Rationale An Aerodrome is intended to be a safe place for Air Systems to operate from. Many
factors need to be considered when constructing an Aerodrome. Standards that are
not met could be instrumental in Air System damage. A safe operating environment, at
MOD aerodromes, can be provided by adherence to design standards and
safeguarding processes1.
1
A MOD aerodrome in the context of this RA is defined as an MOD site, establishment or base into which an Air System (AS), under
Aviation Duty Holder (ADH) Risk to Life (RtL) responsibility, operates, including temporary aerodromes in the UK and overseas.
2
►Non-exhaustive.◄
3
►Refer to◄ RA 1200 - Defence Air Safety Management and the Manual of Air Safety.
4
New, refurbished or modified installations where more than 25% of the system has been changed. All Runway Services and
Taxiway Centreline only.
5
Determined by Approach Category and Take-off Runway Visual Range (RVR).
6
Where bases may have been affected or a PAPI unit has been damaged or removed and replaced.
7
Full system check required after any work is undertaken. Compliance with Defence Infrastructure Organization (DIO) Policy
Instruction 19/2006 is mandatory.
8
Results to comply with DIO Policy Instruction 29/2005 Annex B.
9
Accounts to access ICAO documentation are available to MOD employees and contractors from http://portallogin.icao.int/
Kingston Road
Sutton Coldfield
West Midlands
B75 7RL
Kingston Road
Sutton Coldfield
West Midlands
B75 7RL
Visual Aids DIO, Technical Services, Tel: 0121 311 3622/3725
Technical Authority (AGL)
Engineering and
Construction, Electrical
Infrastructure
Kingston Road
Sutton Coldfield
West Midlands
B75 7RL
Compass Calibration QinetiQ, Land Magnetic Tel: 01305 862022
Bases Facilities MOD Portland Bill 01305 862000
Portland
Dorset
DT5 2JT
13. Responsibilities for military aerodrome design, standards, inspections and
surveys are as follows:
Surveys
Responsible
Remarks
Organization/Responsibility
Classification
Monitoring
Special
STATIONS
Seek MOD
Set operational and design requirements • Specialists'
advice
Stns without
Mu-Meters
Conduct Friction Monitoring Surveys • to request
surveys as
required
Except at
handover of
major
Fund Inspections/Surveys • • • • •
projects
when project
pays
Request surveys as required •
Guidance In
Material accordance
Conduct periodic inspections •
with the
3500(1) MMATM
Frequency of Inspections/Surveys
1 4c a a 2 1d
(years)
a As required
b Statutory
c Annually
when Friction Level is below Maintenance Planning Level (MPL)
dCheck Survey Annually, Full Survey every 5 years, or at frequencies as determined in
accordance with CAP 232