (STA. 7+700.00~8+400.00 )
PLAN AND PROFILE (PR314D-13)
(STA. 8+400.00~9+100.00)
Well
PC-18 PC-19
15
10
PVI - 12
-0.0520% 0.0205%
5
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-13)
13
Project Director (STA. 8+400.00~9+100.00 )
PLAN AND PROFILE (PR314D-14)
(STA. 9+100.00~9+800.00)
PC-20
15
10
PVI - 13
0.0205% 0.0378%
5
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-14)
14
Project Director (STA. 9+100.00~9+800.00 )
PLAN AND PROFILE (PR314D-15)
(STA. 9+800.00~10+500.00)
PBM2
PC-21 PC-22
15
10
PVI - 14 PVI - 15
0.0378% -0.0675%
5
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-15)
15
Project Director (STA. 9+800.00~10+500.00 )
PLAN AND PROFILE (PR314D-16)
(STA. 10+500.00~11+200.00)
PC-23 Well
PC-24
To Tibkaram
Pagoda
15
10
PVI - 16
-0.0215% -0.0239%
5
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-16)
16
Project Director (STA. 10+500.00~11+200.00 )
PLAN AND PROFILE (PR314D-17)
(STA. 11+200.00~11+900.00)
Well
PC-25
15
10
PVI - 17
-0.0239% -0.0173%
5
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-17)
17
Project Director (STA. 11+200.00~11+900.00 )
PLAN AND PROFILE (PR314D-18)
(STA. 11+900.00~12+600.00)
TBM5
PC-26
15
10
PVI - 18
5 -0.0173% 0.0108%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-18)
18
Project Director (STA. 11+900.00~12+600.00 )
PLAN AND PROFILE (PR314D-19)
(STA. 12+600.00~13+300.00)
15
10
PVI - 19
5 0.0108% -0.0339%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-19)
19
Project Director (STA. 12+600.00~13+300.00 )
PLAN AND PROFILE (PR314D-20)
(STA. 13+300.00~14+000.00)
To ha
r Pagod
a
PC-29
15
10
PVI - 20
5 -0.0339% -0.0158%
-5
Cross Section
TYPE - E TYPE - D
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-20)
20
Project Director (STA. 13+300.00~14+000.00 )
PLAN AND PROFILE (PR314D-21)
(STA. 14+000.00~14+700.00)
TBM6
PC-30
15
10
PVI - 21
5 -0.0158% 0.0267%
-5
Cross Section
TYPE - D E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-21)
21
Project Director (STA. 14+000.00~14+700.00 )
PLAN AND PROFILE (PR314D-22)
(STA. 14+700.00~15+400.00)
Rot
Sruk Ko Pung Raod Village
pons
to stockpile wea
PC-30
PC-31
15
10
PVI - 22
5 0.0267% -0.0505%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-22)
22
Project Director (STA. 14+700.00~15+400.00 )
Pagoda
KomPong Ro
PLAN AND PROFILE (PR314D-23)
(STA. 15+400.00~16+100.00)
PC-32
.1
No
ad
Ro
To
g
pin
Pum ll
we
Br
ge as ak
illa
ha v Tax Station Ba
Toilet
n k
TB
M
7
r
de
or b
ir
Vo
ey
Pr
To
Ka
mpo
ng
PC Ro
-3 M
3 ark
et
15
10
PVI - 23
5 -0.0505% 0.1404%
-5
Cross Section
TYPE - E TYPE - F TYPE - G
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-23)
23
Project Director (STA. 15+400.00~16+100.00 )
PLAN AND PROFILE (PR314D-24)
(STA. 16+100.00~16+800.00)
PC-34 PC-35
15
10
PVI - 24
5 0.1404% -0.0373%
-5
Cross Section
TYPE - G TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-24)
24
Project Director (STA. 16+100.00~16+800.00 )
PLAN AND PROFILE (PR314D-25)
(STA. 16+800.00~17+500.00)
PC-36
15
10
PVI - 25 PVI - 26
5 -0.0373% -0.0425% 0.0370%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-25)
25
Project Director (STA. 16+800.00~17+500.00 )
PLAN AND PROFILE (PR314D-26)
(STA. 17+500.00~18+200.00)
TBM 8
8A
M
TB
g
PC-37 an
r Pe oda
o g
Tr Pa
To rav
oo da
T
PC-38
ch ago
l
yS P
tar rav
en T
.m ang
EL r Pe
o
Tr
15
10
PVI - 27
5 0.0370% -0.0880%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-26)
26
Project Director (STA. 17+500.00~18+200.00 )
PLAN AND PROFILE (PR314D-27)
(STA. 18+200.00~18+900.00)
TBM 8A PC-39
15
10
PVI - 28
5 -0.0880% -0.0160%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-27)
27
Project Director (STA. 18+200.00~18+900.00 )
PLAN AND PROFILE (PR314D-28)
(STA. 18+900.00~19+600.00)
PC-40
BC-01
15
10
5 PVI - 29
-0.0160% 0.0163%
-5
Cross Section
TYPE - E TYPE - D
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-28)
28
Project Director (STA. 18+900.00~19+600.00 )
PLAN AND PROFILE (PR314D-29)
(STA. 19+600.00~20+300.00)
PC-41
BC-01
PBM3
15
10
PVI - 30
5 0.0163% 0.0146%
-5
Cross Section
TYPE - D TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-29)
29
Project Director (STA. 19+600.00~20+300.00 )
PLAN AND PROFILE (PR314D-30)
(STA. 20+300.00~21+000.00)
PBM3A
PC-42 PC-43
15
10
5 0.0146%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-30)
30
Project Director (STA. 20+300.00~21+000.00 )
PLAN AND PROFILE (PR314D-31)
(STA. 21+000.00~21+700.00)
PBM3A
t Pagoda
Ar Ndea
To Kao
PC-44
PC-45
To Chuk Preing
Village
Market
15
10
PVI - 31
5 0.0146% -0.0093%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-31)
31
Project Director (STA. 21+000.00~21+700.00 )
PLAN AND PROFILE (PR314D-32)
(STA. 21+700.00~22+400.00)
PC-46 PC-47
15
10
5 -0.0093%
-5
Cross Section
TYPE - E TYPE - F TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-32)
32
Project Director (STA. 21+700.00~22+400.00 )
PLAN AND PROFILE (PR314D-33)
(STA. 22+400.00~23+100.00)
Well TBM9
PC-48
15
10
PVI - 32
5 -0.0093% 0.0831%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-33)
33
Project Director (STA. 22+400.00~23+100.00 )
PLAN AND PROFILE (PR314D-34)
(STA. 23+100.00~23+800.00)
To Rever Raod
TBM9
BR-01
PC-49
15
10
PVI - 33 PVI - 34
0.0831% -0.1645% PVI - 35
5 -0.1140%
-5
-7
Cross Section
TYPE - D TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-34)
34
Project Director (STA. 23+100.00~23+800.00 )
PLAN AND PROFILE (PR314D-35)
(STA. 23+800.00~24+500.00)
d
To Rever Rao
To Rever Raod d
To Rever Rao
PC-50
15
10
PVI - 35
5 0.0185%
-5
Cross Section
TYPE - E
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-35)
35
Project Director (STA. 23+800.00~24+500.00 )
PLAN AND PROFILE (PR314D-36)
(STA. 24+500.00~25+200.00)
TEL
CASINO & HO
333
Small shop
HOUSE
To 9999 Raod
15
10
5 0.0185%
-5
Cross Section
TYPE - E TYPE - H
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-36)
36
Project Director (STA. 24+500.00~25+200.00 )
PLAN AND PROFILE (PR314D-37)
(STA. 25+200.00~25+491.76)
CASINO & HOTEL UNDER
CONSTRUCTION
HOUSE
To 9999 Raod
CAMBODIA GATE
Cambodi
Border Po am
CUSTOM&EXICISE
a Vietn
int
FREE LAND BACK FILL
ING
FOR SELL AND RENT FREE LAND Prey Voir Internal
Lucky 89 . CASINO PBM4
LUCKY CASIN Revenue Office
O 89 BM3 BM20LD PREY VOIR CHECK POINT
15
10
PVI - 36
5 0.0185% -0.3305%
-5
Cross Section
TYPE - H
Type
Finish
Ground Level
Existing
Ground Level
Vertical
Alignment
Horizontal
Alignment
Left Lane
Superelevation
Right Lane
Superelevation
Station
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) H= 1 : 2000
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM V= 1 : 200
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PLAN AND PROFILE ( PR314D-37)
37
Project Director (STA. 25+200.00~25+491.76 )
10.3.TYPICAL WATER GATE
STANDARD REINFORCED CONCRETE - PIPE CULVERTS
d L (MIN. 1200) CLASS OF
TEST LOAD ULTIMATE LOAD
(D) (T) (kN/m) (kN/m)
c
DETAILS
T
b
INNER CAGE OUTER CAGE
a
25mm
600 63 340 - 25 37.5
b
W W 800 72 340 - 32 48
1 1000 88 340 200 40 60
I.D. I.D.
1200 100 450 270 48 72
D
1500 125 530 320 60 90
600 66 340 - 30 45
800 72 340 - 40 60
2 1000 88 340 200 50 75
a
a
1200 100 450 270 60 90
b
T
T
c
c
L (MIN. 1200) d TWO LINES OF 1500 125 640 380 75 112.50
b
ONE LINE OF CIRCULAR
CIRCULAR 600 66 340 - 40 60
REINFORCEMENT
REINFORCEMENT
800 72 440 - 52 70
1A PIPE DETAIL 1B SECTION 1C SECTION 3 1000 88 530 320 65 97.50
DS-02 NOT TO SCALE DS-02 NOT TO SCALE DS-02 NOT TO SCALE
1200 100 680 410 75 117
1500 125 830 560 97.50 148
AROUND
1000 88 32 20 36 40
70
T 70
1,2,&3
1200 100 38 22 42 45
R8 6mm @ 40 1500 125 48 25 52 50
T
PIPE DIMENSIONS
D+2T+140
D+2T+140
D+2T
FLOW LINE D
D
INTERIOR JOINT SHALL BE
MORTARED FLUSH ON 40CLEAR (TYP.)
LOWER HALF OF PIPES
(CEMENT AND SAND
RATIO 1:2 BY VOLUME) R.C. COLLAR
NOTE:
70 T
70
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT STANDARD REINFORCED CONCRETE - PIPE CULVERTS DS-01
Project Director
HEAD WALLS FOR PIPE CULVERTS (SINGLE PIPE)
REINFORCEMENT DETAILS
1 2
DS-04 DS-04 BAR SIZE D=500 D=600 D=1000 D=1200 D=1500
MARK
No. LENGTH No. LENGTH No. LENGTH No. LENGTH No. LENGTH
C C
L U1 12 1 3740 1 4980 - 5350 - - - -
L
F U2 16 - - - - 2 5350 2 6580 2 6425
F
D L1 12 7 800 9 800 11 800 11 800 11 800
D
L2 16(12) 2 1070 2 1070 2 1320 2 1320 2 1320
100
50
B1
L3 16(12) 2 1200 2 1200 2 1450 2 1450 2 1450
200
150
L4 16(12) 2 1330 2 1330 2 1580 2 1580 2 1580
0
00
0
30
30
50 B2 L5 16(12) 2 1460 2 1460 2 1710 2 1710 2 1710
@
@
B
B
HWO2, HWO3 15 U2,H1, H2 & W1
L7
L9
50 & HS01 L6 16(12) 2 1590 2 1590 2 1840 2 1840 2 1840
TO
TO
HS01 B3-B5 L7 16(12) - - 2 1720 2 1970 2 1970 2 1970
A
L2
HS02 @ 400
L2
L8 16 - - - - - - 2 1200 2 1200
300 W1
L9 18 - - - - - - 2 2250 2 2250
150
450
300
200
W1 12 4 1190 4 1650 4 1650 4 2110 4 2800
FT01 @ 300 L1 @ 300 B1 16 - - - - 1 1620 1 1850 1 2195
E E B2 16 - - - - 1 1740 1 1970 1 2315
B3 12 - - - - 1 2200 1 2420 1 2750
B4 12 - - - - 1 2720 1 2940 1 3270
PLAN PLAN B5 12 - - - - - - 1 3460 1 3860
L2-L9 @ 300 C B6 12 4 - 4 - 4 - 4 - 4 -
HW01 @ 300 L
CL
H1 12 2 1220 2 1690 2 1810 2 2250 2 2910
H2 12 - - - - 2 1770 2 2230 2 2920
L2
REINF. (Kg) 32 41 84 111 150
HW02
CONC. (M 3) 0.8 1.2 2.0 2.8 4.0
D
D
HW03 H1 NOTE: FIGURES IN BRACKETS REFER TO 600 & 800 PIPE CULVERT
H2
750
HS01 B6 TABLE OF DIMENSIONS
VARIES
DIA. OF DIMENSIONS
FT01 @ 300 B3-B5 L1 @ 300 PIPE
D A B C E F H a b
r=2BAR DIA.
500 900 1040 540 2030 810 850 770 1160
END VIEW END VIEW
600 1100 1270 730 2370 920 950 880 1430
600
DETAILS FOR 600 & 800 DETAILS FOR 1000 & 1200 800 1500 1730 990 3070 1160 1150 1120 1930
NOT TO SCALE NOT TO SCALE 1000 1500 1730 1220 3410 1450 1350 1430 1960
600
r=2BAR DIA. 1200 1900 2190 1450 4110 1680 1550 1660 2460
A 200
L2 TO L7 @ 300 E 2:1 1500 2200 2680 1795 5160 2025 1850 2005 3210
A 150 OP
2:1 SL
HW01 @ 300 PE a
350
O L2
SL
H1
350
HW02
H2 r=2BAR DIA. NOTE:
HW03 L10 1. ALL DIMENSIONS ARE IN MILLIMETERS.
H
H
D
L8
D
b
HS01 BLINDING CONCRETE 15 MPa/20
500 400
600
W1
50
B3-B5
50 BLINDING CONCRETE 4. ALL EXPOSED FACES SHALL HAVE 18mmx18mm
150 FT01@300
150 250 100 SAND BEDDING
50
@400
150350 100 SAND BEDDING U1 & U2 CHAMFER UNLESS NOTED OTHERWISE.
L1 @ 450 B6 B2
5. ALL REINFORCEMENT TO BE HOT ROLLED GRADE 400
200 BAR BENDING DIAGRAMS DEFORMED BARS TO AASHTO M-31M-86.
NOT TO SCALE 6. MINIMUM REINFORCEMENT LAP TO BE 30 BAR DIAMETERS.
1 SECTION 2 SECTION 7. LOCATION OF LAPS TO BE APPROVED BY THE ENGINEER.
DS-04 NOT TO SCALE DS-04 NOT TO SCALE
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT HEAD WALLS FOR PIPE CULVERTS (SINGLE PIPE) DS-02
Project Director
HEAD WALLS FOR PIPE CULVERTS (MULTIPLE PIPES) REINFORCEMENT DETAILS
FOR 600 & 800
(D=500,600,800)
FOR 2 PIPES FOR 3 PIPES
(D=1000,1200)
SIZE
BAR
1 2 C
L MARK (MM.)
D=600 D=800 D=600 D=800
DS-05 C DS-05
L
SYMM. ABOUT
SYMM. ABOUT F 400 B1 12 1 2230 1 2670 1 3430 1 4070
F C B2 12 1 2450 1 3360 1 3680 1 4760
C
450
650
B3 12 1 2920 1 3820 1 4120 1 5220
G G r=2BAR DIA.
150
D B4 12 3 - 3 - 3 - 3 -
350
50
B1
50 L10 L1 L1 12 9 850 11 850 11 850 14 850
50
0
L2-L7 12 10 - 12 - 10 - 12 -
200
30
0
50 G/2 600
30
B
@
B
@
L8
VARIES
L7
L9
TO
100
W1 & W1
TO
400 400
r=2BAR DIA. H1 12 2 1220 2 1690 2 1220 2 1690
150
L2
B2
A
B3-B5 @ 400 0
W1 20
L2
W1 12 4 1190 4 1650 4 1190 4 1650
L2 TO L10
300
450
300
(D 500)
200
=8 0)
REINFORCEMENT DETAILS
0
)
=
00
=6
B3 B4
(D
L1 @ 450 B6
L1 @ 450 FOR 1000 & 1200
(D
E a
E FOR 2 PIPES FOR 3 PIPES
r=5BAR DIA. SIZE
BAR
D=1000 D=1200 D=1000 D=1200
MARK (MM.)
14 0
PLAN PLAN
8
19 0
11
3
50
B1 16 1 3320 1 3750 1 5020 1 5650
L10 C
L
C
L L2-L9 @ 300 B2 16 1 3440 1 3870 1 5140 1 5770
SYMM. ABOUT SYMM. ABOUT
L2-L7 @ 300
L2
U1 B3 12 1 3510 1 4400 1 5210 1 6300
20 )
(D 1000
B4 12 1 3960 1 4870 1 5680 1 6770
0)
L8
U1 175 B5 12 1 4440 1 5330 1 6140 1 7230
=
=1
(D
H1 D D D a B6 12 3 - 3 - 3 - 3 -
H1 D D
H2 H1 12 2 1770 2 2230 2 1770 2 2230
r=5BAR DIA.
H2 12 2 1810 2 2350 2 1810 1 2350
24 0
6
60
19
L1 16 12 1050 14 1050 16 1050 18 1050
END VIEW DETAILS END VIEW DETAILS BAR BENDING DIAGRAMS L5 16 2 1710 2 1710 2 1710 2 1710
NOT TO SCALE L6 16 2 1860 2 1860 2 1860 2 1860
FOR 600 & 800 PIPE CULVERTS FOR 1000 & 1200 PIPE CULVERTS L7 16 2 1970 2 1970 2 1970 2 1970
NOT TO SCALE NOT TO SCALE TABLE OF QUANTITIES
L8 16 - - 2 2100 - - 2 2100
A 200 DIA. CONCRETE
A 150 OF KG. L9 16 - - 2 2250 - - 2 2250
:1
2:1
L2 TO L7 @ 300 E2 PIPE
L2 TO L7 @ 300 PE L OP L10 16 2 2050 2 2250 4 2050 4 2250
O S "D"
SL U2 16 2 7050 2 4440 2 4750 2 10350
350
L2
350
D
50
W1 B1
600
W1
HEAD WALLS FOR PIPE CULVERTS 2. CONCRETE CLASS SHALL BE:
200
B1 250 MIN. UNDER THE PIPE TABLE OF DIMENSIONS 3. CLEAR COVER TO REINFORCEMENT SHALL BE
50
B4 B3 B2
50
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT HEAD WALLS FOR PIPE CULVERTS (MULTIPLE PIPES) DS-03
Project Director
CROSS PIPE CULVERT INSTALLATION
TRENCH WIDTH
AT TOP OF PIPE FINISHED SURFACE
SEE TABLE
300 NATURAL GROUND
CL
MIN. SURFACE
MAXIMUM DEPTH
EMBANKMENT FILL 1000 1700 3.0 7.0 >15
IN METERS
1200 1800 3.0 6.5 12
1500 2100 3.0 6.0 10
MIN.
150
300
D
b
a
MAX. DEPTH (M)
SURROUNDING CONCRETE MAX. TRENCH
PIPE CLASS
(D) WIDTH (W)
1 2 3
AGGREGATE
COMPACTED 10 CM. 800 1500 3.0 4.0 6.0
1000 1800 3.0 4.0 5.5
ROCK / SOIL 1200 2000 3.0 4.0 5.0
W 1500 2300 3.0 4.0 4.5
TRENCH INSTALLATION
NOT TO SCALE
EMBANKMENT INSTALLATION
C
L FINISHED SURFACE
ZONE
EMBANKMENT FILL 17.0 2.36 0.60 0.30 0.15 0.075
IN METERS
300
SURFACE OR COMPACTED
SELECT FILL FOR 1700
EACH SIDE OF PIPE SELECT FILL MATERIAL
D
b
NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
a
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT CROSS PIPE CULVERT INSTALLATION DS-04
Project Director
SIDE PIPE CULVERT INSTALLATION
PLAN
NOT TO SCALE
C
L
1500
NOTES :
1. ALL DIMENSIONS IN MILLIMETERS.
SIDE PIPE CULVERT 2. SAND MATERIAL FILLING APPROVED BY ENGINEER.
TRENCH INSTALLATION 3. BLINDING CONCRETE, T=150mm (CLASS D).
NOT TO SCALE CONCRETE CURB AND MANHOLE
NOT TO SCALE
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT SIDE PIPE CULVERT INSTALLATION DS - 05
Project Director
MANHOLE DETAILS - TYPE 2A
CONC.CURB
80 15010 3@460=1380 150
10
HANDHOLE 1330
200 220 5mm CLEAR
80 1200 80
65 65
100 194
100
120 80
335 660 335
88 1000 88 5 5
TYP.
200
1900
400
400
300
300
300
VERT. BARS 1400 1200
150
1A SECTION 1B SECTION
DS-06 NOT TO SCALE DS-06 NOT TO SCALE
2B
DS-06
1B
DS-06
FLOW
HANDHOLE 30 30
80
CLR CLR
200
CONC. CURB
2 PLAN
200 220
80
200
DROP INLET MORTAR
2 CONC. COVER
DS-06 NOT TO SCALE
80 80
FLOW
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT MANHOLE DETAILS - TYPE 2A DS-06
Project Director
MANHOLE DETAILS - TYPE 2B
CONC.CURB
80 15010 4@403=1612 150
10
HANDHOLE 1562
200 220 5mm CLEAR
80 1432 80
65 65
100 194
100
120 80
335 762 335
100 1200 100 5 5
TYP.
200
2150
400
400
300
300
300
VERT. BARS 1632 1432
150
1A SECTION 1B SECTION
DS-07 NOT TO SCALE DS-07 NOT TO SCALE
2B
DS-07
1B
DS-07
FLOW
HANDHOLE 30 30
80
CLR CLR
2C COVER DETAILS
1A FLOW FLOW
1572
200
CONC. CURB
200 220
2 PLAN
80
200
DROP INLET MORTAR
2 CONC. COVER
DS-07
FLOW
80 80 NOT TO SCALE
NOTES:
1. ALL DIMENSIONS IN MILLIMETERS.
1 MANHOLE DETAIL (TYPE-2) 2. CONCRETE SHALL BE CLASS D (BODY).
DS-07 NOT TO SCALE 3. CONCRETE SHALL BE CLASS B-3 (COVER).
4. ALL REINFORCEMENTS SHALL BE GRADE 300 PLAIN BARS.
5. SEE DWG. No. DS-08 FOR THE DETAILS OF CURB & SIDE DRAIN.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT MANHOLE DETAILS - TYPE 2B DS-07
Project Director
TYPICAL CONCRETE CURB FOR SIDE DRAIN
150 1400 150
80
HANDHOLE
MAN HOLE
TYPE 2B
420
1340
180 240
80
600 600 600 600 600 600
130
Normal Curb Normal Curb Transition Curb Transition Curb Normal Curb Normal Curb
200
190
Concrete Curb
50
Class D
220
220
80
Leveling Concrete 50mm. Thk
200
200
DBST
Aggregate Base Course
300
300
DBST
1
DBST
100
1700
600 600 200 1300 200 600 600 Base Course
Normal Curb Transition Curb Normal Curb Transition Curb Grating
12mm. @100mm
130
DBST
Base Course
1 SECTION
FRONT VIEW SCALE 1:10
SCALE 1:25
NOTES:
1. ALL DIMENSIONS IN MILLIMETERS.
2. CONCRETE SHALL BE CLASS D.
3. ALL REINFORCEMENTS SHALL BE GRADE 400.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TYPICAL CONCRETE CURB FOR SIDE DRAIN DS-08
Project Director
TYPICAL CONCRETE SURROUNDING DETAILS
(FOR SINGLE PIPE)
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. CONCRETE CLASS SHALL BE :
SURROUNDING CONCRETE IS CLASS E (20 MPa/40)
BLINDING CONCRETE IS CLASS E (20 MPa/40)
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOW
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TYPICAL CONCRETE SURROUNDING DETAILS DS - 09
Project Director (FOR SINGLE PIPE)
TYPICAL CONCRETE SURROUNDING DETAILS
(FOR DOUBLE PIPE)
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. CONCRETE CLASS SHALL BE :
SURROUNDING CONCRETE IS CLASS E (20 MPa/40)
BLINDING CONCRETE IS CLASS E (20 MPa/40)
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOW
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TYPICAL CONCRETE SURROUNDING DETAILS DS - 10
Project Director (FOR DOUBLE PIPE)
TYPICAL CONCRETE SURROUNDING DETAILS
(FOR MULTIPLE PIPE)
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. CONCRETE CLASS SHALL BE :
SURROUNDING CONCRETE IS CLASS E (20 MPa/40)
BLINDING CONCRETE IS CLASS E (20 MPa/40)
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOW
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TYPICAL CONCRETE SURROUNDING DETAILS DS - 11
Project Director (FOR MULTIPLE PIPE)
DETAILS OF GABION ARRANGEMENT
1018
1000 1000 724 724 294
55
0
465
1000
1000
1000
10
00
535
1000
2000
1173
173 845
10
1000
1018
00
1000
10
00
1068
845 223
10
00
150
352
535
10
1391
1391
00
1039
856
10
00
542 526
1068
10
00
41
6
1000 1000 1000 1000 1000 1000
1000
1000
10
00 00
10
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT DETAILS OF GABION ARRANGEMENT DS - 12
Project Director
Drainage marker post
S S S S S S TO NR5
S S
S S S1
S1
S2 S2 CL OF ROADWAY
S3 S3
A
TO AM LERNG
GUIDE POSTS
Drainage marker post
Y
CL OF ROADWA SHOULDER
P.C
P.T
13 13
94
13
ORANGE PAINT
GENERAL DETAIL AT SHOULDER 25
BLACK PAINT
NOT TO SCALE
150
SPACING FOR DELINEATOR PORT AND GUIDE POSTS 25
WHITE REFLECTIVE SHEETING
KM
0
NAILING 0
Less than 25 5 5 10 20
B2 0 B2
800
SEE DETAIL ''1'' CLOF ROADWAY
+
800
25 to 50 5 10 15 30
50 50 50 50 50 50
51 to 100 10 20 30 60 0
0 WHITE PAINT
LOP
E
101 to 150 15 30 45 90 0
S
SIDE 151 to 200 20 40 60 100
201 to 250 24 48 72 100
SECTION A - A 251 to 300 25 50 75 100
NOT TO SCALE
301 to 400 30 60 100 100
50
400
RED PAINT 501 to 800 35 72 100 100 75 150 75
250
200
150
WHITE REFLECTORIZED SHEETING (ON THE ALUMINUME PLATE) 801 to 1000 40 80 100 100
25 1001 to 1500 45 90 100 100
1501 to 2000 50 100 100 100
200
Over 2000 55 100 100 100
B1 B1
800
25
100
4 9MM 150
4 9MM
100
150
150
100
6MM @0.15M
500 (min)
25
25
4 9MM
300
150
CONCRERTE CLASS E
SECTION B1 - B1 SECTION B2 - B2
SCALE 1: 5 SCALE 1: 5
300
NOTE:
''1'' GUIDE POST DETAIL 1. ALL DIMENTIONS ARE IN MILLIMETER UNLESS OTHE WISE INDICATED.
2. POST SHALL BE ERCTED TRULY VERTICAL.
300
SCALE 1:15
2. CONCRETE POST SHALL BE CLASS D (fc'=20) FOOTING DETAIL
SCALE 1: 5
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT STANDARD GUIDE POST AND DRAINAGE MARKER RF-01
Project Director
ROAD SIGNS POST DETAIL(1)
952 850 700
600 600 600
300 300 300
8 BOLTS NUTS
8 BOLTS NUTS 8 BOLTS NUTS
152
50
100250 250 50
STEEL PLATE 50x3mm
50
STEEL PLATE 50x3mm
952
850
RIVET RIVET
RIVET
RIVET
RIVET RIVET
89mm STEEL PIPE POST 89mm STEEL PIPE POST 89mm STEEL PIPE POST
2000
2000
2000
3900
3900
3750
1050 1050 1050
400
400
400
700
700
700
CONCRETE CLASS D CONCRETE CLASS D CONCRETE CLASS D
300
300
300
POST LENGHT = 3900mm POST LENGHT = 3900mm POST LENGHT = 3750mm
300 300 300
1 DETAIL-1 1 DETAIL-2 NOTE: All bolt and nut shall be weld connected. 1 DETAIL-3
RF-02 NTS RF-02 NTS RF-02 NTS
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT ROAD SIGNS POST DETAIL(1) RF-02
Project Director
ROAD SIGNS POST DETAIL(2)
1200
230 740 230 DETAIL A - A DETAIL B - B
Aluminum Plate T=2MM
Aluminum Plate T=2MM
75 270 50
(A5052P-H32)
50
420 STEEL PLATE 50x3mmx100mm LONG (A5052P-H32)
8 BOLTS NUTS Band T=2MM CLAMP
Aluminum Channel T=2MM
50
1L 50x50x250mm LONG (A6063S-T5)
Aluminum Channel T=2MM
(A6063S-T5)
(S.T.S 304)
STEEL BOX 50x20mm ( SING FRAME)
Washer T=2MM
(S.T.S 304) (S.T.S 304)
ROAD SIGN PLATE
Washer T=2MM
(S.T.S 304)
89mm STEEL PIPE POST
2000
1 DETAIL-1
NTS
3400
RF-02
3700
780
COVER DETAIL ALUMINUM CHANNEl DETAIL
(KSD3501) (A6063S-T5)
T=2mm
305
Cover T=2MM
(S.H.P 2)
605
700
1000
300
1 DETAIL-2
RF-02 NTS
1 DETAIL-3
RF-02 NTS
NOTE: All bolt and nut shall be weld connected.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT ROAD SIGNS POST DETAIL(2) RF-03
Project Director
ROAD SIGNS POST DETAIL(3)
AA STEEL PLATE 50x5mm
RF-04
300 300 WELDED
50 50 50 50 SEE DETAIL 1 REVET
BOLTS NUTS 8x125mmLONG
GI PIPE 35mm STEEL PLATE 50x5x3mm
300
BOLTS NUTS 8x25mmLONG
300
ROAD SIGN PLATE
STEEL BOX 50x20mm 1L 50x50x250mm LONG BOLTS NUTS 8x125mmLONG BOLTS NUTS 8x25mmLONG
( SING FRAME) 1L 50x50x100mm LONG
ALREADY FIXED WITH SING FRAME)
65
WELDED 65 BOLTS NUTS 8x25mmLONG
ROAD SIGN PLATE 75 100 75 ROAD SIGN PLATE
1 PLAN ANGLE BAR FIXIED WITH SIGN PLATE FROM FACTORY
250
RF-04 SCALE 1:15
2215 2215
480 1255 480 480 1255 480
50 627.5 627.5 50 50 627.5 627.5 50
POST
75
75
100 100 100 100
100
100
50
450 50
450 50
STEEL PLATE 50x3mmx100mm LONG STEEL PLATE 50x3mmx100mm LONG
STELL BOX FIXIED WITH SIGN PLATE FROM FACTORY
400
400
35mm GI PIPE 35mm GI PIPE
WELDED WELDED DETAIL 1
RF-04 SCALE 1:5
1765
1515
1765
1515
800
800
ANGLE BAR FIXIED WITH SIGN PLATE FROM FACTORY
1015
1015
STEEL BOX 50x20mm ( SING FRAME) STEEL BOX 50x20mm ( SING
FRAME)
8 BOLTS NUTS 8 BOLTS NUTS
50
50
1L 50x50x250mm LONG 1L 50x50x250mm LONG
125
125
100
100
POST
4500
4500
ROAD SIGN PLATE ROAD SIGN PLATE
4800
2000
STELL BOX FIXIED WITH SIGN PLATE FROM FACTORY
5500
1030
1030
1L 50x50x3mmx100mm LONG
150
410
SEE DETAIL 2
1110
1L 50x50x250mm LONG
1810
1000
300 300
1155
300
AA SECTION
2A G1-TYPE ROAD SIGN FOR RURAL AREA RF-04 SCALE 1:10 NOTE: All bolt and nut shall be weld connected.
RF-04 SCALE 1:40
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT ROAD SIGNS POST DETAIL(3) RF-04
Project Director
CURVE SIGNS POST DETAILS
0.6 0.6
0.018 0.018
0.7
0.025
0.2 0.2
0.75 0.75
0.025 0.025
0.025 Slope 1:1
1.875 d
0.018 0.018 r oun
g
Edge of Shoulder ing
xist
E
0.8
Left Curve Right Curve
(min) Concrete
0.80
0.6
0.075 0.8
0.75 0.075
0.2
0.075 Existing Ground
Detail "A"
Detail "A"
B Position of Sign Post(Post of Length 3.375 m)
Frame 25 x 50 x 1.6 mm. SCALE 1:30
RF-05
A1 Side View
RF-05 SCALE 1:20 0.075
0.075 Frame 25 x 50 x 1.6 mm.
Frame 25 x 50 x 1.6 mm.
Frame 25 x 50 x 1.6 mm. Thickness Signs Plate 1.2 mm. 8 x 125 mm. Bolts Nuts
A
8 x 125 mm. Bolts Nuts 0.075 8 x 25 mm. Bolts Nuts GI. Pipe Post 75 mm.
0.75
0.305
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT CURVE SIGNS POST DETAILS RF-05
Project Director
DETAIL OF KILOMETER POST (10 Km INTERVAL)
C
00 00 BM........
kMBg;Rtac NE.......
A
000 000 NW.......
00Km 00Km SE.......
B
A
A
PLAN A B C
80
SECTION A-A kMBg;Rtac
000
00Km
00
kMBg;Rtac
000
00Km
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT DETAIL OF KILOMETER POST (10 Km INTERVAL) RF-06
Project Director
DETAIL OF KILOMETER POST (1 Km INTERVAL)
00
kMBg;Rtac
000
13
00Km
112
kMBg;Rtac
000
SECTION A-A SECTION B-B
00Km
B
A A PLAN
B ISOMETRIC VIEW
00
00
REBAR PLAN kMBg;Rtac
kMBg;Rtac 000
000
00Km
00Km
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT DETAIL OF KILOMETER POST (1 Km INTERVAL) RF-07
Project Director
540 2000 2000
250
2000
PLAN 19 x 60 19 x 60
19 x 60 50 220 50
PLAN
700
49 110110 110110 49 19 x 60
4000
E PLAN
310
ELEVATION RF-08 SCALE 1:30
A GUARDRAIL W-BEAM
76 178 RF-08 SCALE 1:30 76
EQUAL TO SHOULDER WIDTH BLOCKING PIECE 50110 11050
50
ELEVATION
310
354
POST
H END PIECE DETAIL
720
RF-08 SCALE 1:20
254
354
64
SLOPE
300
177
J 150
RF-08
50
B BLOCKING PIECE
RF-08 SCALE 1:10
178 76
C GUARDRAIL POST
50
15 3 50 3
5
7
1620 MIN.
2.
60
40
178
310
VARIES (30-180) 30
15
76
97
82
F BOLT & NUT
38
RF-08 SCALE 1:5
4.5
J 57
RF-08
80 2 J SECTION
82 RF-08 SCALE 1:5 NOTES:
END ELEVATION ELEVATION 1. ALL DIMENSIONS ARE IN MILLIMETERS.
B INTERMEDIATE POST G W-BEAM DETAIL 2. POSTS ARE TO BE INSTALLED EITHER BY PRE-BORING HOLE AND
RF-08 SCALE 1:5 PLACING POST IN 20 MPa CONCRETE OR BY DRIVING POST INTO
RF-08 SCALE 1:10
GROUND USING DROP HAMMER OF A TYPE APPROVED BY THE ENGINEER.
3. TERMINAL SECTION AND STIFFENER PLATES TO BE MANUFACTURED
FROM STEEL PLATE PANEL 2.7mm THICK.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT STANDARD DETAIL OF GUARDRAIL RF-08
Project Director
GUARDRAIL INSTALLATION LAYOUT DETAIL
20 M. MIN.
4 SPACES AT 2 M. CRS. FLARE 1200 IN 12 M.
APPROACH DEPARTURE
1:5
TRAFFIC
APPROACH LAYOUT
GUARDRAIL LAYOUT AT BRIDGES SCALE 1:250
NOT TO SCALE NORMAL SHOULDER WIDENING
FORMATION 1200 FLARE ON ROADWAYS FOR GUARDRAIL
EDGE INSTALLATION
500 DESIRABLE MINIMUM
1:5 1:5
20 M. MIN. 12 10 8 6 4 2 2 4 6 8 10 12
FLARE DISTANCE, M. 1200 850 500 300 135 35 35 135 300 500 850 1200 FLARE DISTANCE, M.
FLARE 500 IN 8 M. 6 SPACES AT 2 M. CRS. 1200 FLARE 500 FLARE
FLARE OFFSET, MM. FLARE OFFSET, MM.
1200 FLARE
CARRIAGEWAY EDGE
LOCATION OF GUARDRAIL
1:5
PLAN
END PANEL
SHOULDER
500 DESIRABLE MINIMUM BRIDGE
LOCATION OF GUARDRAIL
TRAFFIC 2000 2000 SPACES 2000 - UNLESS SPECIFIED AS 4000 2000 2000
DEPARTURE LAYOUT
SCALE 1:250
5 MIN.
2/M 30 x 260 BOLTS AND NUTS 2 H1 BOLTS WITH NUTS
PROVIDED WITH ENDWALL AND CIRCULAR WASHERS PLAN
4 SPACES AT 2 M.
300
720
ENDWALL CONNECTION BRACKET ANCHOR PLATE
720
STIFFENER
PLATE
720
STIFFENER 8 C3 BOLTS
543
900 MIN.
PLATE
STIFFENER PLATE
900
ELEVATION
END ELEVATION
CONNECTION TO ENDWALL ELEVATION
SCALE 1:40 END PANEL DETAIL 500
SCALE 1:40 ELEVATION
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT GUARDRAIL INSTALLATION LAYOUT DETAIL RF-09
Project Director
DETAIL OF EXISTING BRIDGE AREA ROAD SAFETY
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT DETAIL OF EXISTING BRIDGE AREA ROAD SAFETY RF-10
Project Director
GENERAL NOTES
(ROAD AND DRAINAGE STRUCTURES)
1.0 SPECIFICATIONS 11.0 PAVEMENT MARKING
1.1 ALL WORKS SHALL COMPLY WITH MPWT "CAMBODIAN CONSTRUCTION 11.1 PAVEMENT MARKING SHALL CONFORM WITH THE PAVEMENT DRAWING RS-03.
SPECIFICATION, 2003", SPECIAL PROVISIONS AND SUPPLEMENTAL
SPECIFICATIONS PERTAINING TO THIS PROJECT. CONDITIONS OF CONTRACT
12.0 RIGHT-OF-WAY
d
d
(INTERNATIONAL) FOR WORKS OF CIVIL ENGINEERING CONSTRUCTION, LATEST
D
D
12.1 ROAD CLASSIFICATION DICTATES THE RIGHT OF WAY LIMITS.
EDITION, PREPARED BY FIDIC SHALL ALSO GOVERN.
13.0 EXISTING UTILITIES
12d
2.0 DIMENSIONS 13.1 ALL EXISTING UTILITIES SHOWN ON THE PLANS ARE INDICATIVE ONLY. THE 4d OR
2.1 DISTANCE BETWEEN HORIZONTAL CONTROL POINTS INCLUDING REFERENCE
POINTS ARE MEASURED AND EXPRESSED IN METERS. CONTRACTOR IS REQUIRED TO VERIFY ACTUAL LOCATION PRIOR TO THE 70mm
2.2 UNLESS OTHERWISE SPECIFIED, DIMENSIONS OF PIPES, BOX CULVERTS, BRIDGES COMMENCEMENT OF WORK, AND SHALL TAKE ALL NECESSARY PRECAUTIONS
AND OTHER STRUCTURES ARE MEASURED AND EXPRESSED IN MILLIMETERS. TO PREVENT DAMAGE ON EXISTING UTILITIES.
2.3 ALL OTHER DIMENSIONS ARE EXPRESSED IN METERS UNLESS OTHERWISE PIN DIAMETER D = 6d FOR GRADE 300 REINFORCING BAR
SPECIFIED.
14.0 CONCRETE D = 8d FOR GRADE 400 REINFORCING BAR
14.1 CONCRETE STRENGTH BY CLASS.
3.0 STATIONING MAX. 28 DAYS
3.1 THE ROAD STATIONINGS AND ELEMENTS OF HORIZONTAL AND VERTICAL CURVES
CLASS USE SIZE AGGRIGATE CYLINDER SIZES FOR STIRRUPS AND TIE HOOKS
SHOWN ON THE PLANS ARE RECKONED FROM THE ROADWAY CENTERLINE.
3.2 STATIONINGS OF THE BRIDGES, RCPC AND OTHER STRUCTURES ARE RECKONED mm STRENGTH 6d OR 10
FROM THE STATIONING OF THE ROADWAY CENTERLINE SHOWN ON THE PLAN. ROAD SIGN POSTS / BOX 70mm 10 d
3.3 ROAD STATIONING AND BRIDGE & CULVERT LOCATIONS WERE LOCATED USING B1 CULVERTS / HEADWALLS FOR 19.0 32.0 MPa 0m OR
GLOBAL POSITIONING SYSTEM. ALL STATIONING ARE TO BE VERIFIED BY THE PIPE AND BOX CULVERTS.ROAD m
CONTRACTOR PRIOR TO CONSTRUCTION. B2 BREAK WATER WALL 37.5 32.0 MPa
B3
4.0 HORIZONTAL CONTROL PIPE CULVERTS 12.5 32.0 MPa
d d
4.1 ALL THE COORDINATES OF THE BENCH MARK WERE OBTAINED BY THE GPS DRAINAGE AND ROAD FURNITURE
SURVEY AND THE TOPOGRAPHIC MAP USED WAS TAKEN BY THE TOPOGRAPHIC D COMPONENTS,MANHOLES, POSTS 19.0 20.0 MPa
FOUNDATIONS KILOMETRE POSTS
SURVEY WITH A SCALE OF 1 : 2,000
ALL UNREINFORCING COMPONENTS
D
5.0 VERTICAL CONTROL BLINDING CONCRETE
5.1 ALL THE ELEATION OF BENCH MARK WERE OBTAINED BY THE GPS SURVEY. E (LEAN CONCRETE) 50.0 17.0 MPa
6.0 ELEVATIONS AND GRADES UNDER FOUNDATIONS
PIN DIAMETER D = 6d FOR GRADE 300 REINFORCING BAR
6.1 FINISHED GRADE ELEVATION SHOWN ON PLAN AND PROFILE SHEETS REFERS TO 14.2 ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED OR AS DIRECTED BY D = 8d FOR GRADE 400 REINFORCING BAR
THE FINISHED PAVEMENT LEVEL SHOWN ON TYPICAL ROAD SECTION. THE ENGINEER.
6.2 GROUND LEVEL SHOWN ON THE PLAN AND PROFILE SHEETS REFERS TO THE
ELEVATION OF ORIGINAL GROUND ALONG THE CENTERLINE OF THE PROJECT
NOTES : BENDS AND HOOKS IN STIRRUPS OR
ROAD. TIES MAY BE BENT A DIAMETER NOT
15.0 REINFORCING STEEL LESS THAN 2d
7.0 ROAD CONNECTIONS 15.1 REINFORCING STEEL SHALL CONFORM TO AASHTO M 31M GRADE 300 & 400
7.1 APPROACHES AND CONNECTIONS SHALL BE CONSTRUCTED BY THE 15.2 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR 15.5 UNLESS OTHERWISE SHOWN ON THE DRAWINGS, THE CLEAR
CONTRACTOR AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER IN APPROVAL PRIOR TO FABRICATION. SHOP DRAWINGS SHOULD SHOW DETAILS DISTANCE BETWEEN PARALLEL BAR SHALL NOT BE LESS THAN
SUCH MANNER AS TO ENSURE SMOOTH CONNECTION AND GOOD RIDING FOR FABRICATION AND FOR PLACING REINFORCING STEEL. ONLY THOSE THE 1.5 TIMES THE NOMINAL DIAMETER OF THE BARS, NOR 1.5
QUALITY. NECESSARY FOR THE PROPER LOCATION OF THE STEEL ARE REQUIRED ON THE TIMES THE MAXIMUM SIZE OF THE COARSE AGGREGATE. THE
7.2 EXACT LOCATIONS OF INTERSECTING ROADS WHERE ITEM 15 ABOVE APPLIES, DRAWINGS. BENDING DETAILS MAY BE SHOWN ON A SEPARATE SHEET. CLEAR DISTANCE OF AGGREGATE AND THE BARS IN THE UPPER
SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER. 15.3 NO MORE THAN ONE BAR IN THREE SHALL BE SPLICED AT THE SAME SECTION LAYER SHALL BE PLACED DIRECTLY ABOVE THOSE IN THE
UNLESS OTHERWISE SHOWN ON DRAWINGS. SPLICING SHALL BE KEPT TO A
8.0 DRAINAGE STRUCTURE MINIMUM AND SHOULD BE STAGGERED AND LAPPED NOT LESS THAN 40 BAR
BOTTOM LAYER.
8.1 EXACT LOCATIONS, SLOPES, OUTFALLS, AND INVERT ELEVATIONS OF DRAINAGE
DIAMETER UNLESS OTHERWISE SHOWN ON DRAWING. WHERE THE CLEAR 15.6 EXCEPT OTHERWISE SHOWN ON THE DRAWINGS, MINIMUM
STRUCTURES SHALL BE CHECKED IN THE FIELD. ADJUSTMENTS MAY BE MADE
DISTANCE BETWEEN LAPPED BARS DO NOT MEET THE REQUIREMENTS IN ITEM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCEMENT
TO SUIT ACTUAL FIELD CONDITIONS WITH THE APPROVAL OF THE ENGINEER.
14.5. THE CONTRACTOR SHALL USE CRANKED SPLICES AS DETAILED BELOW. AS FOLLOWS.
8.2 EXISTING DRAINAGE STRUCTURES OR PARTS THEREOF REMOVED BY THE
CONTRACTOR WHICH ARE STILL SERVICEABLE SHALL BE DEPOSITED AT A
PLACE DESIGNATED BY THE ENGINEER WITHIN THE PROJECT SITE. EXTREME LAP MIN.=4 MINIMUM CLEAR COVER
VERTICAL OFFSET =
PRECAUTIONS SHALL BE EXERCISED BY THE CONTRACTOR SO AS NOT TO MAX.=d+3
mm
DAMAGE THE MATERIALS DURING THE REMOVAL AND HANDLING.
d
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
GENERAL NOTES
APPROVED PHENG SOVICHEANO AND TRANSPORT (ROAD AND DRAINAGE STRUCTURES) RS-01
Project Director
GEOMETRIC DESIGN STANDARDS
HORIZONTAL CIRCULAR CURVE VERTICAL PARABOLIC CURVE TRANSITION: STRAIGHT - CIRCULAR CURVE
PI
X PVI
I
TANGENT SUPERELEVATION
RUN OUT RUNOFF (Lo) OUTER EDGE OF PAVEMENT
MO
Y
S ef
AXIS OF ROTATION
PVC (ROADWAY CENTER)
PVT RC
S
T
E
T
g1 LVC/2 LVC/2 g2
NC ef INNER EDGE OF PAVEMENT
LVC
R= PC(BC)
R
FORMULA:
(LVC)(g1-g2) (g1-g2)X 2
MO = Y =
800 200 x (LVC)
LEGEND :
RC- REMOVE ADVERSE CROWN, SUPERELEVATE AT NORMAL
PC PT
R R CROWN SLOPE
I
WHERE: PC- POINT OF CURVATURE
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT GEOMETRIC DESIGN STANDARDS RS-02
Project Director
STANDARD PAVEMENT MARKING
RURAL
URBAN
SINGLE BROKEN LINE
RURAL
URBAN
BROKEN LINE
PEDESTRIAN CROSSING NOTE: All dimensions are in millimeters unless otherwise indicated.
NOT TO SCALE
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT STANDARD PAVEMENT MARKING RS-03
Project Director
TYPICAL ACCESS ROADS AT INTERSECTIONS (T-TYPE) ROADWAY
PROJECT ROAD
CL
SHOULDER
5000
15m STANDARD LIMIT LENGTH (MIN)
ACCESS ROAD
SHOULDER
1
ROADWAY
B
CL
RS-10
DBST PAVEMENT
AGGREGATE BASE COURSE
ORIGINAL GROUND LINE
SUBBASE COURSE
SHOULDER
B TYPICAL SECTION OF ACCESS ROAD INTERSECTION
RS-10 NOT TO SCALE
A PLAN
RS-10 NOT TO SCALE
1500 7000 1500
PAVEMENT
WIDTH OF
SHOULDER
PAVEMENT
WIDTH OF
C
L OF C
ACCESS ROAD
L OF
PROJECT ROAD
PROJECT ROAD
CL O
SHOULDER SHOULDER
L OF
SHOULDER SHOULDER
F
AC
C
CE
0m
R5m
SS
.
R1
RO
AD
1m. VARIES 1m.
TANGENT
(MIN5000)
VARIES
POINT S
T R IE M
IT
EN LI
C G T VA N
N I N IO
RS-10 CONSTRUCTION LIMIT TA PO CT
RU
50 IN)
T
NS
(M
00
TYPE C2-SKEWED ROAD CO
TYPE A-MAJOR PROVINCIAL ROAD NOT TO SCALE
NOT TO SCALE C -10
RS
3% 3%
PAVEMENT
SIDE WALK SHOULDER
WIDTH OF
1:
1:
ACCESS ROAD
C
2
L OF
7000
PROJECT ROAD
R5
m
L OF
SHOULDER
SHOULDER SHOULDER
SHOULDER
C SECTION THRU SECTION C
C
RS-10 NOT TO SCALE
TANGENT TANGENT
R5
POINT
(MIN)
5000
(MIN5000)
POINT
VARIES
m
VARIES C
RS-10 CONSTRUCTION LIMIT NOTES :
C 1. GRADING REQUIREMENT SHALL BE AS DIRECTED BY THE ENGINEER.
RS-10 CONSTRUCTION LIMIT 500 VARIES 500
2. HORIZONTAL GEOMETRY IN CASE OF SKEWED MINOR ROADS SHALL BE
VERIFIED DURING CONSTRUCTION.
TYPE B-FOR TOWN PROPER TYPE C1-NORMAL ROAD 3. WORKS ON MINOR ROADS SHALL NOT GO BEYOND LIMIT OF
NOT TO SCALE NOT TO SCALE CONSTRUCTION..
4. ACCESS ROADS AT INTERSECTIONS SHALL HAVE THE SAME PAVEMENT
AS THE PROJECT ROAD UP TO THE LIMIT OF TANGENT POINT.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
TYPICAL ACCESS ROADS AT
APPROVED PHENG SOVICHEANO AND TRANSPORT INTERSECTIONS (T-TYPE) RS-04
Project Director
PROJECT SIGNBOARD DETAIL 300 300
3000 3000
67 283 40 2165 40 283 67 67 283 40 2165 40 283 67
300
300
584 1833 584 584 1833 584
68 76 2713 76 68 68 76 2713 76 68
362 86
362 86
THE KINGDOM OF CAMBODIA A A
ECONOMIC DEVELOPMENT
568
568
COOPERATION FUND B B A KINGDOM OF CAMBODIA LOGO B ADB LOGO
2000
1200
RS-11 NOT TO SCALE RS-11 NOT TO SCALE
87
87
PROVINCIAL ROADS IMPROVEMENT PROJECT
ADB LOAN NO. 2839-CAM (SF) 250 350
ADB LOAN NO. 8254-CAM
747
747
THNAL THOR THOUNG-TUEK PHOS-KAMPONG CHHNANG PROVINCE
Km. 00+000 TO Km. 62+432.69
DATE STARTED:
DATE OF COMPLETION: BI K>m 00+000 dl; K>m 62+432.69
ESTIMATED PROJECT COST
167 167 167 333 133 83
67
C C
150
CLIENT :
250
MINISTRY OF PUBLIC WORKS AND TRANSPORT
D D
50 50 50
50 50 50
CONSULTANT :
CONTRACTOR :
E E
6167
6167
SUBCONTRACTOR
D CONSULTANT LOGO
RS-11
F F NOT TO SCALE
1830
150
SEE DETAIL" A "
VERTICAL SECTION
NOT TO SCALE E CONTRACTOR LOGO
100 RS-11 NOT TO SCALE
150
1000
1000
40
500 500
52
ELEVATION
150
NUTS AND WASHERS
NOTES:
1. SIGNBOARD 1 IN KHMER
2. SIGNBOARD 1 IN ENGLISH
DETAIL "A" F SUBCONTRACTOR LOGO
RS-11 NOT TO SCALE
NOT TO SCALE
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT PROJECT SIGNBOARD DETAIL RS-05
Project Director
DETOUR ROAD DETAIL OF STRUCTURES
I I
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT DETOUR ROAD DETAIL OF STRUCTURES RS-06
Project Director
~50m
TRAFFIC MANAGEMENT PLAN
~10m Construction site
~2m
~50m
W2-04 W2-08
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT TRAFFIC MANAGEMENT PLAN RS-07
Project Director
W1-12
PR 314D - 01
TBM1A
TOWN
W1-34
G4-03
W1-03
BAVIT
R2-24
R1-41 (40Km)
G1-02 W1-01
PBM
1
R3-01
W1-02
W1-02 vil e
Ci ffic
ab O
y Te ring
a ee
Sv gin
En
aet R1-41 (40Km)
De
Tro e
To illag
V
G4-03
W1-03 W1-11
W1-34
Market
Brou Sout
R2-24
W1-36
W1-11
W1-12
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (1)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 08
STA. 0+000 ~ STA. 2+000
Project Director
PR 314D - 02
TBM1
To P W1-13
ech M
W1-36 Pago un Trei
da
R1-41 (30Km)
W1-36
W1-13 R2-24
W1-33
W1-33
R1-41 (30Km)
G4-03
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (2)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 09
STA. 2+000 ~ STA. 4+100
Project Director
PR 314D - 03
TBM
2
W1-04
W1-11
W1-14
To Prau Radoul Pagoda TBM3
W1-04
W1-14
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (3)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 10
STA. 4+100 ~ STA. 6+200
Project Director
PR 314D - 04
W1-03
W1-12
W1-11
W1-02
To K
ro W1-07
u Pe
ang
leac
h To
SaRa
yP
ago
da
W1-08
W1-03
TBM4
Well
Well
To SaR
ay Pago
da
W1-02
Well
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (4)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 11
STA. 6+200 ~ STA. 8+300
Project Director
W1-33 PR 314D - 05
W1-36
R2-24
R1-41 (30Km)
Well
R1-41 (30Km)
R2-24
W1-36
W1-33
W1-03
W1-02 PBM2
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (5)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 12
STA. 8+300 ~ STA. 10+400
Project Director
PR 314D - 06
To Tibkaram
Pagoda
W1-03
W1-14
W1-33
W1-02
R2-24
G4-03
R1-41 (30Km)
Well
R1-41 (30Km)
G4-03
R2-24
W1-33
TBM5
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (6)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 13
STA. 10+400 ~ STA. 12+500
Project Director
PR 314D - 07
W1-03
W1-14
To h
ar Pa
goda
W1-02
W1-13
R1-41 (60Km)
TBM6
To har Pa
goda
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (7)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 14
STA. 12+500 ~ STA. 14+500
Project Director
PR 314D - 08
Raod Village
ng Rot
Sruk Ko Pu apons
we
to stockpile
W1-36
W1-33
High School
Hun Sen KomPong Ro
ty
n
Peo bodia
Par
W1-36
ple
R1-41 (30Km)
Cam
G4-03
ank
aB
Led
To Road No.1
AC
ha villag
e
da
ago
oP
gR
Pon
m
Pumping
R1-41 (30Km)
Ko
well
R2-24 W1-02
let
Toi
W1-33
W1-15 on
tati
xS
Ta
da
go
Pa
TBM7
Ro
ng
Po
om K
W1-34
Brasak Bank
R1-41 (30Km)
Ta
xS
tat
io
n
W1-34
W1-14 W1-36
G4-03
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (8)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 15
STA. 14+500 ~ STA. 16+500
Project Director
PR 314D - 09
TBM 8
R2-24
TBM
8 W1-02
W1-11
W1-36
W1-33
W1-03
8A
M
TB
g
ean
rP a
Tro god
da To av Pa
go Tr
R2-24 W1-12 W1-33 v Pa l
a o o
Tr Sch
ng
DESIGNED HWANG JUNG JOO DATE Rev.Pea tary DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
o r e n
Road Design Engineer Tr lem ADB Loan No. 2839-CAM (SF)
E NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (9)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 16
STA. 16+500 ~ STA. 18+400
Project Director
PR 314D - 10
R3-04
R3-04
PBM3
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (10)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 17
STA. 18+400 ~ STA. 20+500
Project Director
PR 314D - 11
PBM3A
W1-03
W1-02
W1-33
R2-24 R3-04
R1-41 (30Km)
To C
R3-04 huk
P
Villa reing
ge
Mark
et
W1-33 W1-05
W1-11
W1-04
W1-12
W1-36
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (11)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 18
STA. 20+500 ~ STA. 22+600
Project Director
PR 314D - 12
Well
R1-07
TBM9
W1-04
R1-07
W1-01
W1-05
To Rever Raod
W1-01
W1-36 W1-01
To Rever Raod
d
To Rever Rao
W1-01
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (12)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 19
STA. 22+600 ~ STA. 24+700
Project Director
TEL UNDER
CASINO & HO
PR 314D - 13
CONSTRUCTIO
N
HOUSE
333
HOUSE CASINO Raod
LUCKY CASINO 89
ELE: 8.20m
FREE LAND BACK FILLING
FOR SELL AND RENT
R3-04 R3-01
R2-24 W1-34
R1-41 (30Km)
CONSTRUCTIO
N CUSTOM AND EXCISE
HOUSE
333 W1-34
HOUSE CASINO Raod
Cambodia Vie
Border Point
CAMBODIA GATE
To 9999 Raod CUSTOM&EXICISE
tnam
PBM4 Prey Voir Internal
Revenue Office
FREE LAND BM20LD
CK POINT
PREY VOIR CHE
BELONG
Lucky 89 . CASINO FIELD FARM D EXISE
BM3 AN
ELE: 9.95m
TO CUSTOM
LUCKY CASINO 89
ELE: 8.20m
FREE LAND BACK FILLING
FOR SELL AND RENT
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NTS
KOREA CONSULTANTS CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
KCI INTERNATIONAL Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE :
TRAFFIC SIGN (13)
DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT RS - 20
STA. 24+700 ~ STA. 25+492
Project Director
DETAIL OF INTERSECTION ( , TYPE ) SCALE : 1 / 500
CONSTRUCTION LIMIT
B B
(MIN 5.0M)
VARIES
A
MARGIN
500
2000
1500
SHOULDER SHOULDER
PAVEMENT
WIDTH OF
3500 3500
11000
7000
2000
1500
SHOULDER SHOULDER
500 MARGIN
A
1m VARIES 1m
(MIN 5.0M)
VARIES
CONSTRUCTION LIMIT
SECTION - A S = NONE
SECTION - B S = NONE
LOCATION OF INTERSETION ( , TYPE)
11,000
2 21+410 1 CL
CL
3% 3% 3% 3%
TOTAL 2 2
3% 3% 3% 3%
2
1 1
2 2
1 1
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT DETAIL OF INTERSECTION ( , TYPE ) ID - 01
Project Director
DETAIL OF INTERSECTION ( Y , TYPE ) SCALE : 1 / 500
A
MARGIN
500
2000
1500
SHOULDER SHOULDER
PAVEMENT
WIDTH OF
3500 3500
11000
7000
AM LERNG
2000
1500
SHOULDER SHOULDER
500
MARGIN
1m
ES
B
RI
25m
VA
1m
IT
M
LI
ON
TI
UC
TR
NS
B
CO
SECTION - A S = NONE
SECTION - B S = NONE
LOCATION OF INTERSETION ( Y , TYPE) 11,000
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT DETAIL OF INTERSECTION ( Y , TYPE ) ID - 02
Project Director
DETAIL OF INTERSECTION ( T , TYPE ) SCALE : 1 / 500
AM LERNG
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT DETAIL OF INTERSECTION ( T , TYPE ) ID - 03
Project Director
EXISTING STRUCTURE PROPOSED STRUCTURE EXISTING STRUCTURE PROPOSED STRUCTURE
REFERENCE REFERENCE
STATION DRAINAGE POST DRAINAGE POST REMARKS STATION DRAINAGE POST DRAINAGE POST REMARKS
NO. RCBC RCPC RCBC RCPC NO. RCBC RCPC RCBC RCPC
RIGHT LEFT RIGHT LEFT RIGHT LEFT RIGHT LEFT
PR314-P001 0+274.257 2@700 2@1200 1 1 REPLACEMENT PR314-P027 12+650.00 1@1200 1 1 NEW
PR314-P002 0+750.00 1@1200 1 1 NEW PR314-P028 13+169.687 2@790 2@1200 1 1 REPLACEMENT
PR314-P003 1+350.00 1@1200 1 1 NEW PR314-P029 13+300.00 2@1200 1 1 NEW
PR314-P004 1+832.172 1@600 1@1200 1 1 REPLACEMENT PR314-P030 14+681.696 1@700 1@1200 1 1 REPLACEMENT
PR314-P005 2+094.409 1@700 1@1200 1 1 REPLACEMENT PR314-P031 15+404.761 1@600 1@1200 1 1 REPLACEMENT
PR314-P006 2+590.00 1@1200 1 1 NEW PR314-P032 15+758.089 1@600 1@1000 1 1 REPLACEMENT
PR314-P007 2+931.334 1@700 1@1000 1 1 REPLACEMENT PR314-P033 16+004.255 1@1000 1 1 NEW
PR314-P008 3+336.841 1@850 1@1200 1 1 REPLACEMENT PR314-P034 16+405.057 1@600 1@1200 1 1 REPLACEMENT
PR314-P009 4+008.257 1@910 1@1200 1 1 REPLACEMENT PR314-P035 16+674.603 1@600 1@1200 1 1 REPLACEMENT
PR314-P010 4+476.087 1@560 1@1200 1 1 REPLACEMENT PR314-P036 17+215.00 1@1200 1 1 NEW
PR314-P011 4+533.99 2@570 1@1200 1 1 REPLACEMENT PR314-P037 17+641.519 2@600 2@1200 1 1 REPLACEMENT
PR314-P012 5+132.756 1@590 1@1200 1 1 REPLACEMENT PR314-P038 18+050.00 1@1200 1 1 NEW
PR314-P013 5+700.00 1@1200 1 1 NEW PR314-P039 18+600.00 1@1200 1 1 NEW
PR314-P014 6+230.00 1@1200 1 1 NEW PR314-P040 19+290.00 1@1200 1 1 NEW
PR314-P015 6+715.312 1@580 1@1200 1 1 REPLACEMENT PR314-P042 20+225.562 1@900 1@1200 1 1 REPLACEMENT
PR314-P016 7+341.656 1@630 1@1200 1 1 REPLACEMENT PR314-P043 20+652.1 1@1000 1@1200 1 1 REPLACEMENT
PR314-P017 7+784.426 1@730 3@1200 1 1 REPLACEMENT PR314-P044 20+713.054 2@580 2@1200 1 1 REPLACEMENT
PR314-P018 8+497.327 1@590 1@1200 1 1 REPLACEMENT PR314-P045 21+102.859 2@600 2@1000 1 1 REPLACEMENT
PR314-P019 8+861.036 1@570 1@1200 1 1 REPLACEMENT PR314-P046 21+526.690 1@590 1@1000 1 1 REPLACEMENT
PR314-P020 9+430.00 1@1200 1 1 NEW PR314-P047 21+838.034 1@500 1@800 1 1 REPLACEMENT
PR314-P021 10+010.347 1@610 1@1200 1 1 REPLACEMENT PR314-P048 22+330.00 1@1200 1 1 NEW
PR314-P022 10+300.00 1@1200 1 1 NEW PR314-P049 22+900.00 2@1200 1 1 NEW
PR314-P023 10+670.86 2@580 2@1200 1 1 REPLACEMENT PR314-P050 23+676.640 2@1200 1 1 REPLACEMENT
PR314-P024 11+149.954 2@800 2@1200 1 1 REPLACEMENT PR314-P051 23+850.00 2@1200 1 1 NEW
PR314-P025 11+600.00 1@1200 1 1 NEW PR314-P052 24+450.00 2@1200 1 1 NEW
PR314-P026 12+087.232 1@590 1@1200 1 1 REPLACEMENT
Sub-Total = - - 51 51
Total = 102
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF)
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT
Project Director
6.1(2) REINFORCED CONCRETE PIPE SIDE PIPE CULVERT(1)
SIZE TOTAL
STATION LOCATION NUMBER REMARKS
(RCPC) LENGTH(m)
PR314D
0+000~0+550 BOUTH 1@800 2 1,100.00 NEW
15+900~16+150 BOUTH 1@800 2 500.00 NEW
24+800~25+492 BOUTH 1@800 2 1,384.00 NEW
PR314D ACCESS ROAD 1@800 40 200 1EA=5M
1@800 3,184.00
Total 1@1000 -
1@1200 -
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF)
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT
Project Director
SCHEDULE OF GUIDE POST (PR314D)
RADIUS CURVE Guide Post Guide Post
IP No. BC STA. EC STA. DIRECTION (m) LENGTH (m) S Spacing Q'ty REMARKS
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF)
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT
Project Director
SCHEDULE OF TRAFFIC SIGNS(PR314D)
m sq.m m sq.m
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT SCHEDULE OF TRAFFIC SIGNS(PR314D) ST-04
Project Director
SCHEDULE OF TRAFFIC SIGNS(PR314D)
m sq.m
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT SCHEDULE OF TRAFFIC SIGNS(PR314D) ST-05
Project Director
SCHEDULE OF GUARDRAIL SCHEDULE OF ROAD STUD
BRIDGE 1 4 20 80
LENGTH(m) LENGTH(m)
ITEMS STATION LOCATION REMAEKS
BEFORE AFTER
LEFT 20 20
BRIDGE NO.1 STA.23+297.5 PR314D
RIGHT 20 20
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
SCHEDULE OF GUARDRAIL
APPROVED PHENG SOVICHEANO AND TRANSPORT ST-06
Project Director SCHEDULE OF ROAD STUD
LAYOUT OF ENGINEER'S SITE CAMP
Road Road
NR13 PR314D
LABORATORY LABORATORY
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) 1 : 500
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT ENGINEER SITE CAMP
F-01
Project Director
TYPE 'A1'
OFFICE FOR THE ENGINEER
NOTES
1. DRAWINGS ARE SCHEMATIC ONLY IN ORDER TO
1 FLOOR PLAN DEMONSTRATE INTENDED BUILDING LAYOUTS.
F-06 ROOM DIMENSIONS ARE INTENDED TO INDICATE
SCALE 1:60
APPROXIMATE INTERNAL DIMENSIONS REQUIRED.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
TYPE 'A1'
APPROVED PHENG SOVICHEANO AND TRANSPORT F-02
OFFICE FOR THE ENGINEER
Project Director
TYPE 'A2'
OFFICE FOR THE ENGINEER
NOTES
1. DRAWINGS ARE SCHEMATIC ONLY IN ORDER TO
1 FLOOR PLAN DEMONSTRATE INTENDED BUILDING LAYOUTS.
F-06 SCALE 1:60 ROOM DIMENSIONS ARE INTENDED TO INDICATE
APPROXIMATE INTERNAL DIMENSIONS REQUIRED.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
TYPE 'A2'
APPROVED PHENG SOVICHEANO AND TRANSPORT F-03
OFFICE FOR THE ENGINEER
Project Director
TYPE 'B1'
ENGINEER'S LIVING QUARTERS PLAN
1 FLOOR PLAN
F-01 SCALE 1:80
NOTES
1. DRAWINGS ARE SCHEMATIC ONLY IN ORDER TO
DEMONSTRATE INTENDED BUILDING LAYOUTS.
ROOM DIMENSIONS ARE INTENDED TO INDICATE
APPROXIMATE INTERNAL DIMENSIONS REQUIRED.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
TYPE 'B1'
APPROVED PHENG SOVICHEANO AND TRANSPORT ENGINEER'S LIVING QUARTERS PLAN F-04
Project Director
TYPE 'B1'
ENGINEER'S LIVING QUARTERS ELEVATION
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
TYPE 'B1'
APPROVED PHENG SOVICHEANO AND TRANSPORT F-05
ENGINEER'S LIVING QUARTERS ELEVATION
Project Director
TYPE 'B2'
ENGINEER'S LIVING QUARTERS PLAN AND ELEVATIONS
NOTES
1. DRAWINGS ARE SCHEMATIC ONLY IN ORDER TO
DEMONSTRATE INTENDED BUILDING.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
TYPE 'B2'
APPROVED PHENG SOVICHEANO AND TRANSPORT F-06
ENGINEER'S LIVING QUARTERS PLAN AND ELEVATIONS
Project Director
LABORATORY FOR THE ENGINEER
NOTES
1. DRAWINGS ARE SCHEMATIC ONLY IN ORDER TO
DEMONSTRATE INTENDED BUILDING LAYOUTS.
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) AS SHOWN
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT LABORATORY FOR THE ENGINEER F-07
Project Director
200
300
350
300
500
100
300
600
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT STANDARD DEEP WELL DETAILS - 01 DW-01
Project Director
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT STANDARD DEEP WELL DETAILS - 02 DW-02
Project Director
100
100100
100
3000
300
GL
200
5m
4m 5m
100
300
8m
100
3m
200 500
D.T.H Method
Drilling Well
with Hand Pump
DESIGNED HWANG JUNG JOO DATE Rev. DESCRIPTION DATE PROJECT : Provincial Roads Improvement Project SCALE :
Road Design Engineer ADB Loan No. 2839-CAM (SF) NONE
CHECKED KIM SE JONG
KINGDOM OF CAMBODIA ADB Loan No. 8254-CAM
Team Leader MINISTRY OF PUBLIC WORKS DRAWING TITLE : DRAWING No. :
APPROVED PHENG SOVICHEANO AND TRANSPORT STANDARD DEEP WELL DETAILS - 03 DW-03
Project Director