Labour Schedule

This document outlines the items, quantities, rates, and costs for a 10-stage construction project. Stage 1 involves ground floor to first floor construction including lintel and block wall work costing 902,200. Stage 2 repeats this work for the first to second floor costing another 902,200. Stage 3 extends to the roof beam involving additional columns, lintel, block wall, roof beam work costing 3,618,000. The remaining stages cover roofing, doors, windows, fittings, mechanical, electrical, and finishing work. The total cost of the 28.7 million construction project is broken down across the 10 stages.

Uploaded by

kin001sella
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views5 pages

Labour Schedule

This document outlines the items, quantities, rates, and costs for a 10-stage construction project. Stage 1 involves ground floor to first floor construction including lintel and block wall work costing 902,200. Stage 2 repeats this work for the first to second floor costing another 902,200. Stage 3 extends to the roof beam involving additional columns, lintel, block wall, roof beam work costing 3,618,000. The remaining stages cover roofing, doors, windows, fittings, mechanical, electrical, and finishing work. The total cost of the 28.7 million construction project is broken down across the 10 stages.

Uploaded by

kin001sella
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

ITEM DESCRIPTION QTY UNIT RATE AMOUNT LABOUR

A STAGE 1 (GROUND FLOOR TO FIRST FLOOR)


LINTEL
1 Caster 8.00 cum 7,000.00 56,000.00
2 Iron bender 0.90 tons 40,000.00 36,000.00
3 carpenter 73.00 sqm 1,500.00 109,500.00

BLOCK WALL
4 Masonry Man 10,010.00 nr 70.00 700,700.00

STAGE 1
Carried to Collection 902,200.00

B STAGE 2 (FIRST FLOOR TO SECOND FLOOR)


LINTEL
1 Caster 8.00 cum 7,000.00 56,000.00
2 Iron bender 0.90 tons 40,000.00 36,000.00
3 carpenter 73.00 sqm 1,500.00 109,500.00

BLOCK WALL
5 Masonry Man 10,010.00 nr 70.00 700,700.00

STAGE 2
Carried to Collection 902,200.00

C STAGE 3 (SECOND FLOOR TO ROOF BEAM)


COLUMNS
1 Caster 17.00 cum 7,000.00 119,000.00
2 Iron bender 3.60 tons 40,000.00 144,000.00
3 carpenter 284.00 sqm 1,700.00 482,800.00
LINTEL
4 Caster 8.00 cum 7,000.00 56,000.00
5 Iron bender 0.90 tons 40,000.00 36,000.00
6 carpenter 73.00 sqm 1,500.00 109,500.00

BLOCK WALL
7 Masonry Man 10,010.00 nr 70.00 700,700.00

ROOF BEAM
8 Caster 45.00 cum 10,000.00 90,000.00
9 Iron bender 9.20 tons 45,000.00 414,000.00
10 carpenter 733.00 sqm 2,000.00 1,466,000.00

STAGE 3
Carried to Collection 3,618,000.00

D STAGE 4 ( ROOF AND ROOF COVERING)


1 Roof Carcass 3,705.00 lm 200.00 741,000.00
2 Roof Covering 1,750.00 sqm 620.00 1,085,000.00

STAGE 4
Carried to Collection 1,826,000.00

E STAGE 5 ( DOORS)
1 Fixing 91.00 nr 25,000.00 2,275,000.00
STAGE 5
Carried to Collection 2,275,000.00

F STAGE 6 ( WINDOWS)
1 Fixing sum 650,000.00

STAGE 6
Carried to Collection 650,000.00

G STAGE 7 ( FITTINGS AND FIXTURES)


1 Sundries sum 700,000.00

STAGE 7
Carried to Collection 700,000.00

H STAGE 8 ( MECHANICAL INSTALLATION)


1 Plumber sum 889,100.00

STAGE 8
1 Carried to Collection 889,100.00

J STAGE 9 ( ELECTRICAL INSTALLATION


1 Electrician sum 1,500,000.00
STAGE 9
Carried to Collection 1,500,000.00

K STAGE 10 ( FINISHING)
FLOOR TILING
1 Tiler 2,830.00 sqm 1,000.00 2,830,000.00
2 skirting 995.00 lm 200.00 199,000.00

WALL TILING
3 Tiler 618.00 sqm 1,000.00 618,000.00

WALL PLASTERING
4 Mansonry Man 6,399.00 sqm 1,000.00 6,399,000.00

CEILING FINISHING
5 Screeder 904.00 sqm 2,000.00 1,808,000.00
6 carpenter 182.00 sqm 1,000.00 182,000.00

PAINTING
7 Painter 6,867.00 sqm 500.00 3,433,500.00

15,469,500.00
SUMMARY
A STAGE 1 902,200.00

B STAGE 2 902,200.00

C STAGE 3 3,618,000.00

D STAGE 4 1,826,000.00

E STAGE 5 2,275,000.00

F STAGE 6 650,000.00

G STAGE 7 700,000.00

H STAGE 8 889,100.00

J STAGE 9 1,500,000.00

K STAGE 10 15,469,500.00

Grand Total 28,732,000.00