Time and Work Quiz 5v6
Time and Work Quiz 5v6
Time and Work Quiz 5v6
1. A can do piece of work in 8 days which B can destroy in 3 days. A has worked for 6
days, during the last 2 days of which B has been destroying. How many days must A
now work alone to complete the work?
2. A takes three times as long as B and C together to do a job. B takes four times as
long as A and C together to do the same work, If all three, working together can
complete the job in 24 days, then the number of days, A alone will take to finish the
job is:
A. 100 B. 9 C. 95 D. 90 E. None of these
3. A can do piece of work in 8 days which B can destroy in 3 days. A has worked for 6
days, during the last 2 days of which B has been destroying. How many days must A
now work alone to complete the work?
4. 4 boys and 3 women can do a piece of work in 6 days while 2 boys and 4 women
can do the same piece of work in 9 days. How much time will be taken by 7 boys
and 9 women to do the same piece of work?
A. 3 days B. 7 days C. 8 days D. 12 days E.
None of these
7. 7 men and 9 women can earn Rs. 3288 in 8 days. 9 men and 5 women can earn Rs.
2106 in 6 days. In how many days will 6 men and 5 women earn Rs. 1116?
A. 4 days B. 6 days C. 8 days D. 9 days E.
None of these
8. A man is Thrice as fast as a woman and a woman is twice as fast as a boy in doing a
work. If all of them, a man, a woman and a boy can finish the work in 9 days, in how
many days a boy will do it alone ?
A. 81 days B. 9 days C. 6 days D. 27 days E.
None of these
9. Nitin and Nirdosh can do a piece of work in 45 days and 40 days respectively. They
began to work together but Nitin leaves after ‘x’ days and Nirdosh finished the rest of
the work in (x + 14) days. After how many days did Nitin leave?
A. 11 days B. 12 days C. 13 days D. 9 days E.
None of these
10. A garrison of 6600 men had provisions for 64 days at the rate of 1700 g per
head. At the end of 14 days, reinforcement arrives and it was found that the provision
will last 34 days more at the rate of 1650 g per head. What is the strength of the
reinforcement?
A. 3400 B. 6800 C. 3300 D. 3500 E. None of these
A. 8 B. 10 C. 12 D.
16
A. 12 h B. 16 h C. 20 h D.
24 h
4. X can do a piece of work in 25 days. Y is 25% more efficient than X. The number
of daystaken by Y is
5. A mason can build a tank in 12 h. After working for 6 h, he took the help of a
boy andfinished the work in another 5 h. The time that the boys will take alone to
complete thework is
A. 30 h B. 45 h C. 60 h D.
64 h
6. A can finish a work in 15 days, B in 20 days and C in 25 days. All these worked
togetherand earned Rs. 4700. The share of C is
10. If 5 men and 7 women can plough a field in 10 days while 20 men and 42 women
do the same work in 2 days, find the time taken by 10 men and 15 women to plough the
field.
24 24
A. 5 days B. 5 29 days C. 6 days D. 4
29 days