This document provides a weekly report on the progress of the construction of drilling accommodations in Brgy. Ilomavis, Kidapawan City. It shows the project is 0.819% completed as of August 8-12, 2023, with an actual accomplishment of 3.54% against a planned accomplishment of 5.44%, resulting in a 1.89% slippage. A second weekly report from August 13-19, 2023 shows preliminary works 50% completed, temporary facilities 100% completed, and other works 11-57% completed. The balance of works remaining and amounts owed are also detailed.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
57 views8 pages
Weekly Progress Report
This document provides a weekly report on the progress of the construction of drilling accommodations in Brgy. Ilomavis, Kidapawan City. It shows the project is 0.819% completed as of August 8-12, 2023, with an actual accomplishment of 3.54% against a planned accomplishment of 5.44%, resulting in a 1.89% slippage. A second weekly report from August 13-19, 2023 shows preliminary works 50% completed, temporary facilities 100% completed, and other works 11-57% completed. The balance of works remaining and amounts owed are also detailed.