Mya Kyun Thar - Shopping Centre DATE: 8-April-2023: Elv System Layout at Basement Floor
Mya Kyun Thar - Shopping Centre DATE: 8-April-2023: Elv System Layout at Basement Floor
Mya Kyun Thar - Shopping Centre DATE: 8-April-2023: Elv System Layout at Basement Floor
CONSTRUCTION DRAWING
N
DATE : 8-April-2023 MYA KYUN THAR
COMPANY
PROJECT NAME
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
111.03M
[364'-3"]
6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
[19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"] BLOCK NO. LOT NO.
CAM-3 CAM-4 CAM-5 CAM-6 CAM-7 CAM-8 CAM-9 CAM-10 CAM-11 CAM-12 CAM-13
~-5'-0'' pavement
LOCATION
MEP
riser = 0'-6"
thread =0'-10"
Disable Disable
B CAM-16
[20'-5"]
6.21M
Travelator - 2
Travelator - 1
CAM-2 ARCHITECT
21.64M
C
[71']
CAM-1
Supermarket-B
[19'-8"]
6.00M
F.F.L -8'-0''
CAM-15
12.27M
D
[40'-3"]
CAM-14
7.00M
[23']
E ramp
14 degree
ramp
2.03M
14 degree
[6'-8"]
112.46M
[369'] M&E ENGINEER
DRAWN BY CHECKED BY
-
WMT BBS
MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE MYA KYUN THAR - SHOPPING CENTRE
DATE : 8-April-2023 DATE : 18-May-2023 DATE : 5-Jun-2023 DATE : 5-Jun-2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] 4.00M
[13'-1"] 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 111.03M
[364'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] [27'-5"] 8.35M 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] [13'-1"] 4.00M 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.35M
[27'-5"] 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M
[364'-3"]
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M 6.06M 8.00M 8.00M 4.35M 8.00M 8.00M [364'-3"] 8.00M
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
CAM-3 CAM-4 CAM-5 CAM-6 CAM-7 ~-5'-0'' pavement CAM-8 CAM-9 CAM-11
CAM-10 CAM-12 CAM-13 [1']
0.30M CAM-9 CAM-8 CAM-7 CAM-6 [1'] [19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"]
10' brick + 4'x8' [29'-5"] [1'] [19'-11"] [26'-3"] [26'-3"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"]
0.30M
0.30M
A riser = 0'-6"
thread =0'-10" MEP Disable A Stair =- 10'-7"
riser
thread =0'-10" A riser = 0'-7"
thread =0'-10" riser = 0'-7"
thread =0'-10" glass A
3.86M
[12'-8"]
B CAM-16 B BOSR.M DN - 1
UP
Stair BOSR.F Stair =- 20'-7"
riser
thread =0'-10" UP
DN BOSR.B
1983sqft. Stair =- 30'-6.92"
riser
thread =0'-10" B UP Gent.
DN Lady BOSR.H
6749 sqft. DN Stair =- 30'-6.92"
riser B DN BOSR.H
6361 sqft. DN
[20'-5"]
6.21M
[20'-5"]
21.64M
3448sqft. BOSR.L
1880sqft. 1951sqft. BOSR.J BOSR.I
1720sqft. BOSR.H
1989sqft. BOSR.G
1982sqft. 1700sqft. BOSR.E
2200sqft. BOSR.A
2145sqft. BOSR.C
1914 sqft. Stair - Type:A BOSR.A
2144 sqft. thread =0'-10" 6.21M
21.64M
25.43M
[83'-5"]
25.43M
[19'-8"]
[83'-5"]
6.00M
D CAM-15 CAM-14 D Up. F.F.L + 4'-0'' F.F.L + 4'-0'' Steps Stair - Type:B Up.
F.F.L + 4'-0'' riser = 0'-6"
Steps F.F.L + 4'-0'' F.F.L + 4'-0'' BOSR.C
1924sqft. Up. - Type:C
Stair CAM-5 D Dn. 10311 sqft. Dn. BOSR.B
1984 sqft. Stair - Type:C D F.F.L + 38'-0'' Dn. F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 35'-0''
12.27M
[40'-3"]
[23']
7.00M riser = 0'-6" [23']
7.00M riser = 0'-6"
thread =1'-8" thread =1'-8" Steps
riser = 0'-6" Stair - Type:B T=11"
R=7.385 F.F.L + 20'-0'' Stair - Type:B F.F.L + 20'-0'' T=11"
R=7.385 Dn. Stair - Type:B
1.44M
[4'-9"]
7.00M
1.44M
[23']
[4'-9"]
E 14 degree
ramp thread =1'-0" E R.E.T wall DN UP
F.F.L + 0'-0'' CAM-3 F.F.L
CAM-4 + 0'-0'' DN =1'-0"
thread Up. E Stair - Type:B Dn. E Stair - Type:B Dn.
[6'-8"]
2.03M 14 degree
ramp CAM-1 ~ -3'-2'' riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~ -3'-2''
=0'-10" riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~
=0'-10" -3'-2''
CAM-2 riser =+0'-6"
F.F.L
Steps
thread 0'-0''
=0'-10" ~ -3'-0'' riser = 0'-6"
Steps ~ -1'-8'' = 0'-6"
riser
Steps
thread =1'-0" ~ -1'-6'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' Ø6'' TUBEWELL [3'-3"]
1.00M [3'-3"]
1.00M
2.03M
[6'-8"]
[369']
112.46M 369'-0"
thread =1'-0" Ø6'' TUBEWELL 369'-0" 369'-0"
ELV SYSTEM LAYOUT AT BASEMENT FLOOR ELV SYSTEM LAYOUT AT GROUND FLOOR ELV SYSTEM LAYOUT AT FIRST FLOOR FIRST FLOOR PLAN ROOF SLAB
BASEMENT
(TOTAL FLOOR
FLOOR
AREA=29329
PLAN SQ.FT) GROUND FLOOR PLAN (TOTAL FLOOR AREA=29646 SQ.FT) ELV SYSTEM LAYOUT AT ROOF SLAB FLOOR (TOTAL FLOOR AREA=28000 SQ.FT)
SCALE - 1:400 (TOTAL FLOOR AREA=28446 SQ.FT) SCALE - 1:400 SCALE - 1:400
SCALE - 1:400
+44'-6" Roof Top Level LOCATED AT FLOOR RISER +44'-6" Roof Top Level +44'-6" Roof Top Level
16 Port POE Switch
FOR ALL BOSR 16 Port POE Switch ALL BOSR INTERNAL STAIR-2 STAIR-1 BOSR-H TOILET
BOSR-N BOSR-E TOILET BOSR-B TOILET
BOSR-C BOSR-A TOILET
+20'-0" First Floor Level LOCATED AT FLOOR RISER +20'-0" First Floor Level +20'-0" First Floor Level 2.5mm² FR CABLE
16 Port POE Switch
+4'-0" Ground
±0'-0" Plinth Level
Level LOCATED AT FLOOR RISER
FOR ALL BOSR CORE FIBER OPTIC CABLE IMCOMING FIBER CABLE +4'-0" Ground
±0'-0" Plinth Level
Level CAM-9 CAM-8 CAM-7
CAM-6 CAM-5 CAM-4 CAM-3
CAM-2 CAM-1 CAT 6 CABLE +4'-0" Ground
±0'-0" Plinth Level
Level
ALL BOSR INTERNAL STAIR-1 RISER STAIR-2 STAIR-1
BOSR-M TOILET BOSR-L TOILET BOSR-J TOILET
BOSR-K TOILET BOSR-I TOILET BOSR-H TOILET BOSR-F TOILET
BOSR-G TOILET BOSR-E TOILET BOSR-C TOILET
BOSR-D BOSR-B TOILET BOSR-A TOILET 2.5mm² FR CABLE
POWEWR AMPLIFIER
POE Switch
NVR SYSTEM
UPS
32CH
13A S.S.O
32"
UPS LED TV 32" LED TV BASEMENT Level SUPER MARKET AREASTAIR-2 STAIR-1 MALE TOILET
FEMALE TOILET MEP ROOM LOCATED AT BASEMENT FLOOR MSB ROOM
24 PORT
CD/DVD
FIRE
VOLUME
24U RACK
CONTROL
PLAYER
CONTROLLER
GIGABIT
SIGNAL
SWITCH
6-ZONE
DATA (NETWORK) SYSTEM SCHEMATIC DIAGRAM CCTV SYSTEM SCHEMATIC DIAGRAM LOCATED AT BASEMENT FLOOR MSB ROOM PA SYSTEM SCHEMATIC DIAGRAM
CONSTRUCTION DRAWING
OWNER/APPLICANT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
COMPANY
6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
[19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"] PROJECT NAME
0.30M
[1']
CAM-6
A Stair - 1
riser = 0'-7"
thread =0'-10"
BOSR.C Up.
D Up. Up.
Steps
1924sqft.
CAM-5
Steps Stair - Type:C
riser = 0'-6" Stair - Type:B riser = 0'-6" ARCHITECT
R=7.385
thread =1'-8" thread =1'-8" T=11"
7.00M
[23']
E DN
R.E.T wall UP CAM-3 CAM-4 DN
F.F.L + 0'-0'' F.F.L + 0'-0''
CAM-1
~ -1'-6'' + 0'-0''
F.F.L + 0'-0'' ~ -3'-2'' F.F.L + 0'-0'' F.F.L + 0'-0'' ~ -1'-8'' Steps
~ -3'-2'' CAM-2
+ 0'-0'' riser = 0'-6"
Steps
Steps
riser = 0'-6"
Steps
riser = 0'-6"
~ -3'-2'' Steps
riser = 0'-6"
~ -3'-0'' Steps riser = 0'-6"
Steps
riser = 0'-6"
thread =0'-10" Ø6'' TUBEWELL
thread =0'-10" thread =0'-10" thread =0'-10" riser = 0'-6" thread =1'-0" thread =0'-10"
thread =1'-0" CIVIL & STRUCTURE ENGINEER
Ø6'' TUBEWELL
369'-0"
A ROAD
KABARAYE PAGOD
YANGON, MYANMAR.
E-mail: [email protected]
TEL: 95 9 260040839 , 95 9421068325 , 95 9 796370587
SERVICE
M&E
SUBJECT
ELV SYSTEM
DRAWING TITLE
DRAWN BY CHECKED BY
-
WMT BBS
MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE MYA KYUN THAR - SHOPPING CENTRE
DATE : 8-April-2023 DATE : 18-May-2023 DATE : 5-Jun-2023 DATE : 5-Jun-2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] 4.00M
[13'-1"] 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 111.03M
[364'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] [27'-5"] 8.35M 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] [13'-1"] 4.00M 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.35M
[27'-5"] 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M
[364'-3"]
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M 6.06M 8.00M 8.00M 4.35M 8.00M 8.00M [364'-3"] 8.00M
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
CAM-3 CAM-4 CAM-5 CAM-6 CAM-7 ~-5'-0'' pavement CAM-8 CAM-9 CAM-11
CAM-10 CAM-12 CAM-13 [1']
0.30M CAM-9 CAM-8 CAM-7 CAM-6 [1'] [19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"]
10' brick + 4'x8' [29'-5"] [1'] [19'-11"] [26'-3"] [26'-3"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"]
0.30M
0.30M
A riser = 0'-6"
thread =0'-10" MEP Disable A Stair =- 10'-7"
riser
thread =0'-10" A riser = 0'-7"
thread =0'-10" riser = 0'-7"
thread =0'-10" glass A
3.86M
[12'-8"]
B CAM-16 B BOSR.M DN - 1
UP
Stair BOSR.F Stair =- 20'-7"
riser
thread =0'-10" UP
DN BOSR.B
1983sqft. Stair =- 30'-6.92"
riser
thread =0'-10" B UP Gent.
DN Lady BOSR.H
6749 sqft. DN Stair =- 30'-6.92"
riser B DN BOSR.H
6361 sqft. DN
[20'-5"]
6.21M
[20'-5"]
21.64M
3448sqft. BOSR.L
1880sqft. 1951sqft. BOSR.J BOSR.I
1720sqft. BOSR.H
1989sqft. BOSR.G
1982sqft. 1700sqft. BOSR.E
2200sqft. BOSR.A
2145sqft. BOSR.C
1914 sqft. Stair - Type:A BOSR.A
2144 sqft. thread =0'-10" 6.21M
21.64M
25.43M
[83'-5"]
25.43M
[19'-8"]
[83'-5"]
6.00M
D CAM-15 CAM-14 D Up. F.F.L + 4'-0'' F.F.L + 4'-0'' Steps Stair - Type:B Up.
F.F.L + 4'-0'' riser = 0'-6"
Steps F.F.L + 4'-0'' F.F.L + 4'-0'' BOSR.C
1924sqft. Up. - Type:C
Stair CAM-5 D Dn. 10311 sqft. Dn. BOSR.B
1984 sqft. Stair - Type:C D F.F.L + 38'-0'' Dn. F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 35'-0''
12.27M
[40'-3"]
[23']
7.00M riser = 0'-6" [23']
7.00M riser = 0'-6"
thread =1'-8" thread =1'-8" Steps
riser = 0'-6" Stair - Type:B T=11"
R=7.385 F.F.L + 20'-0'' Stair - Type:B F.F.L + 20'-0'' T=11"
R=7.385 Dn. Stair - Type:B
1.44M
[4'-9"]
7.00M
1.44M
[23']
[4'-9"]
E 14 degree
ramp thread =1'-0" E R.E.T wall DN UP
F.F.L + 0'-0'' CAM-3 F.F.L
CAM-4 + 0'-0'' DN =1'-0"
thread Up. E Stair - Type:B Dn. E Stair - Type:B Dn.
[6'-8"]
2.03M 14 degree
ramp CAM-1 ~ -3'-2'' riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~ -3'-2''
=0'-10" riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~
=0'-10" -3'-2''
CAM-2 riser =+0'-6"
F.F.L
Steps
thread 0'-0''
=0'-10" ~ -3'-0'' riser = 0'-6"
Steps ~ -1'-8'' = 0'-6"
riser
Steps
thread =1'-0" ~ -1'-6'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' Ø6'' TUBEWELL [3'-3"]
1.00M [3'-3"]
1.00M
2.03M
[6'-8"]
[369']
112.46M 369'-0"
thread =1'-0" Ø6'' TUBEWELL 369'-0" 369'-0"
ELV SYSTEM LAYOUT AT BASEMENT FLOOR ELV SYSTEM LAYOUT AT GROUND FLOOR ELV SYSTEM LAYOUT AT FIRST FLOOR FIRST FLOOR PLAN ROOF SLAB
BASEMENT
(TOTAL FLOOR
FLOOR
AREA=29329
PLAN SQ.FT) GROUND FLOOR PLAN (TOTAL FLOOR AREA=29646 SQ.FT) ELV SYSTEM LAYOUT AT ROOF SLAB FLOOR (TOTAL FLOOR AREA=28000 SQ.FT)
SCALE - 1:400 (TOTAL FLOOR AREA=28446 SQ.FT) SCALE - 1:400 SCALE - 1:400
SCALE - 1:400
+44'-6" Roof Top Level LOCATED AT FLOOR RISER +44'-6" Roof Top Level +44'-6" Roof Top Level
16 Port POE Switch
FOR ALL BOSR 16 Port POE Switch ALL BOSR INTERNAL STAIR-2 STAIR-1 BOSR-H TOILET
BOSR-N BOSR-E TOILET BOSR-B TOILET
BOSR-C BOSR-A TOILET
+20'-0" First Floor Level LOCATED AT FLOOR RISER +20'-0" First Floor Level +20'-0" First Floor Level 2.5mm² FR CABLE
16 Port POE Switch
+4'-0" Ground
±0'-0" Plinth Level
Level LOCATED AT FLOOR RISER
FOR ALL BOSR CORE FIBER OPTIC CABLE IMCOMING FIBER CABLE +4'-0" Ground
±0'-0" Plinth Level
Level CAM-9 CAM-8 CAM-7
CAM-6 CAM-5 CAM-4 CAM-3
CAM-2 CAM-1 CAT 6 CABLE +4'-0" Ground
±0'-0" Plinth Level
Level
ALL BOSR INTERNAL STAIR-1 RISER STAIR-2 STAIR-1
BOSR-M TOILET BOSR-L TOILET BOSR-J TOILET
BOSR-K TOILET BOSR-I TOILET BOSR-H TOILET BOSR-F TOILET
BOSR-G TOILET BOSR-E TOILET BOSR-C TOILET
BOSR-D BOSR-B TOILET BOSR-A TOILET 2.5mm² FR CABLE
POWEWR AMPLIFIER
POE Switch
NVR SYSTEM
UPS
32CH
13A S.S.O
32"
UPS LED TV 32" LED TV BASEMENT Level SUPER MARKET AREASTAIR-2 STAIR-1 MALE TOILET
FEMALE TOILET MEP ROOM LOCATED AT BASEMENT FLOOR MSB ROOM
24 PORT
CD/DVD
FIRE
VOLUME
24U RACK
CONTROL
PLAYER
CONTROLLER
GIGABIT
SIGNAL
SWITCH
6-ZONE
DATA (NETWORK) SYSTEM SCHEMATIC DIAGRAM CCTV SYSTEM SCHEMATIC DIAGRAM LOCATED AT BASEMENT FLOOR MSB ROOM PA SYSTEM SCHEMATIC DIAGRAM
CONSTRUCTION DRAWING
DATE : 5-Jun-2023
OWNER/APPLICANT
COMPANY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
riser = 0'-7"
A thread =0'-10" riser = 0'-7"
thread =0'-10"
BLOCK NO. LOT NO.
Gent.
LOCATION
Lady
B UP DN BOSR.H Stair - 3
DN riser = 0'-6.92"
6749 sqft.
thread =0'-10"
BOSR.C
1914 sqft.
Stair - Type:A
BOSR.A
2144 sqft.
C BOSR.E
6260 sqft.
25.43M
Stair - Type:D
[83'-5"]
1.44M
[4'-9"]
F.F.L + 20'-0'' F.F.L + 20'-0''
Dn.
Stair - Type:B
E
1.00M
[3'-3"]
CIVIL & STRUCTURE ENGINEER
369'-0"
SCALE - 1:400
No.25, LETPAN STREET, SANCHAUNG TOWNSHIP,
YANGON, MYANMAR.
E-mail: [email protected]
TEL: 95 9 260040839 , 95 9421068325 , 95 9 796370587
SERVICE
M&E
SUBJECT
ELV SYSTEM
DRAWING TITLE
DRAWN BY CHECKED BY
-
WMT BBS
MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE MYA KYUN THAR - SHOPPING CENTRE
DATE : 8-April-2023 DATE : 18-May-2023 DATE : 5-Jun-2023 DATE : 5-Jun-2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] 4.00M
[13'-1"] 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 111.03M
[364'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] [27'-5"] 8.35M 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] [13'-1"] 4.00M 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.35M
[27'-5"] 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M
[364'-3"]
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M 6.06M 8.00M 8.00M 4.35M 8.00M 8.00M [364'-3"] 8.00M
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
CAM-3 CAM-4 CAM-5 CAM-6 CAM-7 ~-5'-0'' pavement CAM-8 CAM-9 CAM-11
CAM-10 CAM-12 CAM-13 [1']
0.30M CAM-9 CAM-8 CAM-7 CAM-6 [1'] [19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"]
10' brick + 4'x8' [29'-5"] [1'] [19'-11"] [26'-3"] [26'-3"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"]
0.30M
0.30M
A riser = 0'-6"
thread =0'-10" MEP Disable A Stair =- 10'-7"
riser
thread =0'-10" A riser = 0'-7"
thread =0'-10" riser = 0'-7"
thread =0'-10" glass A
3.86M
[12'-8"]
B CAM-16 B BOSR.M DN - 1
UP
Stair BOSR.F Stair =- 20'-7"
riser
thread =0'-10" UP
DN BOSR.B
1983sqft. Stair =- 30'-6.92"
riser
thread =0'-10" B UP Gent.
DN Lady BOSR.H
6749 sqft. DN Stair =- 30'-6.92"
riser B DN BOSR.H
6361 sqft. DN
[20'-5"]
6.21M
[20'-5"]
21.64M
3448sqft. BOSR.L
1880sqft. 1951sqft. BOSR.J BOSR.I
1720sqft. BOSR.H
1989sqft. BOSR.G
1982sqft. 1700sqft. BOSR.E
2200sqft. BOSR.A
2145sqft. BOSR.C
1914 sqft. Stair - Type:A BOSR.A
2144 sqft. thread =0'-10" 6.21M
21.64M
25.43M
[83'-5"]
25.43M
[19'-8"]
[83'-5"]
6.00M
D CAM-15 CAM-14 D Up. F.F.L + 4'-0'' F.F.L + 4'-0'' Steps Stair - Type:B Up.
F.F.L + 4'-0'' riser = 0'-6"
Steps F.F.L + 4'-0'' F.F.L + 4'-0'' BOSR.C
1924sqft. Up. - Type:C
Stair CAM-5 D Dn. 10311 sqft. Dn. BOSR.B
1984 sqft. Stair - Type:C D F.F.L + 38'-0'' Dn. F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 35'-0''
12.27M
[40'-3"]
[23']
7.00M riser = 0'-6" [23']
7.00M riser = 0'-6"
thread =1'-8" thread =1'-8" Steps
riser = 0'-6" Stair - Type:B T=11"
R=7.385 F.F.L + 20'-0'' Stair - Type:B F.F.L + 20'-0'' T=11"
R=7.385 Dn. Stair - Type:B
1.44M
[4'-9"]
7.00M
1.44M
[23']
[4'-9"]
E 14 degree
ramp thread =1'-0" E R.E.T wall DN UP
F.F.L + 0'-0'' CAM-3 F.F.L
CAM-4 + 0'-0'' DN =1'-0"
thread Up. E Stair - Type:B Dn. E Stair - Type:B Dn.
[6'-8"]
2.03M 14 degree
ramp CAM-1 ~ -3'-2'' riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~ -3'-2''
=0'-10" riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~
=0'-10" -3'-2''
CAM-2 riser =+0'-6"
F.F.L
Steps
thread 0'-0''
=0'-10" ~ -3'-0'' riser = 0'-6"
Steps ~ -1'-8'' = 0'-6"
riser
Steps
thread =1'-0" ~ -1'-6'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' Ø6'' TUBEWELL [3'-3"]
1.00M [3'-3"]
1.00M
2.03M
[6'-8"]
[369']
112.46M 369'-0"
thread =1'-0" Ø6'' TUBEWELL 369'-0" 369'-0"
ELV SYSTEM LAYOUT AT BASEMENT FLOOR ELV SYSTEM LAYOUT AT GROUND FLOOR ELV SYSTEM LAYOUT AT FIRST FLOOR FIRST FLOOR PLAN ROOF SLAB
BASEMENT
(TOTAL FLOOR
FLOOR
AREA=29329
PLAN SQ.FT) GROUND FLOOR PLAN (TOTAL FLOOR AREA=29646 SQ.FT) ELV SYSTEM LAYOUT AT ROOF SLAB FLOOR (TOTAL FLOOR AREA=28000 SQ.FT)
SCALE - 1:400 (TOTAL FLOOR AREA=28446 SQ.FT) SCALE - 1:400 SCALE - 1:400
SCALE - 1:400
+44'-6" Roof Top Level LOCATED AT FLOOR RISER +44'-6" Roof Top Level +44'-6" Roof Top Level
16 Port POE Switch
FOR ALL BOSR 16 Port POE Switch ALL BOSR INTERNAL STAIR-2 STAIR-1 BOSR-H TOILET
BOSR-N BOSR-E TOILET BOSR-B TOILET
BOSR-C BOSR-A TOILET
+20'-0" First Floor Level LOCATED AT FLOOR RISER +20'-0" First Floor Level +20'-0" First Floor Level 2.5mm² FR CABLE
16 Port POE Switch
+4'-0" Ground
±0'-0" Plinth Level
Level LOCATED AT FLOOR RISER
FOR ALL BOSR CORE FIBER OPTIC CABLE IMCOMING FIBER CABLE +4'-0" Ground
±0'-0" Plinth Level
Level CAM-9 CAM-8 CAM-7
CAM-6 CAM-5 CAM-4 CAM-3
CAM-2 CAM-1 CAT 6 CABLE +4'-0" Ground
±0'-0" Plinth Level
Level
ALL BOSR INTERNAL STAIR-1 RISER STAIR-2 STAIR-1
BOSR-M TOILET BOSR-L TOILET BOSR-J TOILET
BOSR-K TOILET BOSR-I TOILET BOSR-H TOILET BOSR-F TOILET
BOSR-G TOILET BOSR-E TOILET BOSR-C TOILET
BOSR-D BOSR-B TOILET BOSR-A TOILET 2.5mm² FR CABLE
POWEWR AMPLIFIER
POE Switch
NVR SYSTEM
UPS
32CH
13A S.S.O
32"
UPS LED TV 32" LED TV BASEMENT Level SUPER MARKET AREASTAIR-2 STAIR-1 MALE TOILET
FEMALE TOILET MEP ROOM LOCATED AT BASEMENT FLOOR MSB ROOM
24 PORT
CD/DVD
FIRE
VOLUME
24U RACK
CONTROL
PLAYER
CONTROLLER
GIGABIT
SIGNAL
SWITCH
6-ZONE
DATA (NETWORK) SYSTEM SCHEMATIC DIAGRAM CCTV SYSTEM SCHEMATIC DIAGRAM LOCATED AT BASEMENT FLOOR MSB ROOM PA SYSTEM SCHEMATIC DIAGRAM
CONSTRUCTION DRAWING
COMPANY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BOSR.H
B DN 6361 sqft.
LOCATION
DN
[20'-5"]
6.21M
21.64M
C
[71']
BOSR.E MEP Equipments
25.43M
BOSR.N
[83'-5"]
4322 sqft.
[19'-8"]
6.00M
10000 sqft.
F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 35'-0''
Dn. ARCHITECT
D Stair - Type:B
7.00M
1.44M
[4'-9"]
[23']
Dn.
Stair - Type:B
E
1.00M
[3'-3"]
2.03M
[6'-8"]
369'-0"
ROOF SLAB
(TOTAL FLOOR AREA=28000 SQ.FT) M&E ENGINEER
ELV SYSTEM LAYOUT AT ROOF SLAB FLOOR SCALE - 1:400
SERVICE
M&E
SUBJECT
ELV SYSTEM
DRAWING TITLE
DRAWN BY CHECKED BY
-
WMT BBS
MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE MYA KYUN THAR - SHOPPING CENTRE
DATE : 8-April-2023 DATE : 18-May-2023 DATE : 5-Jun-2023 DATE : 5-Jun-2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] 4.00M
[13'-1"] 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 111.03M
[364'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] [27'-5"] 8.35M 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] [13'-1"] 4.00M 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.35M
[27'-5"] 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M
[364'-3"]
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M 6.06M 8.00M 8.00M 4.35M 8.00M 8.00M [364'-3"] 8.00M
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
CAM-3 CAM-4 CAM-5 CAM-6 CAM-7 ~-5'-0'' pavement CAM-8 CAM-9 CAM-11
CAM-10 CAM-12 CAM-13 [1']
0.30M CAM-9 CAM-8 CAM-7 CAM-6 [1'] [19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"]
10' brick + 4'x8' [29'-5"] [1'] [19'-11"] [26'-3"] [26'-3"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"]
0.30M
0.30M
A riser = 0'-6"
thread =0'-10" MEP Disable A Stair =- 10'-7"
riser
thread =0'-10" A riser = 0'-7"
thread =0'-10" riser = 0'-7"
thread =0'-10" glass A
3.86M
[12'-8"]
B CAM-16 B BOSR.M DN - 1
UP
Stair BOSR.F Stair =- 20'-7"
riser
thread =0'-10" UP
DN BOSR.B
1983sqft. Stair =- 30'-6.92"
riser
thread =0'-10" B UP Gent.
DN Lady BOSR.H
6749 sqft. DN Stair =- 30'-6.92"
riser B DN BOSR.H
6361 sqft. DN
[20'-5"]
6.21M
[20'-5"]
21.64M
3448sqft. BOSR.L
1880sqft. 1951sqft. BOSR.J BOSR.I
1720sqft. BOSR.H
1989sqft. BOSR.G
1982sqft. 1700sqft. BOSR.E
2200sqft. BOSR.A
2145sqft. BOSR.C
1914 sqft. Stair - Type:A BOSR.A
2144 sqft. thread =0'-10" 6.21M
21.64M
25.43M
[83'-5"]
25.43M
[19'-8"]
[83'-5"]
6.00M
D CAM-15 CAM-14 D Up. F.F.L + 4'-0'' F.F.L + 4'-0'' Steps Stair - Type:B Up.
F.F.L + 4'-0'' riser = 0'-6"
Steps F.F.L + 4'-0'' F.F.L + 4'-0'' BOSR.C
1924sqft. Up. - Type:C
Stair CAM-5 D Dn. 10311 sqft. Dn. BOSR.B
1984 sqft. Stair - Type:C D F.F.L + 38'-0'' Dn. F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 35'-0''
12.27M
[40'-3"]
[23']
7.00M riser = 0'-6" [23']
7.00M riser = 0'-6"
thread =1'-8" thread =1'-8" Steps
riser = 0'-6" Stair - Type:B T=11"
R=7.385 F.F.L + 20'-0'' Stair - Type:B F.F.L + 20'-0'' T=11"
R=7.385 Dn. Stair - Type:B
1.44M
[4'-9"]
7.00M
1.44M
[23']
[4'-9"]
E 14 degree
ramp thread =1'-0" E R.E.T wall DN UP
F.F.L + 0'-0'' CAM-3 F.F.L
CAM-4 + 0'-0'' DN =1'-0"
thread Up. E Stair - Type:B Dn. E Stair - Type:B Dn.
[6'-8"]
2.03M 14 degree
ramp CAM-1 ~ -3'-2'' riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~ -3'-2''
=0'-10" riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~
=0'-10" -3'-2''
CAM-2 riser =+0'-6"
F.F.L
Steps
thread 0'-0''
=0'-10" ~ -3'-0'' riser = 0'-6"
Steps ~ -1'-8'' = 0'-6"
riser
Steps
thread =1'-0" ~ -1'-6'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' Ø6'' TUBEWELL [3'-3"]
1.00M [3'-3"]
1.00M
2.03M
[6'-8"]
[369']
112.46M 369'-0"
thread =1'-0" Ø6'' TUBEWELL 369'-0" 369'-0"
ELV SYSTEM LAYOUT AT BASEMENT FLOOR ELV SYSTEM LAYOUT AT GROUND FLOOR ELV SYSTEM LAYOUT AT FIRST FLOOR FIRST FLOOR PLAN ROOF SLAB
BASEMENT
(TOTAL FLOOR
FLOOR
AREA=29329
PLAN SQ.FT) GROUND FLOOR PLAN (TOTAL FLOOR AREA=29646 SQ.FT) ELV SYSTEM LAYOUT AT ROOF SLAB FLOOR (TOTAL FLOOR AREA=28000 SQ.FT)
SCALE - 1:400 (TOTAL FLOOR AREA=28446 SQ.FT) SCALE - 1:400 SCALE - 1:400
SCALE - 1:400
+44'-6" Roof Top Level LOCATED AT FLOOR RISER +44'-6" Roof Top Level +44'-6" Roof Top Level
16 Port POE Switch
FOR ALL BOSR 16 Port POE Switch ALL BOSR INTERNAL STAIR-2 STAIR-1 BOSR-H TOILET
BOSR-N BOSR-E TOILET BOSR-B TOILET
BOSR-C BOSR-A TOILET
+20'-0" First Floor Level LOCATED AT FLOOR RISER +20'-0" First Floor Level +20'-0" First Floor Level 2.5mm² FR CABLE
16 Port POE Switch
+4'-0" Ground
±0'-0" Plinth Level
Level LOCATED AT FLOOR RISER
FOR ALL BOSR CORE FIBER OPTIC CABLE IMCOMING FIBER CABLE +4'-0" Ground
±0'-0" Plinth Level
Level CAM-9 CAM-8 CAM-7
CAM-6 CAM-5 CAM-4 CAM-3
CAM-2 CAM-1 CAT 6 CABLE +4'-0" Ground
±0'-0" Plinth Level
Level
ALL BOSR INTERNAL STAIR-1 RISER STAIR-2 STAIR-1
BOSR-M TOILET BOSR-L TOILET BOSR-J TOILET
BOSR-K TOILET BOSR-I TOILET BOSR-H TOILET BOSR-F TOILET
BOSR-G TOILET BOSR-E TOILET BOSR-C TOILET
BOSR-D BOSR-B TOILET BOSR-A TOILET 2.5mm² FR CABLE
POWEWR AMPLIFIER
POE Switch
NVR SYSTEM
UPS
32CH
13A S.S.O
32"
UPS LED TV 32" LED TV BASEMENT Level SUPER MARKET AREASTAIR-2 STAIR-1 MALE TOILET
FEMALE TOILET MEP ROOM LOCATED AT BASEMENT FLOOR MSB ROOM
24 PORT
CD/DVD
FIRE
VOLUME
24U RACK
CONTROL
PLAYER
CONTROLLER
GIGABIT
SIGNAL
SWITCH
6-ZONE
DATA (NETWORK) SYSTEM SCHEMATIC DIAGRAM CCTV SYSTEM SCHEMATIC DIAGRAM LOCATED AT BASEMENT FLOOR MSB ROOM PA SYSTEM SCHEMATIC DIAGRAM
CONSTRUCTION DRAWING
CONSTRUCTION DRAWING
OWNER/APPLICANT
ARCHITECT
12 U
RACK CIVIL & STRUCTURE ENGINEER
M&E ENGINEER
SERVICE
M&E
SUBJECT
ELV SYSTEM
DRAWING TITLE
DRAWN BY CHECKED BY
-
WMT BBS
MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE MYA KYUN THAR - SHOPPING CENTRE
DATE : 8-April-2023 DATE : 18-May-2023 DATE : 5-Jun-2023 DATE : 5-Jun-2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] 4.00M
[13'-1"] 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 111.03M
[364'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] [27'-5"] 8.35M 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] [13'-1"] 4.00M 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.35M
[27'-5"] 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M
[364'-3"]
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M 6.06M 8.00M 8.00M 4.35M 8.00M 8.00M [364'-3"] 8.00M
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
CAM-3 CAM-4 CAM-5 CAM-6 CAM-7 ~-5'-0'' pavement CAM-8 CAM-9 CAM-11
CAM-10 CAM-12 CAM-13 [1']
0.30M CAM-9 CAM-8 CAM-7 CAM-6 [1'] [19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"]
10' brick + 4'x8' [29'-5"] [1'] [19'-11"] [26'-3"] [26'-3"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"]
0.30M
0.30M
A riser = 0'-6"
thread =0'-10" MEP Disable A Stair =- 10'-7"
riser
thread =0'-10" A riser = 0'-7"
thread =0'-10" riser = 0'-7"
thread =0'-10" glass A
3.86M
[12'-8"]
B CAM-16 B BOSR.M DN - 1
UP
Stair BOSR.F Stair =- 20'-7"
riser
thread =0'-10" UP
DN BOSR.B
1983sqft. Stair =- 30'-6.92"
riser
thread =0'-10" B UP Gent.
DN Lady BOSR.H
6749 sqft. DN Stair =- 30'-6.92"
riser B DN BOSR.H
6361 sqft. DN
[20'-5"]
6.21M
[20'-5"]
21.64M
3448sqft. BOSR.L
1880sqft. 1951sqft. BOSR.J BOSR.I
1720sqft. BOSR.H
1989sqft. BOSR.G
1982sqft. 1700sqft. BOSR.E
2200sqft. BOSR.A
2145sqft. BOSR.C
1914 sqft. Stair - Type:A BOSR.A
2144 sqft. thread =0'-10" 6.21M
21.64M
25.43M
[83'-5"]
25.43M
[19'-8"]
[83'-5"]
6.00M
D CAM-15 CAM-14 D Up. F.F.L + 4'-0'' F.F.L + 4'-0'' Steps Stair - Type:B Up.
F.F.L + 4'-0'' riser = 0'-6"
Steps F.F.L + 4'-0'' F.F.L + 4'-0'' BOSR.C
1924sqft. Up. - Type:C
Stair CAM-5 D Dn. 10311 sqft. Dn. BOSR.B
1984 sqft. Stair - Type:C D F.F.L + 38'-0'' Dn. F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 35'-0''
12.27M
[40'-3"]
[23']
7.00M riser = 0'-6" [23']
7.00M riser = 0'-6"
thread =1'-8" thread =1'-8" Steps
riser = 0'-6" Stair - Type:B T=11"
R=7.385 F.F.L + 20'-0'' Stair - Type:B F.F.L + 20'-0'' T=11"
R=7.385 Dn. Stair - Type:B
1.44M
[4'-9"]
7.00M
1.44M
[23']
[4'-9"]
E 14 degree
ramp thread =1'-0" E R.E.T wall DN UP
F.F.L + 0'-0'' CAM-3 F.F.L
CAM-4 + 0'-0'' DN =1'-0"
thread Up. E Stair - Type:B Dn. E Stair - Type:B Dn.
[6'-8"]
2.03M 14 degree
ramp CAM-1 ~ -3'-2'' riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~ -3'-2''
=0'-10" riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~
=0'-10" -3'-2''
CAM-2 riser =+0'-6"
F.F.L
Steps
thread 0'-0''
=0'-10" ~ -3'-0'' riser = 0'-6"
Steps ~ -1'-8'' = 0'-6"
riser
Steps
thread =1'-0" ~ -1'-6'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' Ø6'' TUBEWELL [3'-3"]
1.00M [3'-3"]
1.00M
2.03M
[6'-8"]
[369']
112.46M 369'-0"
thread =1'-0" Ø6'' TUBEWELL 369'-0" 369'-0"
ELV SYSTEM LAYOUT AT BASEMENT FLOOR ELV SYSTEM LAYOUT AT GROUND FLOOR ELV SYSTEM LAYOUT AT FIRST FLOOR FIRST FLOOR PLAN ROOF SLAB
BASEMENT
(TOTAL FLOOR
FLOOR
AREA=29329
PLAN SQ.FT) GROUND FLOOR PLAN (TOTAL FLOOR AREA=29646 SQ.FT) ELV SYSTEM LAYOUT AT ROOF SLAB FLOOR (TOTAL FLOOR AREA=28000 SQ.FT)
SCALE - 1:400 (TOTAL FLOOR AREA=28446 SQ.FT) SCALE - 1:400 SCALE - 1:400
SCALE - 1:400
+44'-6" Roof Top Level LOCATED AT FLOOR RISER +44'-6" Roof Top Level +44'-6" Roof Top Level
16 Port POE Switch
FOR ALL BOSR 16 Port POE Switch ALL BOSR INTERNAL STAIR-2 STAIR-1 BOSR-H TOILET
BOSR-N BOSR-E TOILET BOSR-B TOILET
BOSR-C BOSR-A TOILET
+20'-0" First Floor Level LOCATED AT FLOOR RISER +20'-0" First Floor Level +20'-0" First Floor Level 2.5mm² FR CABLE
16 Port POE Switch
+4'-0" Ground
±0'-0" Plinth Level
Level LOCATED AT FLOOR RISER
FOR ALL BOSR CORE FIBER OPTIC CABLE IMCOMING FIBER CABLE +4'-0" Ground
±0'-0" Plinth Level
Level CAM-9 CAM-8 CAM-7
CAM-6 CAM-5 CAM-4 CAM-3
CAM-2 CAM-1 CAT 6 CABLE +4'-0" Ground
±0'-0" Plinth Level
Level
ALL BOSR INTERNAL STAIR-1 RISER STAIR-2 STAIR-1
BOSR-M TOILET BOSR-L TOILET BOSR-J TOILET
BOSR-K TOILET BOSR-I TOILET BOSR-H TOILET BOSR-F TOILET
BOSR-G TOILET BOSR-E TOILET BOSR-C TOILET
BOSR-D BOSR-B TOILET BOSR-A TOILET 2.5mm² FR CABLE
POWEWR AMPLIFIER
POE Switch
NVR SYSTEM
UPS
32CHS.S.O
13A
13A
32"
UPS LED TV 32" LED TV BASEMENT Level SUPER MARKET AREASTAIR-2 STAIR-1 MALE TOILET
FEMALE TOILET MEP ROOM LOCATED AT BASEMENT FLOOR MSB ROOM
24 PORT
CD/DVD
FIRE
VOLUME
24U RACK
CONTROL
PLAYER
CONTROLLER
GIGABIT
SIGNAL
SWITCH
6-ZONE
DATA (NETWORK) SYSTEM SCHEMATIC DIAGRAM CCTV SYSTEM SCHEMATIC DIAGRAM LOCATED AT BASEMENT FLOOR MSB ROOM PA SYSTEM SCHEMATIC DIAGRAM
CONSTRUCTION DRAWING
CONSTRUCTION DRAWING
OWNER/APPLICANT
PROJECT NAME
LOCATION
ARCHITECT
BASEMENT Level CAM-16 CAM-15 CAM-14 CAM-13 CAM-12 CAM-11 CAM-10 CAM-9 CAM-8 CAM-7 CAM-6 CAM-5 CAM-4 CAM-3 CAM-2 CAM-1
UPS UPS
M&E ENGINEER
SERVICE
M&E
SUBJECT
ELV SYSTEM
DRAWING TITLE
CCTV SYSTEM
SCHEMATIC DIAGRAM
DRAWN BY CHECKED BY
-
WMT BBS
MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE MYA KYUN THAR - SHOPPING CENTRE
DATE : 8-April-2023 DATE : 18-May-2023 DATE : 5-Jun-2023 DATE : 5-Jun-2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] 4.00M
[13'-1"] 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 111.03M
[364'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] [27'-5"] 8.35M 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] [13'-1"] 4.00M 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.35M
[27'-5"] 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M
[364'-3"]
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M 6.06M 8.00M 8.00M 4.35M 8.00M 8.00M [364'-3"] 8.00M
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
CAM-3 CAM-4 CAM-5 CAM-6 CAM-7 ~-5'-0'' pavement CAM-8 CAM-9 CAM-11
CAM-10 CAM-12 CAM-13 [1']
0.30M CAM-9 CAM-8 CAM-7 CAM-6 [1'] [19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"]
10' brick + 4'x8' [29'-5"] [1'] [19'-11"] [26'-3"] [26'-3"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"]
0.30M
0.30M
A riser = 0'-6"
thread =0'-10" MEP Disable A Stair =- 10'-7"
riser
thread =0'-10" A riser = 0'-7"
thread =0'-10" riser = 0'-7"
thread =0'-10" glass A
3.86M
[12'-8"]
B CAM-16 B BOSR.M DN - 1
UP
Stair BOSR.F Stair =- 20'-7"
riser
thread =0'-10" UP
DN BOSR.B
1983sqft. Stair =- 30'-6.92"
riser
thread =0'-10" B UP Gent.
DN Lady BOSR.H
6749 sqft. DN Stair =- 30'-6.92"
riser B DN BOSR.H
6361 sqft. DN
[20'-5"]
6.21M
[20'-5"]
21.64M
3448sqft. BOSR.L
1880sqft. 1951sqft. BOSR.J BOSR.I
1720sqft. BOSR.H
1989sqft. BOSR.G
1982sqft. 1700sqft. BOSR.E
2200sqft. BOSR.A
2145sqft. BOSR.C
1914 sqft. Stair - Type:A BOSR.A
2144 sqft. thread =0'-10" 6.21M
21.64M
25.43M
[83'-5"]
25.43M
[19'-8"]
[83'-5"]
6.00M
D CAM-15 CAM-14 D Up. F.F.L + 4'-0'' F.F.L + 4'-0'' Steps Stair - Type:B Up.
F.F.L + 4'-0'' riser = 0'-6"
Steps F.F.L + 4'-0'' F.F.L + 4'-0'' BOSR.C
1924sqft. Up. - Type:C
Stair CAM-5 D Dn. 10311 sqft. Dn. BOSR.B
1984 sqft. Stair - Type:C D F.F.L + 38'-0'' Dn. F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 35'-0''
12.27M
[40'-3"]
[23']
7.00M riser = 0'-6" [23']
7.00M riser = 0'-6"
thread =1'-8" thread =1'-8" Steps
riser = 0'-6" Stair - Type:B T=11"
R=7.385 F.F.L + 20'-0'' Stair - Type:B F.F.L + 20'-0'' T=11"
R=7.385 Dn. Stair - Type:B
1.44M
[4'-9"]
7.00M
1.44M
[23']
[4'-9"]
E 14 degree
ramp thread =1'-0" E R.E.T wall DN UP
F.F.L + 0'-0'' CAM-3 F.F.L
CAM-4 + 0'-0'' DN =1'-0"
thread Up. E Stair - Type:B Dn. E Stair - Type:B Dn.
[6'-8"]
2.03M 14 degree
ramp CAM-1 ~ -3'-2'' riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~ -3'-2''
=0'-10" riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~
=0'-10" -3'-2''
CAM-2 riser =+0'-6"
F.F.L
Steps
thread 0'-0''
=0'-10" ~ -3'-0'' riser = 0'-6"
Steps ~ -1'-8'' = 0'-6"
riser
Steps
thread =1'-0" ~ -1'-6'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' Ø6'' TUBEWELL [3'-3"]
1.00M [3'-3"]
1.00M
2.03M
[6'-8"]
[369']
112.46M 369'-0"
thread =1'-0" Ø6'' TUBEWELL 369'-0" 369'-0"
ELV SYSTEM LAYOUT AT BASEMENT FLOOR ELV SYSTEM LAYOUT AT GROUND FLOOR ELV SYSTEM LAYOUT AT FIRST FLOOR FIRST FLOOR PLAN ROOF SLAB
BASEMENT
(TOTAL FLOOR
FLOOR
AREA=29329
PLAN SQ.FT) GROUND FLOOR PLAN (TOTAL FLOOR AREA=29646 SQ.FT) ELV SYSTEM LAYOUT AT ROOF SLAB FLOOR (TOTAL FLOOR AREA=28000 SQ.FT)
SCALE - 1:400 (TOTAL FLOOR AREA=28446 SQ.FT) SCALE - 1:400 SCALE - 1:400
SCALE - 1:400
+44'-6" Roof Top Level LOCATED AT FLOOR RISER +44'-6" Roof Top Level +44'-6" Roof Top Level
16 Port POE Switch
FOR ALL BOSR 16 Port POE Switch ALL BOSR INTERNAL STAIR-2 STAIR-1 BOSR-H TOILET
BOSR-N BOSR-E TOILET BOSR-B TOILET
BOSR-C BOSR-A TOILET
+20'-0" First Floor Level LOCATED AT FLOOR RISER +20'-0" First Floor Level +20'-0" First Floor Level 2.5mm² FR CABLE
16 Port POE Switch
+4'-0" Ground
±0'-0" Plinth Level
Level LOCATED AT FLOOR RISER
FOR ALL BOSR CORE FIBER OPTIC CABLE IMCOMING FIBER CABLE +4'-0" Ground
±0'-0" Plinth Level
Level CAM-9 CAM-8 CAM-7
CAM-6 CAM-5 CAM-4 CAM-3
CAM-2 CAM-1 CAT 6 CABLE +4'-0" Ground
±0'-0" Plinth Level
Level
ALL BOSR INTERNAL STAIR-1 RISER STAIR-2 STAIR-1
BOSR-M TOILET BOSR-L TOILET BOSR-J TOILET
BOSR-K TOILET BOSR-I TOILET BOSR-H TOILET BOSR-F TOILET
BOSR-G TOILET BOSR-E TOILET BOSR-C TOILET
BOSR-D BOSR-B TOILET BOSR-A TOILET 2.5mm² FR CABLE
POWEWR AMPLIFIER
POE Switch
NVR SYSTEM
UPS
32CHS.S.O
13A
13A
32"
UPS LED TV 32" LED TV BASEMENT Level SUPER MARKET AREASTAIR-2 STAIR-1 MALE TOILET
FEMALE TOILET MEP ROOM LOCATED AT BASEMENT FLOOR MSB ROOM
24 PORT
CD/DVD
FIRE
VOLUME
24U RACK
CONTROL
PLAYER
CONTROLLER
GIGABIT
SIGNAL
SWITCH
6-ZONE
DATA (NETWORK) SYSTEM SCHEMATIC DIAGRAM CCTV SYSTEM SCHEMATIC DIAGRAM LOCATED AT BASEMENT FLOOR MSB ROOM PA SYSTEM SCHEMATIC DIAGRAM
CONSTRUCTION DRAWING
CONSTRUCTION DRAWING
OWNER/APPLICANT
COMPANY
+44'-6" Roof Top Level
PROJECT NAME
LOCATION
ALL BOSR INTERNAL STAIR-2 STAIR-1 BOSR-N TOILET BOSR-H TOILET BOSR-E TOILET BOSR-C TOILET BOSR-B TOILET BOSR-A TOILET
ALL BOSR INTERNAL STAIR-1 RISER STAIR-2 STAIR-1 BOSR-M TOILET BOSR-L TOILET BOSR-K TOILET BOSR-J TOILET BOSR-I TOILET BOSR-H TOILET BOSR-G TOILET BOSR-F TOILET BOSR-E TOILET BOSR-D TOILET BOSR-C TOILET BOSR-B TOILET BOSR-A TOILET
2.5mm² FR CABLE
+4'-0" Plinth Level
POWEWR AMPLIFIER
SERVICE
M&E
SUBJECT
ELV SYSTEM
DRAWING TITLE
CCTV SYSTEM
SCHEMATIC DIAGRAM
DRAWN BY CHECKED BY
-
WMT BBS
MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE N MYA KYUN THAR - SHOPPING CENTRE MYA KYUN THAR - SHOPPING CENTRE
DATE : 8-April-2023 DATE : 18-May-2023 DATE : 5-Jun-2023 DATE : 5-Jun-2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] 4.00M
[13'-1"] 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 111.03M
[364'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] [27'-5"] 8.35M 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M
[19'-11"] 8.00M
[26'-3"] 8.00M
[26'-3"] 7.65M
[25'-1"] [13'-1"] 4.00M 4.35M
[14'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.35M
[27'-5"] 7.65M
[25'-1"] 8.00M
[26'-3"] 8.00M
[26'-3"] 8.97M
[29'-5"] 6.06M 8.00M 8.00M 7.65M 4.00M 4.35M 8.00M 8.00M 8.00M
[364'-3"]
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M 6.06M 8.00M 8.00M 4.35M 8.00M 8.00M [364'-3"] 8.00M
111.03M 8.00M 8.35M 7.65M 8.00M 8.00M 8.97M
CAM-3 CAM-4 CAM-5 CAM-6 CAM-7 ~-5'-0'' pavement CAM-8 CAM-9 CAM-11
CAM-10 CAM-12 CAM-13 [1']
0.30M CAM-9 CAM-8 CAM-7 CAM-6 [1'] [19'-11"] [26'-3"] [26'-3"] [25'-1"] [13'-1"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"]
10' brick + 4'x8' [29'-5"] [1'] [19'-11"] [26'-3"] [26'-3"] [14'-3"] [26'-3"] [26'-3"] [26'-3"] [26'-3"] [27'-5"] [25'-1"] [26'-3"] [26'-3"] [29'-5"]
0.30M
0.30M
A riser = 0'-6"
thread =0'-10" MEP Disable A Stair =- 10'-7"
riser
thread =0'-10" A riser = 0'-7"
thread =0'-10" riser = 0'-7"
thread =0'-10" glass A
3.86M
[12'-8"]
B CAM-16 B BOSR.M DN - 1
UP
Stair BOSR.F Stair =- 20'-7"
riser
thread =0'-10" UP
DN BOSR.B
1983sqft. Stair =- 30'-6.92"
riser
thread =0'-10" B UP Gent.
DN Lady BOSR.H
6749 sqft. DN Stair =- 30'-6.92"
riser B DN BOSR.H
6361 sqft. DN
[20'-5"]
6.21M
[20'-5"]
21.64M
3448sqft. BOSR.L
1880sqft. 1951sqft. BOSR.J BOSR.I
1720sqft. BOSR.H
1989sqft. BOSR.G
1982sqft. 1700sqft. BOSR.E
2200sqft. BOSR.A
2145sqft. BOSR.C
1914 sqft. Stair - Type:A BOSR.A
2144 sqft. thread =0'-10" 6.21M
21.64M
25.43M
[83'-5"]
25.43M
[19'-8"]
[83'-5"]
6.00M
D CAM-15 CAM-14 D Up. F.F.L + 4'-0'' F.F.L + 4'-0'' Steps Stair - Type:B Up.
F.F.L + 4'-0'' riser = 0'-6"
Steps F.F.L + 4'-0'' F.F.L + 4'-0'' BOSR.C
1924sqft. Up. - Type:C
Stair CAM-5 D Dn. 10311 sqft. Dn. BOSR.B
1984 sqft. Stair - Type:C D F.F.L + 38'-0'' Dn. F.F.L + 38'-0'' F.F.L + 38'-0'' F.F.L + 35'-0''
12.27M
[40'-3"]
[23']
7.00M riser = 0'-6" [23']
7.00M riser = 0'-6"
thread =1'-8" thread =1'-8" Steps
riser = 0'-6" Stair - Type:B T=11"
R=7.385 F.F.L + 20'-0'' Stair - Type:B F.F.L + 20'-0'' T=11"
R=7.385 Dn. Stair - Type:B
1.44M
[4'-9"]
7.00M
1.44M
[23']
[4'-9"]
E 14 degree
ramp thread =1'-0" E R.E.T wall DN UP
F.F.L + 0'-0'' CAM-3 F.F.L
CAM-4 + 0'-0'' DN =1'-0"
thread Up. E Stair - Type:B Dn. E Stair - Type:B Dn.
[6'-8"]
2.03M 14 degree
ramp CAM-1 ~ -3'-2'' riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~ -3'-2''
=0'-10" riser =+0'-6"
F.F.L
Steps
thread 0'-0'' ~
=0'-10" -3'-2''
CAM-2 riser =+0'-6"
F.F.L
Steps
thread 0'-0''
=0'-10" ~ -3'-0'' riser = 0'-6"
Steps ~ -1'-8'' = 0'-6"
riser
Steps
thread =1'-0" ~ -1'-6'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' riser = 0'-6"
Steps
thread =0'-10" + 0'-0'' Ø6'' TUBEWELL [3'-3"]
1.00M [3'-3"]
1.00M
2.03M
[6'-8"]
[369']
112.46M 369'-0"
thread =1'-0" Ø6'' TUBEWELL 369'-0" 369'-0"
ELV SYSTEM LAYOUT AT BASEMENT FLOOR ELV SYSTEM LAYOUT AT GROUND FLOOR ELV SYSTEM LAYOUT AT FIRST FLOOR FIRST FLOOR PLAN ROOF SLAB
BASEMENT
(TOTAL FLOOR
FLOOR
AREA=29329
PLAN SQ.FT) GROUND FLOOR PLAN (TOTAL FLOOR AREA=29646 SQ.FT) ELV SYSTEM LAYOUT AT ROOF SLAB FLOOR (TOTAL FLOOR AREA=28000 SQ.FT)
SCALE - 1:400 (TOTAL FLOOR AREA=28446 SQ.FT) SCALE - 1:400 SCALE - 1:400
SCALE - 1:400
+44'-6" Roof Top Level LOCATED AT FLOOR RISER +44'-6" Roof Top Level +44'-6" Roof Top Level
16 Port POE Switch
FOR ALL BOSR 16 Port POE Switch ALL BOSR INTERNAL STAIR-2 STAIR-1 BOSR-H TOILET
BOSR-N BOSR-E TOILET BOSR-B TOILET
BOSR-C BOSR-A TOILET
+20'-0" First Floor Level LOCATED AT FLOOR RISER +20'-0" First Floor Level +20'-0" First Floor Level 2.5mm² FR CABLE
16 Port POE Switch
+4'-0" Ground
±0'-0" Plinth Level
Level LOCATED AT FLOOR RISER
FOR ALL BOSR CORE FIBER OPTIC CABLE IMCOMING FIBER CABLE +4'-0" Ground
±0'-0" Plinth Level
Level CAM-9 CAM-8 CAM-7
CAM-6 CAM-5 CAM-4 CAM-3
CAM-2 CAM-1 CAT 6 CABLE +4'-0" Ground
±0'-0" Plinth Level
Level
ALL BOSR INTERNAL STAIR-1 RISER STAIR-2 STAIR-1
BOSR-M TOILET BOSR-L TOILET BOSR-J TOILET
BOSR-K TOILET BOSR-I TOILET BOSR-H TOILET BOSR-F TOILET
BOSR-G TOILET BOSR-E TOILET BOSR-C TOILET
BOSR-D BOSR-B TOILET BOSR-A TOILET 2.5mm² FR CABLE
POWEWR AMPLIFIER
POE Switch
NVR SYSTEM
UPS
32CHS.S.O
13A
13A
32"
UPS LED TV 32" LED TV BASEMENT Level SUPER MARKET AREASTAIR-2 STAIR-1 MALE TOILET
FEMALE TOILET MEP ROOM LOCATED AT BASEMENT FLOOR MSB ROOM
24 PORT
CD/DVD
FIRE
VOLUME
24U RACK
CONTROL
PLAYER
CONTROLLER
GIGABIT
SIGNAL
SWITCH
6-ZONE
DATA (NETWORK) SYSTEM SCHEMATIC DIAGRAM CCTV SYSTEM SCHEMATIC DIAGRAM LOCATED AT BASEMENT FLOOR MSB ROOM PA SYSTEM SCHEMATIC DIAGRAM