0% found this document useful (0 votes)
101 views9 pages

Retest Site

1. The document contains details from several site audits, including site name, owner, swap date, date of audit, and issues found. 2. Common issues included missing or incorrect cell information, mismatches between configuration and measurements, and throughput or signal quality problems. 3. The audits found a variety of technical problems across 2G, 3G, and 4G networks that need to be addressed.

Uploaded by

Bokamra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views9 pages

Retest Site

1. The document contains details from several site audits, including site name, owner, swap date, date of audit, and issues found. 2. Common issues included missing or incorrect cell information, mismatches between configuration and measurements, and throughput or signal quality problems. 3. The audits found a variety of technical problems across 2G, 3G, and 4G networks that need to be addressed.

Uploaded by

Bokamra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Review Site Name Iepms Submit 1.

DT
COT and DT Analysis
reports
Site Owner Swap date DT Checking items PassIssues
or not
Date Now Date Basic Information: OK for DT
Pass
PCI/PSC/BCCH Match(Prject
Information not
parameters with Config):OK
right
Pass or not Pass Information:
2. RSCP very
Chen ChaoShuai 2023/12/20 TRI907 10/23/2023 11/25/2023 NOK
bad and 3G
SINR: Normal
Plots not
4G DL Throughput: NOK
TRI907
Rxlevel/RSCP/RSRP: NOK
3.L1800 DL
Cross Sector:Normal
Throughput
Guo Yunsheng 12/20/2023 TRI122 10/19/2023 11/28/2023 Basic Information:NOK this bad.site has 6 sector
Basic Information:OK
PCI/PSC/BCCH Match(Prject
1. Pass or not
parameters with Config):OK 1. missing
Pass
Pass or not Pass Information:
Basic Information:OK L700 CI in cell
Information
Chen ChaoShuai 2023/12/26 BWLD015 10/30/2023 11/27/2023 NOK
PCI/PSC/BCCH
SINR: OK information
incorrect
Match(Prject parameters 2.L1800
2. CQT
4G DL Throughput: NOK
with Config):NOK OK Throughput
TRI897L-2/5 bad
Rxlevel/RSCP/RSRP:
Pass
Cross or not Pass
Sector:OK Throughput
Chen ChaoShuai 2023/12/27 TRI897 11/5/2023 11/30/2023 Information: NOK UL per sector
SINR: OK Pass or not
4G DL Throughput: OK Pass
Basic Information:NOK
Rxlevel/RSCP/RSRP: 1. Antenna
Information
PCI/PSC/BCCH
NOK solution
incorrect
Chen ChaoShuai 2024/1/1 TRI181 11/8/2023 12/3/2023 Match(Prject parameters Information
Cross Sector:OK 3. 2G DT
with Config):NOK incorrect
route too few
Pass or not Pass 2.G1800 S3
Basic Information:OK 1. 4G missing
Information: OK BCCH
PCI/PSC/BCCH L700 CI in
Chen ChaoShuai 2024/1/1 TRI027 11/16/2023 12/3/2023 incorrect,
Match(Prject parameters cell
missing LTE
with Config):NOK information,
Pass or not Pass 2. No L700
Basic Information:OK 1. 4G missing
Information: NOK DT&DT KPI
PCI/PSC/BCCH L700 CI in
Chen ChaoShuai 2024/1/1 TRI880 11/19/2023 12/6/2023 Match(Prject parameters cell
with Config):NOK information,
Pass or not Pass 2. No L700
Basic Information:OK 1.Missing
Information: OK DT&DT KPI
PCI/PSC/BCCH L2100 CI
Chen ChaoShuai 2024/1/2 TRI698 11/22/2023 12/10/2023 Match(Prject parameters CQT and DT
with Config):OK KPI
Pass or not Pass
Basic Information:OK 1. 3G and 4G
Information: OK
PCI/PSC/BCCH missing cell
Chen ChaoShuai 2024/1/2 TRI080 11/22/2023 12/14/2023 Match(Prject parameters information, 6
with Config):NOK sector site
Pass or not Pass 2.CQT
Basic Information:NOK CQT data not
Information: NOK TRI080L-2/5
UMTS 9 cell match,through
Guozhaochong 1/2/2024 GSR001 10/30/2023 11/25/2023 KPI missing
PCI/PSC/BCCH put not same
value
Match(Project LTE SINR
parameters/UME RSRP not OK
Basic Information:NOK DT route isn't
Config):NOK UMTS 9 cell
PCI/PSC/BCCH around the
ChengQi 2024/1/2 TRI969 10/27/2023 11/13/2023 Match(Prject parameters site
with Config):OK
Pass or not Pass
Basic Information:OK 1.DT-L1800
Information: OK
PCI/PSC/BCCH ERAB Setup
Chen ChaoShuai 2024/1/4 GRYN_R3 11/26/2023 12/9/2023 Match(Prject parameters Success Rate
with Config):OK Pass or not
Pass or not Pass Pass
Basic Information:OK All
Information:NOK
PCI/PSC/BCCH LTE/UMTS/G
Guo Yunsheng 1/7/2024 TRI976 11/8/2023 12/21/2023 Match(Project SM DTs have
parameters/UME no
Config):OK corresponding
Basic Information:NOK test road not
LTE 9 cell around site
Guozhaochong 1/7/2024 TRI735 11/6/2023 11/30/2023 PCI/PSC/BCCH GSM Plot not
Match(Project Continuous
parameters/UME LTE SINR
Config):NOK LTE 9 cell NOK
Basic Information:NOK CQT data not
LTE 9 cell match,through
Guozhaochong 1/7/2024 TRI933 11/12/2023 12/17/2023 PCI/PSC/BCCH put not same
Match(Project NO L700 plot
parameters/UME G900 plot not
Basic Information:OK
Config):NOK LTE 9 cell find 19331
PCI/PSC/BCCH 1.DT data of
Guo Yunsheng 1/8/2024 TRI175 11/12/2023 12/21/2023 cell
Match(Project cells without
parameters/UME LTE 700
Config):OK
Basic Information:OK NO L700
PCI/PSC/BCCH GSM G900
Guozhaochong 1/8/2024 TRI1091 11/14/2023 12/3/2023 Match(Project plot not find
parameters/UME 62912
Config):OK coverage
Basic Information:NOK
NOK
PCI/PSC/BCCH 1.Antenna
Guo Yunsheng 1/9/2024 TRI1054 11/14/2023 12/4/2023 Match(Project information
parameters/UME error
Config):OK 1.Basic
2.DT data of
Basic Information:NOK NO L700
Information:A
cells without
LTE 9 Information:NOK
Basic cell ntenna
Guozhaochong 1/9/2024 TRI008 11/22/2023 12/4/2023 LTE 700type is
PCI/PSC/BCCH wrong
Match(Projectparameters
Match(Prject 2.Rxlevel/
parameters/UME
with Config):OK RSCP/
Config):NOK
Pass LTE 9 cell
or not Pass RSRP:2G DT
ChengQi 2024/1/9 TRI316 11/5/2023 12/13/2023 Information: OK route is
SINR:OK different from
4G DL Throughput:OK 3&4G
Basic Information:OK
Rxlevel/RSCP/RSRP: GSM service cell NOK
3.Cross
PCI/PSC/BCCH
NOK Sector:2G DT
Guozhaochong 1/10/2024 TRI062 11/23/2023 12/12/2023 Match(Project
Cross Sector:NOK route is
parameters/UME different from
Config):OK 3&4G
Basic Information:NOK 1.UMTS have
PCI/PSC/BCCH 9 cells
Guo Yunsheng 1/17/2024 TRI665 10/21/2023 11/25/2023 Match(Project 2.No U900 DT
parameters/UME repeport
Config):NOK 3.CQT DL/UP
Basic Information:OK SINR NOK
througput is
PCI/PSC/BCCH DL NOK
Guozhaochong 1/17/2024 TRI672 10/21/2023 11/27/2023 weak
Match(Project PRB42%
parameters/UME
Config):OK
Basic Information:NOK CQT data not
UMTS 6 cell match,through
Guozhaochong 1/21/2024 MIS068 11/8/2023 12/5/2023 PCI/PSC/BCCH put not same
Match(Project PRB 40%
parameters/UME
Basic Information:NOK 1.LTE&UMTS
Config):OK
PCI/PSC/BCCH cell number is
Guo Yunsheng 1/23/2024 TRI935 11/12/2023 12/4/2023 Match(Project wrong.
parameters/UME 2.L1800&L21
Config):OK 00 DL
Basic Information:OK 1.SINR:L2100 SINR bad
Throughput/Si
PCI/PSC/BCCH &1800 sector for the low
ChengQi 2024/1/23 TRI685 11/14/2023 12/3/2023 nr is weak.
Match(Prject parameters 2&3 SINR bad throughtput
with Config):OK 2.4G DL points
Pass or not Pass Throughput:L
Basic Information:NOK 1.Basic
Information: OK 2100&1800
PCI/PSC/BCCH Information:A
ChengQi 2024/1/23 TRI715 11/16/2023 12/4/2023 sector 2&3
Match(Prject parameters ntenna
with Config):NOK informatioin is
Pass or not Pass wrong
Basic Information:NOK 1.Basic
Information: OK
PCI/PSC/BCCH Information:A
ChengQi 2024/1/23 TRI026 11/20/2023 11/30/2023 Match(Prject parameters ntenna
with Config):NOK informatioin is
Pass or not Pass wrong
Basic Information: NOK 1.Basic DL PRB
Information: OK
PCI/PSC/BCCH Information:A utilization
ChengQi 2024/1/23 TRI203 11/22/2023 11/30/2023 Match(Prject parameters ntenna is 52.9%
with Config):OK informatioin is and 38.6%
Pass or not Pass wrong for
Information: OK
Basic Information:OK LTE
PCI/PSC/BCCH throughput
Guozhaochong 1/24/2024 TRI277 12/2/2023 1/2/2024 Match(Project NOK
parameters/UME PRB 61.87%
Config):OK
Basic Information:NOK 1.Antenna
PCI/PSC/BCCH information
Guo Yunsheng 1/25/2024 TRI1064 11/15/2023 12/3/2023 Match(Project error
parameters/UME 2.LTE
Config):OK Antenna map
error
Improveme
Traffic nt ZTE Final
Howso Remark Date
Trend Suggestion Remark Remark
s 3G 900/2100 site down during test need
retest
4G LTE 1800M
Normal NOK The coverage and sinr is normal
but throughput is low,Check PRB
utilization of TRI907L-3 in this time
he coverage and sinr is normal but
period 20231025 12:20-13:00 is high.
throughput is low,Check PRB utilization
NOK of TRI122L-1/2/3 in this time period
20231023 10:00-11:00 is normal,need
retest 4G 1800M.

Normal NOK L1800 RSRP\SINR\PRB normal but


Throughput bad,need retest

Normal NOK 2G 900/1800 Need retest

LTE PS
traffic NOK G / U Need retest
decreased

Normal NOK L700 Need retest

L700 Need retest


L1800&L2100 SINR and throughput
weak:
Normal NOK
TRI863L-2/5 (PCI:83)
overshooting,E_tilt down 2 degree

Normal NOK L2100 CQT DT didn't test, need retest

Normal NOK L700 CQT DT didn't test, need retest

Normal NOK 2G 1800 didn't test, need retest

Normal NOK 2G 900/1800 Need retest

Normal NOK L1800 S2 RSRP\SINR\PRB normal but


Throughput low,need retest

Normal NOK 2GL700


needdidn't
retesttest, 2,3G need retest,
LTE 1800M
SINR was a bit weak due to some
area Pilot contamination.
TRI602L-2 overshooting put E tilt
Normal NOK
down 2 degree.
TRI886L-3 overshooting put E tilt
down 3 degree.
TRI105L-2 overshooting put E tilt
down 2 degree.
L700M CQT DT didn't test need retest,
2G need retest
LTE 2100M
The throughput was low due to the
DL PRB Utilization Rate of TRI933L-4
was high during test at 2023-11-22
10:00 to 11:00.
LTE 1800M
Normal NOK
The throughput was low due to
some area weak SINR
TRI933L-2 Weak coverage put E tilt
up 2 degree.
Normal NOK L700M CQT DTwas
TRI015L-3 didn't test, need retest
overshooting put E
Tilt down 1 degree.
TRI168L-3 was overshooting put E
Tilt down 1 degree.
Normal NOK L700M CQT DT didn't test, need retest

L700 need retest


L1800 & L2100 DL Throughput weak
Normal NOK
The PRB Utilization Rate of TRI1054
L1800 & L2100 was high during test
L700 need test
1.L1800 &&L2100
GSM900 SINRneed
GSM1800 & DLretest
Normal NOK Throughput weak:TRI998L-
SINR & DL Throughput weak:
1/4(PCI:267)overshooting,E_tilt down 2
1.TRI047L-
degree
1/4(PCI:152)overshooting,E_tilt down 2
degree
Normal NOK 2.TRI1053L-
3/6(PCI:47)overshooting,E_tilt down 2
degree
3.TRI323L-
3/6(PCI:50)overshooting,E_tilt down 2
Normal NOK 2,3,4G DT Need retest (Few test road)
degree

U900 need retest


The PRB Utilization Rate of TRI665
Normal NOK L1800 was high during test(2023-10-24
12:29~15:12)

L1800 RSRP\SINR\PRB normal but DL


Normal NOK
Throughput bad,need retest

CQT test at 22:30~23:30, DL/UL


Normal NOK Throughput less than 0.5M/s,need
retest

L700 didn't test,need retest


Normal NOK L1800 & L2100 SINR weak
1.TRI1095L-
2/5(PCI:22)overshooting,E_tilt down 2
L700 didn't test,need retest
degree;
Normal NOK TRI685 S3 RSRP & SINR & Throughput
weak
1.TRI321L-
1/4(PCI:168)overshooting,E_tilt down 2
Normal NOK degree;
L700 didn't test,need retest

L700 didn't test,need retest

Normal NOK GSM 1800 RxQual weak: TRI561D-3


(CI=15616)overshooting,E_tilt down 2
degree
L700 didn't test,need retest
Normal NOK L1800 & L2100: RSRP & SINR &
Throughput weak
1.TRI203L S1 azimuth adjust to 95°
L2100 need retest(Lock L1800 band)
Normal NOK L1800 DL Throughput weak:
The PRB Utilization Rate of TRI277L-
1/3 was high(S1:72%,S3:87%) during
L700 didn't test,need retest
test(2023-12-5 19:59~20:54)
Normal NOK L1800 & L2100 DL Throughput weak:
The PRB Utilization Rate of TRI1064L
S1 & S2 was
high(S1:93%,S2:88%,S4:84%,S5:71%)
during test(2023-11-22 10:54~11:33)
tester

Ahmed Ali Ibrahim

Badr

Ahmed Ali Ibrahim

Mahmoud Abu-Qamar

Abdul Hafide Abograra

Abdul Hafide Abograra

Badr

Li

badr

Ahmed Ali Ibrahim

Badr

Abdul Hafide Abograra

Abdul Hafide Abograra

Mahmoud Abu-Qamar
Badr

badr

Mahmoud Abu-Qamar

Mahmoud Abu-Qamar

LI

Mahmoud Abu-Qamar

Khalifa Shoaib

hassan

Badr

Khaled Mustafa Atia

badr

Mahmoud Abu-Qamar

LI

LI

LI
LI

Mahmoud Abu-Qamar

You might also like