0% found this document useful (0 votes)
33 views1 page

Docu Pending 240102

The document is a table listing various engineering documents for a construction project. It includes the document reference, description, incoming date, number of days ahead or behind schedule, person responsible for leading and forwarding the document. Dates range from late November to early January with most documents coming in within the next week or two.

Uploaded by

Soy Chandara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views1 page

Docu Pending 240102

The document is a table listing various engineering documents for a construction project. It includes the document reference, description, incoming date, number of days ahead or behind schedule, person responsible for leading and forwarding the document. Dates range from late November to early January with most documents coming in within the next week or two.

Uploaded by

Soy Chandara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Incoming Ahead /

Document ref. Document description Leader Forward to Forward date


date Delay
NAB-TCV-ACT-WP2-SHD-327-01 [LV] 8-10TH floor Lighting System Layout Plan (Individual System) 21/Dec/23 (5) Ravuth 21/Dec/23
NAB-TCV-ACT-WP2-SHD-328-01 [ELV] 8-10TH floor Public Address System Layout Plan (Individual System) 21/Dec/23 (5) Ravuth 21/Dec/23
NAB-TCV-ACT-WP2-SHD-331-00 [FF] 1st floor Fire Fighting System Layout Plan (Individual System) 30/Nov/23 (26) Ravuth 30/Nov/23
NAB-TCV-ACT-WP2-RFI-106-00 [MVAC] Missing Information for Duct Pipe and Pressure Relief Damper for Pressurization
18/Dec/23
System (8) Dara Jaime 18/Dec/23
NAB-TCV-ACT-WP2-MDS-080-00 [MEP] Lift, Dumbwaiter & Escalator 18/Dec/23 (8) Ravuth 18/Dec/23
NAB-TCV-ACT-WP2-SHD-345-00 [MEP] 2ND Floor Level - MEP Combined Services Access Panel 19/Dec/23 (7) Ravuth 19/Dec/23
NAB-TCV-ACT-WP2-SHD-346-00 [ELV] 8-10TH floor Access Control and CCTV System Layout Plan (Individual System) 21/Dec/23 (5) Ravuth 21/Dec/23
NAB-TCV-ACT-WP2-MDS-072-01 [PL] Testing and Commissioning of Submersible pump 21/Dec/23 (5) Ravuth 21/Dec/23
NAB-TCV-ACT-WP2-SHD-356-00 [MEP] 1ST Floor Level - MEP Equipment on the wall 22/Dec/23 (4) Ravuth 22/Dec/23
NAB-TCV-ACT-WP2-INS-616-00 [MEP] Inspection installation of uPVC conduit embedded for lighting for staircase 03 26/Dec/23
2MF to 3F 0 Samnang 26/Dec/23
NAB-TCV-ACT-WP2-RFA-119-00 [PL] Stop Valve (Brand COTTO) 26/Dec/23 0 Ravuth Dilip 27/Dec/23
NAB-TCV-ACT-WP2-MAS-051-02 [LV] Switch, Socket and Isolator Switch 26/Dec/23 0 Ravuth 26/Dec/23
NAB-TCV-ACT-WP2-MAS-137-03 [PL] Geotextile 26/Dec/23 0 Ravuth 26/Dec/23
NAB-TCV-ACT-WP2-INS-617-00 [MEP] 1F Inspection installation of Fire alarm System, Public address System and CCTV27/Dec/23
System 1 Dara 27/Dec/23
NAB-TCV-ACT-WP2-SHD-357-00 [MEP] 11TH Floor Level - MEP Ceiling Combined Services 25/Dec/23 (1) Ravuth 25/Dec/23
NAB-TCV-ACT-WP2-SHD-358-00 [MEP] 2ND Floor Level - MEP Equipment on the wall 28/Dec/23 2 Ravuth 28/Dec/23
NAB-TCV-ACT-WP2-SHD-340-01 [PL] 2ND floor Domestic Water Supply System Layout plan (Individual System) 29/Dec/23 3 Ravuth 29/Dec/23
NAB-TCV-ACT-WP2-INS-618-00 [MEP] 9F Inspection Installation of pipe sleeves & Opening Layout 29/Dec/23 3 Dara 29/Dec/23
NAB-TCV-ACT-WP2-SHD-359-00 [MVAC] 2ND Floor Ducting System Layout Plan (Individual System) 2/Jan/24 7 Ravuth 2/Jan/24
NAB-TCV-ACT-WP2-SHD-326-01 [LV] 8-10TH floor BMS & Power Supply for MVAC System Layout Plan (Individual System) 2/Jan/24 7 Ravuth 2/Jan/24
NAB-TCV-ACT-WP2-INS-621-00 [MEP] 9F Inspection Installation of PVC conduit embedded for Power socket, Power supply2/Jan/24
for MVAC and7 lighting Samnang 2/Jan/24
NAB-TCV-ACT-WP2-INS-622-00 [MEP] Inspection Installation of uPVC conduit at staircase 02 3F to 3MF 2/Jan/24 7 Samnang 2/Jan/24
NAB-TCV-ACT-WP2-INS-623-00 [MEP] 9F Inspection Installation WW PVC Pipe Sleeve for Plumbing System 2/Jan/24 7 Samnang 2/Jan/24
NAB-TCV-ACT-WP2-SHD-362-00 [PL] 4TH floor Storm drain and drainage system for Irrigation Layout plan (Individual System)
2/Jan/24 7 Ravuth 2/Jan/24