Alrashed Mall - Chiller Unit Quotation - Vs#2

Nine Minarets Est. has provided a quotation to Mr. Abdulrrhman to replace 10 York chiller units at a client site in Madinah, Saudi Arabia. The scope of work includes removing the existing chillers, modifying the concrete bases, installing new 480TR York chillers, and associated piping, valves, electrical work, and crane rental. The total cost quoted is 1,569,200 Saudi Riyals. Payment terms are 70% advance and 30% after completion, and the quotation is valid for one month.

Uploaded by

Mohamed Askar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views3 pages

Alrashed Mall - Chiller Unit Quotation - Vs#2

Nine Minarets Est. has provided a quotation to Mr. Abdulrrhman to replace 10 York chiller units at a client site in Madinah, Saudi Arabia. The scope of work includes removing the existing chillers, modifying the concrete bases, installing new 480TR York chillers, and associated piping, valves, electrical work, and crane rental. The total cost quoted is 1,569,200 Saudi Riyals. Payment terms are 70% advance and 30% after completion, and the quotation is valid for one month.

Uploaded by

Mohamed Askar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Al Salem York Services Ltd.Co.

Date: 08h Jan 2024


Madinah,
Kingdom of Saudi Arabia. Quot- No. 700185
VS#2
Attn: Mr. Abdulrrhman,
Subject : Replacement of York Chiller Units

Thank you very much for your kind valuable enquiry for Installation of York Chiller
Units, please find herewith our scope of work and offer for the same, we hope you
will find the same and release official purchase order in order to serve your esteem
organization.
Scope of Works:
BILL OF QUANTITY
DESCRIPTION UNIT TOTAL
S.no. UNITS QTY REMARKS
PRICE SR PRICE SR
Removal/Dismantle of existing equipment
A
and hand over to the customer
Removal of existing chiller 480TR with
A.1.1 No.s 10 4,000 40,000
attached fitting and accessories
Repair & modification existing base as
A.2
per new equipment requriements
Repair & modification of concerate chiller
A.2.1 base in length to (L=11864mm No.s 10 1,500 15,000
*W=2242mm)weight=11.21tons
Installation of mechanical equipment as
B
per following description
Installation of 480 TR 380-3-60 York Chiller -
on Spring Isolators , piping connections,
B.1 No.s 10 7,500 75,000
power cabling connections with required
accessories.
Supply & Installation of following accessories,
Blacksteel pipe seamless SCH 40 with 50 mm
B.2 fiberglass insulation, density 48 Kg/m3 along
with 0.6 mm aluminum cladding & chilled
water pipe support.
B.2.1 Flexible connector - 8" No.s 20 1,560 31,200
B.2.2 Pressure gauge No.s 20 850 17,000
B.2.3 Temperature gauge No.s 20 970 19,400
B.2.4 Double regulating valve 8" No.s 10 13,000 130,000

Nine Minarets Est. ‫مؤسسة التسع منارات للمقاوالت‬


Mob. 0540583520 7011265845 : ‫السجل التجاري‬
Email. [email protected] ‫ المدينة‬42761 :‫ ب‬.‫ص‬
Web. nmcoonline.com ‫المملكة العربية السعودية‬
B.2.5 Strainer - 8" No.s 10 6,500 65,000
B.2.6 Bypass gate valve No.s 10 6,800 68,000
B.2.7 butterfly valve 8" No.s 20 5,600 112,000
B.2.8 Pipe size - 8" LM 100 720 72,000
B.2.9 elbows,reducers and joints LS 1 25,000 25,000
B.2.10 dead/end plugs 6" No.s 20 860 17,200
New chilled water pipe cleaning, flushing
B.3 LS 1 25,000 25,000
&balancing
C ELECTRICAL SCOPE OF WORK
Supply and installation of Electrical Circuit
Breaker for chillers of 1600A with IP55/NEMA
C.1 No.s 10 16,500 165,000
3 out door panel box enclosure with mounts
and support.
Supply & Installation of Electrical cables
C.2 copper conductor XLPE insulated &pvc
sheathed and Accessories
Multicore 3.5 core (3x240 mm2) Chillers
C.2.1 Lm 360 590 212,400
power cable
Flow switch (supply by JCI) installation along
C.3 No.s 10 500 5,000
with control cable (supply by contractor)
Crane Charges for placing the unit at
D height=60m and 25m far from crane center LS 5 95,000 475,000
for unit weight=11 tons
GRAND TOTAL PRICE SR 1,569,200

Payment Terms:
- 70% advance with the P.O
- 30% after completion of the work

Validity:
This offer is valid for only one month from above date.

Note:
- The customer must arrange electrical point near to each unit or machine.

Exclusion:
- Any other work – required beside the scope of work mentioned in our offer above.
- Any civil work or decorate work.

Nine Minarets Est. ‫مؤسسة التسع منارات للمقاوالت‬


Mob. 0540583520 7011265845 : ‫السجل التجاري‬
Email. [email protected] ‫ المدينة‬42761 :‫ ب‬.‫ص‬
Web. nmcoonline.com ‫المملكة العربية السعودية‬
Starting Work:
Immediate after receipt of official PO.

Condition of Sales:
We are trust to have given you all the detail required at this stage. However, if you
require any further assistance please call us at your convenience.

Best regards,

Mohammed Ibrahim
Projects Engineer
Nine Minarets Est.

Nine Minarets Est. ‫مؤسسة التسع منارات للمقاوالت‬


Mob. 0540583520 7011265845 : ‫السجل التجاري‬
Email. [email protected] ‫ المدينة‬42761 :‫ ب‬.‫ص‬
Web. nmcoonline.com ‫المملكة العربية السعودية‬

You might also like