0% found this document useful (0 votes)
103 views3 pages

Lane Closure Form

The document details street closure requests for filming in Atlanta from February 22nd to 24th. It lists 6 closures including: 1) Parking lane and sidewalk closures on both sides of Walton St NW between Broad St NW and Peachtree St NE 2) A full street closure of Walton St NW between Broad St NW and Peachtree St NE 3) Parking lane and sidewalk closures on Marietta St N between Forsyth St and Broad St and between Peachtree St and Broad St 4) A parking lane closure on the east side of Broad St NW between Poplar St NW and Marietta St NW 5) A sidewalk closure on the east side

Uploaded by

Ellie Parker
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views3 pages

Lane Closure Form

The document details street closure requests for filming in Atlanta from February 22nd to 24th. It lists 6 closures including: 1) Parking lane and sidewalk closures on both sides of Walton St NW between Broad St NW and Peachtree St NE 2) A full street closure of Walton St NW between Broad St NW and Peachtree St NE 3) Parking lane and sidewalk closures on Marietta St N between Forsyth St and Broad St and between Peachtree St and Broad St 4) A parking lane closure on the east side of Broad St NW between Poplar St NW and Marietta St NW 5) A sidewalk closure on the east side

Uploaded by

Ellie Parker
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

CITY OF ATLANTA

Mayor’s Office of Entertainment


55 Trinity Avenue SW
2nd Floor, Suite 2500
Atlanta, Georgia 30303
(404) 330-6006 E-Fax (404) 546-8681
[email protected]
www.atlantaga.gov

LANE, STREET, SIDEWALK CLOSURE

CLOSURE #1

Mark X for all that apply to your project: X Parking lane Lane closure Full street closure
X Sidewalk closure

Date(s) for work to be performed: From _______


2/22 To _________
2/24 Time of work: From ________
7AM To _________
7PM

Location(s) of closure (e.g. West side of Jackson Street, N.E., between Irwin Street and Auburn Avenue,
or street address)
WALTON ST NW
_____________________________________________________________________________________________
PARKING LANE CLOSURE AND SIDEWALK CLOSURE-BOTH SIDES- BETWEEN BROAD ST NW AND PEACHTREE ST NE ST NW
_____________________________________________________________________________________________

_____________________________________________________________________________________________
9
Number of lanes _______
2 Feet blocked ________
150 Number of parking meters/spaces blocked ________________
PARKING LANES

CLOSURE #2

Mark X for all that apply to your project: Parking lane Lane closure X Full street closure
Sidewalk closure

2/23 2/23 7AM 11PM


Date(s) for work to be performed: From _______ To _________ Time of work: From ________ To _________

Location(s) of closure (e.g. West side of Jackson Street, N.E., between Irwin Street and Auburn Avenue,
or street address)
WALTON ST NW
_____________________________________________________________________________________________
FULL STREET CLOSURE BETWEEN BROAD ST NW AND PEACHTREE ST NE ST NW
_____________________________________________________________________________________________

_____________________________________________________________________________________________
2 150
Number of lanes _______ Feet blocked ________ Number of parking meters/spaces blocked ________________
0
(THIS IS COVERED
UNDER PARKING LANE CLOSURE)
CLOSURE #3

Mark X for all that apply to your project: X Parking lane Lane closure Full street closure X

Sidewalk closure

Date(s) for work to be performed: From _______


2/22 To _________
2/24 Time of work: From ________
7AM To _________
7PM

Location(s) of closure (e.g. West side of Jackson Street, N.E., between Irwin Street and Auburn Avenue,
or street address)

_____________________________________________________________________________________________
MARIETTA ST NORTH CURB PARKING LANE CLOSURE AND SIDEWALK CLOSURE BETWEEN FORSYTH ST AND BROAD ST

_____________________________________________________________________________________________
MARIETTA ST NORTH CURB PARKING LANE AND SIDEWALK CLOSURE BETWEEN PEACHTREE ST AND BROAD ST

_____________________________________________________________________________________________

Number of lanes _______


1 Feet blocked ________
310 Number of parking meters/spaces blocked ________________
8
PARKING LANE
CLOSURE #4

Mark X for all that apply to your project: X Parking lane Lane closure Full street closure
Sidewalk closure
7AM
Date(s) for work to be performed: From _______ To _________ Time of work: From ________ To _________

Location(s) of closure (e.g. West side of Jackson Street, N.E., between Irwin Street and Auburn Avenue,
or street address)

_____________________________________________________________________________________________
BROAD ST NW
EAST CURB PARKING LANES CLOSURE BETWEEN POPLAR ST NW
_____________________________________________________________________________________________
AND MARIETTA ST NW

_____________________________________________________________________________________________

Number of lanes _______


1 Feet blocked ________
460 Number of parking meters/spaces blocked ________________
8

For more closures, please attach additional pages providing the same information.
CLOSURE #35

Mark X for all that apply to your project: Parking lane Lane closure Full street closure X
Sidewalk closure

Date(s) for work to be performed: From _______


2/22 To _________
2/24 Time of work: From ________
7AM To _________
7PM

Location(s) of closure (e.g. West side of Jackson Street, N.E., between Irwin Street and Auburn Avenue,
or street address)
BROAD ST NW
_____________________________________________________________________________________________
EAST CURB SIDEWALK CLOSURE BETWEEN WALTON ST NW AND MARIETTA ST NW
_____________________________________________________________________________________________

_____________________________________________________________________________________________

Number of lanes _______


0 Feet blocked ________
200 Number of parking meters/spaces blocked ________________
0

CLOSURE #4 6

Mark X for all that apply to your project: X Parking lane Lane closure Full street closure
X Sidewalk closure

Date(s) for work to be performed: From _______


2/22 To _________
2/24 Time of work: From ________
7AM To _________
7PM

Location(s) of closure (e.g. West side of Jackson Street, N.E., between Irwin Street and Auburn Avenue,
or street address)

_____________________________________________________________________________________________
PEACHTREE ST NW WEST CURB PARKING LANE AND SIDEWALK CLOSURE BETWEEN WALTON ST NW AND MARIETTA ST NW

_____________________________________________________________________________________________

_____________________________________________________________________________________________

Number of lanes _______


1 Feet blocked ________
200 Number of parking meters/spaces blocked ________________
3