1 2 3 4 5.00
(A) Skilled Workmen
First Class
1 1a Mason and stone Cutter Day 156.00
2 b Brick Layer Day 156.00
3 c Carpenter Day 156.00
4 d Painter Day 156.00
5 e Plumber Day 156.00
6 f Welder Day 156.00
7 g Fitter Day 156.00
8 h Electrician Day 156.00
9 I Cook Day 156.00
10 2 Mechanic Day 156.00
11 3 Rigger Day 156.00
12 4 Rigger Syrang Day 156.00
13 5 Well Sinker Day 156.00
14 6 Blaster Day 156.00
15 7 Tipper and Heavy Vehicle Driver above 12 T Day 165.00
16 Tanker and Medium Vehicle Driver (7.5 T to 12 T) Day 144.00
17 Tanker and Light Vehicle Driver up to 7.5 T Day 130.00
18 Wagon Drill Operator upto 7.5 T Day 165.00
19 8 Lorry and Heavy Vehicle Driver above 12 T Day 165.00
20 Road Roller Driver ( 7.5 T to 12 T) Day 144.00
21 Road Roller Driver up to 7.5 T Day 130.00
22 9 Tractor Driver above 12 T Day 165.00
23 Tractor Driver ( 7.5 T to 12 T) Day 144.00
24 Tractor Driver upto 7.5 T Day 130.00
Operator
25 10 Pan Mixer Day 156.00
26 Concrete mixer Day 156.00
27 Vibrator Day 156.00
28 Compressor Day 156.00
29 Jack Hammer Day 156.00
30 Driller Day 156.00
31 Boring Maistry Day 156.00
32 11 Pump Operator Day 156.00
33 12 Turner Grade-I Day 156.00
34 13 Wireless Operator Day 165.00
35 14 Assistant Wireless Operator Day 137.00
36 15 Jeep Driver Day 130.00
37 16 Work inspector with I.T.I qualification Day 151.00
38 17 Work Inspector with LCE,LME,L.E.E Qualification Day 165.00
39 18 Work Inspector with B.E ( Civil, Mechanical and Electrical qualification) Day 250.00
40 19 Work Inspector with Non-technical qualification SSLC/SSC/HSC Day 137.00
41 20 Mason Spl. Grade for Mossaic and Polished shahabad stone floor Day 165.00
42 21 Computer Operator Day 137.00
(B) SEMI-SKILLED WORKMEN
SECOND CLASS Day
43 1:00 AM Mason Day 137.00
44 b Brick Layer and Stone Cutter Day 137.00
45 c Carpenter Day 137.00
46 d Painter Day 137.00
47 e Plumber Day 137.00
48 f Blacksmith Day 137.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
1 2 3 4 5.00
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING WEDGING, BREAKING,BURNING, SPLITING
AND STACKING
89 22.a For R.R Masonary Work (other than Granite, Dolomite and Trap 1 cum 94.00
90 b.I For SS Revetment work 225 mm 1 cum 50.00
91 b.ii For SS Revetment work 300 mm 1 cum 66.50
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
198 d Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps. 1 Sqm 2.10
199 2.a.I Cutting and removing Palmyrah trees including stacking of girth 30 to 100 cm. Each 19.00
200 ii - do - 100 to 200 cm. Each 33.00
201 2.b.I Uprooting and removing Palmyrah stumps including stacking of girth 30 to 100 cm. Each 23.50
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND CAREFULLY STACKING MATERIALS
USEFUL FOR REUSE.
223 n.(i) Dry rough stone revetment for aprons and stacking within 40 metres 1 cum 24.50
(C) QUARRYING AND BLASTING
224 6 Blasting and removing hard granite measured in solid 1 cum covered under earth work item
237 8.a Sand or loose soils wet sand not under water, silt in canals,channels and drains SS 20-A. 1 cum 19.00
262 ii Extra for every additional 10 mtrs. Lead or part there of from 4 th extra lead to 6 th extra 1 cum 3.30
lead
263 iii -do- from 7 th extra lead to 9 th extra lead 1 cum 4.60
FOR FISSURED AND FRACTURED HARD ROCK AND BOULDERS ETC., (ITEM 18 &
19 a ABOVE)
264 20.c.I (Extra for every additional 10 metres lead or part there of) over the initial lead for the first 1 cum 3.40
3 extra leads
265 ii Extra for every additional 10 mtrs. Lead or part there of from 4 th extra lead to 6 th extra 1 cum 5.60
lead
266 iii -do- from 7 th extra lead to 9 th extra lead 1 cum 6.20
FOR ALL SOILS, SOFT DISINTEGRATED ROCK AND STONE MATRIX (ITEM N0s 8-b
to 15 ABOVE )
267 21.a.I Extra for every additional 1 metre lift or part there of over the initial lift for the first 3 extra 1 cum 1.30
lifts
268 ii Extra for every additional 1 mtrs. lift or part there of from 4 th extra lift to 6 th extra lift 1 cum 2.10
269 iii -do- from 7 th extra lift and above 1 cum 3.20
FOR HARD DISINTEGRATED ROCK (ITEM 16 & 17 ABOVE )
270 21.b. I Extra for every additional 1 metres Lift or part there of over the initial lift for first 3 extra 1 cum 2.10
lifts
271 ii Extra for every additional 1 mtrs. lift or part there of from 4 th extra lift to 6 th extra lift 1 cum 3.10
272 21.b.iii -do- from 7 th extra lift and above 1 cum 4.60
FOR FISSURED AND FRACTURED, HARD ROCK AND BOULDERS ETC.,(ITEM 18 TO
19 a ABOVE ).
273 21.c.I Extra for every additional lift of 1 metre or part there of over the initial lift for the first 3 1 cum 4.10
extra lifts
274 ii Extra for every additional lift of 1metre or part there of over from 4th extra lift to 6 th extra 1 cum 5.10
lift
275 iii -do- from 7 th extra lift and above 1 cum 6.60
276 Note: The lift charges mentioned in SS item Nos 21a,21 b, and 21c under (D) Earth work
are applicable to delifts also.
277 22.a Add to relevant SS 20-A rates for new tank bunds, closing breaches, road formation and 1 cum 2.10
embankments for extra watering and consolidation by stone roller upto 1 tonne.
280 Note: The element of Hire charges is Rs 51.76 per 10 cum corresponding to the hire 1 cum
charges of 8 to 10 Tonne power roller fixed at Rs. 2200/- per day of 8 hours. The rate
shall be increased when the element of hire charges increases for item No. 22 c above,if
the roller is lent to the contractor at a rate of Rs 275/- per hour(i.e., Rs 2200/- per day of 8
hours may be effected).
281 22.d Extra for every additional 1/2 km lead for water over the initial lead of 1/2 Km for 1 cum 2.20
consolidation of banks .
282 23.a Benching old embankment slopes 0.45 x 0.45 metres. 1 RM 1.30
283 23.b Puddle wall work 1 cum 33.50
284 24 Turfing slopes including watering for 3 months with initial lead for conveyance of water 1 Sq.m 13.50
and grass for 1 hectometre.
285 25 Refilling with the excavated sand complying with the standard specifications for filling 1 cum 10.50
foundations
286 26.a Refilling with the excavated soils ( other than sand) complying with the standard 1 cum 7.10
specifications for filling foundations.
287 b Trimming of slopes of embankments and depositing the soils on the top of the bank. 1 cum 50% of earth work
of similar classification
290 Note:
291 1. Add for vibrating concrete 1 cum 32.00
292 2. Add for machine mixing of concrete. 1 cum 31.50
293 3.Add where the power is available for operating the mixer, the rate is, 1 cum 21.00
294 aI White washing and colour banding for guard and guide stones including cost of materials each 4.10
299 L2 Centering charges for bed blocks and culvert slabs and other structures of less than 3 1 cum 572.00
mts. span.
CENTERING CHARGES FOR MINOR AND MAJOR BRIDGE WORKS
300 L3 For mass concrete piers, abutments and steining well curbes, well caps etc., 1 cum 507.00
301 L4 For RCC piers, abutments, wing wall, steining, well curbs, well caps etc., 1 cum 634.00
302 NOTE:- The rates under L3 and L 4 are applicable to Roads and Buildings and Irrigation structures up
to 2 metres width
303 L5 For RCC deck slabs 1 cum 1206.00
304 L6 For RCC beams 1 cum 1524.00
305 L7 For RCC hand rails 1 cum 1627.00
306 L8 For CC pavements, wearing coats, approach, slabs, guide stone, J. M. stone etc., 1 cum 121.00
n Laying and fixing RCC Hume pipes in position including lifting, aligning etc., complete with
(fixing ) collars for the following diametres of pipes but excluding cost of materials ( NP2
Class )
307 n1 250 mm diameter 1 Rm 12.00
308 n2 300 mm diameter 1 Rm 16.00
309 n3 450 mm diameter 1 Rm 22.00
310 n4 600 mm diameter 1 Rm 35.00
311 n5 750 mm diameter 1 Rm 44.00
312 n6 800 mm diameter 1 Rm 52.00
313 n7 1000 mm diameter 1 Rm 58.00
314 n8 1220 mm diameter 1 Rm 74.00
315 Note:- For NP3 class 50% extra over the rates of NP2. Class
may be allowed.
(S ) ROAD WORK ITEMS
PICKING OLD METALLED SURFACE TO DEPTH OF 40 TO 100 mm SPREADING OLD
METAL AND NEW METAL SECTIONING INCLUDING EDGEBUNDS AND SUBGRADE
ROLLING, SPREADING METAL INCLUDING BLINDAGE OFGRAVEL WATERING
WITH AN INITIAL LEAD OF 2 HECTOMETERS AND HAND ROLLER ( 1.5 TO 2
TONNES) ROLLING ETC., INCLUDING BARRICADING, DIVERSION OF TRAFFIC
AND WETTING THE NEW CONSOLIDATION FOR A FORTNIGHT COMPLETE.
323 2 Picking 5 to 100 mm old metalled surface and sectioning 10 sqm 14.00
324 3 Picking gravelled surface 25 mm deep and levelling and sectioning 10 sqm 4.10
325 4 Picking the existing B.T. surface and removal of chips 10 sqm 14.50
326 5 Picking old metalled surface to a depth of 40 to 100 mm and spreading metal
including watering with an initial lead of 2 Hectometres and rolling with power
rollers watering and spreading gravel for blindage and power roller rolling including
hire chages of power roller( 8 to 10 t of) barricading and diversion of traffic and
wetting the new consolidation for a fortnight(for compacted thickness of )
HARD METAL
327 5 (a) 40 mm thick ness 10 sqm 100.00
328 (b) 50 mm thick ness 10 sqm 114.00
329 (c ) 75 mm thick ness 10 sqm 127.00
330 (d ) 100 mm thick ness 10 sqm 134.00
331 (e) 150 mm thick excluding hire charges 10 sqm 240.00
Spreading gravel watering with an initial lead of 2 hectometres and power roller ( 8
to 10 T ) rolling excluding hire charges of power roller and barricading etc., ( for a
compact thickness of )
332 6a 50 mm thickness 10 sqm 18.50
333 b 75 mm thickness 10 sqm 24.50
334 c 100 mm thickness 10 sqm 39.50
335 d 150 mm thickness 10 sqm 44.50
336 7a Blinding the road surface 6 mm thick with gravel or sand available at site after 10 sqm 1.10
remaining loose stones including watering.
337 b -do- without watering 10 sqm 1.00
338 8a Blinding the road surface 6 mm thick with gravel or sand dug from road site 10 sqm 2.10
including watering.
339 b -do- without watering 10 sqm 1.60
340 Spreading gravel sand including watering and roller rolling ( for compacted
thickness of )
341 9a -do- 6mm to 20 mm thick 1 cum 28.50
342 b -do- from 20 to 25 mm thick 1 cum 24.50
343 c -do- from 25 to 40 mm thick 1 cum 23.50
344 d -do- from 40 to 50 mm thick 1 cum 21.50
345 10 Picking 50 to 100 mm Old metalled surface, spreading metal and blindage watering 10 sqm 19.50
tamping for patch repairs ( labour only )
346 11 Picking old metalled surface 50 to 100 mm deep spreading gravel watering and tamping ( 10 sqm 10.00
labour only )
347 12 Levelling ruts and tamping gravelled roads 10 sqm 2.40
348 13 Levelling ruts and tamping metalled roads 10 sqm 4.20
349 14 Spreading gravel or sand including watering and rolling with hand roller irrespective of 10 cum 173.00
thickness in layer
350 15 Carrying for water for WBM consolidation metal and blindage of 40 to 150 mm thickness 10 sqm 2.40
for every one hectometre beyond initial lead of 2 hectometres
351 Gelatin(For MORTH data,for works of state & national high ways only) Per Kg 36.00
352 Electric Detonators(For MORTH data,for works of state & national high ways only) each 1.00
353 Hot applied thermoplastic compound(For MORTH data,for works of state & national high Per Litre 150.00
ways only)
354 Reflectionising glass beads of 2 mm thick(For MORTH data,for works of state & national Per Kg 50.00
high ways only)
355 Road marking paint confirming to IS 164(For MORTH data,for works of state & national Per Kg 125.00
high ways only)
BAILING OUT WATER CHARGES FOR CD & CM WORKS (WHEREVER REQUIRED)
356 I 14 For earth work excavation for foundations below low water level 1 cum 85.00
357 I 15 For cement concrete for foundation below low water level 1cum 85.00
358 n Labour charges for laying filters with coarse aggregate. 1 cum 34.00
359 o Labour charges for laying filter with sand. 1 cum 16.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
BUILDING ITEMS
SS RATE
FOR 2005-
S. No Details Unit 06
1 2 3 4.00
IV . RATES OF MATERIALS
(A) BRICKS & TILE PRODUCTS
Bricks second class or ground moulded (Non-Modular or traditional size) 23 x
1 11 x 7 cm 1000 Nos 1350.00
2 - do- modular size 19 x 9 x 9 cm 1000 Nos 1404.00
3 Bricks country (Non-modular tradditional size) 22 x 11 x 5 cm 1000 Nos 972.00
Flyash lime solid blocks with compressive strength of 100 kg/sq.cm
4 290 x 225 x 140 mm Each 8.30
5 290 x 200 x 140 mm Each 7.10
6 290 x 122 x 140 mm Each 4.80
7 290 x 100 x 140 mm Each 4.00
8 225 x 100 x 60 mm Each 1.70
9 145 x 225 x 140 mm Each 4.80
10 145 x 200 x 140 mm Each 3.60
Flyash lime solid blocks with compressive strength of 50 kg/sq.cm
11 290 x 225 x 140 mm Each 7.10
12 290 x 200 x 140 mm Each 5.90
13 290 x 122 x 140 mm Each 3.60
14 290 x 100 x 140 mm Each 3.00
15 225 x 100 x 60 mm Each 1.30
16 145 x 225 x 140 mm Each 3.60
17 145 x 200 x 140 mm Each 3.20
18 Cynder 1 Cum 248.40
Supply of ‘AEROCON’ HQ building Blocks & ‘COMFORTILE-Thermal Roof
Tile’ (‘Ex-factory price) including all taxes.
A. AEROCON – HQ BUILDING BLOCKS
19 600 x 200 x 75 mm Each 24.80
20 600 x 200 x 100 mm Each 33.50
21 600 x 200 x 125 mm Each 40.00
22 600 x 200 x 150 mm Each 46.40
23 600 x 200 x 200 mm Each 62.60
24 600 x 200 x 230 mm Each 72.40
B. COMFORTILE -Thermal Roof Tile
25 300 x 200 x 50 mm Each 9.70
Supply & fixing of AEROCON PANELS
26 Supply & fixing of 50mm thick Aerocon sandwich Panels having Tongue and
Groove joint for partitions and walls using G.I. Flooring & Ceiling channels,
hardware, Labour, transportation, wastages, etc.,as a complete item of work
excluding finishings, fittings & fixtures. Sqm. 918.00
27 Supply & fixing of 75mm thick Aerocon sandwich Panels having Tongue &
groove joint for partitions And walls using G.I. Flooring & Ceiling channels,
hardware, Labour, transportation, wastages, etc.,As a complete item of work
Excluding finishings, fittings & fixtures Sqm. 1026.00
AEROCON PANELS
28
50mm thick x 600mm standard width x 2400mm, 2700mm & 3000mm lengths Sqm. 648.00
29 75mm thick x 600mm standard width x 2400mm, 2700mm & 3000mm lengths Sqm. 864.00
CUDDAPAH/SHAHABAD STONES
Cuddapah/Shahabad slab 40 mm thick and size not less than 0.457 M x 0.457
30 M 1 Sqm 90.70
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Cuddapah/Shahabad slab 50 mm thick and size not less than 0.457 M x 0.457
31 M 1 Sqm 101.50
Shahabad Stone slab of Tandur 25.4 mm thick
32 White 10 Sqm 680.40
33 Blue 10 Sqm 734.40
Shahabad Stone slab of Tandur 50.8 mm thick
34 White 10 Sqm 777.60
35 Blue 10 Sqm 885.60
Polished Shabad stone slab 25.4mm thick (0.457 x 0.457M)
36 White 10 Sqm 1323.00
37 Blue 10 Sqm 1674.00
38 Polished black cuddapah slabs 25.4 mm thick (0.457x 0.457M) 10 Sqm 1247.40
39 Polished Bethamcherla white stone 25.4 mm thick (0.254M x0.254M) 10 Sqm 3267.00
40 Polished Bethamcherla colored stone 25.4 mm thick (0.254M x0.254M) 10 Sqm 3483.00
41 High Polished Granite 18 to 20 mm thick up to 8'-00 (2.43 M) other than black 1Sqm 1587.60
42 High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black 1Sqm 1458.00
43 High Polished Granite 18 to 20 mm thick up to 8'-00 (2.43 M) black 1Sqm 1360.80
44 High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black 1Sqm 1231.20
Rounding the edges of cuddapah Slabs and Shahabad stone slabs & Marble
45 slabs including polishing the same. 1 Rm 27.00
46 Rounding the edges of Granite slabs including polishing the same. 1 Rm 81.00
47 Flat nosing to Cuddapah slabs and Shahabad stone slabs 40mm thick 1 Rm 3.90
48 Flat nosing to Cuddapah slabs and Shahabad stone slabs 50mm thick 1 Rm 4.50
49 Flat nosing to Cuddapah slabs and Shahabad stone slabs 60mm thick 1 Rm 5.70
50 Flat nosing to Cuddapah slabs and Shahabad stone slabs 75mm thick 1 Rm 6.50
FLOORING SLABS/ TILES
Dongari Adanga marble slab polished 18 mm to 20 mm (average ) thick (size
51 0.457 M x 0.457 M)/ (0.6M x 0.6M) 1 sqm 486.00
Dongari Adanga marble slab polished 16 mm to 20 mm (average ) thick (size
52 0.457 M x 0.457 M)/ (0.6M x 0.6M) 1 sqm 432.00
Dongari Adanga marble slab polished 18 mm to 20 mm (average ) thick 0.305
53 M x 0.305 M 1 sqm 405.00
Dongari Adanga marble slab polished 16 mm to 20 mm (average ) thick 0.305
54 M x 0.305 M 1 sqm 351.00
Dongari Adanga marble slab polished 18 mm to 20 mm (average ) thick ( 0.610
55 M width of any length). 1 sqm 648.00
Dongari Adanga marble slab polished 16 mm to 20 mm (average ) thick ( 0.610
56 M width of any length) 1 sqm 594.00
57 Marble Tiles polished 8 mm thick 1 sqm 280.80
58 Cutting marble slabs upt o 50 mm thick by mechanical device. 1 RM 5.40
59 Granite stone tiles 8 mm thick ( mirror polished of all shades) 1 sqm 604.80
Ceramic tiles 7.3mm thick 1st quality of all shades ( as per manufacture
60 specification) 1 sqm 324.00
Chequrred Terrazo tiles of 22 mm thick ( Medium shade) 0.254
61 M x 0.406 M 1 sqm 189.00
Chequrred Terrazo tiles of 22 mm thick (Dark shade) 0.254
62 M x 0.406 M 1 sqm 172.80
Chequrred Terrazo tiles of 30 mm thick ( Light shade) 0.305 M x
63 0.305 M 1 sqm 172.80
Chequrred Terrazo tiles of 30 mm thick (Dark shade)
64 0.305 M x 0.305 M 1 sqm 183.60
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
77 Supply & Fixing precast Terrazo Tiles Marbleite in white tiles 20 mm thick 1 Sqm 167.40
78 a) Fixing charges only 1 Sqm 17.80
79 b) Polishing charges only 1 Sqm 23.80
80 c) Wax polishing charges only. 1 Sqm 14.60
81 Supply & fixing Terrazo tiles 20 mm thick grey tiles 1 Sqm 97.20
82 a) Fixing charges only 1 Sqm 17.80
83 b) Polishing charges only 1 Sqm 23.80
84 c) Wax polishing charges only. 1 Sqm 14.60
Supply & fixing of Crazy Marble flooring
85 Marble powder 1 Kg 2.10
86 Marble chips 1 Sqm 351.00
87 Mosaic chips 1 Sqm 1984.00
88 Grinding, Polishing, electricity charges 1 Sqm 69.70
89 Vitrified polished floor tiles 800x 800x10 mm thickness premium type 1st quality 1 Sqm 1220.40
Vitrified polished floor tiles 600x 600x 8mm thickness premium colour 1st
90 quality. 1 Sqm 864.00
91 Vitrified polished floor tiles 600x 600x 8mm thickness normal colour 1st quality. 1 Sqm 756.00
92 Vitrified polished floor tiles 400x 400x 7mm thickness normal colour 1st quality. 1 Sqm 702.00
Providing Bisazza glass Tiles Group 1 series or equivalent quality 20 x 20x4 mm
thick to be aplied on sponge finish using laucratic 290 thin set polymer based
93 adhesive. 1 Sqm 1395.40
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled laths
143 (rate includes top cover bearings, and locking arrangements etc. ) 1 Sqm 1296.00
Supplying & fixing collapsable steel shutters with verticle, double channel of 20
x10x2 mm of 100 mm center Bracers with flat iron 40x40x6 mm with 38 mm dia
144 steel plully with all fixtures and furniture as per special spn. 1105 1 Sqm 1080.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
210 Heavy duty mortice lock 6/7 levers with PC or CP handles complete set Each 326.20
211 Heavy duty mortice lock 6/7 levers with brass heavy handles Each 1137.20
212 Brass latch heavy 300 mm Each 238.70
213 Brass latch heavy 350 mm Each 274.30
214 Brass latch heavy 450 mm Each 361.80
215 Friction stay hinges for windows Each 48.60
216 Keyless lockset for toilet with CP or PC handles (complete set) Each 140.40
217 Keyless lock set for toilet with brass handles Each 373.70
(E) MISCELLANEOUS ITEMS
218 Alluminium sheet 24 Gauge 1 Sqm 180.40
Alluminium strips
219 Alluminium Strip 40 mm wide and 2 mm thick 1 Kg. 125.30
220 Alluminium plain strip edging 38x12x3 mm Metre 40.00
221 Alluminium plain strip edging 57x12x3 mm Metre 57.20
222 Alluminium strips 10 mm 1 Kg. 113.40
223 Alluminium Strips 25 mm 1 Kg. 113.40
224 Alluminium Stips 38 mm wide and 1.6 mm thick. 1 Kg. 113.40
225 7.5mm thick Alluminium Grill (as approved by the department) 3.58 Kg/Sq.m. 1 Sqm 664.20
226 Supply & fixing MS/CI grills of any design 1 Kg. 32.40
227 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1" (25.4 mm ) thick 1 Sqm 530.30
228 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1/2" (12.7 mm ) thick 1 Sqm 303.50
229 Expanded metal Jally 3/4" (19.05 mm ) size 1 Sqm 82.10
230 GI (M.S) fly proof wire mesth 16 x 20 guage 1 Sqm 111.20
231 SS fly proof mesh 1 Sqm 270.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
232 Chain link mesh 8 guage 2" x2" (50.8 mm x 50.8 mm) 1 Sqm 128.50
233 Chain link mesh 8 guage 3" x 3" (76.2 mm x 76.2 mm) 1 Sqm 87.50
234 Chain link mesh 8 guage 4"x4" (101.6 mm x 101.6 mm) 1 Sqm 74.50
235 Rabbit wire mesh (chicken mesh) 1 Sqm 8.60
Providing Tarfelting roof repairs duly applying one coat of appropriate grade of
bitumen in hot condition @ 1.2 Kg/1Sqm of roof area, fixing tarfelt
(Manufactures to IS 1322/1972 specification), applying second coat of
appropriate grade of hot bitumen at 1.20 Kg/1Sqm of roof area and spreading
course aggregate (sand ) at 0.063 cum per 1 Sqm of roof area finished item
236 including all taxes. 1 Sqm 113.40
ROOFSHIELD-1500 OR EQUIVALENT (1.50 mm thickness, 2.25Kg per Sq.Mt
and 20 X1 Mtr. roll with a center core of 90 micron thickness HMHDPE film)
Water Proofing Membrane.A) apply one coat of Butiminous Emulsion, first coat
of bituminous grade 85/25, fix "ROOFSHIELD-1500 OR EQUIVALENT" water
proofing membrane, apply second coat of Bitumen grade 90/15 after sealing all
the joints and abutments with a Gas torch and apply one coat of BITUMINOUS
ALUMINIUM PAINT for heat resistance for finished item including all taxes
Supplying and finishing (Altek or equivalent brand) to interior faces of new walls
and ceiling of approved colour as per manufacturers specification including cost
and conveyance of materials to site and labour charges such as preparing the
333 wall, applying primary coat etc, complete for finished item of work. 1 Sqm 70.20
334 Altek paint 25 Kg 313.20
335 Trump 1 Ltr 129.60
336 Snowcem or equivalent quality 25 Kg 864.00
337 Surya Cem or equivalent quality 25 Kg 162.00
338 a).Unitek Fine Grade or equivalent brand 25kg 259.20
b).Supply and finishing of Unitek fine Grade or
equivalent brand t with superfine grade to interior
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Supply & Application of One Coat of Alltek Water Based Cement Primer & Two
353 Coats of Alltek Alltimate (100% Pure Acrylic Emulsion Paint) 1 Sqm. 118.00
ANTI TERMITE TREATMENT TO OLD & EXISTING BUILDINGS
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Providing post construction anti termite treatment to drilling 1/2 inch dia., holes
in 12mm depth at the edges of wall floor junction every foot apart and pouring
anti termite chemical (Chloriphriphos 20% E.C / Lindine - 20 % E.C. ) with a
hand operator pressure pump until refusal or to a maximum of one litre per hole.
Holes will sealed with cement motor after treatment and providing spraying and
injenction termiticides fro treating and applying doors, windows, frames,
removing , crusting treating with preventive chemicals ( the plinth area of the
building each floor shall be taken for purpose of payment) finished item
354 including all costs, conveyances and all taxes. 1 Sqm. 118.00
Kremasoie INS, Semi gloss finish Artilin Anti Insect paint OR EQUIVALENT for
interior and exterior surfaces, which will be applied on cement plastered surface,
brick, old matt finish paints adhering to the substrate, wood, wood products,
357 plasttic products, tiles, glass texttile covering etc., washable finished item . 1 Sqm. 262.00
Kremacryl, Matt finish Artilin Anti Insect paint OR EQUIVALENT for interior and
exterior, which will be applied on cement plastered surface, brick, old matt finish
358 paints adhering to the substrate, wood etc., washable finished item . 1 Sqm. 287.00
Vernis 107, Semi gloss finish transparent Artilin Anti Insect Varnish OR
EQUIVALENT for wood work, works against wood borers and termites also for
interiors only, which will be applied on wooden surfaces, steel surfaces and
359 tiles, washable finished item . 1 Sqm. 262.00
Kermasoie Fongicide, Semi gloss finish Artilin Anti Fungus paint OR
EQUIVALENT for inreriors and exteriors which will be applied on cement
plastered surface, brick, old Matt finish paints adhering to the substrate,wood
and wood products, plaster products, tiles and glass texttile covering etc.,
360 washable finished item . 1 Sqm. 237.00
Kermasoie INS& Fong, Semi gloss finish acrylic Artilin Anti Insect and Anti
Fungus paint OR EQUIVALENT for inreriors and exteriors which will be applied
on cement plastered surface, brick, old Matt finish paints adhering to the
substrate,wood and wood products, plaster products, tiles and glass texttile
361 covering etc., washable finished item . 1 Sqm. 292.00
Bactesoie, Semi gloss finish Artilin bactericidal and fungicidal paint OR
EQUIVALENT for inreriors only which will be applied on cement plastered
surface, brick, old Matt finish paints adhering to the substrate,wood and wood
products, plaster products, tiles and glass texttile covering etc., washable
362 finished item . 1 Sqm. 320.00
Prelaminated particle Board
(One side choice colour and other side balancing white lamination)
A EXTERIOR (GRADE-I)
363 9 mm thick 1 Sqm 567.00
364 12 mm thick 1 Sqm 626.40
365 18 mm thick 1 Sqm 756.00
366 25 mm thick 1 Sqm 816.50
B. REGULAR (GRADE -II)
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
419 Extra for venered particle Board with commercial venerrring on both sides. 1 Sqm 95.00
Venering on both sides with one side teak venered and other side commercial
420 venered 1 Sqm 202.00
421 Teak venering on both sides 1Sqm 315.40
422 Particle Board 12 mm thick (Three Layer) 1 Sqm 249.50
PANELS
Plain particle Board (PPB) (Interioir Grade)
423 9 mm thick 1 Sqm 205.20
424 12 mm thick 1Sqm 227.90
425 15 mm thick 1 Sqm 258.10
426 18 mm thick 1Sqm 285.10
427 21.4 mm thick 1 Sqm 324.00
428 25 mm thick 1Sqm 343.40
Plain particle Board (PPB) (Exterior Grade)
429 9 mm thick 1 Sqm 273.20
430 12 mm thick 1Sqm 295.90
431 15 mm thick 1 Sqm 353.20
432 18 mm thick 1Sqm 385.60
433 21.4 mm thick 1 Sqm 446.00
434 25 mm thick 1Sqm 482.80
Prelaminated particle Board (OSL) (Interior Grade)
435 9 mm thick 1 Sqm 419.00
436 12 mm thick 1Sqm 451.40
437 15 mm thick 1 Sqm 497.90
438 18 mm thick 1Sqm 529.20
439 21.4 mm thick 1 Sqm 568.10
440 25 mm thick 1Sqm 594.00
Prelaminated particle Board (OSL) (Exterior Grade)
441 9 mm thick 1 Sqm 470.90
442 12 mm thick 1Sqm 529.20
443 15 mm thick 1 Sqm 565.90
444 18 mm thick 1Sqm 600.50
445 21.4 mm thick 1 Sqm 661.00
446 25 mm thick 1Sqm 698.80
Prelaminated particle Board (BSL) (Interior Grade )
447 9 mm thick 1 Sqm 475.20
448 12 mm thick 1Sqm 516.20
449 15 mm thick 1 Sqm 548.60
450 18 mm thick 1Sqm 587.50
451 21.4 mm thick 1 Sqm 661.00
452 25 mm thick 1Sqm 737.60
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
False ceiling with 12.5 mm Gypsum Board IS 2095 -1982 using Gyp steel
484 section including installation and complete finish excluding painting. 1 Sqm 577.80
Supply & fixing GVP board 0.595 x 0.595M 12.5mm thick tile using fine line
485 grid system including installation and complete finished excluding painting 1 Sqm 640.40
Gypboard wall lining :
Supply & fixing of Gypboard wall lining using 9.5/12.5 mm thick Gyp - board
(cnforming to IS 2095-1982), fixing to Gypsteel GI channels of perimeter
channel (20mm x30mm x27mm x0.55mm thick) and ceiling channels of (51.5
mm x 26mm x26mmx10.5mmx0.55mm thick) and fixing and finishing using joint
486 compound and paper tapecomplete finish as per specification without painting. 1 Sqm 591.80
Gypboard plain false ceiling:
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Supply and fixing of Gypboard plain false ceiling using 12.5 mm thick Gypboard
conforming to IS 2095 -1982, fixing to Gypsteel GI channels frame work using
perimeter channel (20mm x30mmx27mmx0.55mm) Intermediate channels
(45mm x15mmx15mmx0.9mm) and ceiling channels (51.5 mm x26mm x10.5mm
x 0.55 mm thick) jointing and finishing using joint compound and paper tape
487 complete finish as per specification without painting 1 Sqm 651.20
Gypboard (fine line) Grid suspended ceiling
Supply and fixing of Gypboard (conforming to IS 2095-1982 ) FALSE
CEILING WITH FINE LINE EXPOSED Grid suspended ceiling system using
pre-coated galvanized steel main "T" section (24x38x0.35 mm thick x 3600
mm) Cross "T" (24x38x0.35mm x 600mm)and wall angle of (24x24x0.8 mm
thick x 3050 mm) to form Grid size 600x 600 mm using MS Rods, "J" Bolts
and anchor fasterners etc as per specification & as directed by dept,
officers.
488 Using Plain Gypsum Board 9.5 mm laid on to the Grid 1 sqm 534.60
489 Using Plain Gypsum board 12.5 mm laid on to the Grid. 1 Sqm 577.80
Gypboard metal stud partition single layer:-
Supply &fixing 75mm thick metal stud partition using 12.5 mm thick Gypboard
conforming to IS 2095-1982 screw fixed to either side to 48 mm studs of 0.55
mm thick with the 50 mm floor and ceiling channel 0.55 mm and the joints duly
finished with joint compound, paper tape and two coats Dry wall top coat as per
490 specification. 1 Sqm 972.00
Providing false ceiling with 15 mm thick Arm strong mineral fiber Board fine
finished of size 600x 600mm fixed over Aluminum frame using "T" Angles
38.1x25.4 mm (1 1/2" x1") size heavy duty weight suspended from roof using
6mm dia MS Rod hooking over roof replacement and outer attached to the "J"
Bolts fixed to the"T" angles including Cost &conveyance of all materials and
labour charges such as cutting , fixing of standing of frame work exposing roof
491 making complete for finished item of work 1 Sqm 702.00
Plywood 3 ply with teak ply on one face and commercial ply on another face
501 4mm thick 1 Sqm 374.80
502 Plywood 5 ply with commercial ply on both faces 6 mm thick 1 Sqm 332.60
503 Plywood 5 ply with commercial ply on both faces 8 mm thick 1 Sqm 339.10
504 Plywood 5 ply with Teak ply on both faces 9 mm thick 1 Sqm 814.30
Plywood 5 ply with teak ply on one face and comercial ply on another face 6 mm
505 thick 1 Sqm 487.10
Plywood 5 ply with teak ply on one face and comercial ply on another face 9 mm
506 thick 1 Sqm 624.20
507 Plywood 9 ply with commercial ply on both faces 12 mm thick. 1 Sqm 386.60
508 Plywood 9 ply with commercial ply on both faces 15 mm thick. 1 Sqm 558.40
509 Plywood 9 ply with commercial ply on both faces 19 mm thick. 1 Sqm 641.50
510 Plywood 9 ply with teak ply on both faces 12 mm thick 1 Sqm 950.40
Plywood 9 ply with teak ply on one face and commerical ply on another face 13
511 mm thick 1 Sqm 796.00
Flush Door Shutters ( Kutty or Equivalent ) Conforming to IS 2201
(Providing Solid core Flush Doors veneer facing).
Both Sides Teak
512 40/38 mm thick 1 Sqm 1303.00
513 35mm thick 1 sqm 1272.20
514 30 mm thick 1 sqm 1213.90
One Side teak wood and other side commercial
515 40/38 mm thick 1 sqm 1172.90
516 35 mm thick 1 sqm 1123.70
517 30 mm thick 1 sqm 1075.70
One Side teak wood and other side Kutty Coat
518 40/38 mm thick 1 sqm 1386.70
519 35 mm thick 1 sqm 1332.50
520 30 mm thick 1 sqm 1279.30
Both Side Commercial
521 40/38 mm thick 1 sqm 995.80
522 35 mm thick 1 sqm 948.20
523 30 mm thick 1 sqm 899.10
Both Sides Kutty Coat
524 40/38 mm thick 1 sqm 1236.60
525 35 mm thick 1 sqm 1183.70
526 30 mm thick 1 sqm 1129.70
Providing Internal Lipping by Teak Wood Single Leaf
527 All edges 30 mm thick & below 1 sqm 317.50
528 35 mm thick 1 sqm 359.60
529 38/40 mm thick 1 sqm 395.30
Providing Internal Lipping by Teak Wood Double Leaf
530 All edges 30 mm thick & below 1 sqm 485.50
531 35 mm thick 1 sqm 509.50
532 38/40 mm thick 1 sqm 671.20
Providing External Lipping by Teak Wood Single Leaf
533 All edges 30 mm thick & below 1 sqm 221.40
534 35 mm thick 1 sqm 245.70
535 38/40 mm thick 1 sqm 245.70
536 Bottom edges only 1 sqm 23.80
Providing External Lipping by Teak Wood Double Leaf
537 All edges 30 mm thick & below 1 sqm 263.50
538 35 mm thick 1 sqm 293.80
539 38/40 mm thick 1 sqm 293.80
540 Bottom edges only 1 sqm 23.80
Providing External Lipping by Hard Wood Single Leaf
541 All edges 30 mm thick & below 1 sqm 83.90
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
The Door Chaukhat Frame (Single Rebate) shall be made of solid PVC foam
profile with homogenous fine cellular structure having smooth outer integral skin
having 60mm width and 30mm thickness and shall be fixed to wall as per
instructions of engineer in charge using 100 x 8 sheet metal CSK screws. Door
frame should be waterproof, termite proof, elegant and should have excellent
screw holding strength to fix hinges and hold doors properly for a long life for
finished item of work including all taxes. 1 Rm 245.00
ACCUCEL OR EQUIVALENT PANEL DOOR SHUTTER: 750mm(W)
634 x2100mm(L) x28mm (T)
The door shutter shall be made of solid PVC foam profile with homogenous fine
cellular structure having smooth outer integral skin having 71mm width and
28mm thick as vertical and horizontal stiles, joints are made using solvent
adhesive and GI ‘C’ sections (39mm x 19mm x 19mm x 0.6mm thick) or MS
pipe (40mm x 20mm) stiffener frame insert and telescopic polymeric ‘L’ corners.
The panel shall be filled with 3mm thick high-pressure compact laminate as per
manufacturer’s guidelines. Cover molding shall be provided for covering fixing
screws and elegant look. Panel Door shutter should be waterproof, termite
proof, elegant and should have excellent screw holding strength to fix hinges
and hold doors properly for a long life. Normal hardware and fitting shall be
fixed for finished item of work including all taxes. 1 sqm 2350.00
ACCUCEL OR EQUIVALENT OPENABLE WINDOW SHUTTER WITH
635 DOUBLE REBATE CHAUKHAT FRAME (1600mm x 1600mm)
The Window Chaukhat Frame (Double Rebate) shall be made of solid PVC
foam profile with homogenous fine cellular structure having smooth outer
integral skin having 100mm width and 30mm thickness. Made of two sections
joined together with solvent adhesive and GI ‘C’ section (25mm x 19mm x
0.6mm thick) stiffener insert. Press fit type ‘Tee’ section 25mm width and 19mm
thick is fixed in the frame after fixing it to wall as per instructions of engineer in
charge using 100x8 sheet metal CSK screws. The Open able Window shutter
should made of solid PVC foam profile with homogenous fine cellular structure
having smooth outer integral skin having 71mm width x 28mm thick as vertical
and horizontal stiles. Joints are made using solvent adhesive and GI ‘C’
sections (39mm x 19mm x 19mm x 0.6mm thick) stiffener frame insert and
telescopic polymeric ‘L’ corners. The 4mm thick glass panel shall be fixed using
PVC foam profile beading (12mm x 10mm) for finished item of work including all
taxes. 1 Sqm. 4600.00
636 RAJSHRI OR EQUIVALENT SOLID DOOR FRAME
Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the
size 50 x 47mm with a wall thickness of 5mm, made out of extruded 5mm rigid
PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long
brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be
reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall
be fixed to the wall using 65/100mm long M.S. Screws through the frame by
using PVC fasteners. A minimum of 4nos. of screws to be provided for each
vertical member & minimum 2nos. for horizontal member etc. complete as per
manufacturers specification and direction of Engineer-in-Charge for finished
item of work including all taxes. 1 Rm 253.00
637 RAJSHRI OR EQUIVALENT SOLID PANEL DOOR SHUTTER
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Providing and fixing 30mm thick Solid panel PVC door shutter consisting of
frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm
for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat
of steel primers of approved make and manufacture. M.S. frame shall be
covered with 5mm thick heat moulded PVC ‘C’ channel of size 30 x 50mm
forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &
bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC
sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet
to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm
wide x 5mm thick PVC sheet beading on either side, and joined together with
solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width
is to be stuck on the interior side of the ‘C’ Channel using PVC solvent
adhesive. complete as per direction of Engineer-in-charge, manufacturer’s
specification & drawing for finished item of work including all taxes. 1 Sqm. 1743.00
DOOR FRAMES
MS. Hallow door frames manufactured by cold roll formed process steel sheet
1.25mm thick bright CRCA confirming to IS 4351 - 1976 with Hinges tower Bolts
638 etc. 1 Rm 167.40
Flush door shutters, solid bond wood block board type with teak ply on
both faces.
639 25 mm thick 1 sqm 902.90
640 30 mm thick 1 sqm 933.10
641 35 mm thick 1 sqm 1004.40
Flush door shutters, solid bond wood block board type with commercial
ply on both faces.
642 25 mm thick 1 sqm 459.00
643 30 mm thick 1 sqm 517.30
644 35 mm thick 1 sqm 567.00
645 40 mm thick 1 sqm 675.00
Flush door shutters, solid bond wood block board type with teak venner
on one face and commericla ply on another face (liping)
646 20 mm thick 1 sqm 605.90
647 25 mm thick 1 sqm 675.00
648 30 mm thick 1 sqm 756.00
649 35 mm thick 1 sqm 810.00
650 40 mm thick 1 sqm 864.00
Plain cement bonded particle boards conforming to IS 14276 truly exterior
grade (Bison panel or equivalent)
651 6 mm thick 1 sqm 150.10
652 8 mm thick 1 sqm 184.70
653 10 mm thick 1 sqm 217.10
654 12 mm thick 1 sqm 251.60
655 16 mm thick 1 sqm 335.90
656 20 mm thick 1 sqm 402.80
657 25 mm thick 1 sqm 487.10
658 30 mm thick 1 sqm 569.20
659 40 mm thick 1 sqm 737.60
Prelaminated cement particle board truly exterior board one side
laminated (Bison Lam or equivalent)
660 6 mm thick 1 sqm 400.70
661 8 mm thick 1 sqm 423.40
662 10 mm thick 1 sqm 446.00
663 12 mm thick 1 sqm 468.70
664 16 mm thick 1 sqm 521.60
Prelaminated cement particle board truly exterior board both side
laminated (Bison Lam or equivalent)
665 6 mm thick 1 sqm 446.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Supply and fixing of E-board wall paneling (water, fire and Termite proof)
with frame work made of GI stud profile of size 48 x 40 10 x 0.6 mm thick
placed at every 610 mm C/C intervals fixed vertically in between floor and
roof `U’ track of size 50 x 30 x 0.6 mm thick duly fixed with self expansion
screws and with 8 mm thick E-board / 6 mm thick E-board classic cladded
around with self tapping self embedding screws fixed at every 300 mm
(centres) leaving a 3 mm gap between two panels of width 2’-0”. The Gap
will be covered with a decorative beading.Surface will be given a smooth
finish over a coat of primer.
687 With 8 mm E-board 1 Sqm. 797.00
688 With 6 mm E-board Classic 1 Sqm. 860.00
DOUBLE SKIN PARTITION
Supply and fixing double skin E-board partition with Frame work made of GI
stud profile of size 48 x 40 x 10 x 0.6 mm thick placed at every 610 mm C/C
intervals and 915 mm horizontal intervals duly fixed with self expansion screws,
the E-board of 8 mm thick cladded around with self tapping self embedding
screws fixed at every 300 mm (centres) leaving 3 mm gap between two panels
of witdth 2’-0” (610 mm). The gap will be covered with decorative molding
surface will be given a smooth finish over cement primer. The rate is inclusive of
689 cost and conveyance of all materials and labour charges etc. complete. 1 Sqm. 1226.00
DOOR
Supply and fixing of E-board door shutter with alround style “U” lipping size 15 x
18 x 15 mm made from 0.8 mm thick powder coated cold rolled steel profiles
with 16 mm thick E-board with necessary screws fixed at 1’-0” interval 250 mm
long aldrops 2 Nos. M.S. nickel coated 250 mm long 1 No. M.S. Tower bolts
including cost and conveyance of all materials at site and applying 1 coat of
primar, 2 coats of luppum and 2 coats of synthetic enamel paint as per
690 approved design for finished item of work. 1 Sqm. 1050.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Providing and fixing frame made from 1.2 mm powder coated cold rolled steel
profiles of overall section size of 60 mm x 45 mm with 21 mm rivet for shutter
with necessary stiffners hinges and screws. E-board shutter with alround `U’
lipping of size 15 X 18 X 15 mm made from 0.8 mm thick CRCA powder coated
steel profile with 16 mm thick E-board with necessary screws fixed at every 1’-0”
interval 250 mm long aldrops 2 Nos. MS Nickel coated 250 mm long 1 No. MS
tower bolt including cost and conveyance. One coat of primer, 2 coats of luppum
and 2 coats of synthetic enamel paint as per approved colour, labour charges
691 etc. 1 Sqm. 1600.00
Cup Boards Shutters using Cement Bonded Particle Board (Bison Panel
or Equivalent )
Supply and fixing of cup board shutters and frames using 16mm thick Cement
Bonded Particle Board (Bison Panel or Equivalent) duly painted both sides with
one coat of primer and two coats of synthetic / enamel paint of approved shade
and brand including fixing of hardware like M.S. powder coated Piano hinges of
size 18mm x 18mm, brass ball catches, Aluminum tower bolts and handles ,
Godrej locks, Fevicol, screws and nails including cost and conveyance of all
materials, labour charges, all incidental and operational charges etc., complete
692 for finished item of work at site as per the directions of Engineer in Charge. 1 sqm 1269.00
False Ceiling using Cement Bonded Particle Board (Bison Panel or
Equivalent )
Supply and fixing of false ceiling with galvanized and pre painted steel T section
of size 24mm x 38mm x 0.4mm for main T duty pre punched to accept cross T
section of size 24mm x 30mm x 0.4mm duly punched at both ends for insertion
into main T. The grid size will be 610mm x 610mm. The frame work (grid) is
suspended to the roof by using G.I flat of 0.60mm or 14-gauge G.I wire with
necessary fixers to the roof and frame work. 8mm thick Cement Bonded Particle
Board lay on the grid. The cost inclusive of necessary hardware, labour, one
693 coat of primer (Both side) and two coats of smooth finish on visible side. 1Sqm 626.40
WALL PANELING WITH CEMENT BONDED PARTICLE BOARD (BISON
PANEL OR EQUIVALENT)
Supply and fixing bison panel wall paneling (water proof) with frame work made
of GI stud section of size 48mm x 35mm x 0.55mm thick placed at every 610
mm C/C intervals vertically and at 1200mm internals horizontally fixed to the wall
by means of self expansion screws and caps. 10 mm thick cement bonded
particle board (Bison panel or Equivalent) is to be fixed to frame by means of
self taping screws placed at every 300 mm intervals leaving 3mm gap between
two panels. The cost inclusive of one coat of Altek primer and two coats of
Altek smooth finish and cost & conveyance of all materials, labour charges etc.
694 complete as per the direction of Engineer in charge. 1 Sqm 1004.40
DOUBLE SKIN PARTITION WITH CEMENT BONDED PARTICLE BOARD
(BISON PANEL OR EQUIVALENT)
Supply and fixing double skin partition made out of G.I. track section of size
50mmx 35mm x 0.55 mm for fixing to the roof and floor and stud section of size
48mm x 35mmx 0.55mm placed in track section vertically at 610mm
intervalsand at 1200mm intervals horizontally fixed to the wall by means of self
expansion screws and caps to the wall and roof. 10mm thick Cement bonded
particle board (BISON PANEL OR EQUIVALENT) is to be fixed both sides of
frame work by using self taping screws fixed at every 300mm intervals to the
frame work leaving 3 mm gap between two panels. The cost inclusive with one
coat of Altek primer and two coats of Altek smooth finish and cost and
conveyance of all materials to site, labour charges etc., complete as per the
695 direction of Engineer in charge. 1 Sqm 1609.20
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Supply and fixing cement bonded particle board shutter with alround "U" section
of size 12mmx18mm x12mm made from 0.6 mm thick galvanized, color quoted
cold rolled steel profiles 16 mm thick panel with necessary screws fixed at
every 304.8 mm intervals. The cost inclusive of MS Nickel coated Aldrops of
size 255 mm long 2 Nos., 200 mm long tower boalts 1 No., 125 mm handles 2
Nos.m 300 mm long "T" hing cost and conveyance of all materials at site and
applying 1 coat primer, 1 coat of luppum and 2 coats of synthetic enamel paint
696 as per approved design for finished itme of work. 1 Sqm 1188.00
Doors Frames (Colour Coated Steel Sections) & Shutter using Cement
Bonded Particle Board (Bison Panel or Equivalent)
Providing and fixing of door frame made from cold roll formed sections made of
galvanized (Base steel as per IS277 with zinc of 120 Gms/sq.mtr) colour coated
steel sections with total coated thickness of 1mm, primer coated with epoxy
primer coat of 5-7 microns thick, finish paint with polyester paint of 12-16
microns. The Section for door frame is to be filled with polyurethane (P.U) form
of 40kg/m3. Overall size of frame section should be of 50mm x 50mm. With
necessary corner brackets, stiffeners, hinges,and screws. Cement Bonded
particle board shutter (Bison Panel or Equivalent) “Single Leaf” with all round
styles “U” section of size 12m x 18m x 12mm made from 0.6 mm thick
galvanized, colour coated cold rolled steel profiles with 16mm thick Cement
Bonded particle Board (Bison Panel or Equivalent) with necessary screws fixed
at every 1’-0” (304.8mm) intervals. The cost inclusive of MS nickel coated
Aldorp of size 250mm long 2nos. 200mm long tower bolt 1no., 125mm handles
2nos., cost and conveyance of all materials at site and applying one coat primer
, one coat of luppum and two coats of synthetic enamel paint as per approved
697 design for finished item of work 1 Sqm 1890.00
Box Type Cup Board using Cement Bonded Particle Board (Bison Panel or
Equivalent) & Shutter using Pre-Laminated Cement Bonded Particle Board
(Bison Lam or Equivalent)
Supply and fixing of box type cup board using 20mm thick Cement Bonded
Particle Board (Bison Panel or Equivalent) for making frame of size 100mm x
35mm using two sandwiched 16mm boards, one plain board and one Pre-
Laminated cement bonded particle board with plain 35mm wood lipping. The
Shutters are made of 16m thick Pre-Laminated Cement Bonded Particle Board
(Bison Lam or Equivalent) of approved shade inclusive of hardware like M.S.
powder coated Piano hinges of size ¾” x ¾” , Aluminum powder coated
handles of size 4” (101.6mm), Aluminum tower bolt 4” (101.6mm) Godrej locks,
698 screws, wood lipping and Fevicol etc., complete finish item of work. 1 Sqm 2700.00
Door Shutter with Cement Bonded Particle Board (Bison Lam or
Equivalent)
Supply and fixing of door shutter made out of PVC Hollow extruded section
having dimensions of 47mm x 26mm with wall thickness of 1.5mm with
necessary tapering to house Bison Lam thickness of 12mm. All the four corners
are jointed with PVC ‘L’ brackets of size 4’’ x 8’’ (101.6 x 203.2mm) and the PVC
lipping is filled with well-seasoned country wood to hold hinges. The hardware
consists of 250mm long aldrop – 2 Nos.250mm Handle- 1 No. (all are of
699 Aluminum). The cost is inclusive of all incidental, labour transportation charges. 1 Sqm 1239.00
Double Skin Partition with Pre Laminated Cement Bonded Particle Board
(Bison Lam or Equivalent)
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Supply and fixing double skin partition made out of G.I track section of size 50
mm x 35mm x 0.55mm for fixing to the roof and floor and stud section of size
48mm x 35mm x 0.55mm placed in track section vertically at 610mm intervals
and at 1200mm internals horizontally. The frame is fixed by means of self
expansion screws and caps to the wall / roof. 12mm thick Pre Laminated
Cement bonded particle board (Bison Lam or equivalent) is to be fixed both
sides of the frame work by using 2mm thick electro plated CR flat section
leaving 3mm gap between two panels. The cost inclusive of cost and
conveyance of all materials to sites, other materials incidentals and labour
700 charges as per the direction of Engineer in charges. 1 Sqm 1639.00
Wall Paneling with Pre Laminated Cement Bonded Particle Board (Bison
Lam or equivalent)
Supply and fixing of wall paneling with frame work made of G.I stud section of
size 48mm x 35mm x 0.55mm thick placed at every 610mm intervals vertically
and at 1200mm internals horizontally fixed to the wall by means of self
expansion screws and caps. 12mm thick pre laminated Cement bonded particle
board (Bison Lam or equivalent) is to be fixed to frame by means of self-taping
screws placed at every 300mm intervals leaving 3mm gap between two panels.
The cost inclusive of Conveyance of materials, Labour charges etc., complete
701 as per the direction of Engineer in charge. 1 Sqm 1320.00
Aluminum Partition with Pre Laminated Cement Bonded Particle Board
(Bison Lam or Equivalent)
Supply and fixing in position aluminum glazed partitions using 5.50 mm thick
plain glass to full height using with pre laminated cement bonded particle board
(Bison Lam or equivalent) of 10mm thick to a height of 0.91 metre at bottom
panel and remaining height with glass and aluminum sections anodized to 12 to
15 microns and of sections of size 37mm x 62mm and 1.5mm thickness with
one metre centre to centre duly fixed with clip beading on both sides including
fixing the frame to pillars by M.S. flats, bolts and nuts including cost and
702 conveyance of all materials etc., complete as directed during execution. 1 Sqm 2028.10
SINTEX OR EQUIVALENT DOOR (SINGLE PANEL)
Supply and fixing Sintex or equivalent doors are made out of PVC section and
panels. The overall dimension of the same is 33mm X 47mm with usual process
variation and having a wall thickness of 1.5mm with a variation of ± 0.3mm. The
infill is seamless hallow multi chambered PVC single panel having an effective
dimension of 762mm X 20mm having a wall thickness of 1mm ± 0.3mm
703 including all taxes complete, for finished item of work. Sqm. 1755.00
Supply and fixing PVC door frames made from extruded sections in overall
dimensions of 40 X 48mm having a wall thickness of 1.5mm with usual process
704 variation of ± 0.3mm, including all taxes complete, for finished item of work. Sqm. 164.20
SINTEX OR EQUIVALENT OPENABLE WINDOW
Supply and fixing of Sintex window shall be made out of extruded PVC section.
The outer frame having overall dimensions of 40 X 48mm with a wall thickness
of 1.5mm with usual process variation of ± 0.3mm. The shutter frame having
with overall dimensions of 26 X 47mm with wall thickness of 1.2mm ± 0.3mm
provided with 5mm glazing. The centre mullion having over all dimensions of 25
705 X 32.5mm ±0.3mm, including all taxes complete, for finished item of work. Sqm. 2615.80
SINTEX OR EQUIVALENT SLIDING 2 TRACK WINDOWS
Supply and fixing of two track or three track sliding window the outer frame shall
be 58 X 45mm with a wall thickness of 1.2mm ± 0.3mm. The sliding shutter
frame is made of PVC section 57 X 32mm with overall dimensions of 1.5mm ±
0.3mm provided with 5mm glazing. Roller bearings and arrestor type handle
cum lock shall be provided, including all taxes complete, for finished item of
706 work. Sqm. 2268.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Supply and fixing of PVC false ceiling on MS/GI made skeleton framework. The
frame shall be 24 X 48mm MS tube section fixed along with the wall. The entire
frame work shall be concealed with PVC section having overall dimensions of 6
X 250mm with a wall thickness of 1mm ± 0.3mm with tongue and groove
system, provided with necessary arrangements for electrical connections,
707 including all taxes complete, for finished item of work. Sqm. 1161.00
SINTEX OR EQUIVALENT WALL PANELLING
Supply and fixing of PVC cupboards for kitchen and bedrooms shall be made
out of multi chambered PVC sections having overall dimensions of 20 X 762mm
with a wall thickness of 1.2mm ± 0.3mm. The cabinets shall be made as per the
requirements of the room with groove system. The PVC section surface shall be
plain and laminated finish to have good look, including all taxes complete, for
709 finished item of work. Sqm. 3202.20
SINTEX OR EQUIVALENT SMC SIGN BOARDS
Supply of hot pressed compression moulded SMC sign plates for making road
signs ass per the approved dimensions of National Highway Authority Of India,
including all taxes complete, for finished item of work.
710 Circular sign plate Dia 400mm. Each. 464.40
711 Circular sign plate Dia 600mm. Each. 1220.40
712 Circular sing plate Dia 870mm Each. 2445.10
713 Triangular sign plate 600mm. Each. 626.40
714 Triangular sign plate 900mm. Each. 1414.80
715 Square sign plate 600mm. Each. 1134.00
716 Square sign plate 1000mm. Each. 4212.00
SINTEX OR EQUIVALENT PVC PARTITION
Supply and fixing of PVC Double Skin Partition. The entire framework shall be
carried out by mild steel section having overall dimensions of 24 X 48mm with a
wall thickness of 1.2mm. The entire framework shall be concealed with PVC
section having overal dimensions of 6 X 250mm with a wall thickness of 1mm ±
0.3mm both sides. Glass provision/Door provision can be provided along the
partition wherever required. Partitions can be made full or half as per
717 requirement, including all taxes complete, for finished item of work. Sqm. 2035.80
SINTEX OR EQUIVALENT WATER STORATGE TANKS
Supply of Sintex or equivalent Polyethylene water storage tank double layer
718 confirming to ISI 12701/96 mark with lid including all taxes. Ltr. 5.94
PVC DOOR SHUTTER (Nandi or Equivalent)
Supply and fixing of door shutters made of rigid PVC extruded hollow
section(Nandi or equivalent) of 20mm X 200 mm with the wall thickness of
1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking
arrangements.The shutter frame is made of 58 X 24 mm with the wall thickness
of 1.5mm +/- 0.15mm section metri-cut and joined at 4 cornors with 125mm X
225mm plastic brackets.The shutter shall be horizontally reinforced with 2 no's
of 8mm PVC rods. Teak wood battons shall be reinforced inside the door
shutter during the fabrication of the door shutter at those points wherever the
719 hardware is fixed on to the door shutter. Sqmt. 1074.60
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Supply and fixing of door shutters made of rigid PVC extruded hollow
section(Nandi or equivalent) of 20mm X 200 mm with the wall thickness of
1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking
arrangements.The shutter frame is made of 30mm X 79mm with the wall
thickness of 1.5mm +/-0.15mm section metri-cut and joined at 4 cornors with
125mm X 225mm plastic brackets.The shutter shall be horizontally reinforced
with 2 no's of 8mm PVC rods.Teak wood battons shall be reinforced inside the
door shutter during the fabrication of the door shutter at those points wherever
720 the hardware is fixed onto the door shutter. Sqmt. 1295.00
PVC DOOR FRAME (Nandi or Equivalent)
Supply and fixing of door frame made of hollow extruded PVC section(Nandi or
equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/-
0.2mm duly reinforced with seasoned wood plank at the hinges side. The door
721 frame top 2 cornors shall be metri-cut/weilded. 1 RM 155.00
Supply and fixing of door frame made of hollow extruded PVC section(Nandi or
equivalent) having dimensions of 40 X 46 mm with the wall thickness of 2mm +/-
0.2mm duly reinforced with seasoned wood plank at the hinges side. The door
722 frame top 2 cornors shall be metri cut/weilded 1 RM 135.00
PRE- PAINTED STEEL, WINDOWS, VENTILATORS & DOOR FRAMES.
Supply and fixing of windows & top Hung and fixed louvered ventilators
made of pre - painted steel (base steel as per IS 513 of -0.6 mm thick 'D"
quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with
epoxy primer of 5-7 microns thick, finish painted with a polyester paint of
12-16 microns thick and back coated with 5-7 microsn thick alkyd backer.
Section for outer frame should be 46 x 52 mm section for shutter should
be 46 x 46 mm section for mullion should be 46 x 70 mm, and section for
beading should be 18 x 25 mm and section for louvered ventilation should
be 33 x57mm Box section. The windows should be panelled with 5mm
thick plain float glass & 4 mm pinhead glass for ventilators with Ethy
propylene Diamine monomer Gasket(EPDM). The sections are to be cut to
length mitre joined with corner brocket centre mullions are to be fixed
using mullilon cap. Handle made of high grade aluminium powder coated
and nylon receiver. Gaskets made of Ethyl propylene Diamine
monomer(EPDM). Corner brackets made of
CRCA with Zinc Phasphating. Mullion caps made of glass linked nylon.
The above frames should be fixed to the concrete /masonry wall by means
of self expanidng screws. including 10 mm square guard bars with 6"
pitch and all taxes, complete for finished item of work.
Windows
Single shutter 2'0 x 4'0 (609.6 x 1219.2 mm ) Outer frame section size of 46 x
723 52 mm shutter frame section size of 46 x 46 mm 1 sqm 2929.00
Double shutter 3'-0" x 4'-0" (914.4mm x 1219.2 mm) outer frame sectionsize of
724 46 x 52 mm shuter frame section size of 46 x 46 mm 1 Sqm 2929.00
Double shutter 3'-0" x 4'-0" (914.4mm x 1219.2 mm) outer frame sectionsize of
46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46
725 x 70 mm 1 Sqm 3103.90
Double shutter 4'-0" x 4 '-0" (1219.2x12.19.2mm) outer frame section size of 46
726 x 52 mm shutter frame section size of 46 x 46 mm 1 Sqm 2929.00
Double shutter 4'-0" x 4 '-0" (1219.2x1219.2mm) outer frame section size of 46
x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x
727 70 mm 1 Sqm 3103.90
Double shutter 4'-6" x 4 '-6" (1371.6x1371.6mm) outer frame section size of 46 x
52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70
728 mm 1 Sqm 2767.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Centre fixed both side openable shutter 5'-0" x 4'-0" (1524x1219.2mm) outer
frame section size of 46 x 52 mm shutter frame section size of 46 x 46 mm
729 Mullion section size of 46 x 70 mm fixed beading section size of 18 x 25 mm 1 Sqm 2767.00
Centre fixed both side openable shutter 6'-0" x 4'-0" (1828.8x1219.2mm) outer
frame section size of 46 x 52 mm shutter frame section size of 46 x 46 mm
730 Mullion section size of 46 x 70 mm fixed beading section size of 18 x 25 mm 1 Sqm 2767.00
Centre fixed both side openable shutter 6'-0" x 4'-6" (1828.8x1371.6mm) outer
frame section size of 46 x 52 mm shutter frame section size of 46 x 46 mm
731 Mullion section size of 46 x 70 mm fixed beading section size of 18 x 25 mm 1 Sqm 2767.00
Ventilators :
Top Hung 2 '-0" x 2'-0" (609.6x609.6mm) outer frame section size of 46mm x 52
732 mm shutter frame section size of 46mm x 46 mm 1 Sqm 3208.70
Top Hung 4 '-0" x 3'-0" (1219.2x914.4mm) outer frame section size of 46 x 52m
734 m shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm 1 Sqm 3208.70
Fixed louvers 2'-0" x 2'-0" (609.6x609.6mm)(Box section) outer frame section
735 size of 33 x 57 mm 1 Sqm 2196.70
Fixed louvers 4'-0" x 2'-0" (1219.2x609.6mm)(Box section) outer frame section
736 size of 33 x 57 mm Mulliion section size of 33 x 57 1 Sqm 2196.70
Fixed louvers 4'-0" x 3'-0"(1219.2x914.4mm)(Box section) outer frame section
737 size of 33 x 57 mm Mulliion section size of 33 x 57 1 Sqm 2196.70
NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR
RESIDENTIAL BUILDINGS WITH GRILL PROVISION)
Supply & fixing of Flymesh shtters of size 20 x 40 mm fly proof mesh with
std. Spn (S.S.) flymesh inclding cost and conveyance of all materials, all
taxes and labour charges etc. complete for finished item of work.
748 Single shutter 2'-0" x 4'-0" (609.6x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 673.90
749 Double shutter 3'-0" x 4'-0" (914.4x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 673.90
750 Double shutter 4'-0" x 4'-0" (1219.2x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 673.90
751 Single shutter 2'-0" x 4'-0" (609.6x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 581.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
752 Double shutter 3'-0" x 4'-0" (914.4x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 581.00
753 Double shutter 4'-0" x 4'-0" (1219.2x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 581.00
Door frames
Supply & fixing of Door frames made of all formed sections of 1.25mm
thick CRCA section, size should be 50x60mm with 32mm rebate. The
corner of the frame should be welded. The frame should be painted with
one coat of primer and finished painted with pure polyester paint. The
frame should be provided with approved quality butt hinges of 3 Nos.
including all taxes complete for finished item of work.
Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x
754 60 mm 1RM 146.90
Double shutter 5'-0" x 7'-0" (1524x2133.6mm) outer frame section size of 50 x
755 60 mm 1 RM 146.90
Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick
CRCA section, size should be 50 x 60 mm with 32 mm rebate. The corner of
the frame should be welded. The frame should be painted with one coat of
primer and finished painted with pure plolyester paint. The frame should be
provided with approved quality butt hinges of 3 Nos. including all taxes complete
for finished item of work.
Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x
756 75 mm 1 RM 167.40
Single shutter 5'-0" x 7'-0" (1524x2133.6mm) outer frame section size of 50 x
757 75 mm 1 RM 167.40
SPECIFICATION OF HARDWYN OR EQUIVALENT DOOR CLOSER ISI
MARKED
Providing and fixing IS:3564 marked Aluminium Die cast body tubular type
universal hydraulic door closer, Hardwyn make (Classic Queen) with necessary
758 accessories and screws etc complete Each 453.60
Providing and fixing IS:3564 marked Aluminium Extruded Section body tubular
type universal hydraulic door closer with double speed adjustment, Hardwyn
759 make (Mytel) with necessary accessories and screws etc complete Each 604.80
Providing and fixing IS:3564 marked Aluminium Extruded Section body tubular
type universal hydraulic door closer with double speed adjustment, Hardwyn
760 make (Eddy) with necessary accessories and screws etc complete Each 712.80
Providing and fixing IS:3564 marked Aluminium Extruded Section body tubular
type universal hydraulic door closer with double speed adjustment, Hardwyn
761 make (Gazel) with necessary accessories and screws etc complete Each 745.20
SPECIFICATION OF HARDWYN OR EQUIVALENT FLOOR SPRING ISI
MARKED
Providing and fixing double action hydraulic floor spring of approved brand
manufacture IS : 6315 marked, Hardwyn make (U-32) for doors including cost of
cutting floors as required, embedding in floors and S.S cover plates with
Aluminum Pivot and single piece M.S. Sheet outer box with slide plate etc.
762 complete (Weight Capacity upto 130 Kgs) Each 1803.60
Providing and fixing double action hydraulic floor spring of approved brand
manufacture IS : 6315 marked, Hardwyn make (U-32) for doors including cost of
cutting floors as required, embedding in floors and Brass cover plates with
Aluminum Pivot and single piece M.S. Sheet outer box with slide plate etc.
763 complete (Weight Capacity upto 130 Kgs) Each 1911.60
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Providing and fixing double action hydraulic floor spring of approved brand
manufacture Hardwyn make (U-88) for doors including cost of cutting
floors as required, embedding in floors and S.S cover plates with Aluminum
Pivot and single piece M.S. Sheet outer box with slide plate etc. complete
764 (Weight Capacity upto 80 Kgs) Each 1350.00
Supply and fixing of curtain Glazing made of pre painted steel (base steel
as per IS 513 of 0.6 mm thick D quality, galvanized as per IS 277 with
Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick,
finish painted with a polyester paint of 12- 16 microns thick and back
coated with 5-7 microns thick alkyad backer. Section for outer frame
should be 46 x 52 mm , section for mullion should be 46 x 70 mm and
section for beading should be 18 x 25 mm. The Glazing should be
panelled with 5 mm thick plain float Glass with Ethyl Propylene diameine
Monomer (EPDM) Gaskets. The sections are to be cut to length, mitre
joined with corner bracket. Cnetre mullions are to be fixed suing mullion
cap. Handle made of high grade alluminium powder coated and nylon
receiver. Gaskets made of Ethyl propylence Diamine Monomer (EPDM)
Corner brackets made of CRCA with zinc phosphating. Mullion caps made
of Glass filled nylon. The above frames should be fixed to the concrete /
masonry wall be means of self expanding screws. Including all taxes &
complete for finished item of work.
Fixed Glazing 2'-0" x 2'-0" (609.6x609.6mm) grid outer frames section size of
766 46 x 52 mm 1 Sqm 2708.60
Mullion section size of 46 x 70mm
Beading section size of 18 x 25 mm
Fixed Glazing 2'-0" x 3'-0" (609.6x914.4mm) grid outer frame section size of 46
767 x 52 mm 1 sqm 2708.60
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm
Fixed Glazing 3'-0" x 3'-0" (914.4x914.4mm) grid outer frame section size of 46
768 x 52 mm 1 sqm 2313.40
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm
Fixed Glazing 3'-0" x 4'-0" (914.4x1219.2mm) grid outer frame section size of 46
769 x 52 mm 1 sqm 2313.40
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm
ALLUMINIUM DOORS AND WINDOWS
Supplying alluminium Door frames with rectangular box hollw section (including
770 annodisation cost) 1 Kg 190.10
Supplying alluminium annodised openable sliding window, Ventgilator (including
771 annodisation cost) 1 Kg 190.10
772 A.C sheet Corrugated 6 mm thick 1 sqm 102.60
773 A.C sheet plain 4 m thick 1 sqm 95.00
774 A.C sheet plain 6 m thick 1 sqm 97.20
775 Sun Control film to the glazed windows partition including labour charges. 1 sqm 259.20
776 Alluminium Venetian blinds horizontal 25.4 mm wide with all accessories. 1 sqm 629.60
777 Alluminium Venetian blinds Verticle 100 mm wide with all accessories. 1 sqm 1069.20
778 S & F of marblex flooring with 2.0 mm thick in rolls. 1 sqm 351.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
779 S&F Vinyl Flooring with tiles 1.5 mm thick in rolls 1 sqm 351.00
RATES OF WORKS
A. DISMANTLING
Dismantling clearing away and carefully stacking materials useful for
reuse.
780 Brick or stone masonry in clay upto 3 M height 1 Cum 54.00
781 Brick or stone masonry in clay over 3 M height 1 Cum 64.80
Brick or stone masonry in lime motar or brick masonry in cement mortar upto 3
782 M height 1 Cum 91.80
783 Brick in lime mortar wall up to 3 M height 1 Cum 54.00
Brick or stone masonry in lime motar or brick masonry in cement mortar over 3
784 M height 1 Cum 91.80
785 Brick in lime mortar wall up to 3 M height 1 Cum 54.00
786 Stone masonry in cement mortar upto 3 M height 1 Cum 129.60
787 Stone masonry in cement mortar over 3 M height 1 Cum 156.60
788 Terracing work in roofs or floors 10 Sqm 64.80
789 Flat stones in roof or floors incluidng lifting 10 Sqm 54.00
790 pan tiled or mangalore tiled roof without roof timbers. 10 Sqm 48.60
791 Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers 10 Sqm 54.00
792 Old thatched roofing including tying materials into small bundles for reuse. 10 Sqm 16.20
793 Wrought and framed timber in roofs or floors 1 Cum 81.00
794 Doors and windows including removal of frame, hinges and fastening. 1 sqm 27.00
795 Old lime mortor plaster 10 Sqm 16.20
796 Old cement mortar plaster 10 Sqm 19.40
797 Dry rough stone revetment for aprons and stacking within 40 M lead 1 Cum 25.90
798 Revetment for aprons and stacking grouted within 40 lead 1 Cum 19.40
799 Lime concrete 1 Cum 86.40
800 Surki or cement concrete 1 Cum 135.00
801 Cuddapah slabs or shahabad stone slabs fooring on sand bed 10 Sqm 27.00
802 reinforced cement conrete 1 Cum 793.80
803 Through scraping of old pllastered surface 10 Sqm 16.20
Washing of platered surface with soap, soda and water (or with soda lime
804 cumbly and water) 10 Sqm 5.40
clean removal of lime plaster from walls and raking out joints 20mm deep or
805 from terraced roof and raking out joints 100 mm deep 10 Sqm 17.30
806 Clean removal of cement pllater from walls and raking out joint 200 mm deep 10 Sqm 18.40
Bailing out water for earth work excavation /concrete for foundatin below water
level.(For building items only)
a) other than sandy soil
807 0.0 M to 1.0 M 1 cum 69.10
808 1.0 M to 2.0 M 1 cum 82.10
809 2.0 M to 3.0 M 1 cum 96.10
b) Sandy soil
810 0.0 M to 1.0 M 1 cum 110.20
811 1.0 M to 2.0 M 1 cum 170.60
812 2.0 M to 3.0 M 1 cum 206.30
(E) CONCRETE
a) Supply and placing of the ready (design ) standard mix concrete M 20 grade
from standard suppliers approved by the Department including cost and
conveyance, pumping upto 5 floors and curing etc complete for finished
813 item of work 1 Cum 2484.00
814 For each additional floor for M20 grade concrete 1 Cum 32.40
a) Supply and placing of the ready (design ) standard mix concrete M 25 grade
from standard suppliers approved by the Department including cost and
conveyance, pumping upto 5 floors and curing etc complete for finished
815 item of work 1 Cum 2548.80
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
816 For each additional floor for M25 grade concrete 1 Cum 32.40
(F) labour charges for wrought and put up incluidng fixing in position
frames, shutters for doors, windows, ventilators etc.
817 Fully panelled doors external or internal 1 Sqm 356.40
818 Glazed and panelled doors 1 Sqm 343.40
819 Framed and planked doors 1 Sqm 335.90
820 Ledged, braced and planked doors 1 Sqm 288.40
821 Windows glazed 1 Sqm 343.40
822 Windows panelled 1 Sqm 452.50
823 Windows ledged, braced and planked 1 Sqm 288.40
824 Windows framed and planked 1 Sqm 274.30
825 Ventilators glazed, fixed with double frame with wire netting. 1 Sqm 343.40
826 Swing ventilators glazed 1 Sqm 370.40
827 Weldmesh doors and windows 1 Sqm 288.40
828 G.I or .AC sheet door & windows 1 Sqm 144.70
(G) MISCELLANEOUS ITEMS
829 Preparing gabions with jungle wood Each 2.60
830 Planting plants Each 1.90
831 Pruning plants Each 1.90
Maintaining avenues including fencing, weeding, milching, watering etc per
832 plant. Each 4.50
- do - When scattered in hot weather with extra conveyance from March to
833 June Each 5.20
834 Hoisting or lowering of slab 1 cum 72.40
835 Dressing faces of granite stone (double line dressing) 1 Sqm 119.90
836 Dressing faces of other than granite stone(double line dressing) 1 Sqm 74.50
Expansion Joint fillers
SUPPLY OF HIGH PERFORMANCE EXPANSION
JOINT FILLER BOARD. CONFIRMING TO M.O.S.T
(FOR ROADS&BUILDINGS)
"SILFLEX" CAPCELL HD-100
837 A. 18MM THICK 1 Sqm 540.00
838 B. 20MM THICK 1 Sqm 604.80
839 C. 25MM THICK 1 Sqm 756.00
SUPPLY OF EXPANSION JOINT FILLER BOARD
FOR BUILDINGS, COLUMNS, BEAMS AND
SLABS
"ARMOUR BOARD" SILFILL
840 A. 20MM THICK 1 Sqm 216.00
841 B. 25MM THICK 1 Sqm 270.00
842 C. 50MM THICK 1 Sqm 540.00
SUPPLY OF BACK UP TO COLD APPLIED
SEALANT IN CONSTRUCTION AND
LONGITUDINAL JOINT
"BACK UP ROAD" SILSEAL
843 A. 10MM OD 1 RM 8.60
844 B. 12MM OD 1 RM 10.40
845 C. 15MM OD 1 RM 13.00
846 D. 20MM OD 1 RM 17.30
847 E. 25MM OD 1 RM 21.60
(H) SCAFFOLDING
848 For superstructure in first floor over the rate of foundation and basement 1 cum 31.30
849 For second floor over the rate of first floor superstructure 1 cum 37.80
850 For third floor over the rate of IInd floor superstructure 1 cum 50.80
851 For each additional floor over third floor 1 cum 22.70
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Centering charges for all R.C.C roof slabs projection upto 1.2 M only, at
higher level without having such slab projections at lower levels.
860 At 2nd floor level 10 Sqm 722.50
861 At 3rd floor level 10 Sqm 754.90
862 At 4th floor level 10 Sqm 788.40
Centering charges for all RCC waffle slabs incluidng ribs etc,(plain area) upto
863 3.66 M of floor height 10 Sqm 1203.10
Centering charges for all RCC waffle slabs including ribs etc. (plain area) &
more than 3.66 M of floor height. Add for each additional metre height or part
864 there of over the rate as in item above. 10 Sqm 328.30
865 Centering charges for all R.C.C helical stair cases. 10 Sqm 1284.10
866 Centering charges for RCM facia/ railing 50 to 75 mm thickness 1 Sqm 45.40
867 Centering charges for sunshade 0.6 M width 1 RM 34.00
868 Centering charges for sunshade 0.8 M width 1 RM 42.10
869 Centering charges for sunshade 1.00 M width 1 RM 47.50
870 Centering charges for T beams upto 3.66 M of floor height 1 cum 878.00
Centering charges for T beams more than 3.66 M of floor height . Add for each
871 additional metre height or part there of over the rate as in item above 1 cum 239.80
872 Centering charges for Rectangular beam, L beams, upto 3.66 M of floor height 1 cum 744.10
Centering charges for Rectangular beams & L beams more than 3.66 M of floor
height . Add for each additional metre height or part there of over the rate as in
873 item above 1 cum 203.00
874 Centering charges for columns, pedastals 1 cum 744.10
875 Centering charges for Templates, bed blocks and footings 1 cum 468.70
876 Centering charges for arches upto 1.5 M span 1 cum 1013.00
877 Centering charges for arches above 1.5 M span 1 cum 1081.10
878 Centering charges for lintels and plinth beams ( less than 3.0 span) 1 cum 605.90
879 Centering charges for slabs above 300 mm depth 1 cum 703.10
880 Labour charges for 50 to 75 mm thick RCM Paradah walls 1 sqm 64.80
Labour charges for fixing A.C sheets including cost of J.Bots bitumen washers
881 etc. with or without ridges. 10 sqm 371.50
(j) LIFT CHARGES
For RCC items
882 Between 1 st and 2 nd floor 1 cum 40.00
883 Between 2nd and 3rd floor 1 cum 98.30
884 Between 3rd and 4th floor 1 cum 183.60
885 Between 4th and 5th floor 1 cum 288.40
886 Between 5th and 6 th floor 1 cum 314.30
887 between 6ht and 7 th floor 1 cum 393.10
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
SS RATE
FOR 2005-
S.No Description of item Unit 06
1 2 3
Supplying, laying, jointing and testing 101.6 mm SWG pipes of ISI make
conforming to ISI 651 &4127 with airtight cement joints in CM 1.5 : 1 prop.
incluidng excavation of trenches and socket pits in any soil (except rock
requiring blasting) upto 1524 mm(5'0") depth and refilling with watering and
1 tamping. 1 RM 135.20
Supplying, laying, jointing and testing 101.6 mm SWG pipes of ISI make
conforming to ISI 651 &4127 with airtight cement joints in CM 1:5:1 prop.
incluidng excavation of trenches and socket pits in any soil (except rock
requiring blasting) upto 914.4 mm (3'0") depth and refilling with watering and
2 tamping. 1 RM 105.60
3 a) Supplying & fixing SWG bends 101.6 mm Each 33.00
4 b) - do - labour charges only Each 12.10
Supplying & fixing 152.4 mm x 101.6 mm SWG gully traps of ISI make
conforming to ISI 651 &4127 with C.I Grating & Constg. Brick masonrary in
CM 1 :6 prop. Intermediae chamber and fitted with 304.8 mm x 288.6mm
5 (12"x9")C.I Frame and hinged cover Each 254.10
6 Supply of SWG pipe of ISI make conforming to ISI 651 4" dia (101.6mm) 1 RM 46.00
7 Supply of SWG pipe of ISI make conforming to ISI 651 6" dia (152.4mm) 1 RM 62.20
8 Supply of SWG pipe of ISI make conforming to ISI 651 8" dia (203.2mm) 1 RM 156.80
9 Supply of SWG pipe of ISI make conforming to ISI 651 10" dia (254mm) 1 RM 229.90
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
12 Extra for provision of medium weight 40 Kg in place of light weight cover. Each 357.50
Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry
Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 914.4 mm x
13 457.2 mm (3'0"x1'6") C.I frame and cover of 40 Kg. Each 1870.00
Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry.
Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x
14 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. Each 1127.50
15 a) Supplying & fixing 101.6 mm C.I Plug Bend Each 165.00
16 b) - do - labour charges only Each 33.00
17 a) Supplying & fixing 152.4mm dia CI plug bend Ist quality Each 377.00
18 b) - do - labour charges only Each 43.70
19 a) Supplying & fixing 101.6mm dia CI Plain bend Ist quality Each 154.00
20 b) - do - labour charges only Each 33.00
21 a)Making drainage connection in the existing inspection including all repairs Each 66.00
22 b) - do - labour charges only Each 38.50
a)Supplying , laying, jointing and testing 152.4 mm SWG pipes of ISI make
conforming to ISI 651 &4127 with airtight cement joints in CM 1.5 : 1 prop.
incluidng excavation of trenches and socket pits in any soil (except rock
23 requiring blasting) upto 151.2 cm depth and refilling with watering and tamping. 1 RM 176.00
24 b) - do - labour charges only 1 RM 38.50
a)Supplying , laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using
19.05 mm gauge graded granite metal chips and cradling 152.4 mm SWG pipe
27 line all round to have 76.2 mm thick cover over the sockets. 1 RM 77.00
28 b) - do - labour charges only 1 RM 27.50
Supplying & Laying 101.6 mm SWG channels with cement mortor joints with
29 suitable brick masonry for fixing the channels in position 1 RM 46.10
30 b) - do - labour charges only 1 RM 19.00
a) Supplying & Laying 152.4 mm SWG channels with cement mortor joints with
31 suitable brick masonry for fixing the channels in position 1 RM 86.10
32 b) - do - labour charges only 1 RM 26.60
a) Supplying & fixing 101.6 mm C.I Soil pipes with cement caulked joints and
33 painted black 1 RM 258.50
34 b) - do - labour charges only 1 RM 74.80
a) Supplying and fixing 152.4 mm (6") CI soil pipe Ist quality with cement
35 caulked joints and painted black ( single socket) 1 RM 467.50
36 b) - do - labour charges only 1 RM 74.80
a) Supplying and fixing 76.2 mm (3") CI soil pipe Ist quality with cement caulked
37 joints and painted black ( single socket) 1 RM 154.00
38 b) - do - labour charges only 1 RM 74.30
a) Supplying and fixing 152.4 mm(6") CI soil pipe Ist quality with cement caulked
39 joints and painted black ( Double socket) 1 RM 495.00
40 b) - do - labour charges only 1 RM 74.30
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
a) Supplying and fixing 76.2 mm(3") CI soil pipe 1st quality with cement caulked
41 joints and painted black ( Double socket) 1 RM 176.00
42 b) - do - labour charges only 1 RM 74.30
43 a) Supplying & fixing 101.6 mm (4") CI soil single junction with plug Each 220.00
44 b) - do - labour charges only Each 22.00
45 a) Supplying & fixig 152.4 mm (6") CI soil singel junctin with plain Each 377.00
46 b) - do - labour charges only Each 43.70
a) Supplying & fixing 152.4 x 152.4 mm (6"x6") CI single junction plug /door Ist
47 quality Each 434.50
48 b) - do - labour charges only Each 26.20
49 a) S& F 101.6 mm (4") CI soil double junction with plug Each 237.60
50 b) - do - labour charges only Each 33.00
51 a) S & F 101.6 x 76.2 mmm CI soil offsets (calcutta make) Each 148.50
52 b) - do - labour charges only Each 16.50
53 a) Supplying & fixing 152.4 x 152.4 mm CI single offset Ist quality Each 290.20
54 b) - do - labour charges only Each 26.20
55 a) Supplying & fixing 203.2 x 76.2 mm CI soil offsets Ist quality Each 246.20
56 b) - do - labour charges only Each 26.20
57 a) Supplying & fixing 101.6 mm x 152.4 mm C.I soil offsets (Calcutta make) Each 176.00
58 b) - do - labour charges only Each 19.80
59 a) Supplying & fixing 88.9 mm A.C cowls Each 38.50
60 b) - do - labour charges only Each 6.60
61 a) Supplying & fixing A.C Cowl 63.5 mm dia Each 27.50
62 b) - do - labour charges only Each 5.50
a) supplying & fixing 101.6 mm x 63.5 mm CI inverted double junction
63 (Calcutta/Nagpur make) Each 330.00
64 b) - do - labour charges only Each 28.60
65 a) S & F 76.2 mm CI Naharytrap (Calcutta/Nagpur make) Each 170.50
66 b) - do - labour charges only Each 26.40
67 Removing and refixing W.C s Each 133.10
68 Removing and refixing wash hand basins of any size with fittings complete Each 104.50
69 a) S & F 76.2 x 101.6 mm teak wood block complete Each 14.30
70 b) - do - labour charges only Each 4.40
71 a) S& F 76.2 mm C.I plug bends (Calcutta/Nagpur make) Each 110.00
72 b) - do - labour charges only Each 13.20
73 a) S & F 76.2 mm CI plain beds (Calcutta/Nagpur make) Each 96.80
74 b) - do - labour charges only Each 11.00
75 a) S&F 76.2 mm C.I single junction with Plug ( Calcutta / Nagapur make) Each 148.50
76 b) - do - labour charges only Each 18.70
77 a) S&F 76.2 mm C.I double junction with Plug ( Calcutta / Nagapur make) Each 209.00
78 b) - do - labour charges only Each 22.00
79 a) Supplying & fixing 76.2 mm x 76.2 mm CI offsets (Calcutta/Nagpur make) Each 115.50
80 b) - do - labour charges only Each 3.30
81 a) Supplying & fixing 76.2 mm x 152.4 mm CI offsets (Calcutta/Nagpur make) Each 126.50
82 b) - do - labour charges only Each 16.50
83 Supply & fixing 101.6 mm dia CI floor traps Ist quality Each 205.70
84 a)Boxing of Nahany traps in RCC floors Each 88.00
85 b) - do - labour charges only Each 44.00
86 Boxing of W.C Trap in R.C.C floor in Ist floor Labour charges only Each 176.00
87 Cutting holes in C.C; basement & repairs Labour charges only Each 49.50
88 Cuttinng holes in stone masonry & basement and repairs Labour charges only Each 33.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
89 Cutting holes in Brick masonry & repairs Labour charges only Each 22.00
90 Cutting holes in RCC slab floor & repairs Labour charges only Each 33.00
91 a) S & F 584.2 mm long Indian pattern white glazed W.C and trap Each 506.00
92 b) - do - labour charges only Each 121.00
a) S& F 584.2 mm long Orissa pan of parry Neycer/H.S.W make with 'P' & 'S'
93 trap Each 849.20
94 b) - do - labour charges only Each 151.80
95 a) S & F porcelanin foot rest for I.W.C.(Rectangular pair) Pair 121.00
96 b) - do - labour charges only Pair 27.50
a) S &F low down porcelain flushing tank Hindustan Sanitary wae/ parry/ Neycer
97 with internal components Each 1210.00
98 b) - do - labour charges only Each 220.00
a)S & F European type Hindustan / Neycer or parry W.C best Indian make
99 white glazed (P trap) Each 605.00
100 b) - do - labour charges only Each 110.00
a) S & F European type Hindustan / Neycer or parry W.C best Indian make
101 white glazed with 'S' trap Each 715.00
102 b) - do - labour charges only Each 110.00
a) S& F best Indian make plastic seat and lid for European water closets &
103 Buffers as per IS 2548-1963 Each 242.00
104 b) - do - labour charges only Each 33.00
Supply, Installation and commissioning approved make EWC(suit)
CASCADE model P' or S' trap with porcelin cistern fixed on EWC with all
internal parts of cistern vis. White seat cover of aproved make with rubber
buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection
pipe wall flanges all of approved make etc. complete for finished item of
work in all respects
105 a) white Each 4878.50
106 b) Extra for colour Each 1985.50
107 c) Extra for spl. Colour Each 3971.00
a) Supplying & Fixing 12.7 mm PVC connection with brass union nut C.P
108 coated Each 55.00
109 b) - do - labour charges only Each 11.00
110 a) S & F 12.7 mm NP stop cock Indian make 300 grams Each 101.20
111 b) - do - labour charges only Each 13.20
112 a) S & F concealed stop cock 12.7 mm (1/2") Each 148.50
113 b) - do - labour charges only Each 15.20
114 a) S & F angle stop cock 12.7 mm dia first quality Each 105.60
115 b) - do - labour charges only Each 15.20
116 a) S&F 12.7 mm N.P bib tap Indian make 300 grams Each 101.20
117 b) - do - labour charges only Each 13.20
118 a) S&F 12.7mm N.P bib tap Indian make 250 grams Each 85.80
119 b) - do - labour charges only Each 11.00
120 a)S & F 31.75 mm brass plumber Union best Indian first quality Each 27.50
121 b) - do - labour charges only Each 5.50
122 a) S & F 12.7 mm brass stop cock Indian make 400 grams Each 88.00
123 b) - do - labour charges only Each 11.00
124 a) S & F 12.7 mm brass stop cock Indian make 300 grams Each 82.50
125 b) - do - labour charges only Each 11.00
126 a) S & F 12.7 mm brass bib cock Indian make 400 grams Each 96.80
127 b) - do - labour charges only Each 11.00
128 a) S & F 12.7 mm brass bib cock Indian make 300 grams Each 82.50
129 b) - do - labour charges only Each 12.10
130 S & F CP long body bib cock fancy type delux 300 grames dia 12.7 mm Each 171.60
131 S & F 12.7mm dia high neck piller cock Ist quality Indian make 400 grams Each 274.60
132 a) S & F 12.7 mm .M.P couplings Each 19.80
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
183 Chiselling the stone masonry wall and repairs as directed by the department. 1 Rm 77.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
184 Chiselling the brick masonry wall and repairs as directed by the department. 1 Rm 16.50
a) S & F NP telephonic shower spray set & valve mixer with rest and all fittings
185 complete (ARK/ESSCO make) Each 825.00
186 b) - do - labour charges only Each 198.00
187 a) S & F NP shower spray fancy with NP Flexible pipe Each 275.00
188 b) - do - labour charges only Each 66.00
189 a) S & F NP cover for nahany trap Each 17.60
190 b) - do - labour charges only Each 8.80
191 a) Painting the flushing tank with white enamel paint Each 60.50
192 b) - do - labour charges only Each 30.80
193 S & F internal fittings for flush tank Each 330.00
194 Repairing and over hauling flushing tank Each 44.00
195 a) Supplying & Fixing NP chain rubber and plugh for baisn Each 22.00
196 b) - do - labour charges only Each 3.30
a) S & F 609.6 x 457.2 x 254 mm Indian make white glazed sink on cantilever
197 brackets with 2 NP couplings, plug and chain complete Each 2035.00
198 b) - do - labour charges only Each 165.00
a) S & F 762.00 x 457.2 x 228.6 mm Indian make white glazed sink on
199 cantilever brackets with 2 NP couplings, plug and chain complete Each 2420.00
200 b) - do - labour charges only Each 165.00
a) S & F 609.6 x 457.2 x 254 mm RCC terrazo finished sink (or constructed at
201 site with 50.8mm thick) brass plug and chain incluidng CI cantilever brackets Each 330.00
202 b) - do - labour charges only Each 110.00
a) S & F 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with
203 brackets and aluminium screws Each 82.50
204 b) - do - labour charges only Each 22.00
a) S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with
205 brackets and aluminium screws Each 71.50
206 b) - do - labour charges only Each 33.00
a) S & F 609.6 mm long 127 mm wide plate glass shelf with superior quality
207 aluminium railing complete with aluminium screws Each 104.50
208 b) - do - labour charges only Each 27.50
209 a) S & F 609.6 mm long 127 mm wide plate glass shelf only Each 33.00
210 b) - do - labour charges only Each 5.50
211 a) S & F NP soap dish heavy type with NP SCREWS Each 132.00
212 b) - do - labour charges only Each 6.10
213 a) S &F NP holder brackets with screws Each 27.50
214 b) - do - labour charges only Each 6.60
215 a) S & F liquid soap container NP metalic with NP brackets and screws. Each 121.00
216 b) - do - labour charges only Each 11.00
217 a) Constructing R.C.C over head tank with partition complete 1 Lt 3.90
218 b) - do - labour charges only 1 Lt 0.90
219 a) Constructing R.C.C over head tank with out partition complete 1 Lt 3.30
220 b) - do - labour charges only 1 Lt 0.80
221 a) S & F 25.4 mm copper ball cock ith PVC ball Indian make ISI mark Each 209.00
222 b) - do - labour charges only Each 22.00
223 a) S & F 19.05 mm copper ball cock ith PVC ball Indian make ISI mark Each 170.50
224 b) - do - labour charges only Each 22.00
225 a)S & F 12.7 mm copper ball cock ith PVC ball Indian make ISI mark Each 110.00
226 b) - do - labour charges only Each 22.00
227 a) S & F 25.4 mm GM peet valve Indian make heavy type Each 231.00
228 b) - do - labour charges only Each 22.00
229 a) S & F 19.05 mm GM peet valve Indian make heavy type Each 178.20
230 b) - do - labour charges only Each 22.00
231 a) S & F 12.7 mm GM peet valve Indian make heavy type Each 137.50
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
a)Constructing Brick mlasonry supprt for G.I pipe with C.M 304.8 x 228.6 x228.6
274 mm size including plastering and finishing etc. complete. Each 33.00
275 b) - do - labour charges only Each 11.00
276 a) S & F 12.7 x 152.0 mm NP shower rose heavy Each 82.50
277 b) - do - labour charges only Each 9.90
278 a) S & F 12.7 x 137.0 mm NP shower rose heavy Each 82.50
279 b) - do - labour charges only Each 11.00
280 a) S & F 12.7 x 101.6 mm NP shower rose heavy Each 71.50
281 b) - do - labour charges only Each 11.00
282 a) S & F 12.7 x 88.9 CP fancy shower Each 132.00
283 b) - do - labour charges only Each 11.00
a) Supplying & fixing 12.7 mm GI drain pipe with plug for tanks (Mudvalve)
284 including making a hole Each 22.00
285 b) - do - labour charges only Each 11.00
a) Supplying & fixing 19.05 mm GI drain pipe with plug for tanks (Mud valve)
286 including making a hole Each 33.00
287 b) - do - labour charges only Each 11.00
a) Supplying & fixing 25.4 mm GI drain pipe with plug for tanks (Mud valve)
288 including making a hole Each 38.50
289 b) - do - labour charges only Each 13.20
a) Taking branch water connection from the existing 25.4 mm GI pipe including
290 cutting threading, etc, complete with fitting, Each 77.00
291 b) - do - labour charges only Each 22.00
a) Taking branch water connection from the existing 19.05 mm GI pipe
292 including cutting threading, etc, complete with fitting, Each 44.00
293 b) - do - labour charges only Each 19.80
a) Taking branch water connection from the existing 12.7 mm GI pipe including
294 cutting threading, etc, complete with fitting, Each 33.00
295 b) - do - labour charges only Each 16.50
296 Supplying & fixing leather washers for 12.7 mm bib tap and stop cock Each 1.10
297 Supplying & fixing leather washers for 19.05 mm bib tap and stop cock Each 2.20
298 Supplying & Fixing 12.7 mm fibre washers Each 2.20
299 Supplying & Fixing 19.05 mm fibre washers Each 2.80
300 a) Supplying & fixing 304.8 x 228.6 mm CI frame & cover over gully taps Each 66.00
301 b) - do - labour charges only Each 17.60
302 a) Supplying & fixing CI Nahany trap grating Each 11.00
303 b) - do - labour charges only Each 5.50
304 a) Supplying & fixing CI gully trap grating Each 27.50
305 b) - do - labour charges only Each 5.50
306 a) Supplying & fixing valves for brass ball cocks 25.4 mm dia Each 11.00
307 b) - do - labour charges only Each 4.40
308 a) Supplying & fixing 12.7 m valve for bib tap or stop cocks Each 10.10
309 b) - do - labour charges only Each 2.80
310 a) Supplying & fixing 19.05 m valve for bib tap or stop cocks Each 16.50
311 b) - do - labour charges only Each 3.30
312 Removing 12.7 mm GI pipe and refixing the same Rm 28.60
313 Removing 19.05 mm GI pipe and refixing the same Rm 33.00
314 Removing 25.4 mm GI pipe and refixing the same Rm 48.40
315 Removing 38.1 mm GI pipe and refixing the same Rm 60.50
316 Removing 50.8 mm GI pipe and refixing the same Rm 71.50
317 Cleaning the W.C with acid and Vim powder Each 16.50
318 Cleaning the Urinal with acid and Vim power Each 16.50
319 Cleaning the wash basin with acid and Vim power Each 16.50
320 Cleaning the E.W.C with acid and Vim power Each 16.50
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
a) Supplying & fixing 914.4 x 457.2 mm CI man hole frame and cover (light
321 weight) Each 462.00
322 b) - do - labour charges only Each 44.00
323 a)Supplying & fixingg CI steps for septic tank. Each 27.50
324 b) - do - labour charges only Each 5.50
a) Supplying & fixing 50.8 cm dia man hole frame & cover for 914.4 mm dia
325 chamebr (Light weight) Each 357.50
326 b) - do - labour charges only Each 33.00
a) Supplying & fixing 50.8 cm dia man hole frame & cover for 914.4 mm dia
327 chamebr (Medium weight) Each 660.00
328 b) - do - labour charges only Each 71.50
329 a) Supplying & fixing 101.6 x 101.6 mm SWG Tee Each 49.50
330 b) - do - labour charges only Each 12.10
331 a) S & F SWG pipe 101.6 mm of Ist Class with cement joints 1 RM 50.60
332 b) - do - labour charges only 1 RM 5.50
333 a) Supplying & Fixing SWG pipe 152.4 mm of Ist Class with cement joints 1 RM 66.00
334 b) - do - labour charges only 1 RM 11.00
Constg. 50.8 mm thick RCM baffle wall with 2.267 Kg steel & rabbit wire mesh
335 in CM 1:3 with fine rendering in neat cement 1 Sqm 115.50
336 a) Constg. 50.8 mm RCC partition wall 1 Sqm 132.00
337 b) - do - labour charges only 1 Sqm 22.00
338 a) S & F double layer of bamboo matting tarred on both sides. 10 Sqm 330.00
339 b) - do - labour charges only 10 Sqm 55.00
340 Removing of 101.6 m or 76.2 mm CI pipe 1 RM 16.50
341 a) Supplying & fixing 76.2 mm W.I clamps Each 8.80
342 b) - do - labour charges only Each 3.30
Extra depth of inspection chamber of 914.4 mm diameter excluding rock
343 cutting. 1 Rm 660.00
Extra depth of inspection chamber of 914.4 x 457.2mm diameter excluding
344 rock cutting. 1 Rm 660.00
345 a) Supplying & fixing NP coat hook Each 22.00
346 b) - do - labour charges only Each 5.50
Supplying & fixing small precast RCC water tanks including cover over the roof
347 of building 1 Lit 3.30
348 Labour charges for lay8ing glazed tiles 1 Sqm 55.00
388 Supplying & fixing oval shape basin white(520x410mm) parry or equalivalent Each 1298.00
Supply & fixing RCC cover 22" dia with nominal reinforcement 3 " thick and
389 hooks for lifting Each 440.00
390 Supply & fixing cp spl. Grating with frame and cover of Ist quality Each 31.40
391 Supply & fixing towel rod (CP) of 24" long and 3/4 " dia Each 204.60
392 Supply & fixing of LLC handle set Ist quality Each 44.00
Supply & fixing 4" dia CP thimble pipe
393 a) 150 mm long Each 220.00
394 b) 220 mm long Each 330.00
395 c) 300 mm long Each 440.00
396 Supply & fixing CP long bend Each 178.80
397 Supply & fixing CP short bend Each 89.10
Supply & fixing of PVC low level system parryware, slimline with internal
components & short bend.
398 a) 10 Ltrs capacity white Each 605.00
399 b) 10 ltrs capacity colour Each 671.00
400 c) 8 lts capacity tuffmate white & colour Each 407.00
401 Supplying & fixng bib cock with flange C.P jaquar make queen series. Each 752.00
Supply & fixing bib cock cum health faucet with 1 m long flexible tube and
wall hook of jaquar make queen series
402 a ) Chrome plated Each 2139.80
403 b) Ivory gold Each 3684.50
Supply & fixing pillar cock jaquar make Queen series
404 a ) Chrome plated Each 783.20
405 b) Ivory gold Each 1371.70
Supply & fixing Angular stop cokc with wall flange jaquar make Queen
series
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Supply and fixing wall mirror with provision for ove head shower and 115
mm long bend pipe with wall flange jaquar make queen series
414 a ) Chrome plated Each 2476.10
415 b) Ivory gold Each 4596.40
Supply & fixing overhead shower rose with revolving joint and 150 mm
long swivel shower arm Jaquar make qureen sseries.
416 a) Chrome plated Each 969.10
417 b) Ivory Gold Each 1712.60
Supply and Fixing Wall Mixer with Telephonic shower arrangement with crutch
418 and flexible pipe Jaquar series Ivory gold colour for bath tub. Each 4522.30
Suply & fixing Bath tub overflow set complete with over flow cap, 450 mm Ball
chain with rubber plug & union bend with brass nut jaquar make, Ivory gold
419 colour. Each 775.00
Supply & fixing sink cock with regular swinging spout with wall flange
420 chromeplated Jaquar make Queen series Each 1084.50
Supply & fixing soap dish jaquar make queen series:
421 a) Chrome plated Each 624.50
422 b) Ivory Gold Each 996.30
Supply & fixng of toilet paper holder Jaquar make Queen series.
423 a) Chrome plated Each 507.40
424 b) Ivory Gold Each 803.40
Supply & Fixing of Towel ring Jaquar make Queen series
425 a) Chrome plated Each 523.20
426 b) Ivory Gold Each 803.40
Supply & Fixing of towel coat hok Jaquar make Queen series
427 a) Chrome plated Each 355.60
428 b) Ivory Gold Each 563.80
429 Supply & Fixing of Towel rod 24 " Jaquar make Queen series Ivory gold colour Each 2740.10
Supply & Fixing of Tumbler holder Jaquar make Queen series, Ivory gtold
430 colour Each 877.50
431 Supply & fixing of Glass shelf 22" Jaquar make Queen series, Ivory gold colour Each 1680.90
"CZAR" OR EQUIVALENT BATH ROOM FITTINGS ACCESSORIES PRICES
INCLUSION OF ALL THE TAXES
432 Polo 3 flow hand shower-ts1000 Each 950.00
433 Polo 3 flow overhead shower - ts 1001 Each 779.00
434 Polo 4 flow hand shower - ts 1002 Each 1425.00
435 Rain head shower 6"-ts 1003 Each 665.00
436 Rain head shower 9"- ts 1004 Each 1425.00
437 Rio hand 4 flow shower -ts 1005 Each 903.00
438 Rio 4 flow overhead shower -ts 1006 Each 713.00
439 Viva 4 flow hand shower -ts 1007 Each 1378.00
440 Viva 4 flow overhead shower –ts1008 Each 1045.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
488 Single line flush valve 32 mm w/elbow bend & flange - sy 2405 col/gold Each 2489.00
489 Single line flush valve 32 mm w/elbow bend & flange - sy 2405 spl/gold Each 2765.00
490 Single line flush valve 32 mm w/elbow bend & flange - sy 2405 gold Each 3253.00
491 Single line flush valve 32 mm w/o elbow bend - sy 2406 cp Each 1397.00
492 Single line flush valve 32 mm w/elbow bend & flange - sy 2406 col/cp Each 1862.00
493 Single line flush valve 32 mm w/elbow bend & flange - sy 2406 col/gold Each 2191.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
494 Single line flush valve 32 mm w/elbow bend & flange - sy 2406 spl/gold Each 2434.00
495 Single line flush valve 32 mm w/elbow bend & flange - sy 2406 gold Each 2863.00
496 Flush cock half turn -25mm -s2407 cp Each 713.00
497 Flush cock half turn -25mm -s2407 col/cp Each 950.00
498 Flush cock half turn -25mm -s2407 col/gold Each 1117.00
499 Flush cock half turn -25mm -s2407 spl/gold Each 1242.00
500 Flush cock half turn -25mm -s2407 gold Each 1461.00
501 Flush cock lever type -25mm -s2408 cp Each 806.00
502 Flush cock lever type -25mm -s2408 col/cp Each 1076.00
503 Flush cock lever type -25mm -s2408 col/gold Each 1266.00
504 Flush cock lever type -25mm -s2408 spl/gold Each 1407.00
505 Flush cock lever type -25mm -s2408 gold Each 1656.00
506 Push cock 25mm -s2409 cp Each 722.00
507 Push cock 25mm -s2409 col/cp Each 962.00
508 Push cock 25mm -s2409 col/gold Each 1132.00
509 Push cock 25mm -s2409 spl/gold Each 1258.00
510 Push cock 25mm -s2409 gold Each 1480.00
511 Urinal push cook 15 mm - s 2410 cp Each 229.00
512 Urinal push cook 15 mm - s 2410 col/cp Each 305.00
513 Urinal push cook 15 mm - s 2410 col/gold Each 359.00
514 Urinal push cook 15 mm - s 2410 spl/goldcp Each 399.00
515 Urinal push cook 15 mm - s 2410 gold Each 469.00
516 Pillar cock deluxe s 2000 15mm Each 309.00
517 Pillar cock regular s 2001 15mm Each 371.00
518 Bib cock with flange s 2002 15mm Each 301.00
519 Bib cock long nose with flange s 2003 15mm Each 407.00
520 Bib cock long body straight with flange s 2004 15mm Each 356.00
521 Concealed stop cock sheet flange s 2007 15mm Each 372.00
522 Concealed sheet sliding s 2010 15mm Each 405.00
523 Concealed sheet sliding s 2006 20mm Each 466.00
524 Concealed casted sliding wall flange s 2009 15mm Each 483.00
525 Concealed casted sliding wall flange s 2013 20mm Each 676.00
526 Concealed casted s 2008 15mm Each 475.00
527 Concealed casted s 2012 20mm Each 638.00
528 Angle cock with wall flange s 2014 15mm Each 290.00
529 Angle cock with long thread with flange s 2015 15mm Each 314.00
530 Angle cock with 18" connection with flange s 2016 15mm Each 368.00
531 Swan neck (left/right) s 2018 15mm Each 608.00
532 Sink cock with casted swivel spout with flange s 2019 15mm Each 590.00
533 Bath cock with wall flange s 2020 15mm Each 618.00
534 Two way bib cock with flange s 2021 15mm Each 475.00
535 Two way angle cock with flange s 2022 15mm Each 475.00
536 Sink cock table mounted with casted swivel spout s 2023 15mm Each 594.00
537 Sink cock pipe spout "goose" s 2024 15mm Each 594.00
538 Central hole basin mixer s 2101 15mm Each 1235.00
539 Close hole basin mixer s 2102 15mm Each 1235.00
540 Three hole basin mixer without pop up waste system s 2103 15mm Each 1435.00
541 Three hole basin with pop up waste system s 8-2103 a 15mm Each 1710.00
542 Wall mixer with arrangement for telephonic shower s 2105 a 15mm Each 1406.00
543 Wall mixer non telephonic shower arragement s 2106 15mm Each 1159.00
544 Wall mixer with bend for over head shower s 2105 15mm Each 1454.00
545 Wall mixer with tip ton for telephonic shower arrangement s 2104 15mm Each 1425.00
546 Wall mixer 3 in 1 for both telephonic shower & overlead shower s 2107 15mm Each 1710.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
547 Sink mixer with casted swivel spout s 2109 15mm Each 1088.00
548 Sink mixer table mounted with casted swivel spout s 2111 15mm Each 1197.00
549 Sink mixer pipe spout "goose" s 2112 15mm Each 1259.00
550 Four hole bidet mixer with pop up waste system (bottom spray) s 2110 15 mm Each 1910.00
551 One hole bidet mixer with pop up waste system s 2108 15 mm Each 1663.00
552 Spout plain with flange s 2201 15mm Each 485.00
553 Spout plain with flange s 2202 20mm Each 525.00
554 Spout with flange 9" long s 2203 15mm Each 609.00
555 Tip ton spout with flange s 2205 15mm Each 796.00
556 Shower arm with wall range s 2306 15mm Each 243.00
557 Sona shower s 2305 15mm Each 335.00
558 Tushar shower s 2304 15mm Each 330.00
559 Flush valve without elbow bend s 2401 32mm Each 1563.00
560 Flush valve with elbow blend & wall falnge s 2402 32 mm Each 1781.00
561 Two way bvertor with flange s 2501 15 mm Each 875.00
562 Four way owertor with nrv s 2503 15mm Each 1363.00
563 Four way fflvertor with nrv extended for duct provision s 2504 15mm Each 1811.00
564 Concealed casted sliding extended for duct s 2505 15mm Each 829.00
565 Piller cock sy 101 cp Each 380.00
566 Piller cock sy 101 col/cp Each 506.00
567 Piller cock sy 101 col/gold Each 596.00
568 Piller cock sy 101 spl/gold Each 662.00
569 Piller cock sy 101 gold Each 779.00
570 Bib cock with flange sy 102 cp Each 366.00
571 Bib cock with flange sy 102 col/cp Each 501.00
572 Bib cock with flange sy 102 col/gold Each 589.00
573 Bib cock with flange sy 102 spl/gold Each 654.00
574 Bib cock with flange sy 102 gold Each 770.00
575 Bib cock long nose with flange sy 103 cp Each 475.00
576 Bib cock long nose with flange sy 103 col/cp Each 634.00
577 Bib cock long nose with flange sy 103 col/gold Each 745.00
578 Bib cock long nose with flange sy 103 spl/gold Each 827.00
579 Bib cock long nose with flange sy 103 gold Each 974.00
580 Stop cock male/female sy 105 cp Each 342.00
581 Stop cock male/female sy 105 col/cp Each 456.00
582 Stop cock male/female sy 105 col/gold Each 537.00
583 Stop cock male/female sy 105 spl/gold Each 596.00
584 Stop cock male/female sy 105 gold Each 701.00
585 Concealed casted 15 mm with adjustable w/f sy 106 cp Each 534.00
586 Concealed casted 15 mm with adjustable w/f sy 106 col/cp Each 712.00
587 Concealed casted 15 mm with adjustable w/f sy 106 col/gold Each 837.00
588 Concealed casted 15 mm with adjustable w/f sy 106 spl/gold Each 930.00
589 Concealed casted 15 mm with adjustable w/f sy 106 gold Each 1094.00
590 Concealed casted 20mm with adjustable w/f sy 107 cp Each 724.00
591 Concealed casted 20mm with adjustable w/f sy 107 col/cp Each 965.00
592 Concealed casted 20mm with adjustable w/f sy 107 col/gold Each 1135.00
593 Concealed casted 20mm with adjustable w/f sy 107 spl/gold Each 1262.00
594 Concealed casted 20mm with adjustable w/f sy 107 gold Each 1484.00
595 Concealed casted heavy 20mm with adjustable w/f sy 107a cp Each 770.00
596 Concealed casted heavy 20mm with adjustable w/f sy 107a col/cp Each 1027.00
597 Concealed casted heavy 20mm with adjustable w/f sy 107a col/gold Each 1208.00
598 Concealed casted heavy 20mm with adjustable w/f sy 107a spl/gold Each 1342.00
599 Concealed casted heavy 20mm with adjustable w/f sy 107a gold Each 1580.00
600 Angle cock with wall flange sy 100 cp Each 342.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
601 Angle cock with wall flange sy 100 col/cp Each 456.00
602 Angle cock with wall flange sy 100 col/gold Each 537.00
603 Angle cock with wall flange sy 100 spl/gold Each 596.00
604 Angle cock with wall flange sy 100 gold Each 701.00
605 Angle cock with 18" connection & flange sy 100a cp Each 491.00
606 Angle cock with 18" connection & flange sy 100a col/cp Each 656.00
607 Angle cock with 18" connection & flange sy 100a col/gold Each 771.00
608 Angle cock with 18" connection & flange sy 100a spl/gold Each 857.00
609 Angle cock with 18" connection & flange sy 100a gold Each 1008.00
610 Two way angle cock with flange sy 100b cp Each 665.00
611 Two way angle cock with flange sy 100b col/cp Each 886.00
612 Two way angle cock with flange sy 100b col/gold Each 1043.00
613 Two way angle cock with flange sy 100b spl/gold Each 1159.00
614 Two way angle cock with flange sy 100b gold Each 1363.00
Swan neck (left/right) sy 111 cp Each 694.00
615 Swan neck (left/right) sy 111 col/cp Each 924.00
616 Swan neck (left/right) sy 111 col/gold Each 1088.00
617 Swan neck (left/right) sy 111 spl/gold Each 1208.00
618 Swan neck (left/right) sy 111 gold Each 1422.00
619 Sink cock with casted swivel spout sy 112 cp Each 656.00
620 Sink cock with casted swivel spout sy 112 col/cp Each 874.00
621 Sink cock with casted swivel spout sy 112 col/gold Each 1028.00
622 Sink cock with casted swivel spout sy 112 spl/gold Each 1142.00
623 Sink cock with casted swivel spout sy 112 gold Each 1344.00
624 Bib cock surgical with flange sy 114 cp Each 702.00
625 Bib cock surgical with flange sy 114 col/cp Each 936.00
626 Bib cock surgical with flange sy 114 col/gold Each 1101.00
627 Bib cock surgical with flange sy 114 spl/gold Each 1224.00
628 Bib cock surgical with flange sy 114 gold Each 1440.00
629 Pillar cock surgical sy 115 cp Each 653.00
630 Pillar cock surgical sy 115 col/cp Each 870.00
631 Pillar cock surgical sy 115 col/gold Each 1024.00
632 Pillar cock surgical sy 115 spl/gold Each 1137.00
633 Pillar cock surgical sy 115 gold Each 1339.00
634 Two way bib cock with flange sy 116 cp Each 665.00
635 Two way bib cock with flange sy 116 col/cp Each 886.00
636 Two way bib cock with flange sy 116 col/gold Each 1043.00
637 Two way bib cock with flange sy 116 spl/gold Each 1159.00
638 Two way bib cock with flange sy 116 gold Each 1363.00
639 Bib cock tip ton with wall flange sy 116a cp Each 665.00
640 Bib cock tip ton with wall flange sy 116a col/cp Each 886.00
641 Bib cock tip ton with wall flange sy 116a spl/gold Each 1043.00
642 Bib cock tip ton with wall flange sy 116a spl/gold Each 1159.00
643 Bib cock tip ton with wall flange sy 116a gold Each 1363.00
644 Swan neck with casted swivel spout sy 118 cp Each 732.00
645 Swan neck with casted swivel spout sy 118 col/cp Each 976.00
646 Swan neck with casted swivel spout sy 118 col/gold Each 1148.00
647 Swan neck with casted swivel spout sy 118 spl/gold Each 1275.00
648 Swan neck with casted swivel spout sy 118 gold Each 1500.00
649 Sink cock table top with casted swivel spout sy 119 cp Each 689.00
650 Sink cock table top with casted swivel spout sy 119 col/cp Each 919.00
651 Sink cock table top with casted swivel spout sy 119 col/gold Each 1080.00
652 Sink cock table top with casted swivel spout sy 119 spl/gold Each 1200.00
653 Sink cock table top with casted swivel spout sy 119 gold Each 1413.00
654 Cental hole basin mixer sy 121 cp Each 1335.00
655 Cental hole basin mixer sy 121 col/cp Each 1779.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
699 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 cp Each 2119.00
700 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 col/cp Each 2826.00
701 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 col/gold Each 3325.00
702 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 spl/gold Each 3694.00
703 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 gold Each 4346.00
704 One hole bidet mixer with pop up waste system sy131 cp Each 1816.00
705 One hole bidet mixer with pop up waste system sy131 col/cp Each 2422.00
706 One hole bidet mixer with pop up waste system sy131 col/gold Each 2849.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
707 One hole bidet mixer with pop up waste system sy131 spl/gold Each 3165.00
708 One hole bidet mixer with pop up waste system sy131 gold Each 3725.00
709 Single hole sink mixer table top with waste system sy 132 cp Each 1321.00
710 Single hole sink mixer table top with waste system sy 132 col/cp Each 1760.00
711 Single hole sink mixer table top with waste system sy 132 col/gold Each 2071.00
712 Single hole sink mixer table top with waste system sy 132 spl/gold Each 2301.00
713 Single hole sink mixer table top with waste system sy 132 gold Each 2708.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
714 adjustable legs) sy 133 cp Each 1777.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
715 adjustable legs) sy 133 col/cp Each 2370.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
716 adjustable legs) sy 133 col/gold Each 2788.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
717 adjustable legs) sy 133 spl/gold Each 3098.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
718 adjustable legs) sy 133 gold Each 3645.00
719 Spout up ton with flange sy 141 cp Each 948.00
720 Spout up ton with flange sy 141 col/cp Each 1264.00
721 Spout up ton with flange sy 141 col/gold Each 1487.00
722 Spout up ton with flange sy 141 spl/gold Each 1652.00
723 Spout up ton with flange sy 141 gold Each 1944.00
724 Spout plain with flange sy 142 cp Each 632.00
725 Spout plain with flange sy 142 col/cp Each 843.00
726 Spout plain with flange sy 142 col/gold Each 991.00
727 Spout plain with flange sy 142 spl/gold Each 1101.00
728 Spout plain with flange sy 142 gold Each 1296.00
729 Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152 cp Each 673.00
730 Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152 col/cp Each 896.00
731 Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152 col/gold Each 1055.00
732 Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152 spl/gold Each 1171.00
733 Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152 gold Each 1378.00
734 Bell shower sy 155 cp Each 352.00
735 Bell shower sy 155 col/cp Each 469.00
736 Bell shower sy 155 col/gold Each 552.00
737 Bell shower sy 155 spl/gold Each 614.00
738 Bell shower sy 155 gold Each 722.00
739 Shower arm with flange cp Each 287.00
740 Shower arm with flange col/cp Each 383.00
741 Shower arm with flange col/gold Each 450.00
742 Shower arm with flange spl/gold Each 501.00
743 Shower arm with flange gold Each 589.00
744 Flush valve with elbow bend 32mm &wall range sy 161 cp Each 1933.00
745 Flush valve with elbow bend 32mm &wall range sy 161 col/cp Each 2577.00
746 Flush valve with elbow bend 32mm &wall range sy 161 col/gold Each 3032.00
747 Flush valve with elbow bend 32mm &wall range sy 161 spl/gold Each 3369.00
748 Flush valve with elbow bend 32mm &wall range sy 161 gold Each 3963.00
749 Flush valve with out elbow bend 32mm sy 162 cp Each 1673.00
750 Flush valve with out elbow bend 32mm sy 162 col/cp Each 2231.00
751 Flush valve with out elbow bend 32mm sy 162 col/gold Each 2624.00
752 Flush valve with out elbow bend 32mm sy 162 spl/gold Each 2916.00
753 Flush valve with out elbow bend 32mm sy 162 gold Each 3430.00
754 Flush cock half turn 25mm cp Each 950.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
779 Single lever concealed divertor for bath & over head shower system sy 182 cp Each 2898.00
Single lever concealed divertor for bath & over head shower system sy 182
780 col/cp Each 3864.00
Single lever concealed divertor for bath & over head shower system sy 182
781 col/gold Each 4545.00
Single lever concealed divertor for bath & over head shower system sy 182
782 spl/gold Each 5049.00
783 Single lever concealed divertor for bath & over head shower system sy 182 gold Each 5941.00
784 Single lever wall mixer with telephonic shower arrangement sy 183 cp Each 3705.00
785 Single lever wall mixer with telephonic shower arrangement sy 183 col/cp Each 4940.00
786 Single lever wall mixer with telephonic shower arrangement sy 183 col/gold Each 5812.00
787 Single lever wall mixer with telephonic shower arrangement sy 183 spl/gold Each 6457.00
788 Single lever wall mixer with telephonic shower arrangement sy 183 gold Each 7597.00
789 Single lever sink mixer with casted swivel spout sy 184 cp Each 3409.00
790 Single lever sink mixer with casted swivel spout sy 184 col/cp Each 4545.00
791 Single lever sink mixer with casted swivel spout sy 184 col/gold Each 5347.00
792 Single lever sink mixer with casted swivel spout sy 184 spl/gold Each 5940.00
793 Single lever sink mixer with casted swivel spout sy 184 gold Each 6989.00
794 Single lever bidet mixer with pop up waste system sy 186 cp Each 3408.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
795 Single lever bidet mixer with pop up waste system sy 186 col/cp Each 4544.00
796 Single lever bidet mixer with pop up waste system sy 186 col/gold Each 5346.00
797 Single lever bidet mixer with pop up waste system sy 186 spl/gold Each 5938.00
798 Single lever bidet mixer with pop up waste system sy 186 gold Each 6987.00
799 Single lever concealed divertor extended (quotable) sy 187 cp Each 3548.00
800 Single lever concealed divertor extended (quotable) sy 187 col/cp Each 4731.00
801 Single lever concealed divertor extended (quotable) sy 187 col/gold Each 5566.00
802 Single lever concealed divertor extended (quotable) sy 187 spl/gold Each 6184.00
803 Single lever concealed divertor extended (quotable) sy 187 gold Each 7276.00
804 Sur single lever basin mixer with 455 mm copper connection & nuts sy 188 cp Each 3148.00
Sur single lever basin mixer with 455 mm copper connection & nuts sy 188
805 col/cp Each 4198.00
Sur single lever basin mixer with 455 mm copper connection & nuts sy 188
806 col/gold Each 4938.00
Sur single lever basin mixer with 455 mm copper connection & nuts sy 188
807 spl/gold Each 5486.00
808 Sur single lever basin mixer with 455 mm copper connection & nuts sy 188 gold Each 6455.00
809 Towel rail sy 191 cp Each 575.00
810 Towel rail sy 191 col/cp Each 766.00
811 Towel rail sy 191 col/gold Each 902.00
812 Towel rail sy 191 spl/gold Each 1001.00
813 Towel rail sy 191 gold Each 1178.00
814 Towel ring sy 192 cp Each 350.00
815 Towel ring sy 192 col/cp Each 466.00
816 Towel ring sy 192 col/gold Each 549.00
817 Towel ring sy 192 spl/gold Each 610.00
818 Towel ring sy 192 gold Each 717.00
819 Soap dish sy 193 cp Each 413.00
820 Soap dish sy 193 col/cp Each 551.00
821 Soap dish sy 193 col/gold Each 649.00
822 Soap dish sy 193 spl/gold Each 721.00
823 Soap dish sy 193 gold Each 848.00
824 Tooth brush holder sy 194 cp Each 382.00
825 Tooth brush holder sy 194 col/cp Each 509.00
826 Tooth brush holder sy 194 col/gold Each 599.00
827 Tooth brush holder sy 194 spl/gold Each 666.00
828 Tooth brush holder sy 194 gold Each 784.00
829 Toilet paper holder sy 194 cp Each 432.00
830 Toilet paper holder sy 194 col/cp Each 577.00
831 Toilet paper holder sy 194 col/gold Each 678.00
832 Toilet paper holder sy 194 spl/gold Each 753.00
833 Toilet paper holder sy 194 gold Each 886.00
834 Robe hook sy 195 cp Each 255.00
835 Robe hook sy 195 col/cp Each 339.00
836 Robe hook sy 195 col/gold Each 399.00
837 Robe hook sy 195 spl/gold Each 444.00
838 Robe hook sy 195 gold Each 523.00
839 Bath set complete sy 196 cp Each 2399.00
840 Bath set complete sy 196 col/cp Each 3199.00
841 Bath set complete sy 196 col/gold Each 3763.00
842 Bath set complete sy 196 spl/gold Each 4180.00
843 Bath set complete sy 196 gold Each 4919.00
844 Towel rack 18 " sy 197 cp Each 1012.00
845 Towel rack 18 " sy 197 col/cp Each 1348.00
846 Towel rack 18 " sy 197 col/gold Each 1587.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Excavation of pipe line trenches for drainage and water supply in rock requiring
blasting with initial lead and lift including cost of blasting materials where the
3. a. depth is 1.5 times more than the width, in places where there is no habitation.
Excavation of pipe line trenches for drainage and water supply in rock requiring
blasting with initial lead and lift including cost of blasting materials where the
b. depth is less than 1.5 times the width, in places where there is no habitation.
Cutting rock for pipe line trenches by hammers, nuckles and chisels including
c. stacking where the depth is 1.5 times or more than the width.
Cutting rock for pipe line trenches by hammers, nuckles and chisels including
d. stacking where the depth is less than 1.5 times the width. AS PER
Cutting rock for works other than pipe lines trenches by hammers, nuckles and COMMON
e. chisels including stacking. SSR
25% extra
over relevant
f. For contol blasting at restricted places SSR item
NOTE :- Rock should be measured in solids. In case it
is not possible, stacks should be made in
which case 40% for voids to be deducted from
the stack measurements.
Loading or unloading materials such as C.I. Pipes, PVC Pipes, AC
Pressure Pipes, DI Pipes, SW Pipes, PVC Pipes, A.C/Specials less than
4 300 mm dia upto 4 m in length including stacking.
a. C.I. Pipes/D.I. Pipes and fittings Per Tonne 55.60
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Lowering the C.I. Pipes, D.I. Pipes and fittings with flanged ends carefully
into the trenches and laying them true to alignment and gradient including
all sundries, but excluding conveyance from source of supply as per BIS
8. b. No.3114/85.
DIAMETER OF PIPE : (D/F Pipes) in mm :
80 Per Metre 15.20
100 Per Metre 15.20
125 Per Metre 15.20
150 Per Metre 15.90
180 Per Metre 16.30
200 Per Metre 17.80
225 Per Metre 19.00
250 Per Metre 20.30
300 Per Metre 25.90
350 Per Metre 46.40
380 Per Metre 47.80
400 Per Metre 51.30
450 Per Metre 57.00
500 Per Metre 59.60
530 Per Metre 66.60
560 Per Metre 71.60
600 Per Metre 78.00
650 Per Metre 80.00
680 Per Metre 86.50
700 Per Metre 99.70
750 Per Metre 112.70
800 Per Metre 138.20
900 Per Metre 167.00
1000 Per Metre 197.80
1100 Per Metre 232.10
1200 Per Metre 270.50
Jointing the C.I. / DI Pipes & fittings with S/S ends excluding cost of
jointing materials such as lead or lead wool and hemp yarn but including
sundries such as cost of fuel for melting lead, filling with water, with a
water lead upto 500 m and testing to required pressure etc, complete as
9. a. BIS No.3114/85
DIAMETER OF PIPE : (S/S Pipes) in mm :
80 Each Joint 40.50
100 Each Joint 43.40
125 Each Joint 62.50
150 Each Joint 65.20
180 Each Joint 75.70
200 Each Joint 85.30
225 Each Joint 96.30
250 Each Joint 106.30
300 Each Joint 124.80
350 Each Joint 136.60
380 Each Joint 156.60
400 Each Joint 177.70
450 Each Joint 197.50
500 Each Joint 209.60
530 Each Joint 227.60
560 Each Joint 245.90
600 Each Joint 282.20
650 Each Joint 301.50
680 Each Joint 306.50
700 Each Joint 314.30
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Jointing the C.I. Pipes, fittings and valves with flanged ends excluding
cost of jointing materials such as bolts, nuts, rubber insertion, white lead
and including filling with water with a water lead upto 500 m and testing to
10 required pressure etc., comp as per BIS No.3114/85.
DIAMETER OF PIPE : in mm :
80 Each Joint 47.70
100 Each Joint 50.90
125 Each Joint 73.40
150 Each Joint 76.50
180 Each Joint 89.20
200 Each Joint 100.90
225 Each Joint 114.90
250 Each Joint 124.70
300 Each Joint 149.30
350 Each Joint 163.40
380 Each Joint 186.90
400 Each Joint 210.30
450 Each Joint 235.80
500 Each Joint 247.80
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Lowering and laying in ready made trenches true to alignment and gradient,
jointing and testing of stoneware pipes excluding cost of jointing materials such
15 as cement mortar and hemp yarn as per BIS No. 4127/83.
DIA of Pipes in mm .
100 Per Metre 18.90
150 Per Metre 23.80
200 Per Metre 26.50
225 Per Metre 27.80
250 Per Metre 31.70
300 Per Metre 36.40
400 Per Metre 40.60
450 Per Metre 54.50
Lowering, laying, jointing & testing to Hydraulic Field test pressure including cost
of water with minimum water lead of 500 M (Labour charges only) for PVC pipes
16 excluding the cost of jointing materials.
DIA of Pipes in mm .
63 Per Metre 6.70
75 Per Metre 7.10
90 Per Metre 7.20
110 Per Metre 7.70
125 Per Metre 8.10
140 Per Metre 8.30
160 Per Metre 8.50
180 Per Metre 8.90
200 Per Metre 9.50
225 Per Metre 10.00
250 Per Metre 10.40
280 Per Metre 10.90
315 Per Metre 11.50
NOTE:- For item 9 to 16 the element of testing charges
is to be considered as 20% of the combined rate
for laying, jointing and testing. This 20% shall be
released only after satisfactory testing of the
pipe line to the required pressure.
Labour charges for lowering and keeping in position of C.I. Sluice valves,
17 reflux valves and scour valves. Dia of Valve in mm.
80 Each 19.20
100 Each 25.30
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Labour charges for fixing Air Valves including boring the mains, threading
18 a. the bore and fixing nipple etc., complete. Dia of Air valve in mm.
25 Each 52.70
40 Each 60.40
50 Each 63.80
65 Each 68.00
80 Each 74.70
100 Each 87.70
125 Each 135.90
150 Each 148.60
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves,
Double Air valves/ Air Cushion valve excluding cost of jointing materials
such as bolts, nuts and rubber insertions etc., complete. Dia of Air Valve
18 b. in mm .
25 Each 52.40
40 Each 60.10
50 Each 63.40
65 Each 67.70
80 Each 74.40
100 Each 87.30
125 Each 135.30
150 Each 147.90
Labour charges for fixing fire hydrants excluding cost of jointing
19 materials.
65 mm Each 59.80
80 mm Each 74.50
Uprooting C.I./ DI Pipes by melting the lead, loosening the joints, scraping
the pipes, hoisting and keeping within a lead of 10 m but excluding earth
20 work excavation and refilling. Dia of Pipes in mm.
80 Per Metre
100 Per Metre
125 Per Metre
150 Per Metre
180 Per Metre
200 Per Metre
225 Per Metre
250 Per Metre
300 Per Metre
350 Per Metre
400 Per Metre
450 Per Metre
500 Per Metre Observed
600 Per Metre data only
Uprooting of RCC pipes including breaking the collars, loosening the
joint, scraping the pipes, hoisting and keeping within a lead of 10 m but observed data
21 excluding earthwork excavation and refilling. Per Metre only
22 Removing GI/PVC/HDPE pipes and specials/ fittings and clearing.
Dia of Pipes in mm
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
50% of data of
50 laying &
40 Per Metre jointing of GI/
30 Per Metre PVC/ HDPE
pipes and
25 Per Metre
fittings of
20 Per Metre relevant PH
15 Per Metre item.
23 Cutting C.I./ DI Pipes without water in mains.Dia of pipes in mm.
80 Each cut 28.80
100 Each cut 28.80
125 Each cut 28.80
150 Each cut 28.80
180 Each cut 32.90
200 Each cut 32.90
225 Each cut 32.90
250 Each cut 47.30
300 Each cut 47.30
350 Each cut 65.90
380 Each cut 72.30
400 Each cut 75.40
450 Each cut 93.70
500 Each cut 112.70
530 Each cut 122.50
560 Each cut 132.30
600 Each cut 150.00
680 Each cut 169.20
24 Cutting A.C. Pipes without water in mains.Dia of pipes in mm.
80 Each cut 12.30
100 Each cut 12.30
125 Each cut 12.30
150 Each cut 12.30
200 Each cut 12.90
250 Each cut 20.90
300 Each cut 20.90
350 Each cut 26.20
400 Each cut 29.00
450 Each cut 35.60
500 Each cut 39.60
600 Each cut 44.30
Drilling and tapping CI/ DI Main and fixing brass screw down ferrule and
25 plug.
Each
10 mm to 20mm Tapping 57.40
Each
25 mm to 40mm Tapping 68.50
Cutting road surface including stacking of excavated materials for pipe
26 line trench work.
a) Cutting open B.T. road surface (as well as asphalt concrete upto 75 mm
thick) including water bound macadam 10 Sqm 186.80
b) Cutting open C.C. road surface 1 Cum 354.80
c) Cutting open water bound macadam road including soiling 1 Cum 60.80
27 Bailing out water.(For PH item)
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
a) Bailing out water from the pipe line trenches with oil engine driven pumpsets,
including hire charges, fuel charges and wages for Driver and Helper. HP/Hour 13.00
b) Bailing out water from the pipe line trenches with Electric Driven pumpset
including hire charges, current charges and wages for Driver and Helper. HP/Hour 10.20
NOTE:- The rate is payable on the total H.P. hours
ignoring fractions less than 0.5 HP hour and
rounding off 0.5 HP hour or more to the next
higher integer.
28 Shoring and strutting of trenches for water and sewer main.
10 Sqm of
Shoring
a) Single Staging from (0 to 2.5 Mts.) area 543.80
10 Sqm of
Shoring
b) Double staging from (2.5 m to 4.5 Mts.) area 735.30
Barricading, hoarding, lighting and watching etc., for water supply and
29 sewerage works for trenches. 10 RM 29.40
Excavation of trenches for infiltration galleries, syphon lines and
connecting mains in all soils under water including all leads, lifts, shoring,
strutting, bailing out water and removal of shoring and strutting materials,
30 after completion of pipe line w
a) 0 to 1 m deep under water. 10 Cum 4381.20
b) 1 to 2 m deep under water. 10 Cum 6276.00
c) 2 to 5 m deep under water. 10 Cum 9058.60
d) Beyond 5 m deep under water for every additional 1 m depth over item 'c' 10 Cum 1714.20
NOTE:- The above rates do not include rock requiring
blasting or chiselling
Laying and jointing glazed stoneware pipes including loose jointing with
cement fillets and all other incidental charges for infiltration gallery,
inclusive of bailing out water by pumping to keep the trench reasonably
31 dry to facilitate the work excluding cost of stoneware pipes
a) 200 mm to 400 mm Per Metre 218.10
Laying and jointing perforated RCC pipes inclusive of bailing out water and
jointing with cement fillets and all other incidental charges for infiltration gallery
inclusive of bailing out water by pumping to keep the trench reasonably dry to
32 facilitate the work excluding.
a) 200 mm to 600 mm Per Metre 225.10
Centring and scaffolding charges for RCC members including all materials
and labour charges for forming and dismantling
a) for R C C Elevated Service Reservoir of staging up to 15 metre below L
33 W L.
1) Slabs for thickness (150 mm to 300 mm)
One Sqm of
Centering
area 826.20
2) Slabs for thickness above (300 mm)
1651.70
3) Side walls curved surfaces.
624.50
4) Side wall straight surfaces.
555.50
5) Dome.
676.50
6) Roof Slab.
416.60
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
7) Column footing.
455.40
8) Column braces and beams
278.60
9) Circular braces, ring beams & circular column. 305.20
Note:- For RCC ELSR of staging above 15 m
observed data may be worked out for the extra
staging taking into consideration, the quantum
of concrete to be lifted, extra scaffolding
involved etc., and may be adopted in the
working estimate after getting approval from
the competent authority
b) For Ground level works :-
1) Slabs 1 Sqm
2) Beams & Lintels 1 Sqm As per
3) Sun shades 1 Sqm Common SSR
4) RCC vertical walls of plane surface upto 3 m height
such as ground level tanks clarifiers and sludge
digesters etc. 1 Sqm 302.30
5) RCC vertical walls of circular faces upto 3 m
height. 1 Sqm 385.70
NOTE: Scaffolding for every extra height of 1 m or
part thereof but not less than 0.5 m - 10 Sqm. 10 Sqm
34 Lift or delift of materials :
a) Lifting of cement concrete for RCC elevated
reservoir. For every 3 m height or part thereof over
the initial lift of 5 m 1 Cum 53.90
b) Delifting the materials such as stones, concrete
etc., for concrete below ground level for
construction of masonry ground level reservoirs,
inspection wells, test wells and sump wells etc., for
every 2 m depth or part thereof beyond the initial
depth of 4 meters from ground level. 1 Cum 16.40
35 Labour charges for fixing ventilating shafts complete with all accessories. Each 222.20
Labour charges for fixing water closets including fixing of foot rests (for all
36 sizes). Each
Labour charges for fixing of flushing cistern including fixing of flush pipes, lead
37 pipe, jointing etc., complete Each
Labour charges for fixing wash hand basin including fixing of inlet and waste
38 pipe connections etc., complete Each
39 Fixing urinal with inlet and waste pipe connections etc., complete. Each Relevant
Refilling the trench for pipe line with excavated earth including watering and Common SSR
40 tamping etc., complete 10 Cum item
25% extra
Extra allowance for isolated scattered works viz., valve pits, public fountains, over the cost
41 a meter pits and manholes etc., complete. Each of chamber.
Repairs to the existing mains, interconnections, replacement of valves/specials 100% extra
etc., including the cutting ,jointing, bailing out of water, drying, earth work over the cost
41 b execavation etc., complete. of work
Removal of wet silt and sludge from sullage drains with aid of baskets and
42 vessels. 10 Cum 554.10
As per
separate
Conveyance of C.I./ DI Pipes, C.I. Special excluding loading, unloading and sheet
43 stacking. enclosed
44 Conveyance of RCC pipes including loading, unloading and stacking. Deleted
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
As per local
competitive
45 Conveyance of Stoneware pipes inlcuding loading unloading and stacking. quotations
As per local
Conveyance of A.C. pressure pipes and accessories including loading, competitive
46 unloading and stacking. quotations
Conveyance of PVC pipes and accessories including loading, unloading and
47 stacking. Deleted
Well sinking in sandy and other loose soils under water either by manual
labour, divers, or dredgers, weighting the top of staining to assist sinking
etc., including dewatering and other incidental charges such as hire
48 charges for mechanical equipment etc,complete up to 4 m internal dia.
Upto 2 m below GL/m Per metre 9220.60
From 2 to 4 m below GL/m Per metre 10098.10
From 4 to 6 m below GL/m Per metre 11414.80
From 6 to 8 m below GL/m Per metre 12871.10
From 8 to 10 m below GL/m Per metre 14227.90
Note:-Below 10 m for every metre depth or part
thereof add Rs.250/- per m. For higher dia,
observed data is to be prepared and got
approved.
Sinking in Hard strata other than rock but in soils like limestone, gravel, clay
under water including, pumping dewatering, hire charges for mechanical
49 equipment etc., complete. Deleted
As per
50 Open well excavation in various soils. Common SSR
51 Rates for OHSRs/ELSRs including fixtures with a staging of 15 m.
a Capacity in 500 Kilo litres Per litre 4.75
b Capacity in 1000 Kilo litres Per litre 4.54
c Capacity in 1500 Kilo litres Per litre 4.28
d Capacity in 2000 Kilo litres Per litre 4.10
e Capacity in 2500 Kilo litres Per litre 3.89
NOTE: -1) The above rates are applicable for
Elevated Level Services Reservoirs /
OHSRs with RAFT FOUNDATION and a
rate of Rs.2,700/- per tonne for cement
and Rs.28,000/- per tonne for steel.
2) For every m height of staging above 15 m
or less than 15 m the rate shall be
increased/reduced by Rs.0.02 paise per
litre.
3) For every Rs.100/- increase/decrease in
price of cement per tonn increase/
decrease the rate by 0.7%
4) for every Rs.1000/- increase/decrease in
price of steel per tonne, increase/decrease
the rate by 2%
5) Rate inclusion of three coats of epoxy paint
to inner surface of the reservoir including
roof dome.
6) For intermediate ranges proportional rates
may be adopted.
7) The above rates be adopted for estimate
purposes for construction of ELSR for a
finished work including 2 coats of
snowcem painting for external surfaces,
lettering fixing of all required fixtures,
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Size Unit
NP - 2 Class
80 mm dia Meter 60.77
100 mm dia Meter 70.56
150 mm dia Meter 83.2
200 mm dia Meter 98.37
225 mm dia Meter 107.68
250 mm dia Meter 114.75
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Code
No. Description
1 2
MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. COLLARS CONFORMING TO B.I.S. 458/1988 (RATE PER EACH COLLAR) SUITAB
R.C.C. PLAIN ENDED PIPES INCLUDING TRANSPORTATION BUT EXCLUDING TAXES & DUTIES
MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. SOCKET AND SPIGOT PIPES CONFORMING TO B.I.S. 458/1988 A
FACTORY (RATE PER METER OF EFFECTIVE LENGTH) EXCLUDING TRANSPORTATION, TAXES & DUTIES.
80 mm dia 10.00
100 mm dia 12.00
150 mm dia 21.00
200 mm dia 25.00
225 mm dia 27.00
250 mm dia 31.00
300 mm dia 38.00
350 mm dia 44.00
400 mm dia 48.00
450 mm dia 55.00
500 mm dia 72.00
600 mm dia 94.00
700 mm dia 129.00
800 mm dia 163.00
900 mm dia 204.00
1000 mm dia 239.00
1100 mm dia 288.00
1200 mm dia 460.00
1400 mm dia 506.00
1600 mm dia 630.00
1800 mm dia 785.00
Size P1 - Class
Rate upto 5
Kms Lead
including Rate for
Loading, every
unloading additional 1
and KM lead or
Code No. Description stacking part thereof.
1 2 3 4
CONVEYANCE OF R.C.C. PLAIN ENDED PIPES ON ALL WEATHER ROADS INCLUDING LOADING, UNLOADING AND STACKING (p
NP - 2 Class
80 mm dia 1.30 0.06
100 mm dia 1.60 0.08
150 mm dia 2.25 0.13
200 mm dia 3.00 0.16
225 mm dia 3.50 0.20
250 mm dia 4.00 0.24
300 mm dia 6.00 0.30
350 mm dia 7.80 0.38
400 mm dia 9.00 0.50
450 mm dia 11.50 0.65
500 mm dia 12.50 0.75
600 mm dia 18.00 1.10
700 mm dia 23.00 1.60
800 mm dia 27.00 1.60
900 mm dia 31.00 1.60
1000 mm dia 46.00 3.25
1100 mm dia 50.50 3.25
1200 mm dia 57.00 3.45
1400 mm dia 69.00 3.45
1600 mm dia 80.00 3.50
1800 mm dia 92.00 3.50
Rate upto 5
Kms Lead
including Rate for
Loading, every
unloading additional 1
and KM lead or
Code No. Description stacking part thereof.
1 2 3
CONVEYANCE OF R.C.C. SOCKET AND SPIGOT PIPES ON ALL WEATHER ROADS INCLUDING LOADING, UNLOADIN
STACKING (per Meter of effective length)
Size Unit
Class -5
80 mm dia Rate/Meter 77.27
100 mm dia Rate/Meter 97.34
125 mm dia Rate/Meter 122.3
150 mm dia Rate/Meter 151.63
200 mm dia Rate/Meter 211.85
250 mmdia Rate/Meter 261.77
300 mm dia Rate/Meter 337.27
350 mm dia Rate/Meter 494.21
400 mm dia Rate/Meter 613.08
450 mm dia Rate/Meter 739.13
500 mm dia Rate/Meter 913.54
600 mm dia Rate/Meter 1279.2
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
SCHEDULE OF RATES FOR TRANSPORTATION OF A.C. PRESSURE PIPES AT SITE OF WORK WITHIN THE STAT
ANDHRA PRADESH
Stores delivery charges for transportation of AC pressure pipes at site of work anywhere in Andhra Pradesh on motorable roads for full truc
including transit insurance, unloading, and stacking at Departmental stores etc., complete (A.C. couplings and Rubber rings are to be supplie
transportation charges).
Note The duties and taxes as applicable may be added as per rules at the time of preparation of estimate.
Size Unit
Class - 5
80 mm dia Each Set 25.27
100 mm dia Each Set 30.99
125 mm dia Each Set 40.56
150 mm dia Each Set 51.79
200 mm dia Each Set 53.04
250 mmdia Each Set 61.88
300 mm dia Each Set 62.09
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Size Unit
6 Kg/cm2
Cost of laying jointing, testing to Hydrostatic field test pressure including cost of rubber rings, cost
completion of field testing etc.
350 MM DIA Meter 75.00
400 MM DIA Meter 85.00
450 MM DIA Meter 95.00
500 MM DIA Meter 100.00
600 MM DIA Meter 125.00
700 MM DIA Meter 145.00
800 MM DIA Meter 165.00
900 MM DIA Meter 185.00
1000 MM DIA Meter 210.00
1100 MM DIA Meter 235.00
1200 MM DIA Meter 255.00
Code No.
1
BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002 @ Ex-factory excluding trans
Size Unit
4 - 12 Kg/cm2
Size Unit
4 - 12 Kg/cm2
Conveyance of Bar Wrapped steel Cylindrical (BWSC) pipes and accessories including loading at Factory, un-loading
S S rate for
Code No. Description Unit2005-06
1 2 3 4
CENTRIFUGALLY CAST (SPUN) DUCTILE IRON FITTINGS CONFORMING TO IS:9523/2000 HAVING DIMENTIONS
AS PER TABLE. THE RATES MENTIONED HERE UNDER ARE FOR FITTINGS, ZINC COATED EXTERNALLY WITH
INSIDE MOTOR LINING (WITH FINISHING AS PER CLASS 13/IS 9523/2000) ( Ex-works) Excluding transportation,
taxes and duties etc.
I DI double socket branch flange Tee
Nominal dia in mm
80 x 80 Each 585.00
100 x 80 Each 675.00
100 x 100 Each 765.00
150 x 80 Each 945.00
150 x 100 Each 1035.00
150 x 150 Each 1260.00
200 x 80 Each 1305.00
200 x 100 Each 1395.00
200 x 150 Each 1665.00
200 x 200 Each 1980.00
250 x 80 Each 1620.00
250 x 100 Each 1755.00
250 x 150 Each 2025.00
250 x 200 Each 2385.00
250 x 250 Each 2835.00
300 x 100 Each 2295.00
300x 200 Each 2970.00
300 x 300 Each 3960.00
350 x 100 Each 3000.00
350 x 200 Each 3900.00
350 x 350 Each 5850.00
400 x 80 Each 3400.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
1 2 3 4
Socket and spigot centrifugally cast (spun) iron pressure pipes for water, gas Note: The prevailing
and sewage conforming to specification no: i..s 1536/1989 (third revision) with for Centrifugally
amdt. No: 1 & 2 in standard lengths of 3.66 m, 4 m, 4.5m, 5 m, 5.5 m & 6 m and (Spun) Iron Pressure
details given below, suitable either for lead jointing or rubber gasket (pushon) as per DGS
jointing at purchasers option at ex-factory excluding transportation, taxes & Contract shall be adopted
duties.
Size Unit
3 Bar
350 mm dia Meter 120.00
400 mm dia Meter 180.00
450 mm dia Meter 220.00
500 mm dia Meter 280.00
600 mm dia Meter 300.00
700 mm dia Meter 340.00
800 mm dia Meter 400.00
900 mm dia Meter 440.00
1000 mm dia Meter 510.00
S S RATES FOR H.D.P.E PIPES FOR THE YEAR 2005-06 (PE - 80 Grade)
OD 20 mm - -
OD 25 mm - -
OD 32 mm - -
OD 40 mm - 17.55
OD 50 mm - 25.10
OD 63 mm 21.20 34.39
OD 75 mm 36.20 47.00
OD 90 mm 46.28 68.00
OD 110 mm 65.55 101.68
OD 125 mm 81.00 130.49
OD 140 mm 107.43 161.56
OD 160 mm 138.96 211.67
OD 180 mm 172.79 266.83
OD 200 mm 212.22 326.45
OD 225 mm 279.90 432.15
OD 250 mm 345.30 534.60
OD 280 mm 433.90 665.80
OD 315 mm 544.70 846.90
S S Rates for
S.No. Description Unit 2005-06
1 2 3 4
3 Manufacture, Supply and delivery of CI D/F Kinetic Double Air Valve Heavy
Duty suitable for workking pressure upto 16kg/Cm2 without isolating
valve, conforming to IS 14845 excluding transportation, Central Excise
duty and sale tax etc., complete.
DIA IN MM Rate/Each Rs.
40 1680.00
50 2030.00
80 2716.00
100 3640.00
150 8200.00
200 13580.00
4 Manufacture, Supply and delivery of CI D/F Double Air Valve suitable for
workking pressure upto 10kg/Cm2 conforming to G & K Fig.H7 excluding
transportation, Central Excise duty and sale tax etc., complete.
DIA IN MM Rate/Each
40 1043.00
50 1440.00
80 1995.00
100 2475.00
150 6450.00
200 11250.00
5 Manufacture, Supply and delivery of CI D/F Kinetic Air Valve as per
IS:14845 Heavy Duty with isolating valve bevel gear operated as per IS
14846 excluding transportation, Central Excise duty and sales tax etc.,
complete.
DIA IN MM
Rate/Each in Rs.
PIN 1.0 PIN 1.6
40 4782.00 5500.00
50 5580.00 6417.00
80 7350.00 8450.00
100 10125.00 11650.00
150 19950.00 22950.00
200 29750.00 34215.00
6 Manufacture, Supply and delivery of CI D/F Kinetic Air Valve as per G&K
H42K with isolating valve bevel gear operated as per IS 14845 excluding
transportation, Central Excise duty and sales tax etc., complete.
DIA IN MM
Rate/Each in Rs.
PIN 1.0 PIN 1.6
40 3825.00 4782.00
50 4463.00 5580.00
80 5880.00 7350.00
100 8100.00 10125.00
150 15960.00 19950.00
200 23800.00 29750.00
Conveyance of valves and accessories including loading at factory and
unloading, stacking at site of work. 10% on basic cost of valves
TEST PRESSURE
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
Manufacture, Supply and delivery of zero volocity valve/ PSLV with CI body with flanged ends as per AWWA, Ex-facto
Central Excise duty and sale tax etc., complete.
DIA IN MM Rate/Each
100
125
150 36375.00 42459.00
200 38000.00 43700.00
250 42875.00 49306.00
300 48250.00 55488.00
Manufacture, Supply and delivery of zero volocity valve/ PSLV with MS Fabricated Body with Plain ends.
portation, Central Excise duty and sale tax etc., complete.
DIA IN MM Rate/Each
350 49055.00 56413.00
400 54223.00 62356.00
450 63066.00 72526.00
500 72888.00 83820.00
525/550 78290.00 89000.00
600 87659.00 100808.00
650 98125.00 107938.00
700 114375.00 125875.00
750 126688.00 139375.00
800 154328.00 177478.00
900 183429.00 210943.00
1000 222500.00 222500.00
1050 224725.00 224725.00
1100 283475.00 321438.00
1200 341188.00 375313.00
1400 511782.00 562969.50
1500 596313.00 655938.00
1600 608239.26 669056.76
Manufacture, Supply and delivery of Air Cushan valves / Quick Released damped Air Valves (QRDA) as
Central Excise duty and sale tax etc., complete.
DIA IN MM Rate/Each
100 31750.00 36513.00
150 48250.00 55488.00
200 51500.00 59225.00
Conveyance of valves and accessories including loading at factory and
unloading, stacking at site of work. 10% on basic cost of valves
RATES FOR RUBBER GASKETS SUITABLE FOR C.I/ D.I. S/S PIPES
S S Rates
For
Sl. No. Description Unit 2005-06
1 2 3 4
MANUFACTURE AS PER BIS 12820/89 WITH S.B.R. QUALITY RUBBER
CONFIRMING TO BIS: 5382/85, SUPPLY AND DELIVERY OF RUBBER
GASKETS SUITABLE FOR C.I/ D.I. S/S PIPES ANYWHERE IN A.P. F.O.R.
DESTINATION DEPARTMENTAL STORES INCLUDING COST OF
MATERIAL, LOADING, INCIDENTAL HANDLING WITH COMPANYS
STANDARD PACKING, TRANSPORTATION, UNLOADING & STACKING
BUT EXCLUDING CENTRAL EXCISE DUTY, SALES TAX, OCTROI AND
OTHER GOVT. LEVIES ETC., COMPLETE.
80mm dia Each 27.80
100mm dia Each 40.00
150mm dia Each 63.85
200mm dia Each 78.30
250mm dia Each 87.55
300mm dia Each 133.90
350mm dia Each 168.90
400mm dia Each 184.35
450mm dia Each 198.80
500mm dia Each 299.75
600mm dia Each 354.25
700mm dia Each 470.90
750mm dia Each 523.20
800mm dia Each 626.75
900mm dia Each 757.55
1000mm dia Each 828.40
TEST PRESSURE
2.5
Code No. Description Kgs/cm2 4.0 Kgs/cm2
1 2 3 4
Manufacture, Supply and delivery of Unplasticised PVCs Pipes for potable
water supplies conforming to IS : 4985/2000 (third revision) with bell ends
(Socket) as per specification in light Grey/Natural Ivory Grey/ Any other
Color (except White) inclusive of transportation to the sub-divisional
stores anywhere in AP excluding Excise duty and Sales Tax etc.
DIA IN MM Rate/Metre
20 -- --
25 -- --
32 -- --
40 -- --
50 -- --
63 -- 24.50
75 -- 35.10
90 32.35 49.43
110 48.75 71.50
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
OTHER ITEMS
S S Rates for
Sl. No. Description Unit 2005-06
1 2 3 4
Supply and delivery of pig lead 99.99 % pure including cost and conveyance 48.70
1 etc., complete. Per Kg
Supply and delivery of spun yarn of best quality including cost and conveyance 37.50
2 etc., complete. Per Kg
Supply and delivery of rubber packing including cost and conveyance etc.,
3 complete.
a) 3 mm thick Per Kg 32.00
b) 6 mm thick Per Kg 35.50
Supply and delivery of bolts and nuts with double washers including cost and 34.50
4 conveyance etc., complete. (1/2" to 1") Per Kg
The rates may be revised depending upon the increase/decrease in the cost
of raw materials as per the following method. For every increase/decrease of
Rs.1000/- in the cost of raw materials or part there of proportionately.
Inrespect of Pig Iron: The increase/decrease in cost of CI Specials per Kg is
3.43%.
Inrespect of coke: The increase/decrease in cost of CI Specials per Kg is
0.67%.
The above price is at site of work , Exicise duty, CST/VAT extra as applicable
at the time of supply.
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
S S Rate
for
Sl. No. Description Unit 2005-06
1 2 3 4
MANUFACTURE, SUPPLY AND DELIVERY OF SALT GLAZED
STONEWARE PIPES AND FITTINGS AS PER B.I.S. No. 651/1992 F.O.R.
DEPARTMENTAL STORES ANYWHERE IN A.P. INCLUDING PACKING AS
PER STANDARD SPECIFICATION, LOADING AT FACTORY,
TRANSPORTATION, UNLOADING AND STACKING ETC., COMPLETE BUT
EXCLUDING VAT AND OTHER GOVT. LEVIES.
Salt Glazed Stoneware pipes.
1 Rmt. Rates as
proposed by
R & B in S &
WS items for
Building
items
4" dia (101.6 mm)
6" dia (152.4 mm) 1 Rmt.
8" dia (203.2 mm) 1 Rmt.
10" dia (254.0 mm) 1 Rmt.
Bends (Dia in mm)
100 Each 28.30
150 Each 52.40
200 Each 99.20
250 Each 200.30
Junctions (T's & Y's) (Dia in mm)
Length of barrel is 60 cm
100 x 100 Each 52.40
150 x 100 Each 77.90
150 x 150 Each 85.00
200 x 100 Each 120.40
200 x 150 Each 141.70
200 x 200 Each 162.90
250 x 100 Each 191.30
250 x 150 Each 252.10
250 x 200 Each 312.90
250 x 250 Each 373.70
Plugs (Diameter in mm)
100 Each 10.40
150 Each 19.80
200 Each 38.00
250 Each 66.10
S.W. Gully Traps (Round and Suare)
150 mm x 100 mm Each 80.70
8964.00
Providing fusion bonded epoxy coating not less than 175 microns thickness
and upto 300 microns to reinforcement of all diameters as per IS 13620-1993
including testing of coating at plant. The rate is inclusive of cost on account of
careful handling, PVC coated binding wire instead of GI binding wire, touch up
material supplied by coating agency, repair work, transportation from the
source of supply of steel to the plant and transportation of coated steel from the
plant to site of work, loading, unloading and staightening of bent rods etc.,
complete as per specification and as directed by the Engineer-in-charge. per MT
SS rate
for
S.No. LEAD PER 2005-06
1 2 3 4
1 UP TO 250 METRES cum 37.00
2 250 To 500 METRES cum 54.60
3 1 Km. cum 71.60
4 2 Km. cum 75.00
5 3 Km. cum 79.40
6 4 Km. cum 82.90
7 5 Km. cum 86.40
8 6 Km. cum 89.70
9 7 Km. cum 94.20
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
S S RATES FOR CONVEYANCE OF METAL, STONE, RUBBLE INCLUDING CUDDAPAH SLABS INCLUDING
LOADING, UNLOADING &STACKING ON METALLED ROAD
SS Rate
for
S.No. LEAD UNIT 2005-06
1 2 3 4
1 UP TO 500 mts. cum 83.30
2 1 Km. cum 86.70
3 2 Km. cum 88.90
4 3 Km. cum 93.40
5 4 Km. cum 97.10
6 5 Km. cum 100.50
7 6 Km. cum 106.20
8 7 Km. cum 108.70
9 8 Km. cum 110.80
10 9 Km. cum 116.60
11 10 Km. cum 119.10
12 11 Km. cum 123.20
13 12 Km. cum 128.10
14 13 Km. cum 131.60
15 14 Km. cum 136.20
16 15 Km. cum 138.50
17 16 Km. cum 142.00
18 17 Km. cum 146.60
19 18 Km. cum 150.20
20 19 Km. cum 152.40
21 20 Km. cum 158.10
22 Beyond 20 and up to 30 Km (Rate/Km) cum 4.00
23 Beyond 30 and up to 50 Km (Rate/Km) cum 3.60
24 Beyond 50 and up to 80 Km (Rate/Km) cum 3.30
25 Beyond 80 and up to 100 Km (Rate/Km) cum 3.20
26 Beyond 100 Km (Rate / Km) cum 2.90
27 LOADING cum 9.20
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
28 U N L O A D I N G cum 6.30
29 S T A C K I N G cum 6.30
S S RATES FOR CONVEYANCE OF LIME STONE, BROKEN LATERITE AND BRICK JELLY INCLUDING
LOADING, UNLOADING &STACKING ON METALLED ROAD
SS Rate
for
S.No. LEAD UNIT 2005-06
1 2 3 4
1 0 To 250 mts. cum 79.90
2 251 To 500 mts. cum 80.50
3 1 Km. cum 83.20
4 2 Km. cum 85.20
5 3 Km. cum 89.50
6 4 Km. cum 93.30
7 5 Km. cum 97.00
8 6 Km. cum 99.90
9 7 Km. cum 103.70
10 8 Km. cum 107.40
11 9 Km. cum 110.80
12 10 Km. cum 112.90
13 11 Km. cum 117.70
14 12 Km. cum 120.30
15 13 Km. cum 125.20
16 14 Km. cum 128.10
17 15 Km. cum 131.20
18 16 Km. cum 134.40
19 17 Km. cum 137.70
20 18 Km. cum 141.70
21 19 Km. cum 145.60
22 20 Km. cum 148.10
23 Beyond 20 and up to 30 Km (Rate/Km) cum 3.70
24 Beyond 30 and up to 50 Km (Rate/Km) cum 3.50
25 Beyond 50 and up to 80 Km (Rate/Km) cum 2.90
26 Beyond 80 and up to 100 Km (Rate/Km) cum 2.80
27 Beyond 100 Km (Rate / Km) cum 2.50
28 LOADING cum 7.30
29 UNLOADING cum 5.80
30 STACKING cum 4.00
S S RATES FOR CONVEYANCE OF SURKI AND FLYASH INCLUDING LOADING, UNLOADING &STACKING ON
METALLED ROAD
SS Rate
for
S.No. LEAD UNIT 2005-06
1 2 3 4
1 0 To 250 mts. Tonne 68.30
2 250 To 500 mts. Tonne 68.70
3 1 Km. Tonne 71.80
4 2 Km. Tonne 75.40
5 3 Km. Tonne 77.40
6 4 Km. Tonne 80.90
7 5 Km. Tonne 84.20
8 6 Km. Tonne 87.00
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
S S RATES FOR CONVEYANCE OF STEEL AND LUBRICATING OIL INCLUDING LOADING, UNLOADING
&STACKING ON METALLED ROAD
SS Rate
for
S.No. LEAD UNIT 2005-06
1 2 3 4
1 0 To 500 mts. Tonne 93.90
2 1 Km. Tonne 95.30
3 2 Km. Tonne 99.10
4 3 Km. Tonne 103.30
5 4 Km. Tonne 107.10
6 5 Km. Tonne 110.80
7 6 Km. Tonne 115.20
8 7 Km. Tonne 118.30
9 8 Km. Tonne 122.50
10 9 Km. Tonne 125.90
11 10 Km. Tonne 130.30
12 11 Km. Tonne 134.30
13 12 Km. Tonne 137.70
14 13 Km. Tonne 141.80
15 14 Km. Tonne 145.10
16 15 Km. Tonne 149.40
17 16 Km. Tonne 152.60
18 17 Km. Tonne 156.30
19 18 Km. Tonne 160.20
20 19 Km. Tonne 163.80
21 20 Km. Tonne 168.70
22 Beyond 20 and up to 30 Km (Rate/Km) Tonne 3.50
23 Beyond 30 and up to 50 Km (Rate/Km) Tonne 2.90
24 Beyond 50 and up to 80 Km (Rate/Km) Tonne 2.90
25 Beyond 80 and up to 100 Km (Rate/Km) Tonne 2.50
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
S S RATES FOR CONVEYANCE OF C.I. PIPES, SPECIALS & VALVES PER METRIC TONNE EXCLUDING LOADING
UNLOADING & STACKING
Lead in
Kilometers 80 100 125
1 2 3 4
For every
K.M. or part
thereof
2005-06 2.70 2.80 2.90
RATES FOR CONVEYANCE OF BRICKS, MANGLORE TILES,TERRACE BRICKS, FLAT TILES, LIME, COKE,A.C. SHEETS AND W
INCLUDING LOADING, UNLOADING &STACKING ON METALLED ROAD
HIRE CHARGES
HIRE/USAGE CHARGES FOR PLANT AND MACHINERY FOR 2005-06
Capacity /
Output of Unit of
Sl. No. Description of Machine machine Measurement
1 2 3 4
1 Drum Mix Plant 40 / 60 TPH 50 TPH Per Hour
2 Hot Mix Plant 30/45 TPH 40 TPH Per Hour
3 Hot Mix Plant 30/45 TPH 20/30 25 TPH Per Hour
4 Hot Mix Plant 30/45 TPH 6/10 TPH 8 TPH Per Hour
5 Paver finisher Hydraulic with sensor 75 TPH Per Hour
6 Paver finisher mechanical sold 75 TPH Per Hour
7 1) Bitumen pressure 4T Per Hour
8 Generating get 125 KVA 100 KVA Per Hour
9 Loader of 1 Cu.M. 1 Cu. M Per Hour
10 Tipper 5 cum capacity one trip /hour
11 Tipper 10 T 10 T Per Km.
12 Tandam Road Roller 8.5 T Per Hour
13 Pneumatic tyre Roller 8T Per Hour
14 Road Roller 8/10 T Per Hour
15 JCB Excavator
0.24 / 1 Cu.M Per Hour
16 Wheeled Dozer. D 30 BEML Per Hour
17 Mortar Grader BEML Per Hour
18 Vibratory Roller 10 T Per Hour
19 Tractor 50 HP Per Hour
20 Air Compressor 170 Cu. M Per Hour
21 Bitumen Boilor 1.5 T Per Hour
22 Wet Mix Plant 60 T Per Hour
23 Batching Plant 30 Cu.M PH Per Hour
24 Batching Plant 15 Cu.M PH Per Hour
25 Transit Mixture 4 Cu. M. Per Hour
26 Concrete Pump 6 Cu. M. PH Per Hour
27 Grab dredging crane ( 1cum) (normally runs for 4 hours a day) Per Hour
28 Mastic Cooker 1T Per Hour
29 Drilling equipment Per Hour
30 Needle Vibrator Per Hour
31 Concrete Mixture Per Hour
32 Tipper /Dumper 1 hour Per Hour
33 Vibrating Roller Per Hour
34 Front End Roller Per Hour
35 Water Tanker Per Hour
36 Crane (Rate of sinking 0.8 mts. per day Per Hour
37 Compressor Charges ( 6 cum per minit capacity) Per Hour
38 Compressor Charges ( 10.5 cum per minit capacity) Per Hour
39 Pump ( 23 KW) Per Hour
40 Hydraulic Excavator 0.9 Cum bucket capacity at 60 CUM per hour Per Hour
41 Hydraulic Excavator 1 CUM per hour Per Hour
42 Water Tanker 6 KL. Per Hour
43 Electric Generator Set 33.KVA. per hour
44 Electric Generator Set 63.KVA. Per Hour
45 Electric Generator Set 125.KVA. Per Hour
46 Electric Generator Set 250.KVA. Per Hour
Sl. S.S. Item Description Unit S S RATE FOR
No. No. (per) 2005-06
B 35 TON
67.45 67.45
76.72 76.72
101.98 101.98
121.19 121.19
160.06 160.06
214.94 214.94
272.11 272.11
317.84 317.84
397.87 397.87
503.05 503.05
629.96 629.96
798.02 798.02
1023.25 1023.25
1318.22 1318.22
NFORMING TO B.I.S. 458/1988 AT EX-
N, TAXES & DUTIES.
656.42 668.5
727.78 740.95
803.52 810.1
918.77 997.81
1287.6 1326.02
1643.26 1919.88
2173.45 2509.34
2731.08 3151.5
3093.32 3951.72
3648.75 4564.24
4304.08 5341.41
5700.36 7570.84
7396.3 9125.18
9800.27 12237.16
58.00 58.00
66.00 66.00
75.00 75.00
86.00 86.00
125.00 125.00
150.00 150.00
182.00 182.00
246.00 246.00
297.00 297.00
380.00 380.00
478.00 478.00
526.00 526.00
642.00 642.00
820.00 820.00
P2 - Class P3 – Class
10.00 10.00
13.00 13.00
21.00 21.00
25.00 25.00
28.00 29.00
32.00 33.00
40.00 42.00
51.00 55.00
66.00 68.00
76.00 78.00
86.00 90.00
108.00 107.00
142.00 150.00
180.00 18.00
228.00
275.00
Rate upto 5 Rate for
Kms Lead every
including additional
Loading, 1 KM lead
unloading or part
and stacking thereof.
5 6
UNLOADING AND STACKING (per Meter)
NP - 3 Class
&
NP - 4 Class
17.00 0.45
20.00 0.65
22.00 0.75
24.00 0.75
36.00 1.60
40.00 1.88
48.00 1.88
63.00 3.50
76.00 3.50
82.00 3.75
92.00 3.75
125.00 3.96
150.00 3.96
200.00 5.54
NP - 3 & NP - 4 Class
20.00 0.70
25.00 1.22
27.50 1.25
30.00 1.30
41.00 1.85
55.00 3.68
65.00 3.70
75.00 3.70
79.00 3.70
85.00 3.70
95.00 3.75
127.00 3.75
150.00 4.00
200.00 5.50
P3 – Class
1.65 0.10
1.90 0.11
2.65 0.15
5.00 0.33
5.60 0.38
6.60 0.50
11.50 0.60
16.00 0.75
21.50 1.22
26.50 1.25
32.50 1.75
46.50 2.32
68.50 3.70
87.00 3.70
desh on motorable roads for full truck loads 10% on the value of AC Pressure pipes
gs and Rubber rings are to be supplied free of only. (on basic price)
5382/88 AND WITH BIS MARK EMBOSSED PER EACH SET SUITABLE FOR
G, TRANSPORTATION AND UNLOADING AT SITE TRANSIT RISK ETC., BUT
loading at Factory, un-loading at site and stacking for the following sizes.
adopted.
S S rate for
2005-06
4
00 HAVING DIMENTIONS
ATED EXTERNALLY WITH
Excluding transportation,
5 6
22½ o 11¼o
315.00 315.00
405.00 -
675.00 630.00
1035.00 945.00
1350.00 1260.00
1890.00 1710.00
2650.00 2350.00
3300.00 2900.00
4250.00 3700.00
5665.00 4840.00
8690.00 7370.00
Rates for
prevailing rates
Centrifugally Cast
Pressure Pipes
DGS & D Rate
Contract shall be adopted.
S S Rates for
2005-06
4
594.00
765.00
821.00
880.00
65.00
5
FOR Enclosed Spur Gear
Arrangement with Thrust
bearing for easy
operation.
7500.00
7500.00
7500.00
7500.00
7500.00
9000.00
9000.00
9000.00
9000.00
P.N 0.6
10% on basic cost of valves
TEST PRESSURE
Additional charges for
Flanged ended valves
25
20 Kgs/cm2 Kgs/cm2
5 6 7
44968.00 49465.00
46978.00 51675.00
53004.00 58304.00
59650.00 65615.00
40164.00 44180.00
61036.00 67140.00
65148.00 71663.00
TEST PRESSURE
PN 40 Max.
PN 25 ^ P 32 bar
5 6
28500.00
29550.00
39675.00
48000.00
53500.00
162707.00 230632.00
191407.00
256595.00 285000.00
297828.00 312284.00
560925.00
818691.00
1187155.00
1326201.00
88628.00 116006.00
107640.00 136013.00
131040.00 166023.00
149058.00 181233.00
150930.00 196268.00
191295.00 251726.00
282000.00 364500.00
412900.00 523600.00
520650.00 659600.00
TEST PRESSURE
6 Kgs/cm2 10 Kgs/cm2
5 6
-- 6.28
-- 9.81
-- 15.66
15.48 24.02
22.80 37.29
34.91 53.92
48.69 77.00
69.77 109.15
101.28 163.87
127.24 214.75
165.93 264.11
215.82 348.90
279.39 447.96
337.91 542.59
453.06 721.52
559.95 880.41
706.08 1116.61
885.24 1407.87
Rate/ Kg
including packing,
forwarding, transit risk and
delivery any where in A.P.
for the year 2005-06
Rs.
4
S S Rate for
2005-06
4
TEST PRESSURES
5
PN-1.0
Rs.
1720.00
1870.00
2200.00
2735.00
3650.00
4565.00
5475.00
8500.00
12200.00
18800.00
25200.00
30700.00
39500.00
53200.00
77500.00
113000.00
155150.00
192600.00
235400.00
278200.00
322000.00
150 200 250 300 350 400 450 500 600 700
5 6 7 8 9 10 11 12 13 14
2.90 3.10 3.20 3.30 3.40 3.50 3.70 3.90 3.90 4.70
582.00
1124.00
1128.00
754.00
223.00
196.00
120.00
721.00
1500.00
1250.00
625.00
312.50
2500.00
250.00
882.00
27.87
27.73
202.55
754.00
495.00
223.00
500.00
93.00
145.25
75.00
50.00
840.00
234.00
240.00
250.00
450.00
450.00
30.00
1250.00
206.00
1423.00
2400.00
1545.00
520.00
994.00
297.00
15.60
11.00
18.00
230.00
692.00
516.00
15100.00
11167.00
1700.00
585.00
128.00
670.00
40.00
165.00
825.00
550.00
230.00
10.00
200.00
150.00
150.00
3525.00
8930.00
7150.00
1725.00
629.00
1850.00
5590.00
83.00
450.00
2690.00
14.50
1.60
60.00
650.00
750 Remarks
15 16
6.40
Rate Analysis as per Observations made by Engineering Staff Collage of India for Crushing of Stone Aggregate using
Primary, Secondary - Crushers & Conveyors
Data: Sizes of coarse aggregate considered for data rate analysis.
80 mm size
40 mm size
20 mm size
10 to 4.75 mm size range
Dust (powder)
1 No. primary jaw crusher of 120 tons / hour rated capacity each and 2 Nos. secondary jaw crushers are used
Single shift working for aggregate crushing
Daily output of crushing system with 70% efficiency and 50 minutes per hour working
Daily out turn = 1 x 120 x 0.70 x 8.00 x 50/60 = 560 tons or 350 cum
2 Nos secondary jaw crusher are used for recrushing over size aggregate
Capital cost of Crusher system : Rs. 72,82,167.00
Requirement of electric power : energy consumption per hour in kw.hr. = 190
Capital cost of Conveyer System (Excluding cost of belts) : Rs. 23,67,416.00
RATE ANALYSIS
A. MATERIALS: Unit 343 cum (560 tonns/350 cum including 2% wastage) C) LABOUR:
Total cost of materials 63,721.94 e. Total cost of 343 cum Rs. 95,730.00
Say 63,722.00
B. MACHINERY: Rates for coarse aggregates
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Truck 10t hour 0.500
c&d) Overheads & Contractors Profit 18.00%
Cost for 5.5 cum = a+b+c+d
Rate per cum = (a+b+c+d)/5.5
ii Loading of Earth, Sand, Moorum, Manure, Flyash by manual
means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.260
b) Machinery
Truck 10t hour 0.250
c&d) Overheads & Contractors Profit 18.00%
Cost for 5.5 cum = a+b+c+d
Rate per cum = (a+b+c+d)/5.5
iii Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate,
Kankar, Building Rubbish, Crushed Slag, Stone for Masonry
Work by manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.260
b) Machinery
Truck 10t hour 0.250
c&d) Overheads & Contractors Profit 18.00%
Cost for 5.5 cum = a+b+c+d
Rate per cum = (a+b+c+d)/5.5
iv Unloading of Earth, Sand, Moorum, Manure, Flyash by manual
means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.130
b) Machinery
Truck 10t hour 0.166
c&d) Overheads & Contractors Profit 18.00%
Cost for 5.5 cum = a+b+c+d
Rate per cum = (a+b+c+d)/5.5
1 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
2 Loading and Unloading Lime, Aggregate, Stone Boulder,
Brick Aggregate, Kankar, Building Rubbish, Crushed
Slag, Stone for Masonry Work by Mechanical Means
including hire charges of Tipper 10t for waiting period
and Front end loader 1cum capacity for loading period.
Unit = cum
Taking output = 5.5 cum
Placing tipper at unloading point excluding time for haulage
and return trip
Time required for
i) Positioning of tipper at unloading point Min 1.000
ii) Manoeuvering, reversing, dumping and turning for return Min 2.000
2 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
iii) Waiting time, unforeseen contingencies, etc. Min 2.000
a) Machinery Min 5.000
Tipper 10 t capacity hour 0.080
c&d) Overheads & Contractors Profit 18.00%
Cost for 5.5 cum = a+b+c
Rate per cum = (a+b+c)/5.5
iv Loading and Unloading of Stone Boulder/Stone cum
aggregates/Sand/Kanker/Moorum.
Placing tipper at loading point, loading with front end loader,
dumping, turning for return trip, excluding time for haulage
and return trip
Unit = cum
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point Min 1.000
ii) Loading by front end loader 1 cum bucket capacity @ 25 Min 13.000
cum per hour
iii) Maneuvering, reversing, dumping and turning for return Min 2.000
3 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Truck 10t hour 0.330
c&d) Overheads & Contractors Profit 18.00%
Cost for 2000 Nos. = a+b+c+d
Rate for 1000 bricks = (a+b+c+d)/2
4 Loading, Unloading and Stacking of Cement by Manual Means
including hire charges of Truck 10t for waiting period.
Unit = t
Taking output = 10 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.560
b) Machinery
Truck 10t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 t = a+b+c+d
Rate per tonnes = (a+b+c+d)/10
ii Unloading, stacking of Cement by manual means including a
lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.560
b) Machinery
Truck 10t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 t = a+b+c+d
Rate per tonnes = (a+b+c+d)/10
iii Loading & unloading of Cement including stacking by manual
means including a lead upto 30 m.
Unit = t
Taking output = 10 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Truck 10t hour 2.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 t = a+b+c+d
Rate per tonnes = (a+b+c+d)/10
5 Loading, Unloading and Sticking of Structural Steel and
Steel Bars by manual means including hire charges of
Truck 10t for waiting period.
i Loading of Structural Steel, Steel Bars by manual means
including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.870
b) Machinery
Truck 10t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 t = a+b+c+d
Rate per tonnes = (a+b+c+d)/10
4 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii Unloading of Structural Steel, Steel Bars by manual
means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.870
b) Machinery
Truck 10t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 t = a+b+c+d
Rate per tonne = (a+b+c+d)/10
iii Loading, unloading and Stacking of Structural Steel, Steel Bars
by manual means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Truck 10t hour 2.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 t = a+b+c+d
Rate per tonnes = (a+b+c+d)/10
6 Loading and Unloading of Bitumen Drums by Manual
Means including hirecharges of truck 10t for waiting
period
i Loading of Bitumen Drums by manual means including a
lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.660
b) Machinery
Truck 10t hour 1.250
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 t = a+b+c+d
Rate per tonnes = (a+b+c+d)/10
ii Unloading of Bitumen Drums by Manual Means including
a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.250
b) Machinery
Truck 10t hour 1.250
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 t = a+b+c+d
Rate per tonnes = (a+b+c+d)/10
Note : The weight is inclusive of the self weight of drum
7 Loading and Unloading of Timber by Manual Means
including hirecharges of truck 10t for waiting period
(i) Loading of Timber by manual means including a lead upto 30 m
Unit = t
Taking output = 5 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
5 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Truck 10t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 5 t = a+b+c+d
Rate per t = (a+b+c+d)/5
ii Unloading of Timber by manual means including a lead upto 30
m
Unit = t
Taking output = 5 t
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Truck 10t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 5 t = a+b+c+d
Rate per t = (a+b+c+d)/5
Note : Density of wood has been assumed as 900 kg per cum. If the density
is less the output may be reduced proportionately.
8 Loading and Unloading of C.C. Blocks, Kerb, etc.
including hirecharges of truck 10t for waiting period
i Loading with care C.C. Blocks, km Stone, 200 m Stone,
Boundary Pillar, Kerb, Channel, Bond Stone, etc. by manual
means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Truck 10t hour 1.500
c&d) Overheads & Contractors Profit 18.00%
Cost for 5.5 cum = a+b+c+d
Rate per cum = (a+b+c+d)/5.5
ii Unloading with care C.C. Blocks, km Stone, 200 m Stone,
Boundary Pillar, Kerb, Channel, Bond Stone, etc. by
manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Truck 10t hour 1.500
c&d) Overheads & Contractors Profit 18.00%
Cost for 5.5 cum = a+b+c+d
Rate per cum = (a+b+c+d)/5.5
9 Loading and Unloading of RCC Hume Pipes including
hirecharges of truck 10 t for waiting period and Crane 3t
capacity including all labour charges.
i Loading of RCC Hume pipes by mechanical means
including a lead upto 30 m
A 1000 / 1200 mm dia RCC Hume pipe
Unit = per pipe
Taking output = 9 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Truck 10t hour 0.330
Crane (3 T) hour 0.330
c&d) Overheads & Contractors Profit 18.00%
Cost for 9 pipes = a+b+c+d
Rate per pipe = (a+b+c+d)/9
6 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
B 750 mm dia RCC Hume pipe
Unit = per pipe
Taking output = 15 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Truck 10t hour 0.330
Crane hour 0.330
c&d) Overheads & Contractors Profit 18.00%
Cost for 15 pipes = a+b+c+d
Rate per pipe = (a+b+c+d)/15
C 600/450 mm dia RCC Hume pipe
Unit = per pipe
Taking output = 21 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Truck 10t hour 0.330
Crane hour 0.330
c&d) Overheads & Contractors Profit 18.00%
Cost for 21 pipes = a+b+c+d
Rate per pipe = (a+b+c+d)/21
ii Unloading of RCC Hume pipe by manual means
including a lead upto 30 m
A 1000/1200 mm dia RCC Hume pipes
Unit = per pipe
Taking output = 5 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Truck 10t hour 2.000
c) Material
Wooden sleepers 250mm x 250mm x125mm hire charges 3 nos hour 2.000
sleeper
Crow bars 2 nos not less than 40 mm dia (hire-charges) hour 2.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 5 pipes = a+b+c+d+e
Rate per pipe = (a+b+c+d+e)/5
B 750 mm dia RCC Hume pipe
Unit = per pipe
Taking output = 6 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Truck 10t hour 2.000
c) Material
Wooden sleepers 250mm x 250mm x125mm hire charges 3 nos hour 2.000
sleeper
Crow bars 2 nos not less than 40 mm dia (hire-charges) hour 2.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 6 pipes = a+b+c+d+e
Rate per pipe = (a+b+c+d+e)/6
7 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
C 600/450 mm dia RCC Hume pipe
Unit = per pipe
Taking output = 8 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Truck 10t hour 2.000
c) Material
Wooden sleepers 250mm x 250mm x125mm hire charges 3 nos hour 2.000
sleeper
Crow bars 2 nos not less than 40 mm dia (hire-charges) hour 2.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 8 pipes = a+b+c+d+e
Rate per pipe = (a+b+c+d+e)/8
iii Unloading of RCC Hume pipes by mechanical means including a
lead upto 30 m
A 1000/1200 mm dia RCC Hume pipe
Unit = per pipe
Taking output = 9 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Truck 10t hour 0.200
Crane hour 0.200
c&d) Overheads & Contractors Profit 18.00%
Cost for 9 pipes = a+b+c+d
Rate per pipe = (a+b+c+d+e)/9
B 750 mm dia RCC Hume pipe
Unit = per pipe
Taking output = 15 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Truck 10t hour 0.200
Crane hour 0.200
c&d) Overheads & Contractors Profit 18.00%
Cost for 15 pipes = a+b+c+d
Rate per pipe = (a+b+c+d+e)/15
C 600/450 mm dia RCC Hume pipe
Unit = per pipe
Taking output = 21 pipes
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Truck 10t hour 0.200
Crane hour 0.200
c&d) Overheads & Contractors Profit 18.00%
Cost for 21 pipes = a+b+c+d
Rate per pipe = (a+b+c+d+e)/21
8 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
10 Conveyance of Materials
Haulage of materials by tipper 10t capacity excluding cost of
Loading, Unloading & Stacking, but including hirecharges of
Machinery.
Haulage of materials by tipper excluding cost of loading,
unloading and stacking.
Unit = t.km
Taking output 10 t load and lead 10 km = 100 t.km (5.5 cum)
i Surfaced Road
Speed with load: 25 km per hour
Speed while returning empty: 35 km per hour
a) Machinery
Tipper 10 t capacity
Haulage with load hour 0.400
Empty return trip hour 0.290
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 t.km = a+b+c
Rate per t.km = (a+b+c)/100
Note : In case of carriage of Hume pipes, output of Truck be taken as 8 t and
the rate for t is to be divided by number of pipes of different diameters as
indicated in item 9 to get the rate per pipe.
ii Unsurfaced Gravel Road
Speed with load: 20 km/hour
Speed for empty return trip: 30 km/hour
a) Machinery
Tipper 10 t capacity
Haulage with load hour 0.500
Empty return trip hour 0.330
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 t.km = a+b+c
Rate per t.km = (a+b+c)/100
Note : In case of carriage of Hume pipes, output of Truck be taken as 8 t and
the rate per t is to be divided by number of pipes of different diameters as
indicated in item 9 to get the rate per pipe.
iii Katcha Track and Track in River Bed/Nallah Bed and
Choe Bed
Speed with load: 10 km per hour
Speed while returning empty: 15 km per hour
a) Machinery
Tipper 10 t capacity
Haulage with load hour 1.000
Empty return trip hour 0.670
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 t.km = a+b+c
Rate per t.km = (a+b+c)/100
Note : In case of carriage of Hume pipes, output of Truck be taken as 8 t and
the cost for 8 t is to be divided by number of pipes of different diameters as
indicated in item 9 to get the rate per pipe.
11 Supply of Quarried stone and hand breaking
i Supply of quarried stone and hand breaking into coarse
aggregate to Grading 1 (90 mm to 45 mm) as per Table 400.8 of
Technical Specifications of MORD / 400-7 of MORTH.
Unit = cum
Taking output = 1 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.248
b) Material
Supply of quarried stone 150-200 mm size cum 1.100
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
9 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
i A Hand Broken Stone aggregate 75 mm nominal size
Supply of quarried stone and hand breaking into coarse aggregate
75 mm nominal size (106-63 mm) as per Table 500-17MORD &
stacking as directed.
Unit = cum
Taking output = 1 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.248
b) Material
Supply of quarried stone 150-200 mm size cum 1.100
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
ii Supply of quarried stone and hand breaking into coarse
aggregate to Grading 2 (63 mm to 45 mm) as per Table 400.8 of
Technical Specifications of MORD / 400-7 of MORTH.
Unit = cum
Taking output = 1 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.560
b) Material
Supply of quarried stone 150-200 mm size cum 1.100
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
ii A Hand Broken Stone aggregate 63 mm nominal size
Supply of quarried stone and hand breaking into coarse aggregate to
63 mm to nominal size (passing 80 mm and retained on 50 mm
sieve) & stacking as directed.
Unit = cum
Taking output = 1 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.560
b) Material
Supply of quarried stone 150-200 mm size cum 1.100
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
iii Supply of quarried stone and hand breaking into coarse
aggregate to Grading 3 (53 mm to 22.4 mm)as per Table 400-8
MORTH /400.7 MORD of Technical Specifications.
Unit = cum
Taking output = 1 cum
a) Labour
Mate day
Mazdoor (Unskilled) day 1.872
b) Material
Supply of quarried stone 150-200 mm size cum 1.100
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
iii A Hand Broken Stone aggregate 40 mm nominal size
Supply of quarried stone and hand breaking into coarse
aggregate to 40 mm nominal size (passing 63 mm retained
20mm sieve) & stacking as directed.
Unit = cum
Taking output = 1 cum
a) Labour
Mate day
Mazdoor (Unskilled) day 1.872
b) Material
Supply of quarried stone 150-200 mm size cum 1.100
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
10 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
12 Crushing of Stone Aggregates 100 per cent passing through 53
mm sieve as per Table 500.6 of Technical Specifications of
MORD / 500-7 of MORTH, and 45, 40, 37.5 mm, including
hirecharges of integrated stone crusher of 200 t/h including belt
conveyor and vibrating screens, tipper 5.5 cum (10t) capacity &
Frontend Loader and all labour charges complete.
Crushing of stone boulders of 150 mm size in an integrated stone
crushing unit of 200 t/h capacity comprising of primary and
secondary crushing units, belt conveyor and vibrating screens to
obtain stone aggregates 100 per cent passing through 53 mm sieve
as per Table 500.6 of Technical Specifications of MORD / 500-7 of
MORTH including the cost of stone.
Unit = cum
Taking output = 750 cum at crusher location
a) Labour
Mate day -
Mazdoor (Skilled) day 2.760
Mazdoor (Unskilled) day 17.000
b) Material
Stone Boulder of size 150 mm and below cum 800.000
c) Machinery
Integrated stone crusher of 200 t/h including belt conveyor hour 6.000
and vibrating screens
Front end loader 1 cum bucket capacity hour 20.000
Tipper 5.5 cum capacity hour 20.000
d&e) Overheads & Contractors Profit 18.00%
Total (a+b+c+d+e)
Cost for 750 cum = (a+b+c+d+e) x 0.85
Rate per cum =[ (a+b+c+d+e) x 0.85]/ 750
Note : 1) 800 cum of stone boulders are needed to get 750 cum of stone aggregates.
2) 85 per cent of above cost will be attributed to the production of 750 cum of stone aggregates of 40 mm
size and balance 15 per cent will be for smaller size aggregates and stone dust which comes out as a by-
product.
3) The integrated stone crusher includes primary and secondary crushing units.
13 Crushing of Stone Aggregates 100 per cent passing through
22.4 mm sieve as per Table 500.6 of Technical Specifications
(MORD) & 20mm, 19mm, including hirecharges of integrated
stone crusher of 200 t/h including belt conveyor and vibrating
screens, tipper 5.5 cum (10t) capacity & Frontend Loader and all
labour charges complete.
11 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
2) 90 per cent of above cost will be attributed to the production of 670 cum of stone aggregate and
balance 10 per cent will be for smaller size aggregates and stone dust which comes out as a by-product.
3) The integrated stone crusher includes primary and secondary crushing units.
14 Crushing of Stone Aggregates Nominal Size 13.2 mm as per
Table 500.9 of Technical Specifications (MORD) and Table 500-
21 MORTH and 14 mm, including hirecharges of integrated stone
crusher of 200 t/h including belt conveyor and vibrating screens,
tipper 5.5 cum (10t) capacity & Frontend Loader and all labour
charges complete.
Unit = cum
Taking output = 600 cum at crusher location
a) Labour
Mate day -
Mazdoor (Skilled) day 2.760
Mazdoor (Unskilled) day 17.000
b) Material
Stone Boulder of size 150 mm and below cum 800.000
c) Machinery
Integrated stone crusher of 200 t/h including belt conveyor hour 6.000
and vibrating screens
Front end loader 1 cum bucket capacity hour 20.000
Tipper 5.5 cum capacity hour 20.000
d&e) Overheads & Contractors Profit 18.00%
Total (a+b+c+d+e)
Cost for 600 cum = (a+b+c+d+e) x 0.95
Rate per cum = [(a+b+c+d+e) x 0.95]/ 600
Note : 1) 800 cum of stone boulders are needed to get 600 cum of stone chips of size 13.2 mm and 125
cum stone dust.
2) 95 per cent of above cost will be attributed to the production of 600 cum of stone chips of 13.2 mm size
and balance 5 per cent to the production of stone dust which comes out as a by-product.
3) The analysis for crushing of stone chips of size 11.2 mm will be same as for 13.2 mm
A Crushing of Stone Aggregates Nominal Size 11.2 mm as
per Table 500.9 of Technical Specifications (MORD) and
Table 500-21 MORTH.
Same analysis as in 13.2 mm
Rate per cum
15 Crushing of Stone Aggregates 9.5 and 10 mm Nominal
Size as per Table 500.9 of Technical Specifications
(MORD) and Table 500-21 MORTH, including hirecharges
of integrated stone crusher of 200 t/h including belt
conveyor and vibrating screens, tipper 5.5 cum (10t)
capacity & Frontend Loader and all labour charges
complete.
Crushing of stone boulders of 150 mm size in an integrated
stone crushing unit of 200 t/h capacity comprising of primary
and secondary crushing units, belt conveyor and vibrating
screens to obtain stone aggregates of 9.5 mm nominal size
as per Table 500.9 of Technical Specifications and 10 mm
including the cost of stone.
Unit = cum
Taking output = 600 cum at crusher location
a) Labour
Mate day -
Mazdoor (Skilled) day 2.760
Mazdoor (Unskilled) day 17.000
12 Chapter 1
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Material
Stone Boulder of size 150 mm and below cum 800.000
c) Machinery
Integrated stone crusher of 200 t/h including belt conveyor hour 6.000
and vibrating screens
Front end loader 1 cum bucket capacity hour 20.000
Tipper 5.5 cum capacity hour 20.000
d&e) Overheads & Contractors Profit 18.00%
Total (a+b+c+d+e)
Cost for 600 cum = (a+b+c+d+e) x 0.95
Rate per cum = [(a+b+c+d+e) x 0.95]/ 600
Note :- 1) 800 cum of stone boulders are needed to get 600 cum of stone chips of size 9.5 mm and 125
cum stone dust.
2) 95 per cent of above cost will be attributed to the production of 600 cum of stone chips of 9.5 mm size
and balance 5 per cent to the production of stone dust which comes out as a by-product.
3) The integrated stone crusher includes primary and secondary crushing units.
4) Cost of crushing of stone chips of size 6.7 mm will be 10 per cent extra over that of 9.5 mm size.
Unit = cum
a) Rate per cum for Crushing of Stone Aggregates 9.5 mm as
in S.No. 15
b) Add : 10% extra over that of 9.5 mm size
c) Total (a+b)
d) Overheads & Contractors Profit on (c) 18.00%
Grand Total (c+d)
General Note
1. When materials are used for a finished item of work, overheads and Contractors profit
need not be included in cost of material data. Basic rates only to be carried out as
material cost.
2. Rates are for net quantities after deduction of voids.
Percentage reduction in volume of aggregates
As per Table 500 - 28 MORTH & Table 500 - 18 MORD
Percentage reduction in
volume computed by
Standard Size of Aggregates stack measurements to
arrive at the volume to
be paid for
i. 75 mm and 63 mm 12.5
ii. 45 or 40 mm, 37.5 mm and upto 26.5 mm 10
iii. 25 mm to 13.2 mm, 11.2 mm and 6.3 or 6.7 mm 5
iv. Fine aggregate (sand) 5
v. Rough Stone for apron & revetment (as per APSS) 40
vi. Rough Stone for Soling (Proposed as in v) 40
13 Chapter 1
Andhra Pradesh Standard Data
I. Roads and Bridges
Chapter -2
SITE CLEARANCE
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Unit = 10 sqm
Taking output = 1 hectare
I By Manual Means
A In area of non-thorny jungle (light jungle)
a) Labour
Mate day -
Mazdoor (Unskilled) day 156.000
b) Machinery
Tractor with trolley 3t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Rate per hectare = a+b+c+d
Rate per 10 Sqm = (a+b+c+d)/1000
B In area of thorny jungle
a) Labour
Mate day -
Mazdoor (Unskilled) day 208.000
b) Machinery
Tractor with trolley 3t hour 2.000
c&d) Overheads & Contractors Profit 18.00%
Rate per hectare = a+b+c+d
Rate per 10 Sqm = (a+b+c+d)/1000
15 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
II By Mechanical Means
A In area of non-thorny jungle (light jungle)
a) Labour
Mate Day -
Mazdoor (Unskilled) Day 4.160
b) Machinery
Dozer D 50 with attachment or suitable machinery for hour 10.00
removal of trees & stumps
Tractor with trolley 3t hour 1.00
c&d) Overheads & Contractors Profit 18.00%
Rate per hectare = a+b+c+d
Rate per 10 Sqm = (a+b+c+d)/1000
B In area of thorny jungle
a) labour
Mate day
Mazdoor (Unskilled) day 6.240
b) Machinery
Dozer D 50 with attachment for removal of trees & stumps hour 12.00
Tractor with trolley 3t hour 1.50
c&d) Overheads & Contractors Profit 18.00%
Rate per hectare = a+b+c+d
Rate per 10 Sqm = (a+b+c+d)/1000
Note : The top soil removed during clearing and grubbing of site, if suitable
for re-use shall be transported, conserved and stacked as directed by the
Engineer and shall be incidental to the work.
3 Cutting of Trees including Cutting of Trunks, Branches
and Removal of Stumps
Cutting of trees, including cutting of trunks, branches and
removal of stumps & roots, refilling, compaction of backfilling
and stacking of serviceable material by manual means with
all lifts as per Technical Specification Clause 201MORD /
MORTH
A Lead upto 100 m
Unit = each
i Girth above 300 mm to 600 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 0.624
b) Machinery
Tractor with trolley 3t hour 0.070
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
ii Girth above 600 mm to 900 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 0.936
b) Machinery
Tractor with trolley 3t hour 0.210
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
iii Girth above 900 mm to 1800 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Tractor with trolley 3t hour 0.280
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
16 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
iv Girth above 1800 mm to 2700 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
Tractor with trolley 3t hour 0.420
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
v Girth above 2700 mm to 4500 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 8.320
b) Machinery
Tractor with trolley 3t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
vi Girth above 4500 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 26.000
b) Machinery
Tractor with trolley 3t hour 2.000
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
B Lead upto 1000 m
Unit = each
i Girth above 300 mm to 600 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 0.620
b) Machinery
Tractor with trolley 3t hour 0.100
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
ii Girth above 600 mm to 900 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 0.936
b) Machinery
Tractor with trolley 3t hour 0.300
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
iii Girth above 900 mm to 1800 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Tractor with trolley 3t hour 0.400
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
iv Girth above 1800 mm to 2700 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
Tractor with trolley 3t hour 0.600
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
17 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
v Girth above 2700 mm to 4500 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 8.320
b) Machinery
Tractor with trolley 3t hour 1.200
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
vi Girth above 4500 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 26.000
b) Machinery
Tractor with trolley 3t hour 2.500
c&d) Overheads & Contractors Profit 18.00%
Rate for each tree = a+b+c+d
4 Uprooting and Removing Stumps & Roots
Uprooting and Removing Stumps & roots, compaction of backfilling
and stacking of servicable material by manual means as per
Technical Specification Clause 201.
A Lead upto 100 m
Unit = each
i Girth above 300 mm to 600 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 0.416
b) Machinery
Tractor with trolley 3t hour 0.018
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
ii Girth above 600 mm to 900 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 0.624
b) Machinery
Tractor with trolley 3t hour 0.050
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
iii Girth above 900 mm to 1800 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 1.383
b) Machinery
Tractor with trolley 3t hour 0.070
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
iv Girth above 1800 mm to 2700 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 2.770
b) Machinery
Tractor with trolley 3t hour 0.110
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
v Girth above 2700 mm to 4500 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 5.540
b) Machinery
Tractor with trolley 3t hour 0.250
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
18 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
vi Girth above 4500 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 15.600
b) Machinery
Tractor with trolley 3t hour 0.750
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
B Lead upto 1000 m
Unit = each
i Girth above 300 mm to 600 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 0.416
b) Machinery
Tractor with trolley 3t hour 0.025
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
ii Girth above 600 mm to 900 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 0.624
b) Machinery
Tractor with trolley 3t hour 0.075
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
iii Girth above 900 mm to 1800 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 1.383
b) Machinery
Tractor with trolley 3t hour 0.100
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
iv Girth above 1800 mm to 2700 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 2.770
b) Machinery
Tractor with trolley 3t hour 0.150
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
v Girth above 2700 mm to 4500 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 5.540
b) Machinery
Tractor with trolley 3t hour 0.300
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
19 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
vi Girth above 4500 mm
a) labour
Mate day -
Mazdoor (Unskilled) day 15.600
b) Machinery
Tractor with trolley 3t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Rate for each stump with roots = a+b+c+d
5 Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete,
wood work, steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with all
lifts and lead of 1000 m as per Technical Specification Clause 202
MORD / MORTH
Unit = cum
Taking output = 1.25 cum
I By Manual Means
A Lime Concrete & CC upto M10
a) labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Tractor with trolley 3t hour 0.27
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
B Cement Concrete M15 & M20
a) labour
Mate day -
Mazdoor (Unskilled) day 1.300
b) Machinery
Tractor with trolley 3t hour 0.27
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
C Reinforced Cement Concrete and prestressed Concrete
a) labour
Mate day -
Blacksmith day 0.400
Mazdoor (Unskilled) day 3.500
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
II By Mechanical Means
A Cement Concrete
a) labour
Mate day
Mazdoor (Unskilled) day 0.520
b) Machinery
Air compressor 210 / 250 cfm with 2 leads of pneumatic hour 0.83
breaker @1.5 cum per hour
Tractor with trolley 3t hour 0.27
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
20 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
B Reinforced Cement Concrete and prestressed Concrete
a) labour
Mate day
Mazdoor (Unskilled) day 0.960
Blacksmith day 0.25
b) Machinery
Air compressor 170-210 / 250 cfm working with 2 Jack hour 1.25
Hammers simultaneously @1.00 cum per hour
Tractor with trolley 3t hour 0.27
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
6 Dismantling Brick/Tile Work
Dismantling of existing structures like culverts, bridges, retaining
walls and other structures comprising of brick masonry, including
disposal of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 m as per Technical
Specification Clause 202 MORD / MORTH
Unit = cum
Taking output = 1.25 cum
A Lime mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
B Cement mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 0.780
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
C Mud Mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 0.416
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
D Dry Brick Pitching or Brick Solling
a) labour
Mate day -
Mazdoor (Unskilled) day 0.364
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
21 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
7 Dismantling Stone Masonry as per Technical
Specification Clause 202.
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of stone masonry, including
disposal of unserviceable material and stacking the serviceable
material with all lifts and lead of 1000 m as per Technical
Specification Clause 202 MORD / MORTH
Unit = cum
Taking ouput = 1.25 cum
A Rubble Stone Masonry in Lime Mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 0.620
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
B Rubble Stone Masonry in Cement Mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 0.780
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
C Rubble Stone Masonry in Mud Mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
D Dry Rubble Masonry
a) labour
Mate day -
Mazdoor (Unskilled) day 0.468
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
E Dismantling Stone Pitching / Dry Stone Spalls
a) labour
Mate day -
Mazdoor (Unskilled) day 0.416
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
F Dismantling boulders laid in wire crates including opening of
crates and stacking dismantled materials
a) labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
22 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
8 Dismantling Wood Work Wrought and Planed Fixed in
Frames of Trusses upto a height of 5 m above Plinth
Level as per Technical Specification Clause 202 MORD /
MORTH including stacking of dismantled material with
all lifts and lead upto 1000 m.
Unit = cum
Taking output = 1.25 cum
a) labour
Mate day -
Carpenter 1st Class day 0.500
Mazdoor (Unskilled) day 1.060
b) Machinery
Tractor with trolley 3t hour 0.270
c&d) Overheads & Contractors Profit 18.00%
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
9 2.9 Dismantling Steel Work in all Types of Sections upto a
height of 5 m above Plinth Level excluding Cutting of
rivet as per Technical Specification Clause 202 MORD /
MORTH including stacking of dismantled material with
all lifts and lead upto 1000 m.
202 Unit = t
Taking output = 1 t
A Including dismembering
a) labour
Mate day -
Blacksmith day 1.000
Mazdoor (Unskilled) day 2.640
Add 2.5 per cent of cost of labour for gas cutting, ropes, 2.50%
pulleys, etc.
b) Machinery
Tractor with trolley 3t hour 0.170
c&d) Overheads & Contractors Profit 18.00%
Rate per t = a+b+c+d
B Excluding dismembering
a) labour
Mate day -
Mazdoor (Unskilled) day 2.100
Blacksmith day 0.500
Add 2.5 per cent of cost of labour for gas cutting, ropes, 2.50%
pulleys, etc.
b) Machinery
Tractor with trolley 3t hour 0.170
c&d) Overheads & Contractors Profit 18.00%
Rate per t = a+b+c+d
C Extra over Items (A) and (B) for cutting rivets
Unit = each
Taking output = 10 rivets
a) labour
Mate day
Blacksmith day 0.013
Mazdoor (Unskilled) day 0.014
b&c) Overheads & Contractors Profit 18.00%
Cost for 10 rivets = a+b+c
Rate for each rivet = (a+b+c) /10
23 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
10 Scraping of bricks dismantled from brick work including
stacking as per Technical Specification Clause 202
MORD / MORTH.
Unit = Nos.
Taking output = 1000 Nos.
A In Lime/ Cement Mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 3.640
b&c) Overheads & Contractors Profit 18.00%
Cost for 1000 Nos. = a+b+c
Rate per each = (a+b+c)/1000
B Mud Mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 1.300
b&c) Overheads & Contractors Profit 18.00%
Cost for 1000 Nos. = a+b+c
Rate per each = (a+b+c)/1000
11 Scraping of Stone from Dismantled Stone Masonry as
per Technical Specification Clause 202 MORD / MORTH.
Unit = cum
Taking output = 1 cum
A In Cement or Lime Mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 1.460
b&c) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c
B Mud Mortar
a) labour
Mate day -
Mazdoor (Unskilled) day 0.310
b&c) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c
12 Scraping Plaster in Lime or Cement Mortar from Brick /
Stone Masonry as per Technical Specification Clause
202 MORD / MORTH, including transportation of
unserviceable Material with all lifts upto a lead of 1000
M.
Unit = sqm
Taking ouput = 100 sqm
a) labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
Tractor with trolley 3t hour 0.320
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
13 Removing all types of Hume pipes and stacking within a
lead of 1000 m including Earthwork and Dismantling of
Masonry Works as per Technical Specification Clause
202 MORD / MORTH.
Unit = m
Taking output = 1m
A Upto 600 mm dia Hume pipe
a) labour
Mate day -
Mazdoor (Unskilled) day 0.540
b&c) Overheads & Contractors Profit 18.00%
Rate per m = a+b+c
24 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
B Above 600 mm to 900 mm dia Hume pipe
a) labour
Mate day -
Mazdoor (Unskilled) day 0.730
b&c) Overheads & Contractors Profit 18.00%
Rate per m = a+b+c
C Above 900 mm dia Hume pipe
a) labour
Mate day -
Mazdoor (Unskilled) day 1.250
b&c) Overheads & Contractors Profit 18.00%
Rate per m = a+b+c
Note : 1. The excavation of earth, dismantling of stone masonry
work in head walls and protection works is not included which is to
be measured and paid separately.
2. Credit for retrieved stone from masonry work may be taken as
per actual availability.
14 Dismantling of flexible pavements
Dismantling of flexible pavements and disposal of
dismantled materials upto a lead of 1000 m, stacking
serviceable and unserviceable materials separately as
per Technical Specification Clause 202 MORD / MORTH
Unit = cum
Taking output = 1 cum
I By Manual Means
A Bituminous Courses
a) labour
Mate day -
Mazdoor (Unskilled) day 1.560
b) Machinery
Tractor with trolley 3t hour 0.380
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
B Granular Courses
a) labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Tractor with trolley 3t hour 0.330
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
II By Mechanical Means
Bituminous Courses
a) labour
Mate day -
Mazdoor (Unskilled) day 0.310
b) Machinery
Tractor with trolley 3t hour 0.380
Tractor with ripper @ 60 cum per hour hour 0.017
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
25 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
15 Dismantling of Cement Concrete Pavements as per
Technical Specification Clause 202 MORD / MORTH.
Dismantling of cement concrete pavements by mechanical
means using pneumatic tools breaking to pieces not
exceeding 0.02 cum in volume and stock piling at designated
locations and disposal of dismantled materials upto a lead of
1000 m, stacking serviceable and unserviceable materials
separately.
Unit = cum
Taking output = 1 cum
a) labour
Mate day -
Mazdoor (Semi-skilled) day 0.500
Mazdoor (Unskilled) day 0.530
b) Machinery
Air compressor 210 / 250 cfm with two leads for pneumatic hour 1.000
cutters / hammers @ 1 cum per hour
Tractor with trolley 3t hour 0.400
Joint Cutting Machine with 2-3 blades hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Rate per cum = a+b+c+d
Note : The above analysis is for removal of complete pavement.
In case full depth repair work is required to be done after
dismantling, provision of a concrete saw cutter may be added for
0.25h.
16 Dismantling Guard Rails
Dismantling guard rails by manual means and disposal of
dismantled material with all lifts and upto a lead of 1000 m,
stacking serviceable materials and unserviceable materials
separately as per Technical Specification Clause 202 MORD
/ MORTH.
Unit = running m
Taking Output = 1 m
a) labour
Mate day -
Mazdoor (Unskilled) day 0.156
b) Machinery
Tractor with trolley 3t hour 0.050
c&d) Overheads & Contractors Profit 18.00%
Rate per m = a+b+c+d
17 Dismantling Kerb Stones
Dismantling kerb stones by manual means and disposal of
dismantled material with all lifts and upto a lead of 1000 m
as per Technical Specification Clause 202 MORD / MORTH.
Unit = running m
Taking output = 10 m
a) labour
Mate day -
Mazdoor (Unskilled) day 0.156
b) Machinery
Tractor with trolley 3t hour 0.200
c&d) Overheads & Contractors Profit 18.00%
Cost of 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
26 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
18 Dismantling Kerb Stone Channels
Dismantling kerb stone channels by manual means and
disposal of dismantled material with all lifts and upto a lead
of 1000 m as per Technical Specification Clause 202 MORD
/ MORTH.
Unit = running m
Taking output = 10 m
a) labour
Mate day -
Mazdoor (Unskilled) day 0.240
b) Machinery
Tractor with trolley 3t hour 0.300
c&d) Overheads & Contractors Profit 18.00%
Cost of 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
19 Dismantling Kilometre Stones
Dismantling of kilometre stones including cutting of earth,
foundation and disposal of dismantled material with all lifts
and lead upto 1000 m and backfilling of pit as per Technical
Specification Clause 202 MORD / MORTH.
Unit = each
Taking output = 1 km stone
A 5th km Stone
Quantity of cement concrete = 0.392 cum
a) labour
Mate day
Mazdoor (Unskilled) day 0.780
b) Machinery
Tractor with trolley 3t hour 0.150
c&d) Overheads & Contractors Profit 18.00%
Rate for one 5th km stone = a+b+c+d
B Ordinary km Stones
Quantity of cement concrete = 0.269 cum
a) labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Tractor with trolley 3t hour 0.075
c&d) Overheads & Contractors Profit 18.00%
Rate for one ordinary km stone = a+b+c+d
C 200 m Stones (Hecta Metre Stones)
Quantity of cement concrete = 0.048 cum
a) labour
Mate day -
Mazdoor (Unskilled) day 0.104
b) Machinery
Tractor with trolley 3t hour 0.020
c&d) Overheads & Contractors Profit 18.00%
Rate for one 200 m stone = a+b+c+d
Note : Rate for boundary pillar will be same as that of 200 m stone
27 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
20 Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing
including posts, foundation concrete, backfilling of pit by
manual means including disposal of dismantled material with
all lifts and upto a lead of 1000 m, stacking serviceable
material and unserviceable material separately as per
Technical Specification Clause 202 MORD / MORTH.
Unit = running m
Taking output = 30 m
a) labour
Mate day -
Mazdoor (Unskilled) day 3.150
Blacksmith day 0.750
b) Machinery
Tractor with trolley 3t hour 0.150
c&d) Overheads & Contractors Profit 18.00%
Cost of 30 m = a+b+c+d
Rate per m = (a+b+c+d)/30
21 Dismantling of CI Water Pipe Line
Dismantling of CI water pipe line 600 mm dia including
disposal with all lifts and lead upto 1000 m and stacking of
serviceable material and unserviceable material separately
under supervision of concerned department as per Technical
Specification Clause 202 MORD / MORTH.
Unit = running m
Taking output = 10 m
a) labour
Mate day
Mazdoor (Unskilled) day 2.090
Plumber day 0.250
b) Machinery
Tractor with trolley 3t hour 0.250
Crane upto 8 t capacity hour 0.500
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
Note : The rate analysis does not include any excavation in earth or
dismantling of masonry works which are to be measured and paid
separately.
22 Removal of Cement Concrete Pipe of Sewer Gutter
Removal of cement concrete pipe of sewer gutter 1500 mm dia
under the supervision of concerned department including disposal
with all lifts and upto a lead of 1000 m and stacking of serviceable
and unserviceable material separately but excluding earth
excavation and dismantling of masonry works as per Technical
Specification Clause 202 MORD / MORTH.
Unit = running m
Taking output = 10 m
a) labour
Mate day -
Mazdoor (Unskilled) day 2.600
b) Machinery
Crane upto 8 t capacity hour 0.300
Truck flat body 10 t hour 1.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
Note : The rate analysis does not include any excavation in earth
or dismantling of masonry works which are to be measured and
paid separately.
28 Chapter 2
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
23 Removal of Telephone/Electric Poles and Lines
Removal of telephone/electric poles with wires including
excavation and dismantling of foundation concrete and lines
under the supervision of concerned department, disposal
with all lifts and upto a lead of 1000 m and stacking the
serviceable and unserviceable material separately as per
Technical Specification Clause 202 MORD / MORTH.
Unit = each
Taking output = 30 Nos.
a) labour
Mate day -
Mazdoor (Unskilled) day 10.480
Electrician / Lineman day 2.000
b) Machinery
Tractor with trolley 3t hour 1.500
c&d) Overheads & Contractors Profit 18.00%
Cost for 30 poles = a+b+c+d
Rate per pole = (a+b+c+d)/30
29 Chapter 2
Andhra Pradesh Standard Data
I. Roads and Bridges
Chapter - 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
Tractor with trolley hour 1.500
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
Note : In case material is to be reused at site, transportation cost
catered above (Sub-item b) for disposal shall be deleted.
ii Scarifying existing granular surface to a depth of 50 mm and
disposal of scarified material with all lifts and leads upto 1000
m as per Technical Specification Clause 305.4.3 MORTH
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 5.200
b) Machinery
Tractor with trolley hour 1.670
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
Note : In case material is to be reused at site, transportation cost catered
above (Sub-item b) for disposal shall be deleted.
2 Preparation of Foundation for Embankment
i Scarifying Existing Bituminous Surface to a Depth of 150
mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of 150 mm
and disposal of scarified material with a lift upto 3 m and lead upto
1000 m as per Technical Specification Clause 301.4. MORD
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.260
b) Machinery
Tractor with ripper attachment @ 60 cum per hour hour 0.250
Front end loader 1 cum bucket capacity @ 50 cum per hour hour 0.300
Tipper 5.5 cum capacity, 4 trips per hour hour 0.680
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
33 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii Scarifying Existing Bituminous Surface to a Depth of 50
mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of 50
mm and disposal of scarified material with all lifts and lead
upto 1000 m as per Technical Specification Clause 305.4.3
MORTH
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.260
b) Machinery
Tractor with ripper attachment @ 60 cum per hour hour 0.080
Front end loader 1 cum bucket capacity @ 50 cum per hour hour 0.200
Tipper 5.5 cum capacity, 4 trips per hour hour 0.230
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/100
3 Construction of Embankment with Material Obtained from
Roadway Cutting
Construction of embankment with approved materials deposited at site
from roadway cutting and excavation from drain (not exceeding 0.6 m
depth) and foundation of other structures graded and compacted to
meet requirement of Tables 300.1 and 300.2 as per Technical
Specification Clause 301.5 MORD / 305 MORTH
Unit = cum
Taking output = 100 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Dozer D-50 for spreading @ 200 cum per hour hour 0.500
Motor grader for grading @ 200 cum per hour hour 0.500
Water tanker 6 kl capacity hour 2.000
Three wheel 80-100 kN Static Roller (or) hour 1.250
Vibratory Roller 80 - 100 kN @ 100 cum per hour hour 1.000
c) Material
Water kl 12.000
d&e) Overheads & Contractors Profit 18.00%
Cost for 100 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/100
Cost for 100 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/100
Note : In case the earth cutting is done by dozer and pushed for filling in the
embankment, the input of dozer in the cost of embankment shall be deleted
as the same is already provided in the cost of excavation. However, if the
earth is dumped by tippers from roadway cutting, the input of dozer for
spreading is required to be provided.
4 Construction of Embankment with Material Obtained from
Borrow Pits
i Construction of embankment with approved material obtained from
borrow pits with all lifts, transporting to site, spreading, grading to
required slope and compacting to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification
Clause 301.5 MORD / 305 MORTH
Unit = cum
Taking output = 100 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour hour 1.670
Tipper 5.5 cum with 10 t capacity hour 4.500
Dozer D-50 for spreading @ 200 cum per hour hour 0.500
34 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Motor grader for grading @ 200 cum per hour hour 0.500
Water tanker 6 kl capacity hour 2.000
Three wheel 80-100 kN Static Roller @ 80 cum per hour hour 1.250
or
Vibratory Roller 80 - 100 kN @ 100 cum per hour hour 1.000
c) Material
Water kl 12.000
Compensation for earth taken from private land cum 100.000
d&e) Overheads & Contractors Profit 18.00%
Cost for 100 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/100
Cost for 100 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/100
Note : 1. Compensation for earth will vary from place to place and
will have to be assessed realistically as per particular ground
situation. In case earth is available from Govt. land, compensation
for earth will not be required. The position is required to be clearly
stated in the cost estimate.
2. Loading & Unloading shall not be allowed since excavation
proposed with hydraulic excavator and unloading by tipping.
ii Forming embankment with borrowed useful earth from outside road
boundary by mechanical means with all leads and lifts including pre-
watering of soil at borrow area, removal of top soil, excavation of soils
at borrowed area, conveyance of soil, depositing the soils on the
embankment, spreading soils, breaking clods, sectioning and
consolidation with Vibratory Road Roller @ OMC to meet requirement
of table 300-2 of MoRT&H, including all hire and operational charges
of T&P and seigniorage charges, complete for finished item of work
as per MoRT&H specification 305 (4th revision) - with a lead beyond
1000m. (Payment will be made based on level for finished item of
work).
Unit = cum
Taking output = 10 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.104
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum/ hour hour 0.167
Tipper 5.5 cum with 10 t capacity (L = Actual Lead) t.km 16 x L
Dozer D-50 for spreading @ 200 cum per hour hour 0.050
Motor grader for grading @ 100 cum per hour hour 0.100
Water tanker 6 kl capacity hour 0.400
Vibratory Roller 80 - 100 kN @ 100 cum per hour hour 0.100
c) Material
Water kl 0.240
Compensation for earth taken from private land cum 10.000
d&e) Overheads & Contractors Profit 18.00%
Cost for 10 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/10
Note : Compensation for earth will vary from place to place and will have to
be assessed realistically as per particular ground situation. In case earth is
available from Govt. land, compensation for earth will not be required. The
position is required to be clearly stated in the cost estimate.
35 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
iii Forming embankment with Side earth by mechanical means
including pre-watering of soil, removal of top soil, excavation of
soils, depositing the soils on the embankment, spreading soils,
breaking clods, sectioning and consolidation with Vibratory Road
Roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P and
seigniorage charges, complete for finished item of work as per
MoRT&H specification 305 (4th revision) (Payment will be made
based on level for finished item of work).
Unit = cum
Taking output = 100 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hr 1.670
per hour
Motor grader for grading @ 200 cum per hour hour 1.00
Water tanker 6 kl capacity hour 4.00
Vibratory Roller 80 - 100 kN hour 1.00
C) Water kl 24.000
d) Seigniorage Charge cum 100.000
Total
e) Overheads & Contractors Profit 18.00%
Cost for 100 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/100
Rate per cum
5 i a) Excavation in Cutting in Soil by manual means with
lead upto 50 m
Excavation for roadway in soil using manual means for
carrying of cut earth to embankment site with initial lift of 3
mts and lead upto 50 m as per Technical Specification Clause
302.3 MORD
Unit = cum
Taking output = 120 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 46.800
b&c) Overheads & Contractors Profit 18.00%
Cost of 120 cum = a+b+c
Rate per cum = (a+b+c)/120
b) Excavation in Cutting in Soil by manual means with
lead beyond 50 m & upto 1000 m
Excavation for roadway in soil using manual means for
carrying of cut earth to embankment site with initial lift of 3
mts and lead beyond 50 m & upto 1000 m as per Technical
Specification Clause 301 MORTH
Unit = cum
Taking output = 120 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 46.800
b) Machinery
Truck 5.5 cum capacity hour 10.000
c&d) Overheads & Contractors Profit 18.00%
Cost of 120 cum = a+b+c+d
Rate per cum = (a+b+c+d)/120
Note : In case there is a situation where the cross-section is of cut and fill
and cut earth is required to be used in embankment in the immediate vicinity,
the item of carriage in the truck shall be omitted.
36 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii Excavation in Soil with Dozer with lead upto 100m
Excavation for roadway in soil by mechanical means including
cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes
in accordance with requirements of lines, grades and cross-
sections as per Technical Specification Clause 302.3 MORD /
301 MORTH.
Unit = cum
Taking output = 180 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Dozer D-50 @ 50 cum per hour (cutting with pushing) hour 3.600
c&d) Overheads & Contractors Profit 18.00%
Cost for 180 cum = a+b+c+d
Rate per cum = (a+b+c+d)/180
iii Excavation in Soil using Hydraulic Excavator and Tippers
with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum
bucket capacity including cutting and loading in tippers, trimming
bottom and side slopes, in accordance with requirements of lines,
grades and cross-sections, and transporting to the embankment
location with all lifts and lead upto 1000 m as per Technical
Specification Clause 302.3 MORD / 301 MORTH
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/ hour hour 3.60
Tipper 5.5 cum capacity, 4 trips per hour hour 15.00
c&d) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
6 3.6 Excavation in Marshy Soil
302 Excavation for roadway in marshy soil with hydraulic excavator 0.9
cum bucket capacity including cutting and loading in tippers and
disposal with all lifts and lead upto 1000 m, trimming of bottom and
side slopes in accordance with requirements of lines, grades and
cross- sections as per Technical Specification Clause 302.3.6 MORD /
301 MORTH
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Hydraulic excavator 0.90 cum bucket capacity @ 50 cum per hour 6.00
hour
Tipper 5.5 cum capacity, 4 trips per hour. hour 12.50
c&d) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
37 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
7 Removal of Unsuitable / Unserviceable Soil with Disposal
upto 1000 m
Removal of unsuitable / Unserviceable soil including excavation,
loading and disposal upto 1000 m lead but excluding compaction
ground supporting embankment subgrade replacement by suitable
soil, which shall be paid separately as per Clause 303.5.2 as per
Technical Specification Clause 302.3.11 MORD / 301 MORTH
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Excavator 0.90 cum bucket capacity @ 100 cum per hour hour 3.60
Tipper 5.5 cum capacity, 4 trips per hour hour 15.00
c&d) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
Note : This item does not include replacement of unsuitable soil by suitable
soil. Replacement, where required, is to be provided and paid separately
under Clause 303.5.2.
8 i Excavation in ordinary Rock by manual means
a Excavation in ordinary rock using manual means including
loading in a truck and carrying of excavated material to
embankment site with initial lift of 3 mts and lead upto 50 m
as per Technical Specification Clause 302.3.5 MORD / 301
MORTH
Unit = cum
Taking output = 120 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 72.800
b&c) Overheads & Contractors Profit 18.00%
Cost for 120 cum = a+b+c
Rate per cum = (a+b+c)/120
b Excavation in ordinary rock using manual means including
loading in a truck and carrying of excavated material to
embankment site with initial lift of 3 mts and lead beyond 50
m & upto 1000 m as per Technical Specification Clause 301
MORTH
Unit = cum
Taking output = 120 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 72.800
b) Machinery
Truck 5.5 cum capacity hour 10.000
c&d) Overheads & Contractors Profit 18.00%
Cost for 120 cum = a+b+c+d
Rate per cum = (a+b+c+d)/120
38 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c Earthwork excavation for road way in soil by mechanical
means including cutting and pushing the earth to side of
embankment upto a lead of 100 metres including trimming
bottom and side slopes in accordance with requirements
of lines, grades and cross sections etc., complete for
finished item of work for trench cutting as per MOR&H
specification No.301 and as directed by the Engineer-in-
Charge
Unit = 1 cum
Taking output = 180 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hour 3.000
per hour
c) Seigniorage Charges cum 180.000
d) Overheads & Contractors Profit 18.00%
Cost for 180 cum = a+b+c+d
Rate per cum a+b+c+d / 180
ii Excavation in Ordinary Rock with Dozer with lead upto
100m
Excavation for roadway in ordinary rock by deploying a dozer D-
50 including cutting and pushing the cut earth to site of
embankment upto a distance of 100 m (average lead 50 m),
trimming bottom and side slopes in accordance with the
requirements of lines, grades and cross-sections with lift upto
3 m as per Technical Specification Clause 301 MORTH /
302 MORD.
Unit = cum
Taking output = 108 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.120
b) Machinery
Dozer D-50 @ 50% of 100 cum per hour hour 2.160
c&d) Overheads & Contractors Profit 18.00%
Cost for 108 cum = a+b+c+d
Rate per cum = (a+b+c+d)/108
iii Excavation in Ordinary Rock using Hydraulic Excavator
and Tippers with disposal lead beyond 100 m & upto 1000
m
Excavation for roadway in ordinary rock with hydraulic
excavator of 0.9 cum bucket capacity including cutting and
loading in tippers, transporting to embankment site with all
lifts and lead beyond 100 m & upto 1000 m, trimming bottom
and side slopes in accordance with requirements of lines,
grades and cross-sections as per Technical Specification
Clause 302.3.5 MORD / 301 MORTH
Unit = cum
Taking output = 240 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity @ 40 cum / hour hour 6.00
Tipper 5.5 cum capacity, 4 trips per hour. hour 11.00
c&d) Overheads & Contractors Profit 18.00%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
39 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
iv Earthwork excavation for road way in soil by mechanical
means including cutting and loading in tippers trimming
bottom and side slopes in accordance with requirements
of lines, grades and cross sections and transporting to the
embankment location or disposal of unserviceable soil
with all leads and lifts etc., complete for finished item of
work for trench cutting as per MORT&H specification
No.301 and as directed by the Engineer-in-Charge
Unit = 1 cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hour 6.0000
per hour
Tipper 5.5 cum capacity, 4 trips per hour hour 16.00
c) Seigniorage Charges cum
d) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d
Rate per cum a+b+c+d / 360 (OR)
9 i Excavation in Hard Rock (requiring blasting) with disposal
upto 1000 m
Excavation for roadway in hard rock (requiring blasting) by
drilling, blasting and breaking, trimming of bottom and side
slopes in accordance with requirements of lines, grades and
cross-sections, loading and disposal of cut rock with all lifts
and leads upto 1000 m as per Technical Specification Clause
302.3.5 MORD / 301 MORTH
Unit = cum
Taking output = 180 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.220
Driller day 2.00
Blaster day 0.25
b) Machinery
Dozer D-50 @ 30 cum per hour hour 6.00
Air compressor, 210 cfm with 2 jack hammers hour 6.00
Front end loader 1 cum bucket capacity @ 30 cum / hour hour 6.00
Tipper 5.5 cum capacity, 2 trips per hour hour 16.00
c) Materials
Gelatine 80 per cent kg 70.00
Electric Detonators @ 1 detonator for 2 gelatine sticks of 285 each 252.00
gm each
Credit for excavated rock found suitable for use @ 50 per cent cum 90.00
quantity blasted
d&e) Overheads & Contractors Profit 18.00%
Cost for 180 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/180
Note : 1. The quality and availability of rock shall be checked before affording
credit.
2. In case some rock is issued to the contractor at site, the item of carriage
shall be reduced/restricted to that extent.
3. Credit for useful material received as per site conditions shall be taken into
account. This has been assumed to be 50 per cent for the purpose of
analysis.
40 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii Excavation in Hard Rock (blasting prohibited)
Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal with
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and
side slopes in accordance with requirements of lines, grades and
cross- sections as per Technical Specification Clause 302.3.5 MORD /
301 MORTH
(A) Manual Means
Unit = cum
Taking output = 16 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 17.640
Chiseller (Hammer Man) day 24.00
Blacksmith day 1.00
b) Machinery
Tipper 5.5 cum capacity, 1 trip per hour hour 2.90
Credit for excavated rock found suitable for use @ 50 per cent of cum 8.00
excavated quantity
c&d) Overheads & Contractors Profit 18.00%
Cost for 16 cum = a+b+c+d
Rate per cum = (a+b+c+d)/16
Note : 1. Credit is considered for 50 per cent of quantity of work.
2. Loading for disposal will be done manually, being small quantity.
3. In case some rock is issued to contractor at site, the item of carriage shall
be omitted to the extent of quantity issued to the Contractor.
Unit = cum
Taking output = 180 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.220
Driller day 2.00
Blaster day 0.50
41 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Dozer D-50 @ 30 cum per hour hour 6.00
Air compressor, 210 cfm with 2 jack hammers hour 6.00
Front end loader 1 cum bucket capacity hour 6.00
Tipper 5.5 cum capacity, 4 trips per hour hour 8.20
c) Materials
Gelatine 80 per cent kg 70.00
Electric detonators @ 1 detonator for 2 gelatine stick of 285 each 1008.00
gm each
Credit for excavated rock found suitable for use @ 50 per cent cum 90.00
quantity blasted
d&e) Overheads & Contractors Profit 18.00%
Cost for 180 cum =a+b+c+d+e
Rate per cum = (a+b+c+d+e)/180
Note : 1. Credit is considered for 50 per cent of quantity of blasted
rock, if found suitable for construction.
2. In case some rock is issued to the Contractor at site, the item of
carriage shall be reduced to that extent.
10 a Extra for every additional lift of 1.5 m or part thereof over
initial lift of 3 m in all kinds of soils & rock, when executed
manually
For every additional lift of 1.5 m
Unit 40 cum
Labour
Mazdoor (Unskilled) day 1.00
Overheads & Contractors Profit 18.00%
Cost for 40 cum
Rate per 1 cum
b Extra for every additional lead of 50 m or part thereof over
initial lead of 50 m in all kinds of soils & rock, when
executed manually
For every additional lead of 50 m
Unit 7 cum
Labour
Mazdoor (Unskilled) day 1.00
Overheads & Contractors Profit 18.00%
Cost for 7 cum
Rate per 1 cum
Note : Head Leads limited to 150 m. Beyond 150 m only conveyance
by machinery
11 Stripping, Storing and Relaying Top Soil from Right-of-
Way (R.O.W)
Stripping, storing and preservation of top soil by keeping it
damp in stock piles and keep wet till it is used by road side at
15 m internal and re-application on embankment slopes, cut
slopes and other areas in localities where the available
embankment material is not conducive to plant growth as per
Technical Specification Clause 302.3.2 MORD / 305 MORTH
Unit = cum
Taking output = 10 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 5.200
b) Machinery
Dozer D-50 @ 100 cum per hour hour 0.100
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 cum = (a+b+c+d)
Rate per cum = (a+b+c+d)/10
42 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
12 Stripping, Storing and Relaying Top Soil from Borrow
Areas in Agricultural Fields
Stripping of top soil from borrow areas located in agriculture
fields, storing at a suitable place, spreading and relaying after
taking the borrow earth to maintain fertility of the agricultural
field, finishing it to the required levels to the satisfaction of the
farmer/land owner as per Technical Specification Clause
302.3.2 MORD / 305 MORTH
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Dozer D-50 with 100 cum per hour output (Initially stacking hour 6.000
and relaying)
c&d) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d
Rate per cum = (a+b+c+d)/300
13 Turfing with Sods
Furnishing and laying of the live sods of perennial turf forming
grass on embankment slope, verges or other locations shown
on the drawing or as directed by the Engineer including
preparation of ground, fetching of sods and watering as per
Technical Specification Clause 309 MORD / 307 MORTH.
Unit = sqm
Talking output = 100 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.120
b) Machinery
Water tanker including watering for 3 months hour 2.00
Tractor with Trolley hour 1.00
c) Material
Farmyard manure @ 0.18 cum per 100 sqm at site of work cum 0.18
Water kl 12.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100
14 Seeding and Mulching
Preparation of seed bed on previously laid top soil, furnishing and
placing of seeds, fertilizer, mulching material, applying bituminous
emulsion @ 0.23 litre per sqm and laying and fixing jute netting,
including watering for 3 months all as per Technical Specification
Clause 310 MORD / 308 MORTH.
Unit = sqm
Taking output = 240 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.400
b) Machinery
Water tanker 6 kl capacity including watering for 3 months hour 14.00
Tractor with Trolley hour 2.40
c) Material
Seeds kg 3.60
Sludge/Farmyard manure @ 0.18 cum per 100 sqm cum 0.43
Bitumen Emulsion litere 55.20
Jute netting, open weave, 25 mm square opening sqm 264.00
Water for 3 months kl 84.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 240 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/240
43 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
15 Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved
material obtained from borrow pits with all lifts and leads, transporting
to site, spreading, grading to required slope and compacted to meet
requirement of Table 300.2 with lead upto 1000 m as per Technical
Specification Clause 303 MORD / 305 MORTH, by using machinery.
Unit = cum
Taking output = 100 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/hour hour 1.00
Tipper 5.5 cum capacity, 4 trips per hour hour 4.50
Add rate for loading as per item 1.1 (ii) cum 100.00
Add rate for unloading as per item 1.1 (iv) cum 100.00
Dozer D-50 for spreading @ 200 cum per hour hour 0.50
Motor grader for grading @ 200 cum per hour hour 0.50
Water tanker with 6 kl capacity hour 2.00
Three wheel 80-100 kN Static Roller @ 70 cum per hour hour 1.43
OR
Vibratory road roller 8-10 tonnes @ 80 cum per hour hour 1.25
c) Material
Water kl 12.000
Compensation for earth taken from private land cum 100.000
d&e) Overheads & Contractors Profit 18.00%
Cost for 100 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/100
Cost for 100 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/100
16 Compacting Original Ground
i Compacting original ground supporting embankment
Loosening, Leveling and Compacting original ground
supporting embankment to facilitate placement of first layer of
embankment, scarified to a depth of 150 mm, mixed with water
at OMC and then compacted by rolling so as to achieve
minimum dry density as given in Tables 300.1 and 300.2 for
embankment construction as per Technical Specification
Clause 301.4.1 MORD / 305 MORTH.
Unit = cum
Taking output = 600 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Tractor with ripper attachment hour 6.000
Three wheel 80-100 kN Static Roller hour 7.500
OR
Vibratory road roller 8-10 tonnes @ 80 cum per hour hour 7.500
Water tanker 6 kl capacity hour 4.000
c) Material
Water kl 24.000
d&e) Overheads & Contractors Profit 18.00%
Cost for 600 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/600
Cost for 600 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/600
44 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii Compacting original ground supporting subgrade
Loosening of the ground upto a level of 300 mm below the subgrade
level, watered, graded and compacted in layers to meet requirement of
Tables 300.1 and 300.2 for subgrade construction as per Technical
Specification Clause 303.5.2 MORD / 305 MORTH.
Unit = cum
Taking output = 600 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.120
b) Machinery
Tractor with ripper attachment hour 9.000
Motor grader for grading hour 6.000
Water tanker 6 kl capacity hour 4.000
Three wheel 80-100 kN Static Roller @70 cum per hour hour 8.600
OR
Vibratory road roller 8-10 tonnes @ 80 cum per hour hour 7.500
c) Material
Water kl 24.000
d&e) Overheads & Contractors Profit 18.00%
Cost for 600 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/600
Cost for 600 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/600
17 Repairs of damages caused by rain/spillage of water
Preparation and surface treatment of formation by removing mud and
slurry, watering to the extent needed to maintain the desired moisture
content, trimming to the required line, grade, profile and rolling with
three wheel 80-100 kN static roller, complete as per Technical
Specification Clause 301.5.5.1 MORD
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 6.280
Mazdoor skilled day 1.00
b) Machinery
Three wheel static roller 80-100 kN hour 3.00
Water tanker 6 kl, one trip per hour hour 2.00
c) Material
Water kl 12.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
18 Presplitting Rock Excavation Slopes
Carrying out excavation in hard rock to achieve a specified slope of
the rock face by controlled use of explosives and blasting accessories
in properly aligned and spaced drill holes, collection of the excavated
rock by a D-50 dozer, loading in tipper by a front end loader and
disposing of the material with all lifts and lead upto 1000 m as per
Technical Specification Clause 304.3 MORD / 303 MORTH
Unit = sqm
Taking output = 400 sqm (120 cum considering 300 mm
average depth of excavation over the existing rock face)
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.600
b) Machinery
Air compressor 250/210 cfm with 2 leads @ 20 cum per hour hour 6.00
Dozer D-50 hour 6.00
Front end loader 1 cum bucket capacity hour 6.00
Tipper 5.5 cum capacity 2 trip per hour hour 11.00
45 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material
Gelatine 80 per cent kg 42.00
Electric detonators @ 1 detonator for 2 gelatine sticks of 285 each 672.00
gm each
d&e) Overheads & Contractors Profit 18.00%
Cost for 400 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/400
Note : In case blasted rock is issued to the Contractor against payment for
construction work, the cost of carriage shall be reduced to that extent.
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 60 cum/ hour hour 6.00
Tipper 5.5 cum capacity, flyash 360 x 1.2 = 432 t hour 16.00
Loading as per item 1.1 (ii) cum 360.00
Unloading as per item 1.1 (iv) cum 360.00
Dozer D-50 for spreading @ 200 cum per hour hour 1.80
Motor grader for grading @ 100/200 cum per hour hour 1.80
Water tanker 6 kl capacity hour 9.00
Three wheel 80-100 kN Static Roller hour 4.50
OR
Vibratory road roller 8-10 tonnes @ 100 cum per hour hour 3.60
c) Material
Water kl 54.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Smooth Roller)
Rate per cum = (a+b+c+d+e)/360
Note : 1. As flyash is available free of cost as waste material from Thermal
Plants, cost of material has not been added.
2. If transportation of Flyash beyond 1000 m, conveyance may be
allowed as per Chapter 1.
3. The earthcover on sides and intermediate layers of earth
sandwiching the flyash have not been included in this analysis. The same
are required to be provided as per approved design and priced separately as
embankment construction.
20 i Surface Drains in Soil
Construction of unlined surface drains of average cross-sectional
area 0.40 sqm in soil to specified lines, grades, levels and dimensions.
Excavated material to be used in embankment with a lift upto 3m and
lead of 50 m (average lead 25 m) as per Technical Specification
Clause 307 MORD / 309 MORTH
Unit = m
Taking output = 10 m
(A) Manual Means
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b&c) Overheads & Contractors Profit 18.00%
Cost for 10 m = a+b+c
Rate per m = (a+b+c)/10
46 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Note : Where lining of drain is provided, quantity shall be worked out
based on approved design and drawing and priced on rate of cement
concrete of approved grade or stone/brick masonry as the case may
be.
(B) Mechanical Means
a) Labour
Mate day
Mazdoor (Unskilled) day 0.260
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/hour hour 0.040
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
ii Surface Drains in Ordinary Rock
Construction of unlined surface drain of average cross-
sectional area 0.4 sqm in ordinary rock to specified lines,
grades, levels and dimensions as per approved design and
Technical Specification Clause 307MORD / 309 MORTH.
Excavated material to be used in embankment at site.
Unit = m
Taking output = 10 m
(A) Manual Means
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.120
b&c) Overheads & Contractors Profit 18.00%
Cost for 10 m = a+b+c
Rate per m = (a+b+c)/10
(B) Mechanical Means
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.520
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 40 cum /hour hour 0.100
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 m = a+b+c+d
Rate per m = (a+b+c+d)/10
(iii) Surface Drains in Hard Rock
Rate per m may be worked out based on quantity of hard rock
as per design.
For rate of hard rock cutting, refer relevant item in this Chapter
21 Chute Drains
A Providing chute drains across embankment slopes in
approaches of bridges and on horizontal curves as per
drawings as per Specification 307 MORD.
Unit = 1 m
(a) Earthwork in excavation for foundations of structures as per
drawings and technical specifications Clause 307 including setting out
construction of shoring and bracing deleterious matter, dressings of
sides and bottom and backfilling with approved material (By manual
means).
Unit = m
Taking output = 10 m
a) Labour
Mate day -
Mazdoor for excavation and back filling day 2.040
c) Material
Perforated pipe of cement concrete, internal dia 100mm m 10.000
Crushed stone as per table 300-3 cum 2.400
d&e) Overheads & Contractors Profit 18.00%
Cost for 10 m = a+b+c+d+e
Rate per m = (a+b+c+d+e) /10
Note : Type of pipe may be modified depending upon provision in
design.
23 Aggregate Sub-Surface Drains
Construction of aggregate sub surface drain 300 mm x 450 mm with
aggregates conforming to table 300-4, excavated material to be
utilised in roadway as per Specification 309 MORTH
Unit = metre
Taking output = 10 metres
a) Labour
Mate day -
Mazdoor for excavation and back filling with aggregates day 1.520
b) Material
Crushed stone as per table 300-3 MORTH cum 1.350
c&d) Overheads & Contractors Profit 18.00%
Cost for 10 metres = a+b+c+d
Rate per metre = (a+b+c+d)/10
Note : Provide suitable grading as per table 300-3 MORTH, keeping
classification of soils met.
48 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
24 Underground Drain at Edge of Pavement
Construction of an underground drain 1 m x 1 m (inside dimensions)
lined with RCC-20 cm thick and covered with RCC slab10 cm in
thickness on urban roads as per Specification 309 MORTH.
Unit = sqm
Taking output = 3500sqm
a) Labour
Mate day -
Mazdoor day 6.280
Mazdoor skilled day 1.000
b) Machinery
Smooth 3 wheeled steel roller 8-10 tonnes hour 3.000
Water tanker 6 KL, one trip per hour hour 3.000
c) Material
Cost of water KL 18.000
d&e) Overheads & Contractors Profit 18.00%
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
24 Construction of Rock fill Embankment
Construction of rock fill embankment with broken hard rock
fragments of size not exceeding 300 mm laid in layers not
exceeding 500 mm thick including filling of surface voids with
stone spalls, blinding top layer with granular material, rolled
with vibratory road roller, all complete as per clause 313
MORTH.
Unit = cum
Taking output = 100 cum
a) Labour
Mate day -
Mazdoor for excavation and back filling day 1.540
b) Machinery
Dozer 80 HP for spreading @ 200 cum per hour Hour 0.50
Vibratory road roller 8-10 tonnes @ 100 cum per hour Hour 1.00
Water tanker 6 kl, one trip per hour Hour 2.00
c) Material
Cost of Water Kl 12.00
c&d) Overheads & Contractors Profit 18.00%
Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d) / 100
Note : It is assumed that rock is available at site from roadway cutting. In
case, portion of the rock requires breaking to acceptable size of 300 mm,
breaking charges will have to be added.
49 Chapter 3
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
27 Work in Urban Roads
The cost of earth work in urban roads inhabited area will be comparatively higher due to
following reasons:
a) There is mixed traffic on urban roads like slow moving hand and animal driven carts, rickshaws,
cycles, two/ three wheeler apart from the usual vehicular traffic resulting into traffic jams. This
causes loss of working time which may be in the range of 10 -15 per cent
b) There is considerable disruption of traffic adversely affecting the efficiency of the working
parties including machines due to congestion caused by pedestrian traffic, local road side
venders, parking of vehicles by the road side, encroachments by the shopkeepers and local
shops who make use of the berms of the road in front of these shops and unauthorised
conversion of road berms into mini local market The output of manpower and machines is
substantially reduced due to factors mentioned above.
c) Cost of living in urban areas is comparatively more resulting into higher wages.
d) At times, work is executed during night time due to heavy traffic during day time. This involves
extra expenditure by way of making arrangement for lighting and special transport for working
parties due to odd hour
In the light of above, the authorities engaged in preparing the cost estimates may exercise their
judgment and cater for the additional cost to the extent of 2 to 3 per cent, keeping in view the
severity of factors mentioned above. Supporting details for the extra cost based on the actual
conditions in specific cases will have to give in justification.
50 Chapter 3
Andhra Pradesh Standard Data
I. Roads and Bridges
Chapter - 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
1 Granular Sub-base with Well Graded Material / Close
Graded Material (Table 400.1)
A By Mix in Place Method
Construction of granular sub-base by providing well graded
material / Close graded material, spreading in uniform layers with
motor grader on prepared surface, mixing by mix in place method
with rotavator at OMC, and compacting with smooth wheel
roller 80-100 kN / Vibratory Roller to achieve the desired
density, complete as per Technical Specification Clause 401
MORD / MORTH.
53 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
iii For Grading III Material (CBR Value minimum 20)
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
b) Machinery
Motor Grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @ 10 cum per hour hour 30.00
OR
vibratory roller 80-100 kN hour 6.00
Tractor with Rotavator 25 cum per hour hour 12.00
Water tanker 6 kl capacity hour 3.00
c) Material
Well graded/ Close Graded granular sub-base material as per
Table 400.1
9.5 mm to 4.75 mm @ 66 per cent cum 255.00
2.36 mm below @ 34 per cent cum 129.00
Or
9.5 mm to 4.75 mm @ 35 per cent cum 134.40
4.75 mm to 2.36 mm @ 12.5 per cent cum 48.00
2.36 mm below @ 52.5 per cent cum 201.60
Water kl 18.00
Total
d&e) Overheads & Contractors Profit 18.00%
Cost for 300cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/300
Cost for 300 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/300
B Plant Mix Method
(i) Construction of granular sub-base by providing well graded /
Close Graded material, mixing in a mechanical mix plant at
OMC, carriage of mixed material to work site upto lead of 1000
m spreading in uniform layers with motor grader on prepared
surface and compacting with smooth wheel roller 80-100 kN to
achieve the desired density, complete as per Technical
Specification Clause 401
i For Grading I Material ( CBR Value minimum 30)
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
b) Machinery
Wet mix plant @ 60 /75 t capacity per hour hour 7.50
Water tanker 6 kl capacity 5 km lead with one trip per hour hour 4.00
Front end loader 0.9 cum / 1 cum bucket capacity 37.5 cum per hour 6.00
hour
Tipper 5.5 cum @ 3 trips per hour hour 13.60
Motor grader 110 HP @ 50 cum per hour hour 4.50
Three wheel 80-100 kN static roller 10 cum per hour hour 22.50
OR
vibratory roller 80-100 kN hour 6.00
c) Material
Well graded/ Close Graded granular sub-base material
as per Table 400.1
53 mm to 9.5 mm @ 50 per cent cum 144.00
9.5 mm to 2.36 mm @ 20 per cent cum 57.00
2.36 mm below @ 30 per cent cum 86.40
Water kl 24.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 225 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/225
54 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Cost for 225 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/225
55 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii For Grading II Material (CBR Value minimum 25)
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
b) Machinery
Wet mix plant @ 75 t capacity per hour hour 7.50
Water tanker 6 kl capacity 5 km lead with one trip per hour hour 4.00
Front end loader 0.9 cum bucket capacity 37.5 cum per hour hour 6.00
Tipper 5.5 cum, 3 trips per hour hour 13.60
Motor grader 110 HP @ 50 cum per hour hour 4.50
Three wheel 80-100 kN static roller 10 cum output hour 22.50
OR
vibratory roller 80-100 kN hour 6.00
c) Material
Well graded / Close Graded granular sub-base material
as per Table 400.1
26.5 mm to 9.5 mm @ 35 per cent cum 100.80
9.5 mm to 2.36 mm @ 25 per cent cum 72.00
2.36 mm below @ 40 per cent cum 115.20
Water kl 24.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 225 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/225
Cost for 225 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/225
iii For Grading III Material (CBR Value minimum 20)
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
b) Machinery
Wet mix plant @ 60 t capacity per hour hour 7.50
Water tanker 6 kl capacity 5 km lead with one trip per hour hour 4.00
Front end loader 0.9 cum bucket capacity 37.5 cum per hour hour 6.00
Tipper 5.5 cum, 3 trips per hour hour 13.60
Motor grader 110 HP @ 50 cum per hour hour 4.50
Three wheel 80-100 kN static roller 10 cum output hour 22.50
OR
vibratory roller 80-100 kN hour 6.00
c) Material
Well graded / Close Graded granular sub-base material
as per Table 400.1
9.5 mm to 4.75 mm @ 35 per cent cum 100.80
4.75 mm to 2.36 mm @ 12.5 per cent cum 36.00
2.36 mm below @ 52.5 per cent cum 151.20
Water kl 24.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 225 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/225
Cost for 225 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/225
56 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
2 A Granular Sub-Base with Coarse Graded Material
(Table:- 400- 2)
Construction of granular sub-base by providing coarse graded
material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator at
OMC, and compacting with vibratory roller to achieve the desired
density, complete as per clause 401 MORTH.
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor skilled day 2.40
Mazdoor day 8.00
b) Machinery
Mortar Grader 110 HP @ 50 cum per hour hour 6.00
Vibratory roller 8 -10 tonne hour 6.00
Water tanker 6 KL capacity hour 3.00
c) Material
For coarse graded Granular sub-base Materials per table
400-2
For grading-I Material (CBR Value minimum 30)
53 mm to 26.5 mm @ 35 per cent cum 134.40
26.5 mm to 4.75 mm @ 45 per cent cum 172.80
2.36 mm below @ 20 per cent (Coarse Sand) cum 76.80
Cost of water KL 18.00
OR
For Grading-II Material (CBR Value minimum 25)
26.5 mm to 4.75 mm @ 75 per cent cum 288.00
2.36 mm below @ 25 per cent (Dust) cum 96.00
Cost of water KL 18.00
OR
For Grading-III Material (CBR Value minimum 20)
9.5 mm to 4.75 mm @ 66 per cent cum 255.00
2.36 mm below @ 34 per cent (Dust) cum 129.00
Cost of water KL 18.00
(i) Rate per cum for grading-I Material
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
(ii) Rate per cum for grading-II Material
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
(iii) Rate per cum for grading-III Material
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
Note : Any one of the grading for material may be adopted
as per design
B (i) Gravel / Soil - Aggregate Base (Table 400.2) Grading A
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
57 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Motor grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @ 10 cum per hour hour 30.00
OR
Vibratory Roller 80-100 kN hour 6.00
Water tanker 6 kl capacity hour 5.00
Tractor with Rotavator 25 cum per hour hour 12.00
c) Material
For well graded granular sub-base materials as per Table
400.2
For Grading A Material
53 mm to 26.5 mm @ 35 per cent cum 134.40
26.5 mm to 4.75 mm @ 45 per cent cum 172.80
2.36 mm below @ 20 per cent cum 76.80
Water kl 30.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/300
Cost for 300 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/300
ii Gravel / Soil - Aggregate Base (Table 400.2) Grading B
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
b) Machinery
Motor grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @ 10 cum per hour hour 30.00
OR
Vibratory Roller 80-100 kN hour 6.00
Water tanker 6 kl capacity hour 5.00
Tractor with Rotavator 25 cum per hour hour 12.00
c) Material
For well graded granular sub-base materials as per Table
400.2
For Grading B Material
26.5 mm to 4.75 mm @ 75 per cent cum 288.00
2.36 mm below @ 25 per cent cum 96.00
Water kl 30.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/300
Cost for 300 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/300
58 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
iii Gravel / Soil - Aggregate Base (Table 400.2) Grading C
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
b) Machinery
Motor grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @ 10 cum per hour hour 30.00
OR
Vibratory Roller 80-100 kN hour 6.00
Water tanker 6 kl capacity hour 5.00
Tractor with Rotavator 25 cum per hour hour 12.00
c) Material
For well graded granular sub-base materials as per Table
400.2
For Grading C Material
9.5 mm to 4.75 mm @ 66 per cent cum 255.00
2.36 mm below @ 34 per cent cum 129.00
Water kl 30.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/300
Cost for 300 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/300
C Gravel/Soil-Aggregate Surface Course (Table 400.3)
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
b) Machinery
Motor grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @ 10 cum per hour hour 30.00
OR
Vibratory Roller 80-100 kN hour 6.00
Water tanker 6 kl capacity hour 5.00
Tractor with Rotavator 25 cum per hour hour 12.00
c) Material
For well graded granular sub-base materials as per Table 400.3
59 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Cost for 300 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/300
60 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
3 A Lime Stabilisation for Improving Subgrade
Laying and spreading available soil in the subgrade on a
prepared surface, pulverising, mixing the spread soil in place with
rotavator with 2 per cent slaked lime having minimum 70 per cent
of contents of CaO, grading with motor grader and compacting
with the smooth wheel road roller at 80-100 kN OMC to the
desired density to form a layer of improved Sub-grade as per
Technical Specification Clause 403 MORD.
Unit = cum
Taking output = 300 cum (525 tonne)
i. By Mechanical Means
a) Labour
Mate day -
Skilled mazdoor for alignment and geometrics day 1.36
Mazdoor for spraying lime day 8.00
61 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Tractor with ripper and rotavator attachments @ 60 cum hour 12.00
per hour for ripping and 25 cum per hour for mixing
Unit = cum
Taking output = 300 cum (525 t)
a) Labour
Mate day -
Mazdoor (Skilled) day 2.48
Mazdoor (Unskilled) day 10.00
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity hour 5.00
Tipper 5.5 cum 4 trips per hour hour 14.00
Motor grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN Static roller @ 70 cum /hour hour 4.30
Tractor with rotavator and blade @ 25 cum per hour hour 12.00
Water tanker 6 kl capacity hour 5.00
c) Material
Lime t 21.00
Water kl 30.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
62 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Note :The exact quantity of lime shall be as per design.
63 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
B Providing, laying and spreading soil on a prepared sub
grade, pulverising, mixing the spread soil in place with
rotavator with 3 per cent slaked lime with minimum content
of 70 per cent of CaO, grading with motor grader and
compacting with the road roller at OMC to achieve at least 98
per cent of the max dry density to form a layer of sub base as
per Technical Specification 402 MORTH.
Unit = cum
Taking output = 300 cum (525 tonnes)
a) Labour
Mate day -
Mazdoor skilled day 2.480
Mazdoor day 10.000
b) Machinery
Excavator 0.90 cum bucket capacity hour 6.000
Tipper for carriage of soil t.km -
Tipper 5.5 cum 4 trips per hour hour 14.00
Motor Grader 110 HP @ 50 cum per hour hour 6.000
Vibratory roller 8 - 10 tonne hour 6.000
Tractor with Rotavator and blade @ 25 cum per hour hour 12.000
Water tanker 6 KL capacity hour 12.000
c) Material
Lime at site tonne 15.750
Cost of water KL 72.000
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum= (a+b+c+d+e)/300
5 Soling with 150 mm cubes hard stone including 25% of Metal
of 40 to 80 mm. size for packing and 20% Gravel for filling
interstices and compacting with 80 - 100 kN Power Roller
including hire charges of Power Roller, watering etc.
complete.
Unit = cum
Taking output = 1 cum
a) Labour
Men Mazdoor for conveyance & packing day 1.100
Women Mazdoor day 0.700
b) Machinery
Consolidating soling with static Power Roller80-100kN cum 0.100
Water Tanker 6Kl capacity hour 0.016
c) Material
Hard stone 150 mm size (Granite) (Soling Stone) cum 1.100
40 mm - 80 mm size metal (Hand broken) cum 0.270
Gravel cum 0.220
Water kl 0.1
d&e) Overheads & Contractors Profit 18.00%
Rate per cum = (a+b+c+d+e)
6 A Cement Treated Soil Sub-Base/Base
Providing, laying and spreading soil on a prepared sub-grade,
pulverising, adding the designed quantity of cement to the spread
soil, mixing in place with rotavator, grading with the motor grader
and compacting with the smooth wheel road roller / Vibratory
Roller 80-100 kN at OMC to achieve the desired unconfined
compressive strength and to form a layer of sub-base/base as
per Technical Specification Clause 404 MORD.
Unit = cum
Taking output = 300 cum (525 t)
For 4 per cent quantity of cement by weight of soil
a) Labour
Mate day -
Mazdoor (Skilled) day 2.48
Mazdoor (Unskilled) day 10.00
64 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity hour 5.00
Tipper 5.5 cum hour 14.00
Motor grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @ 70 cum per hour hour 4.30
OR
vibratory roller 80-100 kN @ 60 cum per hour 6.00
Tractor with rotavator and blade @ 25 cum per hour hour 12.00
Water tanker 6 kl capacity hour 5.00
c) Material
Cement at site @ 4% (of 525 t) t 21.00
Water kl 30.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/300
Cost for 300 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/300
Note : The exact quantity of cement shall be as per design.
B Cement Treated Crushed Rock or combination as per clause
403.2 and table 400.4in Sub base/ Base
Providing, laying and spreading Material on a prepared sub
grade, adding the designed quantity of cement to the spread
Material, mixing in place with rotavator, grading with the motor
grader and compacting with the road roller at OMC to achieve the
desired unconfined compressive strength and to form a layer of
sub-base/base as per Technical Specification 403 MORTH.
Unit = cum
Taking output = 300 cum (600 tonnes)
Quantity of cement assumed as 4 per cent of quantity
of crushed rock by weight.
a) Labour
Mate day -
Mazdoor skilled day 2.48
Mazdoor day 10.00
b) Machinery
Motor Grader 110 HP @ 50 cum per hour hour 6.00
Vibratory roller 8 - 10 tonne hour 6.00
Tractor with Rotavator and blade @ 25 cum per hour hour 12.00
Water tanker 6 KL capacity hour 10.00
c) Material
Cement at site @ 4 per cent by weight of crushed tonne 24.00
aggregate (600 tonne)
Grading of material for sub-base course
37.5 mm to 9.5 mm @ 55 per cent cum 211.20
9.5 mm to 4.75 mm @ 20 per cent cum 76.80
4.75 mm to 75 micron @ 25 per cent cum 96.00
Cost of water KL 60.00
or
Grading of material for Base course
37.5 mm to 9.5 mm @ 32.5 per cent cum 124.80
9.5 mm to 4.75 mm @ 5 per cent cum 19.20
4.75 mm to 75 micron @ 62.5 per cent cum 240.00
Cost of water KL 60.00
(i) For Sub-Base course
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
(ii) For Base course
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
Note : Quantities of aggregates provided under 'c' above are
uncompacted quantities.
65 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
7 Making 50 mm x 50 mm Furrows
Making 50 mm x 50 mm furrows, 25mm/ 50mm deep, 450 to the
center line of the road and at one metre interval in the existing
thin bituminous wearing coarse including sweeping and disposal
of excavated material within 1000 metres lead as per Technical
Specification 404.3.1 MORTH.
Unit = sqm
Taking output = 30 m x 7 m = 210 sqm
(i) 25mm deep furrow cutting
a) Labour
Mate day -
Mazdoor day 2.08
b) Machinery
Tractor-trolley hour 0.20
c&d) Overheads & Contractors Profit 18.00%
Cost for 210 sqm= a+b+c+d
Rate per sqm =(a+b+c+d)/210
(ii) 50mm deep furrow cutting
a) Labour
Mate day -
Mazdoor day 4.16
b) Machinery
Tractor-trolley hour 0.40
c&d) Overheads & Contractors Profit 18.00%
Cost for 210 sqm= a+b+c+d
Rate per sqm =(a+b+c+d)/210
8 Inverted Choke
Construction of inverted choke by providing, laying, spreading
and compacting screening B type/ coarse sand of specified grade
in uniform layer on a prepared surface with motor grader and
compacting with power roller etc as per Technical Specification
404.3.2 MORTH.
Unit = cum
Taking output = 600 cum
a) Labour
Mate day -
Mazdoor skilled day 2.92
Mazdoor day 21.00
b) Machinery
Motor Grader 110 HP hour 6.00
Vibratory roller 8-10 tonnes @ 60 cum per hour hour 6.00
Water tanker 6 KL capacity hour 18.00
c) Material
Screening type 'B' or coarse sand cum 720.00
Cost of water KL 108.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 600 cum = a+b+c+d+e
Rate per cum = ( a+b+c+d+e)/600
9 Water Bound Macadam Sub-base/base
A With stone screening / binding materials
I WBM Grading 1
(i) Providing, laying, spreading and compacting stone aggregates
of specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with three
wheel 80 -100 kN static roller in stages to proper grade and
camber, applying and brooming, stone screening/binding
materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density Grading 1 as per
Technical Specification Clause 404 MORTH & 405 MORD. For
compacted thickness of 100 mm.
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.68
Mazdoor (Unskilled) day 15.00
b) Machinery
Motor grader 110 HP @ 50 cum per hour for spreading hour 7.20
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural hour 36.00
Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour for R&B hour 12.00
& Urban Works
(OR)
Vibratory roller 8-10 tonnes @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per 10 sqm for cum 435.60
compacted thickness of 100 mm
Stone Screening
Type A 13.2 mm for Grading-1 @ 0.27 cum per 10sqm cum 97.20
Binding Material
Binding Material @ 0.08 cum per 10 sqm for Grading 2 material cum 28.80
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
67 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
II WBM Grading 2
(i) Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening/binding materials to fill-
up the interstices of coarse aggregate, watering and compacting
to the required density grading 2 as per Technical Specification
Clause 405 MORD / 404 MORTH. For compacted thickness of
75 mm.
By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural hour 36.00
Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour for R&B hour 12.00
& Urban Works
(OR)
Vibratory roller 8-10 tonnes @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 and 10 MORD/
400.6, 7, 8 & 9 MORTH)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm for cum 435.60
compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 / 0.20 cum/10sqm cum 86.40
(OR)
Type B 13.2 mm for Grading 2 @ 0.12 cum per 10sqm cum 57.60
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80
material
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Using 11.2 mm for Grading 2 :
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
Using 13.2 mm for Grading 2
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.68
Mazdoor (Unskilled) day 15.00
68 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Motor grader 110 HP @ 50 cum per hour for spreading hour 7.20
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural hour 36.00
Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour for R&B hour 12.00
& Urban Works
(OR)
Vibratory roller 8-10 tonnes @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6,
7, 8 & 9 MORTH)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm for cum 435.60
compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum per 10sqm cum 86.40
(OR)
Type B 13.2 mm for Grading 2 @ 0.12 cum per 10sqm cum 57.60
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80
material
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Using 11.2 mm for Grading 2 :
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
Using 13.2 mm for Grading 2
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
Note : Type A Screening can be used in Grading 2
III WBM Grading 3
(i) Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages to
proper grade and camber, applying and brooming, stone
screening to fill-up the interstices of coarse aggregate, watering
and compacting to the required density Grading 3 as per
Technical Specification Clause 405 MORD/ 404 MORTH. For
compacted thickness of 75 mm.
By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural hour 36.00
Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour for R&B hour 12.00
& Urban Works
(OR)
Vibratory roller 8-10 tonnes @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
69 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6,
7, 8 & 9 MORTH)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10 sqm for cum 435.60
compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum per 10sqm cum 86.40
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80
material
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
Note : When BT is taken up, simultaneously, avoid Binding material
By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.68
Mazdoor (Unskilled) day 15.00
b) Machinery
Motor grader 110 HP @ 50 cum per hour for spreading hour 7.20
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural hour 36.00
Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour for R&B hour 12.00
& Urban Works
(OR)
Vibratory roller 8-10 tonnes @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6,
7, 8 & 9 MORTH)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10 sqm cum 435.60
for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum per 10sqm cum 86.40
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80
material
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
Note : When BT is taken up, simultaneously, avoid Binding material
70 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
9 B Water Bound Macadam with Crushable Screenings
such as Gravel or Morrum
I WBM Grading 1 (Using Graded Metal)
(i) Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller / Vibratory Roller 80-100 kN in
stages to proper grade and camber, applying and brooming,
crushable screening to fill-up the interstices of coarse aggregate,
watering and compacting to the required density Grading 1 as per
Technical Specification Clause 405 MORD / 404 MORTH.
71 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6,
7, 8 & 9 MORTH)
Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per 10 sqm for cum 435.60
compacted thickness of 100 mm
Crushable type such as Moorum or gravel for Grading 1 cum 108.00
@ 0.30 cum per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 1 cum 28.80
material (for R&B & Urban Works Only)
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
(ii) WBM Grading 1 (Using Single Grade Metal)
Providing, laying, spreading and compacting stone aggregates of
75 mm single Grade to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with three wheel 80-100 kN static roller / Vibratory Roller 80-
100 kN in stages to proper grade and camber, applying and
brooming, crushable screening to fill-up the interstices of coarse
aggregate, watering and compacting to the required density
Grading 1 as per Technical Specification Clause 405 MORD.
72 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Material (Refer Tables 400.7, 8, 9 and 10 MORD)
Aggregate
Grading 1 Hand broken stone aggregate 75 mm cum 435.60
nominal size @ 1.21cum per 10 sqm for compacted
thickness of 100 mm
Crushable type such as Moorum or gravel for Grading 1 cum 108.00
@ 0.30 cum per 10 sqm
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
II WBM Grading 2 (using Graded Metal)
(i) Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static
roller/ Vibratory Roller 80-100 kN in stages to proper
grade and camber, applying and brooming, crushable
screening to fill-up the interstices of coarse aggregate,
watering and compacting to the required density Grading
2 as per Technical Specification Clause 405 MORD / 404
MORTH.
(A) By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural hour 36.00
Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour for R&B hour 12.00
& Urban Works
(OR)
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6,
7, 8 & 9 MORTH)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm for cum 435.60
compacted thickness of 75 mm
Crushable type such as Moorum or gravel for Grading 2 cum 105.59
@ 0.22 cum per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80
material (for R&B & Urban Works Only)
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.68
Mazdoor (Unskilled) day 15.00
73 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Motor grader 110 HP @ 50 cum per hour for spreading hour 7.20
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural hour 36.00
Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour for R&B hour 12.00
& Urban Works
(OR)
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6,
7, 8 & 9 MORTH)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm for cum 435.60
compacted thickness of 75 mm
Crushable type such as Moorum or gravel for Grading 2 cum 105.59
@ 0.22 cum per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80
material (for R&B & Urban Works Only)
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
(ii) WBM Grading 2 (using single grade metal)
Providing, laying, spreading and compacting stone aggregates of
63 mm nominal single size to water bound macadam
specification including spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN static roller/
Vibratory Roller 80-100 kN in stages to proper grade and
camber, applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to the
required density Grading 2 as per Technical Specification Clause
405 MORD.
75 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80
material (for R&B & Urban Works Only)
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.68
Mazdoor (Unskilled) day 15.00
b) Machinery
Motor grader 110 HP @ 50 cum per hour for spreading hour 7.20
Three wheel 80-100 kN static roller @ 10 cum per hour hour 36.00
for Rural Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour hour 12.00
for R&B & Urban Works
(OR)
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/ 400.6,
7, 8 & 9 MORTH)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10 sqm cum 435.60
for compacted thickness of 75 mm
Crushable type such as Moorum or gravel for Grading 3 cum 105.59
@ 0.22 cum per 10 sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 cum 28.80
material (for R&B & Urban Works Only)
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
Note : Whenever BT is taken up simultaneously binding material
can be deleted
(ii) WBM Grading 3 (using Single Grade Metal)
Providing, laying, spreading and compacting stone aggregates of
40 mm Single nominal size to water bound macadam
specification including spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN static roller/
Vibratory Roller 80-100 kN in stages to proper grade and
camber, applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to the
required density Grading 3 as per Technical Specification Clause
405 MORD.
76 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum/ hour hour 36.00
or
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 Hand broken stone aggregate 40 mm cum 435.60
nominal size @ 0.91 cum per 10 sqm for compacted
thickness of 75 mm
Crushable type such as Moorum or gravel for Grading 3 @ 0.22 cum 105.59
cum per 10 sqm
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.68
Mazdoor (Unskilled) day 15.00
b) Machinery
Motor grader 110 HP @ 50 cum per hour for spreading hour 7.20
Three wheel 80-100 kN @ Static roller hour 36.00
or
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 and 10)
Aggregate
Grading 3 Hand broken stone aggregate 40 mm nominal size cum 435.60
@ 0.91 cum per 10 sqm for compacted thickness of 75 mm
Crushable type such as Moorum or gravel for Grading 3 @ 0.22 cum 105.59
cum per 10 sqm
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
10 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing
the material with water at OMC in mechanical mixer (Pug Mill),
carriage of mixed material by tipper to site, laying in uniform
layers in sub-base/base course on a well prepared sub-base and
compacting with smooth wheel roller of 80 to 100kN / Vibratory
Roller 80-100 kN weight to achieve the desired density including
lighting, barricading and maintenance of diversion, etc as per
Tables 400.11 & 400.12 and Technical Specification Clause 406
MORD / MORTH.
77 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Front end loader 1 cum capacity hour 4.00
Wet mix plant (Pug Mill) hour 4.00
Tipper/Dumper (10-t) capacity / 5-6 t capacity hour 5.00
Motor Grader @ 50 cum per hour hour 2.00
Water tanker 6 kl capacity hour 1.33
Three wheel 80-100 kN static roller @ 16cum per hour hour 6.25
(or)
vibratory roller 80-100 kN @ 60 cum per hour hour 1.67
c) Material
Coarse aggregate 45 mm to 22.4 mm @ 30 per cent cum 39.90
Aggregates 22.4 mm to 2.36 mm @ 40 per cent cum 53.20
Fine aggregate / Crushed sand 2.36 mm to 75 micron @ cum 39.90
30 per cent
Fine aggregate 10 mm cum
Coarse Sand cum
Borrow area sand cum
Water kl 8.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 100 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/100
Cost for 100 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/100
B R&B and Urban Area Works :
Unit = cum
Taking output = 225 cum (495 tonnes)
a) Labour
Mate day -
Mazdoor skilled day 2.48
Mazdoor day 10.00
b) Machinery
Wet mix plant of 75 tonne hourly capacity hour 9.00
Electric generator 125 KVA hour 6.00
Front end loader 1 cum capacity hour 6.00
Paver finisher hour 6.00
Vibratory roller 8 - 10 tonne hour 3.90
or
Smooth 3 wheeled steel roller @ 8-10 tonnes. hour 22.50
Water tanker 6 KL capacity hour 3.00
Tipper 10t t.km 495 x L
c) Material ( Table 400-11)
45 mm to 22.4 mm@ 30 per cent cum 89.10
22.4 mm to 2.36 mm @ 40 per cent cum 118.80
2.36 mm to 75 micron@ 30 per cent cum 89.10
Cost of water KL 18.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 225 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/225
Cost for 225 cum = a+b+c+d+e (Smooth Roller)
Rate per cum = (a+b+c+d+e)/225
Note : 1. Though vibratory roller is required only for 3 hours as per norms,
the same is required to be available at site for 6 hours to match with other
machines. The usage rates of vibratory roller may be multiplied with a
factor of 0.65
2. As three wheeled smooth steel rollers are commonly in use, the same
has been provided as an alternative which can be used if the thickness of
individual layer does not exceed 100 mm.
78 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
11 Granular sub-base/base/surface course with local materials
(Table 400.13) by mix in place method normal Construction
of granular sub-base by providing local material spreading in
uniform layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at once and
compacting with smooth wheel roller to achieve the desired
density complete as per Clause 401.4 as per Technical
Specification Clause 408 MORD.
Water kl 30.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = a+b+c+d+e/300
ii Using Gravel mix soil using Soil Gravel Mixture /
quarry waste
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
b) Machinery
Motor grader 110 HP 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @10 cum per hour hour 30.00
Water tanker 6 kl capacity hour 5.00
Tractor with Rotavator 25 cum per hour hour 12.00
c) Material
Soil gravel mixture/quarry waste (Local material as per cum 384.00
Table400.13) (Gravel)
Water kl 30.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
79 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
12 Construction of Water Bound Macadam using locally
available material (Table 400.13)
Providing, laying spreading and compacting local material in
block or large discrete particles, such as kankar, Literate,
Dhandla etc. as per Table 400.13 to water bound macadam
specification including spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN static roller in stages
to proper grade and camber, applying and brooming requisite
type of screening /binding materials to fill-up the interstices of laid
material watering and compacting to the required density as per
Clause 405.3 and Technical Specification Clause 408 MORD.
A By Mechanical Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.68
Mazdoor (Unskilled) day 15.00
b) Machinery
Motor grader 110 H.P @ 50 cum/hr for spreading hour 7.20
Three wheel 80-100 kN @ static roller 8 cum per hour hour 36.00
Water tanker 6 kl capacity hour 24.00
c) Material
Low Grade Aggregate such as Kankar, Literate, Dhandla and cum 435.60
naturally occurring gravels, quarry waste as per Table 400.13 @
1.21 cum per 10 sqm compacted thickness 100 mm
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/360
B By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
b) Machinery
Three wheel 80-100 kN static roller @ 8 cum per hour hour 36.00
Water tanker 6 kl capacity hour 24.00
c) Material
Low Grade Aggregate such as Kankar, Literate, Dhandla and cum 435.60
naturally occurring gravels, quarry waste as per Table 400.13 @
1.21 cum per 10 sqm compacted thickness 100 mm
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
13 Lime-Flyash Stablised Soil Sub-base
Construction of sub-base using lime-flyash admixture with
granular soil, free from organic matter/deleterious material or
clayey silts and low plasticity clays having PI between 5 and 20
and liquid limit less than 25 and commercial dry lime, slaked at
site or pre-slaked with CaO content not less than 50 per cent,
flyash to conform to gradation as per Clause 4.3 of IRC:SP:20,
lime+flyash content ranging between 10 to 30 per cent, the
minimum un-confined compressive strength and CBR value after
28-days curing and 4-days soaking to be 0.75 MPa and 25 per
cent respectively, all as specified in IRC:88 including a lead upto
1000 m as per Technical Specification Clause 409 MORD.
Unit = cum
Taking output = 480 cum (720 t, density 1.50 t/cum)
80 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Assumptions made
Total mass taken for analysis = 720 t
Lime+Flyash admixture
@ 20% = 0.2 x 720=144 t
Soil = 720-144 = 576 t
(578/1.6 = 360 cum)
Lime + Flyash = 144 t
Ratio Lime 4 : Flyash 16
Lime = 29 t
Flyash = 115 t
a) Labour
Mate day -
Mazdoor (Skilled) day 1.24
Mazdoor (Unskilled) day 6.00
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity @ 60 cum hour 6.00
per hour for 360 cum soil
Tipper 10 t capacity for carriage of soil 578 t hour 16.00
Tipper 10 t capacity for carriage of 115 t flyash hour 5.50
Tipper 10 t capacity for carriage of 29 t of lime from store hour 3.80
to work site
Loading as per item 1.1 (ii) cum 480.00
Unloading as per item 1.1 (iv) cum 480.00
Add 10 per cent of cost of carriage to cover cost of -
loading and unloading
Tractor with disc harrows for pulverisation hour 6.00
Motor Grader 110 HP @ 75 per cent 200 cum per hour for hour 3.20
mixing in-place and grading
Three wheel 80-100 kN static roller (or) hour 12.00
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 12.00
c) Material
Lime (Slaked) t 29.00
Compensation for earth taken from private source cum 360.00
Water kl 72.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 480 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/480
Cost for 480 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/480
Note : 1. Compensation for earth will vary from place to place and will
have to be assessed realistically as per particular ground situation. In
case earth is available from Govt. land, compensation for earth will not be
required. The position is required to be clearly stated in the cost estimate.
2. Cost of flyash has not been considered as same will be available free
of cost. Only carriage of flyash has been provided.
3. Lime + Flyash has been taken as 20 per cent of total mass and ratio of
lime and flyash as 1:4 for estimating purposes. Total quantities will be as
per approved design.
14 Construction of Sub-base/Course Using Crushed Slag
as per Table 400.19
Construction of Sub-base by providing crushed slag
spreading in uniform layer with motor grader on prepared
surface mixing by mix-in-place method with Rotavator @
OMC, and compacting with three wheel 80-100 kN static
roller to achieve the desired density complete as per
Technical Specifications Clause 402.4 and 410.3.2 MORD
Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.48
Mazdoor (Unskilled) day 10.00
81 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Motor Grader 110 HP @ 50 cum per hour hour 6.00
Three wheel 80-100 kN static roller @ 10 cum /hour hour 30.00
Tractor with Rotavator 25 cum per hour hour 12.00
Water tanker 6 kl capacity hour 5.00
c) Material
Crushed slag as per Clause 410.4.2 (i)
As per Item No.4.2 of Chapter 4 cum 384.00
Water kl 30.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
15 Water Bound Macadam using crushed slag
Providing, laying, spreading and compacting crushed slag to
water Bound Macadam specification including spreading in
uniform thickness, hand packing rolling with smooth wheel roller
80-100 kN in stages to proper grade and camber, applying and
brooming requisite type of screening/binding materials to fill up
the interstees of crushed slag watering and compacting to the
required density as per Clause 405.3 and Technical Specification
Clause 410.3.2 MORD
Unit = cum
Taking output = 360 cum
Manual Means
a) Labour
Mate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum/ hour hour 36.00
Water tanker 6 kl capacity hour 24.00
c) Material
As per Item No.4.7 (1)(A)© of Chapter 4
Crushed slag as per Clause 410.4.2 (ii) cum 435.60
Crushable screening (Murram / Gravel) cum 108.00
Water kl 144.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/360
16 Cement Bound Granular Material sub-base/base
Providing laying and spreading granulated blast furnace slag on
a prepared sub-grade pulverising adding the designed quantity of
cement to the spread granulated blast furnace slag mixing in
place with rotavator grading with the mortar grader and
compacting with smooth wheel roller 80-100 kN at OMC to
achieve the desired unconfined compressive strength and to
form a layer of sub-base/base as per Technical Specification
Clauses 404.3 and 410.4.2 MORD
Unit = cum
Taking output = 300 cum (525 t)
For 4 per cent quantity of cement by wt of granulated blast
furnace slag
a) Labour
Mate day -
Mazdoor (Skilled) day 2.48
Mazdoor (Unskilled) day 10.00
b) Machinery
5.50 cum Tipper for carriage of GBFS add 10 per cent of hour 15.00
cost of carriage of cover cost of loading and unloading
Tractor with rotavator and blade @ 25 cum per hour hour 12.00
82 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Water tanker 6 kl capacity hour 7.00
83 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material
Cement (4%) t 21.00
Water kl 42.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 300 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/300
Note : 1. The exact quantity of cement shall be as per design
2. Granulated ballast slag will be available free of cost
17 Crusher Run Macadam Base
Providing crushed run stone aggregate grading conforming to
table 400.20 depositing on a prepared surface by hauling
vehicles, spreading and mixing with a motor grader, watering
and compacting with a three wheel 80-100 kN static roller as per
Technical Specification Clause 411MORD/ 410 MORTH to form
a layer of sub-base/base
A By mix-in-place method
ii With 53 mm maximum size of aggregates
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.48
Mazdoor (Unskilled) day 10.00
b) Machinery
Tractor attached with rotavator @ 25 cum / 30 cum per hour hour 12.00
Motor-Grader 110 H.P hour 6.00
Three wheel 80-100 kN static roller @ 10 cum /hour hour 36.00
OR
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 6.00
c) Material
Aggregate at site
For 53 mm maximum size
63 mm to 45 mm @ 33 per cent cum 157.46
22.5 mm to 5.6 mm @ 32 per cent cum 151.06
Below 5.6 mm @ 35 per cent cum 116.68
Water kl 36.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
ii With 37.5 mm maximum size of aggregates
(MORDonly)
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.48
Mazdoor (Unskilled) day 10.00
b) Machinery
Tractor attached with rotavator @ 25 cum / 30 cum per hour hour 12.00
Motor-Grader 110 H.P hour 6.00
Three wheel 80-100 kN static roller @ 10 cum / hour hour 36.00
Water tanker 6 kl capacity hour 6.00
c) Material
Aggregate at site
For 37.5 mm maximum size
45 mm to 22.5 mm @ 5 per cent cum 24.12
22.4 mm to 5.6 mm @ 50 per cent cum 237.60
Below 5.6 mm @ 45 per cent cum 213.48
Water kl 36.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/360
84 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Or
iii For 45 mm maximum size of aggregate (MORTH only)
a) Labour
Mate day -
Mazdoor (Skilled) day 2.48
Mazdoor (Unskilled) day 10.00
b) Machinery
Tractor attached with rotavator @ 30 cum per hour hour 12.00
Motor-Grader 110 H.P hour 6.00
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker 6 kl capacity hour 6.00
c) Material
Aggregate at site
45 mm to 22.5 mm@ 5 per cent cum 24.12
22.4 mm to 5.6 mm@ 50 per cent cum 237.60
Below 5.6 mm@ 45 per cent cum 213.48
Cost of water KL 36.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/360
Or
B By mixing plant method
i With 53 mm maximum size of aggregates
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate day -
Mazdoor (Skilled) day 1.28
Mazdoor (Unskilled) day 6.00
b) Machinery
Wet mix plant @ 75 t per hour hour 6.00
Electric generator set, 125 KVA hour 6.00
Front end loader 1 cum bucket capacity hour 6.00
Motor grader 110 HP hour 6.00
Three wheel roller 80-100 kN @ 8 cum /10 cum /hour hour 22.50
OR
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker hour 3.00
Tipper hour 10.00
Add 10 per cent of cost of carriage to cover cost of -
loading and unloading
c) Material
Aggregate at site
For 53 mm maximum size
63 mm to 45 mm @ 33 per cent cum 98.40
22.4 mm to 5.6 mm @ 32 per cent cum 94.41
Below 5.6 mm @ 35 per cent cum 104.18
Water kl 18.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 225 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/225
Cost for 225 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/225
85 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii With 37.5 mm maximum size of aggregates (MORD
only)
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate day -
Mazdoor (Skilled) day 1.28
Mazdoor (Unskilled) day 6.00
b) Machinery
Wet mix plant @ 75 t per hour hour 6.00
Electric generator set, 125 KVA hour 6.00
Front end loader 1 cum bucket capacity hour 6.00
Mortar grader 110 HP hour 6.00
Three wheel roller 80-100 kN @ 8 cum / 10 cum/ hour hour 22.50
Water tanker hour 3.00
Tipper hour 10.00
c) Material
Aggregate at site
For 37.5 mm maximum size
45 mm to 22.5 mm @ 5 per cent cum 15.06
22.4 mm to 5.6 mm @ 50 per cent cum 148.50
Below 5.6 mm @ 45 per cent cum 133.00
Water kl 18.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 225 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/225
iii For 45 mm maximum size of aggregate (MORTH only)
Unit = cum
Taking output = 225 cum (450 t)
a) Labour
Mate day -
Mazdoor (Skilled) day 1.28
Mazdoor (Unskilled) day 6.00
b) Machinery
Wet mix plant @ 75 t per hour hour 6.00
Electric generator set, 125 KVA hour 6.00
Front end loader 1 cum bucket capacity hour 6.00
Motor grader 110 HP hour 6.00
Three wheel roller 80-100 kN @ 10 cum/ hour hour 22.50
OR
vibratory roller 80-100 kN @ 60 cum per hour hour 6.00
Water tanker hour 3.00
Tipper t.km -
Tipper hour 10.00
Add 10 per cent of cost of carriage to cover cost of
loading and unloading
c) Material
Aggregate at site
45 mm to 22.5 mm@ 5 per cent cum 15.06
22.4 mm to 5.6 mm@ 50 per cent cum 148.50
Below 5.6 mm@ 45 per cent cum 133.43
Cost of water KL 18.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 225 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/225
Cost for 225 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/225
86 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
18 Brick Soling
Laying brick soling layer on prepared sub-grade with brick on end
edging according to lines, graded and cross-section shown on
the drawing filling joints with sand and earth, spreading 25 mm
thick layer of earth over brick soling, watering and rolling the
same with three wheel road roller 80-100 kN as per Technical
Specification Clause 412 MORD
Unit = sqm
Taking output = 150 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.52
Mason 1st Class day 3.00
b) Machinery
Three wheel 80-100 kN static roller hour 1.00
Water tanker hour 1.00
c) Material
Brick 1st Class No. 8160.00
Brick 1st Class on edging No. 1100.00
Fine Sand cum 5.66
Water kl 6.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 150 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/150
19 Stone Set Pavement
Providing and laying stone set pavement on prepared surface
with sub-base 100 mm thick compacted Granular Sub-base as
per Clause 401.4 and base 75 mm thick compacted water bound
macadam grading 2 as per Clause 405.3. The 150 mm thick
hammer desired stones are laid in the herring one or stretched
bond pattern. The stones are compacted into the bedding sand
of 40 mm over the WBM base bounded by edge stone using
suitable compacting device. The gaps are filled with fine sand
stone dust as per Technical Specification Clause 413.4 MORD.
Unit = sqm
Taking output = 360 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 53.16
Mason 2nd class for laying set stone and edge stone 13.00
b) Machinery
Three wheel 80-100 kN static roller hour 2.00
Water tanker 6 kl capacity hour 1.00
c) Material
(1) Collection of fine sand
3.4x0.285x0.150x1.20 = 0.174 cum 0.174
(2) Coarse sand
96x3.35x0.04x1.20 = 15.437 cum cum 15.437
(3) Collection of stone set stone
300 mmx200 mmx150 mm ; 17x304 = 5168 nos. Nos 5,168.00
(4) Collection of edge stone
450 mmx200 mmx350 mm ; 2x232 = 464 nos. Nos 464.00
(5) Water kl 6.00
d&e) Overheads & Contractors Profit 18.00%
Cost of 360 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/360
87 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
20 Crushed Cement Concrete Sub-base / Base
Breaking and crushing of material obtained by breaking damaged
cement concrete slabs to size range not exceeding 75 mm as
specified in table 400.7 transporting the aggregates obtained
from breaking of cement concrete slabs at a lead of L km., laying
and compacting the same as sub base/ base course, constructed
as WBM to clause 404 except the use of screening or binding
Material (405 MORTH).
Unit = cum
Taking output =360 cum
a) Labour
Mate day -
Mazdoor skilled day 6.16
Mazdoor for crushing broken cement concrete pavement / day 102.00
slabs into aggregate
b) Machinery
Motor Grader,110 HP @ 50 cum/hr. hour 6.00
Vibratory roller 8 - 10 tonne@ 60 cum per hour hour 6.00
or
Smooth 3 wheeled steel roller @ 30cum/hr. hour 12.00
Front end loader 1 cum bucket capacity hour 6.00
Tipper 10 tonne capacity t.km 720 x L
Loading Charges cum
Unloading Charges cum
Water tanker 6 KL capacity with 5 km lead @ 1 trip per hour hour 12.00
c) Material
Material available from dismantled concrete slab after
crushing / breaking and only carriage is required to be
provided
Cost of water KL 72.00
d&e) Overheads & Contractors Profit 18.00%
Cost for 360 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/360
Cost for 360 cum = a+b+c+d+e (Smooth Roller)
Rate per cum = (a+b+c+d+e)/360
Note : 1. It is assumed that dismantling of concrete slab/pavement has
been considered separately. Hence same is not added in this analysis.
Only labour for crushing the dismantled slab into aggregate has been
added. Carriage from stock pile to work site has been provided with a lead
of L km. Loading & unloading charges for actual quantity to be allowed.
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor skilled day 2.56
Mazdoor (Unskilled) day 12.00
b) Machinery
Mechanical broom hydraulic @ 1250 sqm per hour hour 6.00
Hydraulic self propelled chips spreader hour 6.00
Front end loader 1 cum bucket capacity hour 6.00
Tipper 10 tonne capacity hour 6.00
88 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Vibratory roller 8 -10 tonnes @ 30 cum per hour hour 3.9
Bitumen pressure distributor @ 1750 sqm per hour hour 4.28
c) Material
Crushed stone aggregate 11.2 mm size cum 97.50
Bitumen (60-70 grade) tonne 0.25
d&e) Overheads & Contractors Profit 18.00%
Cost for 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
Note : Though vibratory roller is required only for 3 hours as per norms,
the same is required to be available at site for 6 hours to match with other
machines. The usage rates of vibratory roller may be multiplied with a
factor of 0.65.
89 Chapter 4
Rate Amount
S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
24 Construction of Shoulders
A. Earthen Shoulders
The rate as applicable for sub-grade construction may be
adopted.
B. Hard Shoulders
Rate as applicable for sub-base and or base may be
adopted as per approved design.
C. Paved shoulders
The rate may be adopted as applicable for different layers
of pavement depending upon approved design of paved
shoulders.
25 Footpaths and Separators
Construction of footpath/separator by providing a 150 mm
compacted granular sub base as per clause 401 and 25 mm thick
cement concrete grade M15, over laid with pre-cast concrete tiles
in cement mortar 1:3 including provision of all drainage
arrangements but excluding kerb channel (MORTH)
Unit = sqm
Taking output = 300 sqm
a) Labour
Mate day -
Mason day 4.00
Mazdoor (Unskilled) day 31.36
b) Machinery
Vibratory road roller 8 -10 tonnes @60 cum per hour hour 0.75
Water tanker 6 KL capacity @ 1 trip per hour hour 2.00
Concrete mixer 0.4/0.28 cum per hour hour 6.00
c) Material
i) For Granular sub base material
53 mm to 26.5 mm @ 35 per cent cum 20.79
26.5 mm to 4.75 mm @ 45 per cent cum 26.73
2.36 mm below @ 20 per cent cum 11.88
ii) For cement concrete grade M 15, 7.5 cum
Aggregate 12 mm crushed @ 0.9 cum of concrete cum 6.75
Sand @ 0.45 cum/cum of concrete cum 3.38
Cement tonne 1.88
iii) For cement plaster 1:3
Sand cum 3.84
Cement tonne 1.83
iv) Pre-cast cement concrete tiles
Tiles size 300 x 300 mm and 25 mm thick each 3300.00
v) RCC pipes
Pipes 200 mm dia,2.5 m long for drainage metre 22.50
General Note : The provisions towards Mate is included in the provision towards
unskilled Mazdoor.
90 Chapter 4