Retest Site
Retest Site
DT
COT and DT Analysis
reports
Site Owner Swap date DT Checking items PassIssues
or not
Date Now Date Basic Information: OK for DT
Pass
PCI/PSC/BCCH Match(Prject
Information not
parameters with Config):OK
right
Pass or not Pass Information:
2. RSCP very
Chen ChaoShuai 2023/12/20 TRI907 10/23/2023 11/25/2023 NOK
bad and 3G
SINR: Normal
Plots not
4G DL Throughput: NOK
TRI907
Rxlevel/RSCP/RSRP: NOK
3.L1800 DL
Cross Sector:Normal
Throughput
Guo Yunsheng 12/20/2023 TRI122 10/19/2023 11/28/2023 Basic Information:NOK this bad.site has 6 sector
Basic Information:OK
PCI/PSC/BCCH Match(Prject
1. Pass or not
parameters with Config):OK 1. missing
Pass
Pass or not Pass Information:
Basic Information:OK L700 CI in cell
Information
Chen ChaoShuai 2023/12/26 BWLD015 10/30/2023 11/27/2023 NOK
PCI/PSC/BCCH
SINR: OK information
incorrect
Match(Prject parameters 2.L1800
2. CQT
4G DL Throughput: NOK
with Config):NOK OK Throughput
TRI897L-2/5 bad
Rxlevel/RSCP/RSRP:
Pass
Cross or not Pass
Sector:OK Throughput
Chen ChaoShuai 2023/12/27 TRI897 11/5/2023 11/30/2023 Information: NOK UL per sector
SINR: OK Pass or not
4G DL Throughput: OK Pass
Basic Information:NOK
Rxlevel/RSCP/RSRP: 1. Antenna
Information
PCI/PSC/BCCH
NOK solution
incorrect
Chen ChaoShuai 2024/1/1 TRI181 11/8/2023 12/3/2023 Match(Prject parameters Information
Cross Sector:OK 3. 2G DT
with Config):NOK incorrect
route too few
Pass or not Pass 2.G1800 S3
Basic Information:OK 1. 4G missing
Information: OK BCCH
PCI/PSC/BCCH L700 CI in
Chen ChaoShuai 2024/1/1 TRI027 11/16/2023 12/3/2023 incorrect,
Match(Prject parameters cell
missing LTE
with Config):NOK information,
Pass or not Pass 2. No L700
Basic Information:OK 1. 4G missing
Information: NOK DT&DT KPI
PCI/PSC/BCCH L700 CI in
Chen ChaoShuai 2024/1/1 TRI880 11/19/2023 12/6/2023 Match(Prject parameters cell
with Config):NOK information,
Pass or not Pass 2. No L700
Basic Information:OK 1.Missing
Information: OK DT&DT KPI
PCI/PSC/BCCH L2100 CI
Chen ChaoShuai 2024/1/2 TRI698 11/22/2023 12/10/2023 Match(Prject parameters CQT and DT
with Config):OK KPI
Pass or not Pass
Basic Information:OK 1. 3G and 4G
Information: OK
PCI/PSC/BCCH missing cell
Chen ChaoShuai 2024/1/2 TRI080 11/22/2023 12/14/2023 Match(Prject parameters information, 6
with Config):NOK sector site
Pass or not Pass 2.CQT
Basic Information:NOK CQT data not
Information: NOK TRI080L-2/5
UMTS 9 cell match,through
Guozhaochong 1/2/2024 GSR001 10/30/2023 11/25/2023 KPI missing
PCI/PSC/BCCH put not same
value
Match(Project LTE SINR
parameters/UME RSRP not OK
Basic Information:NOK DT route isn't
Config):NOK UMTS 9 cell
PCI/PSC/BCCH around the
ChengQi 2024/1/2 TRI969 10/27/2023 11/13/2023 Match(Prject parameters site
with Config):OK
Pass or not Pass
Basic Information:OK 1.DT-L1800
Information: OK
PCI/PSC/BCCH ERAB Setup
Chen ChaoShuai 2024/1/4 GRYN_R3 11/26/2023 12/9/2023 Match(Prject parameters Success Rate
with Config):OK Pass or not
Pass or not Pass Pass
Basic Information:OK All
Information:NOK
PCI/PSC/BCCH LTE/UMTS/G
Guo Yunsheng 1/7/2024 TRI976 11/8/2023 12/21/2023 Match(Project SM DTs have
parameters/UME no
Config):OK corresponding
Basic Information:NOK test road not
LTE 9 cell around site
Guozhaochong 1/7/2024 TRI735 11/6/2023 11/30/2023 PCI/PSC/BCCH GSM Plot not
Match(Project Continuous
parameters/UME LTE SINR
Config):NOK LTE 9 cell NOK
Basic Information:NOK CQT data not
LTE 9 cell match,through
Guozhaochong 1/7/2024 TRI933 11/12/2023 12/17/2023 PCI/PSC/BCCH put not same
Match(Project NO L700 plot
parameters/UME G900 plot not
Basic Information:OK
Config):NOK LTE 9 cell find 19331
PCI/PSC/BCCH 1.DT data of
Guo Yunsheng 1/8/2024 TRI175 11/12/2023 12/21/2023 cell
Match(Project cells without
parameters/UME LTE 700
Config):OK
Basic Information:OK NO L700
PCI/PSC/BCCH GSM G900
Guozhaochong 1/8/2024 TRI1091 11/14/2023 12/3/2023 Match(Project plot not find
parameters/UME 62912
Config):OK coverage
Basic Information:NOK
NOK
PCI/PSC/BCCH 1.Antenna
Guo Yunsheng 1/9/2024 TRI1054 11/14/2023 12/4/2023 Match(Project information
parameters/UME error
Config):OK 1.Basic
2.DT data of
Basic Information:NOK NO L700
Information:A
cells without
LTE 9 Information:NOK
Basic cell ntenna
Guozhaochong 1/9/2024 TRI008 11/22/2023 12/4/2023 LTE 700type is
PCI/PSC/BCCH wrong
Match(Projectparameters
Match(Prject 2.Rxlevel/
parameters/UME
with Config):OK RSCP/
Config):NOK
Pass LTE 9 cell
or not Pass RSRP:2G DT
ChengQi 2024/1/9 TRI316 11/5/2023 12/13/2023 Information: OK route is
SINR:OK different from
4G DL Throughput:OK 3&4G
Basic Information:OK
Rxlevel/RSCP/RSRP: GSM service cell NOK
3.Cross
PCI/PSC/BCCH
NOK Sector:2G DT
Guozhaochong 1/10/2024 TRI062 11/23/2023 12/12/2023 Match(Project
Cross Sector:NOK route is
parameters/UME different from
Config):OK 3&4G
Basic Information:NOK 1.UMTS have
PCI/PSC/BCCH 9 cells
Guo Yunsheng 1/17/2024 TRI665 10/21/2023 11/25/2023 Match(Project 2.No U900 DT
parameters/UME repeport
Config):NOK 3.CQT DL/UP
Basic Information:OK SINR NOK
througput is
PCI/PSC/BCCH DL NOK
Guozhaochong 1/17/2024 TRI672 10/21/2023 11/27/2023 weak
Match(Project PRB42%
parameters/UME
Config):OK
Basic Information:NOK CQT data not
UMTS 6 cell match,through
Guozhaochong 1/21/2024 MIS068 11/8/2023 12/5/2023 PCI/PSC/BCCH put not same
Match(Project PRB 40%
parameters/UME
Basic Information:NOK 1.LTE&UMTS
Config):OK
PCI/PSC/BCCH cell number is
Guo Yunsheng 1/23/2024 TRI935 11/12/2023 12/4/2023 Match(Project wrong.
parameters/UME 2.L1800&L21
Config):OK 00 DL
Basic Information:OK 1.SINR:L2100 SINR bad
Throughput/Si
PCI/PSC/BCCH &1800 sector for the low
ChengQi 2024/1/23 TRI685 11/14/2023 12/3/2023 nr is weak.
Match(Prject parameters 2&3 SINR bad throughtput
with Config):OK 2.4G DL points
Pass or not Pass Throughput:L
Basic Information:NOK 1.Basic
Information: OK 2100&1800
PCI/PSC/BCCH Information:A
ChengQi 2024/1/23 TRI715 11/16/2023 12/4/2023 sector 2&3
Match(Prject parameters ntenna
with Config):NOK informatioin is
Pass or not Pass wrong
Basic Information:NOK 1.Basic
Information: OK
PCI/PSC/BCCH Information:A
ChengQi 2024/1/23 TRI026 11/20/2023 11/30/2023 Match(Prject parameters ntenna
with Config):NOK informatioin is
Pass or not Pass wrong
Basic Information: NOK 1.Basic DL PRB
Information: OK
PCI/PSC/BCCH Information:A utilization
ChengQi 2024/1/23 TRI203 11/22/2023 11/30/2023 Match(Prject parameters ntenna is 52.9%
with Config):OK informatioin is and 38.6%
Pass or not Pass wrong for
Information: OK
Basic Information:OK LTE
PCI/PSC/BCCH throughput
Guozhaochong 1/24/2024 TRI277 12/2/2023 1/2/2024 Match(Project NOK
parameters/UME PRB 61.87%
Config):OK
Basic Information:NOK 1.Antenna
PCI/PSC/BCCH information
Guo Yunsheng 1/25/2024 TRI1064 11/15/2023 12/3/2023 Match(Project error
parameters/UME 2.LTE
Config):OK Antenna map
error
Improveme
Traffic nt ZTE Final
Howso Remark Date
Trend Suggestion Remark Remark
s 3G 900/2100 site down during test need
retest
4G LTE 1800M
Normal NOK The coverage and sinr is normal
but throughput is low,Check PRB
utilization of TRI907L-3 in this time
he coverage and sinr is normal but
period 20231025 12:20-13:00 is high.
throughput is low,Check PRB utilization
NOK of TRI122L-1/2/3 in this time period
20231023 10:00-11:00 is normal,need
retest 4G 1800M.
LTE PS
traffic NOK G / U Need retest
decreased
Badr
Mahmoud Abu-Qamar
Badr
Li
badr
Badr
Mahmoud Abu-Qamar
Badr
badr
Mahmoud Abu-Qamar
Mahmoud Abu-Qamar
LI
Mahmoud Abu-Qamar
Khalifa Shoaib
hassan
Badr
badr
Mahmoud Abu-Qamar
LI
LI
LI
LI
Mahmoud Abu-Qamar