0% found this document useful (0 votes)
75 views82 pages

River Sediment Management

This thesis examines different perspectives on Tidal River Management (TRM) in Bangladesh. TRM is a water management concept originating from local knowledge practiced in southwest Bangladesh. The author interviews national water management experts and conducts fieldwork to understand views of TRM. There are differences in perspectives on current issues preventing TRM implementation but agreement on its characteristics and benefits. Larger differences concern solutions and social problems. While water management in Bangladesh has elements discussed by James Scott, it has evolved enough to potentially implement TRM. However, many changes are needed to resolve implementation conflicts between local communities and agencies. Currently no active TRM projects exist due to these conflicts.

Uploaded by

hasib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views82 pages

River Sediment Management

This thesis examines different perspectives on Tidal River Management (TRM) in Bangladesh. TRM is a water management concept originating from local knowledge practiced in southwest Bangladesh. The author interviews national water management experts and conducts fieldwork to understand views of TRM. There are differences in perspectives on current issues preventing TRM implementation but agreement on its characteristics and benefits. Larger differences concern solutions and social problems. While water management in Bangladesh has elements discussed by James Scott, it has evolved enough to potentially implement TRM. However, many changes are needed to resolve implementation conflicts between local communities and agencies. Currently no active TRM projects exist due to these conflicts.

Uploaded by

hasib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 82

Tidal River Management, Perspectives of

a Water Management Concept

Msc Thesis by Rik Heinen

September 2015
Tidal River Management, Perspectives of a Water
Management Concept

Master thesis of Sociology of Development and Change


group submitted in partial fulfilment of the degree
Master of Science of International Development at
Wageningen University, the Netherlands

Rik Heinen

July 2015

910811318040

Supervisors:
Dr. J.F. Warner, Wageningen University
M.F. van Staveren, MSC, Wageningen University

II
Abstract
This thesis identifies different perceptions of the concept of Tidal River Management (TRM) in
Bangladesh. TRM is a water management concept that originated from local knowledge and is
practised in the South West of Bangladesh. Experts within the water management sector, and who
are working on a national level, are interviewed on their perceptions of Tidal River Management.
Furthermore, during the three months of research in Bangladesh for this thesis, a field visit of two
weeks was carried out in order to have a better understanding of the concept and the local
perceptions of Tidal River Management. By documenting the perceptions of TRM this thesis tries to
identify the current problems and possibilities of TRM. Firstly a short historical review is made where
the water sector in Bangladesh is compared to the ideas of James Scott in his book “Seeing like a
State”. Secondly, the concept of TRM is explained and discussed. Finally the data collected in the
interviews are used to create an overall better understanding of the water sector in Bangladesh, and
to identify the different perceptions of TRM. The perceptions are analysed with the help of the ideas
of James Scott. These perceptions can clarify why there are currently problems with the
implementation process. They can also shed a light on the possible future use in of TRM, especially
within the Bangladesh Delta Plan 2100.

In his book “Seeing like a State” Scott discusses large scale governmental projects and the dangers
they can represent. If all the following elements are present in a project; administrative ordering,
high-modernity, an authoritarian state, and a weak civil society, a governmental project could have
disastrous consequences according to Scott. The short historical review shows that there is a
correlation between water sector projects in Bangladesh and the ideas from Scott. More recently the
similarities are smaller but there are still elements of Scott’s ideas present in the current water
management sector.

The different perceptions about TRM identified for this thesis have proven to be less varied and
controversial then originally hypothesized. The data from the interviews have indicated differences in
perceptions of the current issues preventing implementation, but not on the basics of TRM.
Generally different experts agree on its characteristics and results. The larger differences are in the
perceptions of the solutions, and the current social problems that TRM experiences. There is a
disparity between the different experts in their similarities with the elements of Scott, but overall
they are never completely similar. The water sector in Bangladesh has changed enough to
implement, and use, a local social concept like TRM. Although many changes need to be made to its
implementation process before it can be successful.

Currently there is no active TRM project as there are conflicts between the local population and the
implementing agency. This is where the difference in perceptions result in disagreements, and
different ideas, on what the causes of the current problems are. There are some new programs that
try to solve these issues but overall little progress has been made in recent years. A shared opinion
between different experts and locals is the following; waterlogging will happen again in the South
West of Bangladesh, before there is time to solve the implementation issues of TRM.

III
Acknowledgement
This thesis and my fieldwork in Bangladesh would not have been possible without the help and
support of many people in Bangladesh and in the Netherlands. First I would like to thank all the
people who took the time to answer my questions, professionals working in Dhaka and farmers and
fisherman working in the South West of Bangladesh. My supervisors and people that supported me
in Bangladesh have been crucial to the quality of this thesis and they have always been willing to
answer my many questions, Jeroen Warner, Martijn van Staveren, Prof. Shah Alam Khan and
Mahmuda Mutahara. Furthermore I could not have done the local interviews without the excellent
help and translating of Wahid Shawan. For the warm welcome and willingness to allow me to work at
the BDP2100 office in Dhaka I am very grateful to J. De Heer and the Bandudeltas staff. During the
fieldwork near Khulna I am grateful to have been allowed to work from the Blue Gold Office. My time
in Bangladesh would not have been as great as it was without the company of Richard, Jos and
Mehnaz. Finally the support from home by my family and Merel helped me during the long and warm
days in Bangladesh.

IV
Abbreviations and Bengali concepts.

Abbreviations

ADB Asian Development Bank

BDP2100 Bangladesh Delta Project 2100

Blue Gold project Project of the Government of the Netherlands in the South West of
Bangladesh on participatory water resources management.

BWDB Bangladesh Water Development Board

BWFMS Bangladesh Water and Flood Management Strategy

CEGIS Centre for Environmental and Geographic Information Services

CEP Coastal Embankment Project

CEIP Coastal Embankment Improvement Project

FAP Flood Action Plan

GoB Government of Bangladesh

GoN Government of the Netherlands

GPWM Guidelines for Participatory Water Management

IWM Institute of Water Modelling

IPSWAM Integrated Planning for Sustainable Water Management, project of


the Government of the Netherlands in the South West of
Bangladesh.

KJDRP Khulna Jessore Drainage Rehabilitation Project

LGED Local Government Engineering Department

NWMP National Water Management Plan

TRM Tidal River Management

WAPDA East Pakistan Water and Power Development Authority, would


become the BWDB

WARPO Water Resource Planning Organization

V
Bengali concepts

Beel Low lying area in Bangladesh, mostly in South West region.

Bhabodah regulator Regulator near Beel Kapalia, exact spelling can differ between
documents (Bhabodah/Bhadabaha).

Bigha Surface area 3 bigha is 1 acre.

Decimal Surface area 100 decimal is 1 acre.

Fishing Gher Fish cultivation pond surrounded by embankments.

VI
Table of Contents
Abstract .................................................................................................................................................. III
List of Figures........................................................................................................................................ VIII
Chapter 1 Introduction ............................................................................................................................ 1
1.1 General introduction ..................................................................................................................... 1
1.2 Relevance of the study .................................................................................................................. 3
1.3 Study objective .............................................................................................................................. 3
1.4 Research questions........................................................................................................................ 4
1.5 Research design & Methodology .................................................................................................. 4
Chapter 2 Historical background. .......................................................................................................... 10
2.1 Before 1950 ................................................................................................................................. 10
2.2 CEP project .................................................................................................................................. 12
2.3 Master Water Plan ...................................................................................................................... 15
2.4 Flood Action Plan......................................................................................................................... 16
2.5 KJDRP ........................................................................................................................................... 18
2.6 CEIP .............................................................................................................................................. 24
2.7 BDP2100 ...................................................................................................................................... 26
Chapter 3 Tidal River Management....................................................................................................... 28
3.1 Beginning of TRM ........................................................................................................................ 28
3.2 Beel Bhaina .................................................................................................................................. 30
3.3 Beel Kedaria ................................................................................................................................. 33
3.4 Beel Khuksia................................................................................................................................. 35
3.5 Beel Kapalia ................................................................................................................................. 37
3.6 Compensation program for TRM projects................................................................................... 40
Chapter 4 TRM perceptions .................................................................................................................. 42
4.1 Local Perceptions......................................................................................................................... 43
4.2 Perceptions governmental agencies ........................................................................................... 45
4.3 Perceptions NGO’s....................................................................................................................... 47
4.4 Perception of International experts ............................................................................................ 49
4.5 Perceptions from BDP2100 ......................................................................................................... 52
Chapter 5 Conclusion and Discussion.................................................................................................... 55
5.1 Conclusion ................................................................................................................................... 55
5.2 Reflection..................................................................................................................................... 57
5.3 Discussion .................................................................................................................................... 58

VII
The story of a man and his donkey ....................................................................................................... 60
References ............................................................................................................................................. 61
Interviews with experts: .................................................................................................................... 61
Interviews with locals ........................................................................................................................ 62
Literature ............................................................................................................................................... 63
Annex ..................................................................................................................................................... 67

List of Figures
Figure 1.1 Political map of Bangladesh 2

Figure 1.2 Map TRM areas South West Bangladesh 8

Figure 2.1 Timeline water management in Bangladesh 10

Figure 2.2 CEP project area 11

Figure 2.3 KJDRP area map 18

Figure 2.4 Structure KJDRP management 19

Figure 3.1 Effect tidal flow Beel Bhaina 30

Figure 3.2 Long profile of Hari river from Bhabadaha regulator 31

Figure 3.3 Sedimentation volume in different compartments of Beel Bhaina 31

Figure 3.4 Cross section of river Hari at Ranai during TRM Beel Khuksia 35

Figure 3.5 Cars burning after protest in Beel Kapalia 37

Figure 3.6 Burned out cars in Beel Kapalia 38

Figure 4.1 BDP2100 strategy triangle as according to J. de Heer 51

Figure 4.2 Relevancy of the ideas of Scott in relation to the Bangladesh Water Sector 59

VIII
Chapter 1 Introduction

1.1 General introduction


The country of Bangladesh is situated where the water from the largest delta in the world flows into
the Bengal Basin, resulting in water management being a daily part of the lives of many Bengali
people. As G. Wood (1999) said in his paper: “Every citizen is Bangladesh has an legitimate and acute
interest in water policy” (Wood, 1999). The Ganges-Brahmaputra-Meghna delta covers most of the
area of Bangladesh creating opportunities for the country (Figure 1.1), together with many
challenges. The country experiences frequent flooding events like riverine floods and coastal
flooding, caused by storms and cyclones. Recent cyclones like Sidr in 2007 and Aila in 2009 caused
wide spread flooding and damages (World Bank, 2005), with cyclone Aila breaching embankments at
the coast resulting in long term damages and hardships for Bangladesh (Auerbach, et al., 2015). This
long history with water related disasters resulted in the emergence of many programs and projects,
which throughout the years that have attempted to mitigate the flood risk.

For the sake of this thesis only the “recent” history of water management will be discussed. The
starting point of this is considered to be the 1950’s, in which Bangladesh experienced multiple floods.
These floods prompted new projects and policies sponsored by both national as international actors
which shaped the current day water sector in Bangladesh (Dewan, 2012). The first decades of this
water sector in Bangladesh were characterized by many technocratic and high modernity inspired
projects. Now 70 years later the decisions made during that time are still visible and shape the water
management that is practiced. Since the late 50’s there have also been many changes, and new
concepts that have been introduced.

One of these new concepts is Tidal River Management (TRM), a local water management strategy. It
is adapted from an old water management practice that has been used in the South West of
Bangladesh for hundreds of years. This thesis will explore how this concept of TRM is perceived by
experts in the water sector of Bangladesh, and how it compares with other projects that have been
done or are being carried out in Bangladesh. The research continues on the work of other
Wageningen University students that have researched the perceptions of TRM on a mostly local
level. This research focusses largely on the national level. In order to relate the general research of
perceptions to the actual situation in Bangladesh, this thesis will analyse the new Bangladesh Delta
Project 2100 (BDP2100). It will discuss if and how TRM will fit within this large delta project. The
BDP2100 is a joint project between the Government of Bangladesh (GoB) and the Government of the
Netherlands (GoN). Its goal is to produce a new strategy for the next 50 to 100 years for the entire
water sector in Bangladesh. TRM is a water management practice often considered as a partly social
process. The perceptions of TRM by the people working on the BDP2100, as well as of other experts
in the water sector of Bangladesh, can shed some light on the current strategies of the water sector.
It could also indicate some of the changes it has gone through since the 1950’s.

This thesis is divided into four chapters: the first chapter is a general introduction to the thesis, the
characteristics and situation in Bangladesh and the research that was carried out for this thesis. The
second chapter will look at the water sector of Bangladesh starting from 1950 up to current projects
and policies. The third chapter discusses TRM by looking at the TRM projects that have already been

1
implemented and a new project that is planned but delayed. The final chapter will focus on the
actual perceptions of experts on mostly the national level but also of people that work and live in the
area where TRM has been carried out. The thesis will finalize with a conclusion and discussion on the
answers this thesis has provided and the questions that still remain.

Figure 1.1 Political map of Bangladesh

Source: http://www.mediabangladesh.net/map-of-bangladesh/

2
1.2 Relevance of the study
The concept of TRM has existed for two decades and has already been used in official government
projects like the Khulna Jessore Drainage Rehabilitation Project (KJDRP). There are however many
issues, and the new proposed TRM project that was planned for 2012 has been delayed because of
protests. The likelihood is low that these will be resolved soon. Recently there has been new research
on the technical aspects of TRM (Amir, et al., 2013), (Auerbach, et al., 2015), (van Minnen , 2015).
There already has been research on perceptions of TRM in the South West of Bangladesh, by a
student from Wageningen University (de Die, 2015). This thesis will build on his work, he researched
the emergence of TRM and identified different frames with which the stakeholder perceive TRM. The
majority of the stakeholders interviewed by de Die were from the local region where TRM was
practised. This research focusses on the national level and on organisations and institutions that
operate throughout the country. As the actors that implement the projects and influence the policies
their perceptions of TRM are relevant. This thesis will try to identify the perceptions of experts
working on a national level of the water sector in Bangladesh. These individuals have a large amount
of influence on the decisions made on new projects and policies. The perceptions of this group is
important to understand, in order to make a scientific assumption on the possible future role of
TRM.

The BDP2100 when complete will produce a strategy for the entire water sector in Bangladesh for
the next 50 to 100 years. With that it will determine many of the new projects and policies that will
be created, and greatly influence what kind of projects are realised and how these are undertaken. It
is interesting to research how the BDP2100 will perceive and maybe use, a new and not frequently
practised social concept like TRM. This thesis will attempt to answer this question as fully as possible
given the fact that BDP2100 is still starting up. The question of what the strategy will be that the
BDP2100 will produce, remains very relevant for the entire water sector in Bangladesh.

Finally this thesis forms part of the research project Communities and institutions for flood resilience:
enhancing knowledge and capacity to manage flood risk in the Bangladeshi and Dutch Deltas. This is
a 5-year research project, funded by the Netherlands Organisation for Scientific Research. It enables
two Phd students from the Netherlands and two from Bangladesh to carry out their research. The
work done for this thesis can contribute to the work of the different Phd researchers. The research
carried out as a part of the larger 5-year research project.

1.3 Study objective


The objective of this thesis is to study tidal river management and what it’s possible connection with
the BDP2100 will be. The water sector in Bangladesh has been crucial in mitigation floods and
improving the safety of Bangladesh and has tried to improve the livelihoods of the people living in
the country. It has a long history of projects and policies mostly focussing on large scale strategies,
recently new concepts and ideas are used. This study will try to identify the perception of TRM by
different experts, in order to understand what kind of role the “new” concept of TRM can play within
the national water sector in Bangladesh and specifically the BDP2100.

3
1.4 Research questions
The before mentioned study objective resulted in the following research question: “How is the
concept of Tidal River Management perceived by different stakeholders, in the context of the
Bangladesh Delta Plan 2100?”. The sub research questions that will be explored in order to answer
the main research question are listed below.

1. What is the historical context of the water sector in Bangladesh?


2. What is the historical context of TRM in Bangladesh?
3. How is Tidal River Management perceived by different stakeholders?

The first question will be answered in the second chapter of this thesis, the third chapter will answer
the second question and the final question will be discussed in chapter four. The main research
question will be discussed in all chapters and answered in the conclusion and discussion of this
report.

1.5 Research design & Methodology


The first two research sub questions will be answered mostly with an in depth literature study. Part
of the literature used was collected from the database of the research project Communities and
institutions for flood resilience. This is the project of the four PhD students, this thesis supports their
larger research project. There has also been a further search for new documents and specific projects
documents in Bangladesh, from people who have directly worked on those projects. The documents
used are varied; reports, policy documents and research papers have all been used.

Information on perceptions was gathered by the means of qualitative, in depth interviews. The main
group of people interviewed are experts working on a national level. Furthermore, local officials and
people living and working in the areas where TRM has been implemented or is planned, have been
interviewed. The local interviews were conducted in order to collect their perceptions and opinions,
but also for a personal understanding of the issue and for me to visualize the actual situation on the
ground. The interviews with the locals were only extractive, in order to not give the impression that
the research was done for the government of Bangladesh. The interviews with experts in Dhaka
began only as completely extractive. However as experts were interviewed that were not actively
involved with TRM towards the end, information on TRM was also shared towards the end of the
fieldwork period. A good example of such an interviews was with Mrs. Kazi of the World Bank.

The interviews with the experts focussed on their background and experience working in Bangladesh,
and on their opinions of projects that had taken place or that they were involved with at that
moment. Perceptions are not a straightforward concept to identify, with the help of qualitative
interviews that focussed on their ideas I collected information on their perceptions. The first people
that were interviewed were selected from the contacts M. van Staveren had. Others were selected
via the snowball method once the fieldwork in Bangladesh was started and local contacts were
made. Furthermore I had the opportunity to work from the official BDP2100 project office in Dhaka,
which allowed me to gather valuable information that otherwise would not have been available to
me. For example; I made notes of meetings where TRM was discussed, and I once assisted as an
official note taker during a large conference. This direct connection with the BDP2100 influences the
research and gives it a bias. However, without this direct link it would have been much more difficult
to determine the existing perceptions.

4
Framing and perspectives

How people perceive something influences their reaction towards it, their perceptions are influenced
by their personal background and experiences they have had. When there is a conflict, often it is
because of how different people are perceiving the issue. With large cultural differences between
the people the difference in perception will only be greater. Because of the significance of this, this
research will try to identify the different perceptions of TRM that exist in the different stakeholders
groups. With the differences identified the current use of TRM and its problems can be better
understood and explained.

Perception is similar to framing, of which DeWulf (2007, pg2) wrote: “When people from different
backgrounds work together, they tend to frame the issues at hand in very different ways by defining
differently “what this is all about”.” Framing is a sense making device, according to Weick (1995), and
that is how it will be used in this study. In order to focus this study it will research the perceptions of
the people interviewed, which can be understood as a part of their frame.

The literature collected and the interviews are used to determine the specific perceptions of the
experts interviewed. The official documentation of projects can give valuable insights in the
processes and strategies that existed within the projects. Information on the decision making process
and the final implementation can show clear perceptions of different work methods and different
concepts like TRM. The interviews are the main source of information that is used to determine the
perceptions. All interviews are audio recorded so that they can always be referred to, and a compact
summary is made of each interview with the most important points and quotes. Because of the small
number of interviews they have not been coded as the summaries and the audio recordings were
enough to determine the perceptions.

Limitation of the study

This study is limited in a number of ways, one of the most constraining ones was time. The actual
field work in Bangladesh was for a period of three months. This limited the number of interviews I
was able to conduct, which therefore limits the amount of data that can be used to answer the
research questions. Furthermore the interviews with local farmers, fishermen, landless and land
owners were all done with the help of an interpreter. Without an interpreter these interviews would
not have been possible and they were vital for the research, but working with an interpreter can
decrease the quality of data that is collected.

The political situation in Bangladesh during the time of the fieldwork prevented easy transport
between the Dhaka and Khulna. Because of delays and uncertainties and the overall limited
timeframe I was unable to go to the field a second time. The first time transport back to Dhaka was
delayed for a week. The political situation did not lead to direct troubles in Dhaka, although it was at
sometimes uncertain if it was possible to move around the city during the day.

A final limitation to the research is related to gender. Almost all the experts interviewed were males
as they were often leading the organisation. The interviews were mostly done with the higher level
management, as they were more freely in expressing their opinion. lower level employees expressed
their opinion less freely due to the strong hierarchical system within the organisations in Bangladesh.
The interviews with the locals were also male dominated as they were working in the fields during

5
the days I was there, and they often took control of the conversation. Furthermore Bangladesh as a
predominantly Muslim country, has specific gender roles where it was more problematic for me to
approach females compared with males. Therefore I was not able to balance the gender aspect
within the research.

Theoretical framework

This thesis will use part of the ideas on state building and social engineering that James C. Scott
(1998) outlines in his book: “seeing like a state”. In his book James Scott explains his vision on large
government projects and what strategies they employ to reach their goals of to improving the
livelihoods and quality of life, of the people in the country. Scott identifies four elements used in
these state projects; administrative ordering, high-modernity, an authoritarian state, a weak civil
society. He is critical of the combination of these elements and claims they fail in bringing the
promised improvements for the people.

Scott sees a logic in the failing of these social engineering schemes, with the help of four elements.
He identifies these four elements as the tools a state can use to govern its people. The first element
is the administrative ordering of the society and the nature, within a nation. All governments need an
administrative ordering to govern a nation, it is needed for a social welfare system and to maintain
order. It can also be used to implement projects and control residents. The type of government
determines the use of their administrative ordering. The second element that is needed is the
concept of authoritarian high modernity, in which government is expressed in policies and schemes.
The concept of high modernity stand for the principle of using scientific data and technical progress
to control the nature and order the society according to what it sees as the needs of the human. As
well as to make it legible and governable. It calls for a highly ordered society that controls nature and
is rationally designed according to the understanding of natural laws. Scott gives examples of plans
and cities based on this ideology in his book. Le Corbusier was an architect that used this high
modernity school of thought and planned entire cities. His plans for a new Paris were never realized,
but his principles are clearly visible in the example of Brasília, the new capital of Brazil. This city was
planned with a completely high modernity perspective. After it was constructed it became clear that
the design was not appreciated by the new residents who called it a city without crowds; they could
not make the city their own. The city did not succeed in its goals of creating a new kind of life for its
residents, currently it is changing to encompass the same form of social life as is common in Europe
(Williams, 2005). Scott comments on these kind of cities in his book (pg 342, 1998): “The order and
certainty that had once seemed the function of a God was replaced by a similar faith in a progress
vouchsafed by scientists, engineers and planners”. Scott discusses in his book that this faith is
misplaced and resulted in disasters. The examples in the book of Scott are based on large scale
engineering projects or city planning. In this research it is applied to water management projects.
There are large differences between city planning and water management, however the elements of
Scott are still represented in the water management projects in Bangladesh as this thesis will discuss
in chapter 2. The third element is an authoritarian state that is convinced of the ideology of high
modernity. The state furthermore has the ability and the wish to use their administrative ordering to
full effect to enforce their high modernity schemes on the population. The fourth element is a weak
civil society that does not have the capability or wish to resist the government plans. According to
James Scott this combination can disrupt and large scale government schemes and let them fail.

6
Other researchers have similar ideas and study large projects with the same concept as J. Scott uses.
Pritchard (2011) looks at the projects and infrastructure that were built at the river Rhône in a post
second world war France, it was a time France was trying to show its identity and strength. Another
example of this theoretical framework is the study of Mukerji (2009) on the Canal Du Midi in south
France. Canal Du Midi connects the Mediterranean Sea with the Atlantic Ocean, it was constructed in
1667-1680. Mukerji studies this infrastructure project with the framework that James Scott
describes, where the government is using the large project as an identity project.. Although the
governmental projects can be based on the ideology of high modernity, it can also be a means to
legitimize the authority of the state. With such projects the state will be validated as they are
invariably needed to regulate them. By endorsing these schemes the state causes an increased need
for a strong government. Next to this they increase the governability of the people or the region
where the project takes place.

There is criticism on Scott’s work; the distinction of the great state actor who would have all the
power and the poor farmers who have superior local knowledge is too simplistic. Other aspects like
nationalism and militarism, also influence what is achieved in name of the state. It is not merely high
modernism that influences the actions of the state. Scott furthermore is accused of ignoring the part
capitalism plays in the case studies he discussed (Mann, 1999). Another review of his book discussed
the use of the concept of ‘community’, which is proposed as substitute to the state in relation with
managing the local society. Many are critical of the concept of ‘the community’ and the attributes
that are given to it (Geschiere, 2007). Li (2005) perceives “seeing like a state” as a good
understanding of how states can operate, however she tries to amplify his work. Scott identifies the
State as having a monopoly on power and decision making according to Li (2005). This is not correct
as many other agencies are also capable of implementing large programs, examples are non-
government agencies or institutions like the World Bank (Li, 2005). Li argues that Scott treats “the
state” as a singular aspect, the same thing he proclaims the state does to “the community” the work
with. This is relevant to the situation in Bangladesh, as the country is not very powerful. It is
considered as a “alert” on the failed state index (FFP, 2015) by the Fund for Peace organisation,
“alert” is the third worst category for a state to be in. Although the country is growing economically
(World Bank, 2015) it is not a powerful state that can implement large scale interventions. The
commentary of Li that the state is not the only actor that implements large scale projects, with
possible the elements from James Scott, is used for this research.

The framework Scott gives in his book through his four elements is used in this thesis, together with
the criticism on his work. As Li (2005) argues; Scott simplifies matters and tries to fit everything
within a few phrases, this may be because of his background in political science, where they devise
models on big topics (Li, 2005). The simplification can however help to understand the changes in the
water sector in Bangladesh, and to identify the different perceptions of the experts interviews for
this thesis. The literature study has yielded no research done on water management in south-east
Asia that used the framework of Scott. His ideas are however still applicable as the water sector in
Bangladesh has been controlled by large institutions, that have used rigid planning as their strategy.
Chapter 2 will discuss these projects and policies, where not only the state was the powerful actor,
but also institutions like the World Bank or the Asian Development Bank (ADB). The four elements of
Scott; administrative ordering, high-modernity, an authoritarian state, a weak civil society are used in
this thesis to analyse the different projects and policies in Bangladesh. The idea of the state as the

7
only actor with power will not be used in this thesis. The comments of Li (2015) are considered,
there are more institutions that have to power to implement projects.

In order to comprehend the current practice of Tidal River Management and the perceptions of the
interviewees on the subject, it is vital to understand the history of the water sector in Bangladesh.
The relevant projects and policies can be compared to the ideas of James Scott, in order to create an
overview of the changes that have ensued within the recent history of the Bangladesh water
management sector. Finally TRM and BDP2100 can be placed in relation to the previous projects and
policies according to the ideas of James Scott. Scott emphasizes in his book, that only when all four
elements (administrative ordering, high-modernity, an authoritarian state, a weak civil society) come
together it will lead to schemes that can be disastrous. He stresses the importance of certain
elements, such as a particular administrative ordering and the use of proper scientific knowledge in
planning. This thesis will explore how the water management sector in Bangladesh relates to these
concepts, what progress has been ascertained and what the near prospective future for it will be.

Study area

The bulk of the interviews have been carried out in Dhaka. The experts who work for government
agencies or international organisation are situated in Dhaka so consequently most of the interviews
were conducted there. The fieldwork took place in an area where TRM has already been practised, in
the South West of Bangladesh, close to Khulna (figure 1.1). A visualisation of the beels where TRM
has been implemented or is planned is presented in figure 1.2 below. Since it is an older map it is no
longer up to date, however there is no other map available. The beels of Bhaina and Kedaria (blue)
and the Beel Khuksia (green) have had TRM projects. Beel Kapalia was intended as a new beel for a
TRM project but this has been delayed indefinitely. Local farmers, fisherman and landless labourers
that work and live in the beels Kapalia, Khuksia and Bhaina have been interviewed. Unfortunately, it
was not possible to go for the second planned fieldwork period, due to the political unrest and time
constraints.

8
FIGURE MAP TRM AREAS 1, (IWM, 2010)
Figure 1.2 Map TRM areas South West Bangladesh

Source: (IWM, 2012)

9
Chapter 2 Historical background.

Introduction

Tidal River Management has originated in the South West region of the Bangladesh delta. This
chapter will review and analyse the history of this region and will give an overview of events that
have had an impact on the water management in the South West of Bangladesh. After this, both
projects and policies that have determined the direction and the changes within the water sector in
Bangladesh will be discussed. The projects and practises of the water management in the South West
of Bangladesh will be related to the framework of James Scott.

2.1 Before 1950


The region of Bangladesh was governed by numerous empires and nations before it became
independent. Between 1200 and 1757 AD the region was controlled by the Sultani, the Turkish and
the Mughals in consecutive order. During this time there was already water management. The
Sultani and Turkish rulers concerned themselves mainly with the construction of reservoirs that were
filled during the rainy season, channels and embankments were improved during the Mughals
period. During this period, most of the local governance was done by the Zamindars (Ali, 2002).

A Zamindar was a large land owner (Dewan, 2012), they governed the water management on their
land. The practice local people used in that time was called Doser Badh (Embankment construction
by community). More commonly known as Ostomasi badh (embankment for eight months) (Islam &
Kibria, 2006). This practice was adapted to the local processes of upstream water flows during the
rainy season, and tidal flows from the Bengal Bay year round. It was a balanced process between
sedimentation and land subsidence (Nowreen, et al., 2013). The Zamindars were still governing when
the British arrived in 1757, colonizing a large part of the India subcontinent. The British rulers were
mostly interested in trade and abolished the previous water management systems from the
Mughals. This resulted in badly maintained water management structures and policies. When the
British colonial rule ended in 1947, flooding, crop damages and siltation of rivers were frequent
issues (Ali, 2002). The British colonial region of the Indian subcontinent separated into the India
region, and the two partitions of Pakistan and current-day Bangladesh. This division was created
along religious regions as the Indian partition was mostly Hindu and the Pakistan and Bangladesh
partition mostly Muslim. The region that is now Bangladesh was called East Pakistan and it was
governed from current-day Pakistan.

The above mentioned Ostomasi badh system did not protect the land and the people against the
cyclones, storms, flooding and water logging that Bangladesh experiences frequently (World Bank,
2005). During the 1950s there were multiple devastating floods as indicated in the timeline (figure
2.1). Following these events a united nations mission (the Krug mission) published a report in 1957.
The timeline in figure 2.1 shows the response after numerous disaster events in the 1950. This
repeated itself in the late 80’s where numerous disaster events resulted in new projects and policies
(figure 2.1). The KRUG report emphasized the shortage of engineering data and the need of careful
study before any large-scale construction of embankments (Hughes, et al., 1994), (Hardin, 1963)
(Thijsse, 1964). Based on the recommendations from the Krug mission the East Pakistan Water and
Power Development Authority (EPWAPDA) was created in 1959. The WAPDA would later change into

10
the current Bangladesh Water Development Board (BWDB). Its main objective was to develop power
and water infrastructure in East Pakistan and they started the water planning sector in Bangladesh.
With USAID assistance the EPWAPDA created a 20-year Water Master Plan in 1964 (Chadwick &
Datta, 2000). Furthermore it started the Coastal Embankment Project (CEP) in 1961 that was funded
by USAID and followed the Dutch engineering practice of polder systems (FAO, 1985). The Water
Master Plan focussed on a strategy of flood control and drainage first, and after this irrigation. The
realization of this plan was structural with the construction of embankments and polders across the
country (Chadwick & Datta, 2000). The CEP is an example of this vision of large governmental
structural projects, as it encompassed large scale construction of embankments and polders. This
strategy followed the advice of the KRUG mission, it did not however carefully study the effect the
CEP project would have as is discussed in the next segment.

Figure 2.1 Timeline water management in Bangladesh, original concept from Dewan, 2012

Due to the number of floods in Bangladesh not all the floods that happened are presented in the
timeline above. The ones indicated are the floods that have had the most impact on Bangladesh
(BWDB, 2015), (Karim & Mimura, 2008).

11
2.2 CEP project
The Coastal Embankment Project was created by the WAPDA with help and financing from USAID. It
goal was to increase the agricultural production in its project area, by increasing the flood control
and drainage capabilities of the coastal region in Bangladesh1. The original plan was conceived in the
early sixties. In 1967 the CEP was divided up into two phases with the first phase part of the ‘grow
more food’ program (indicating its focus), it was approved in 1968. During the first phase of the CEP
92 polders in total were constructed, with roughly 4,022 km of embankments and 780 drainage
sluices. The total polder area created by CEP was estimated at 1.01 million ha, and covered the entire
coast of Bangladesh. Figure 2.2 shows the CEP project area which is indicated in red, the dark red line
represents the KJDRP area which will be discussed later in this chapter. All the embankments
constructed whether they were inland or coastal, had a design based on a flood return period of 20
years. Phase I of the CEP was completed in 1971 (Ali, 2002).

Figure 2.2 CEP project area

Source: (van Minnen, 2013)

With the construction of the embankments during the CEP the hydrological characteristics of SW
Bangladesh changed drastically. Where surface water used to be mostly free flowing, especially
during the rainy season, the flow of water was now restricted to the channels. Embankments were
constructed to prohibited the intrusion of saline water into the polder areas, in order to allow
farmers to grow more crops (CEGIS, 2007). The CEP succeeded in this, most local farmers were able
to increase their production to two/three crops a year (de Die, 2013), (Firoze, 2003).

The benefits of the CEP were short lived, already in 1968 the first negative effects were known. There
was a decrease in fish habitats and transportation routes, and an increase in sedimentation in rivers

1
Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka

12
(van Minnen, 2013). It was clear that during the conception of the CEP there had been no
consideration for external effects of the proposed embankments (FAO, 1985). This contradicted with
the advice from the Krug report where the need of careful study was emphasized. The river
sedimentation proved to be the largest issue, due to the confinement of the rivers all the silt that
used to be deposited across the south west of Bangladesh was deposited in the river beds. The new
constraint flow resulted in heavy sedimentation of the water ways. There were multiple contributing
factors to the decreased upstream flow during the dry season. The Farakka dam in India (1975)
decreased the influx of water from India2&3. Furthermore an upstream irrigation project north of the
Jessore district4 decreased the flow to the South West of Bangladesh. This led to the situation that
during dry season the tidal flow could flow freely inland without a strong upstream flow that would
push against it. During transition between high and low tide at which point there is no strong flow,
sediment would be deposited in only the river bed, constricted by the embankments build. With the
level of the river bed higher compared with the level of the polder, drainage by gravity becomes
difficult for the local farmers (Alam, 2015). The accumulation of issues became a problem in the 80´s,
causing wide spread flooding and water logging (FAO, 1985) (Ali, 2002) (Ahmed, et al., 2003) (Amir,
et al., 2013). In early 1990’s the water logging became a permanent problem, effecting 109.000
hectares of land in the SW of Bangladesh (CEGIS, 2007).

During Phase II of the CEP there was a major shift in strategies, with a shift to more small scale
projects like cheap flood control, drainage schemes, low lift pumps (LLP) and tube wells (TW). This
shift was a result from the conclusion drawn in a report by the International Bank for Reconstruction
and Development (IBRD, World Bank) (Ali, 2002). The IBRD reviewed the water sector and the
investments in Bangladesh and published the Land and Water Sector Study in 1972. The government
of Bangladesh never officially accepted the study, it was however used by donors which effected the
new projects in the water sector, like phase II of the CEP (Chadwick & Datta, 2000). This is a shift in
the former large-scale governmental projects thinking which resulted in the first part of the CEP. The
new plans were more small scale although the focus was still completely technical. It does indicate a
change from large government projects; this is already a change from the elements that Scott
identifies as problematic.

Related to Scott

The Coastal Embankment Process fits well with at least three out of the four elements that Scott
identified (the administrative ordering, high-modernity, an authoritarian state, a weak civil society),
not enough is known to discuss the fourth element for this particular project. However because the
project has happened it can be assumed that there was not a civil society that was willing and strong
enough to stop it. The government was using an ideological high modernity approach and have
planned their scheme completely according to that ideology. There was no consideration of the local
systems, both social and natural. It shows a need to control the people who live there by settling
them, and improving their production in order to become self-sufficient as a country. Those two
aspects together with the perceived need to control nature are the three most important goals of the
CEP scheme. The government was at the same time using this project to expand their administrative

2
Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka
3
Alamgir Choudhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka
4
Manoranjan Mondal, IRRI, collaborative research scientist under the Crop and Environmental Sciences
Division and the Social Sciences Division, 02-02-2015, Dhaka

13
control over the lands by formalizing regions, polders and land ownership. And similar with most
project that Scott discussed the project failed in most of its goals, and new problems were caused
because the local situation was not considered.

The project has also brought benefits that exist until this day. When there is no waterlogging the
local people are able to have an increased production. Although the local farmers don’t reap the
benefits of this increased income, the extra money goes to the middle man, not to the farmer5.
Furthermore the construction of the embankments has helped brought a higher safety level to the
local people. The embankments do not stop every storm but as Mr Mondal6 said in his interview
(2015): “because of the poldering they survived, if there was no polder he could have died”.

In the CEP all the four elements of Scott were present, and the project has yielded result that Scott
would specify as failure by state projects. The CEP has however also had positive effects so the
results are not as simplistic as Scott’s framework would suggest.

5
Khaled Khaleduzzaman, Water expert Dutch Embassy Dhaka, 03-02-2015, Dhaka
6
Manoranjan Mondal, IRRI, collaborative research scientist under the Crop and Environmental Sciences
Division and the Social Sciences Division, 02-02-2015, Dhaka

14
2.3 Master Water Plan
The Master Water Plan of 1964 as seen in the timeline (figure 2.1) was developed by the WARPO
with the help of the International Engineering Company Inc (IECO). It was the beginning of the
development of an integrated approach towards water resource management and flood control in
Bangladesh according to some (Ali, 2002). The Master Water Plan had a similar focus to the CEP,
both envisioned an increase in total crop production. It did not consider any interdisciplinary issues
or external impacts. The plan encompassed 58 projects selected on purely engineering and economic
criteria (Hughes, et al., 1994). The interventions carried out under the Master Water Plan brought
immediate results similar with the CEP; although the same problems also existed. Evaluations
showed a decrease in effectiveness of the interventions and specific problems with the operation
and maintenance. The increase in agricultural production which was the main focus of Master Plan
failed to materialize as envisioned (Hughes, et al., 1994).

Water sector development was completely oriented towards flood control and drainage which would
lead to irrigation in a later phase. This bias resulted in mostly interventions on Flood Control
Drainage and Irrigation issues (FCDI projects). There was little to no cooperation between different
agencies during that time and most interventions were carried out by the WAPDA (Chadwick &
Datta, 2000). The WAPDA was, as the current BWDB still is, an engineering institute and were
inclined to envision structural solutions for all water related issues. Given there was no resistance of
other institutions with other visions on water management, new development in this period were
done with an engineering perspective. This resulted in only structural solution for water
management issues, even when non-structural solutions would have been better or most cost-
effective (Chadwick & Datta, 2000).

Related to Scott

The goal of a country that is safe from disasters and has an increased agricultural production, is an
exemplary case of a government trying to show its power and legitimacy. It strengthens the identity
of a country while at the same time increases the administrative order of the society, an example of
what Scott would identify as state building. “Developing” the South West of Bangladesh with large
infrastructural projects has brought the national government to the local level. This was done with
high modernity projects like the previous discussed CEP and the Master Water Plan. The Master
Water Plan was constructed at the same time as the CEP started. Therefore it is not a surprise that
their focus is very similar. The CEP can be perceived as the manifestation of the Master Water Plan,
although it had already started when policy document was published. They both come from the
same ideology of the government and both projects were supported by USAID. Both are high
modernity projects and administrative order to increase the living standard of their people by
controlling nature and using the resources available. Both are also based on scientific research and
the data is used as an explanation for the project. The four elements of Scott can be applied to the
Master Water Plan, especially the first three elements of administrative ordering, high-modernity,
and an authoritarian state.

15
2.4 Flood Action Plan
In 1987 and 1988 Bangladesh experienced two extreme flood events, the 1988 flood was a 1 in 100
year event and disastrous for the country. 45 Million people were affect, it inundated almost 60% of
Bangladesh for two weeks and was a direct cause for 2.300 deaths (Wood, 1999). These events
attracted international attention and in 1989 the World Bank initiated the Flood Action Plan (FAP),
existing of 26 studies and 3 pilot project. The Government of Bangladesh set up the Flood Plan
Coordination Organisation (FPCO) in 1990 to coordinate the efforts of the FAP (Ali, 2002). FAP was
only one of the new projects and policies that were started in a reaction to the flooding in the late
80’s, as can be clearly see in the timeline (figure 2.1).

The FAP symbolized a change in the water sector as more emphasis was placed on safeguarding lives
and livelihoods, a result of the 1987 and 1988 flood experience. The programs encompassed a more
holistic approach including social and environmental impact analysis, flood preparedness programs
and early warning systems. This is a shift compared with the methods of the CEP, the main focus was
however still on structural implementation. Large embankments along the Ganges, Meghna and
Brahmaputra were designed at a total cost of 5-10 billion US dollars (World Bank, 1990). There would
be controlled flooding via sluice gates and compartmentalization. This policy was partly because the
planners reckoned the economic benefits of protecting mostly agricultural land against periodic
flooding would be minimal. Furthermore there was reluctance from local people and international
donors to support more large structural measures. As they were perceived to be governed top-down
with a lack of attention to social and environmental issues (Brammer, 2010). FAP-20 which was a
flag-ship project, focussed on compartmentalization of the polders in order to let local user
committees manage the flood control and drainage of their areas (Warner, 2010). So while the
project was based on the structural bases that was already there, it had a strong new social focus.

FAP received during and after its time a lot of criticism from local and international actors. The
programme envisioned participation from local people, however it lacked ownership which
decreased its effectiveness. In reality the implementation were mostly structural and did not
consider landless, fisherman and char inhabitants outside the polders (Warner, 2010). Participation
was mentioned as one of the main goals in the project documents (World Bank, 1990). The actual
participation of local people was not realized until the 4th or 5th workshops organized for the FAP
(FAP, 1993). There were some individual project that continued after FAP, most of the projects did
not. Foreign aid and many international consulting companies who did not have sufficient knowledge
on possible impacts, shaped the project with their views. Combined with no clear ownership and a
project that kept changing it created a negative perception of the FAP project (Hughes, et al., 1994).

Related to Scott

The FAP already shows a major shift in the methods and principles used in the project. There is no
longer a singular ideology focus on large scale engineering structures based on high modernity
methods to reach the project goals. The project was started by the World Bank, as another institute
with the power to implement large scale interventions. The goal of the project is broader and was
framed with attention towards the safety issues of the population. The overall projects used less
structural implementation and state construction compared with the CEP. There is still a strong focus
on high modernity with the majority of the interventions. Even with the different ideas that FAP
used, most of the implementation were structural projects inspired by high-modernity thinking.

16
There are notable exceptions like the FAP-20 compartmentalization project which depended on the
local community.

Overall most of the elements discussed by Scott in his book can be applied to the FAP. The
government still plans projects with a high modernity focus and uses their administrative system to
implement their scheme. There are differences in how well Scott’s elements can be applied to FAP,
high modernity is no longer the only way of thinking, although it still has a strong impact there are
also other types of schemes being done. The project was also initiated by the World Bank instead of
the state, this follows the comments that Li (2005) provided in here commentary of Scott. It
represent a shift from a complete focus on high modernity to a more inclusive way of making
schemes. The elements from Scott are still applicable but less so compared with the CEP and Master
Water Plan.

17
2.5 KJDRP
The Khulna Jessore Drainage Rehabilitation Project (KJDRP) is the most important project related to
this study. Its project area is in the south west of Bangladesh (figure 2.3), a region that was also part
of the CEP. The KJDRP was funded by the Asian Development Bank (ADB). During the KJDRP there
were multiple events that shaped the project and the water management sector in the SW of
Bangladesh since. This was also the first time Tidal River Management was practised as part of an
official governmental project. This chapter will first discuss the inception of the KJDRP before moving
on to the problems it faced and the final results of the project.

Inception of KJDRP

In the chapter on the CEP the problems that it caused in the SW of Bangladesh were discussed. The
construction of the embankments resulted in sedimentation issues which caused drainage issues and
water logging problems. In the 1980’s most of the waterways were no longer usable due to the heavy
siltation, the problems started first in the northern polders. This problem resulted in large area’s
remaining water logged for multiple years (CEGIS, 2002), (Islam & Kibria, 2006). To deal with these
problems the Khulna Coastal Embankment Rehabilitation Project (KCERP) was launched In 1987/88.
The project was suspended in 1990 because the proposal document was not accepted by the donors
and stakeholders (CEGIS, 2003). In that year the local people of Beel Dakatia cut the embankment of
their polder and received some immediate relieve when the stagnant water was removed. However
the cut in the embankment resulted in saline water entering Beel Dakatia. This salt water remained
and lead to environmental degradation, and a decrease in the quality of the livelihoods of the local
people. In 1995 the area which was to become the KJDRP area experienced flooding, which resulted
in water logging. A total of 58 villages were inundated7. These events triggered the need for solution
that would permanently solve the drainage congestion, and in 1995 the GoB together with the ADB
initiated KJDRP (CEGIS, 2003).

The focus of the KJDRP was, as the name suggests on the drainage issues in the project area. The lack
of proper drainage that was caused by the silted up rivers and low lying polders, resulted in the water
logging that plagued the region from the early 80’s. The KJDRP was the first project that had some
success in solving some of the waterlogging issues. By then part of the SW in Bangladesh had been
experiencing waterlogging for almost 15 years (Amir et al., 2013). The focus was on the waterlogging
issue, if that would be solved the overall situation of the region would improve8. The focus of the
project was mainly technical, although it did had a social mobilisation of beneficiary participation
component7&9 under the supervision of the BWDB.

7
Shorab Hossain, Blue Gold, Community Organization Expert, 05-02-2015, Dhaka
8
Maminul Haque Sarker, CEGIS, Deputy executive director development, 15-02-2015, Dhaka
9
Alamgir Choudhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka

18
Figure 2.3 KJDRP area map

Source: (CEGIS, 2003)

19
Creation of the KJDRP

The Khulna Jessore Drainage Rehabilitation Project encompassed an area in the districts of Khulna
and Jessore of roughly 100.000 ha. An estimated amount of 800,000 people lived in the area at that
time. The project objective of the KJDRP is summarized as follows: “Poverty reduction through
increased agricultural production and creation of on-farm employment in the project area.” (Arcadis
Euroconsult, 1999a). With the project divided up in four components.

A. Mobilisation of beneficiary participation


B. Rehabilitation works
C. Agricultural development
D. Fisheries management

The BWDB was responsible for the components A and B, the Department of Agricultural Extension
(DAE) supervised component C, and component D was the responsibility of the Department of
Fisheries (DoF). The DAE and DoF were supporting executing agencies, BWDB was main executing
agency for the KJDRP (Ahmed, et al., 2003).

Because the BWDB was responsible for the structural as well as the non-structural aspect of the
KJDRP it was divided up in two. Both segments were supported by a team of technical assistants (TA)
as is shown in figure 2.4.

MoWR

BWDB

ADB L&W Directorate O&M/ Implementation


NGO’s + +
TA Team, social TA Team, infrastructure
mobilisation

Figure 2.4 Structure of KJDRP management

The social mobilisation of the KJDRP was responsible for the participation of the local people in all
the aspects of the project (CEGIS, 2002). This would be achieved with the TA team and NGOs who
would facilitate the formation fisherman groups, landless groups, Water Management Groups
(WMG), Water Management Committees (WMC) and Water Management Associations (WMA). In
1998 the first groups were created, however not all groups that were created during the KJDRP had
benn registered in 2001. In total 491 WMG out of 507, all 9 WMAs, 34 out of 58 landless groups and
12 out of 48 fisherman’s groups were registered in 2001. WMC did not have to be registered, a total

20
of 58 were created (CEGIS, 2002). After the KJDRP ended in 2002 the active funding into the groups
also ended, they would be depended on income generating activities. Currently not many WMAs are
active because the groups failed to sustain themselves, the economic benefit brought to the region
did not translate into any sustainable income for the WMAs10.

Proposed interventions during KJDRP

The BWDB started emergency dredging in 1993-94 in the Upper Sholmari river, the dredging was
extended in the following three years to the Hari, Upper Bhadra, Harihar and Buribhadra rivers. This
resulted in partial drainage of Beel Dakatia which had been waterlogged, and was a temporary relief
for the local people (CEGIS, 2002). The improvements achieved by the dredging were temporary with
the heavy siltation in the SW of Bangladesh, the benefits only lasted for three months11.

In 1995 the BWDB started designing regulators, and they consulted the local population at the end of
1996 with four different proposal by different institutions. All these proposals were variants on the
same idea of constructing more regulators to improve the drainage. The major difference in the four
proposals was the number, or the location of proposed regulators (Euroconsult, 1997). Because the
WMO were yet to be formed the KJDRP staff used local government as a representation of the local
population. The local government or Union Parishads as they are known are appointed by the
national government, they are not directly elected. There were in total 42 meetings with an
attendance of 50 people on average. The outcome of the study was that the majority wanted the
“BWDB option”. The construction of a regulator to drain the Beel Dakatia was present in all the four
proposal and this was fully supported by the local people according to the study. There was no
support for any option other than the four proposed and no alternative received widespread
support. According to the official documentation an request was made by the local people for an
Environmental Impact Assessment (EIA). (Euroconsult, 1997). This request was noted down by the
social mobilisation team of the KJDRP project, and approved by the ADB10. The local farmers said
they were worried about the impact of the proposed structure, he translated that into the wish of an
EIA10.

The data from the 1997 Euroconsult report does not comply with later findings and actions
undertaken by the local population. Any report, paper or information collected during interviews
after 1996, describes opposition of the local people against the construction of new regulators7&12
(CEGIS, 2002), (CEGIS, 2007), (Nowreen, et al., 2013) (Islam & Kibria, 2006).

In 1996 local people cut the embankment of Beel Bhaina in order to relieve the area of water logging
problems. After some discussion with the BWDB who opposed the action and sued some of the locals
for destroying dikes that were government property, the cut was allowed11&13 . It was briefly closed in
1998 but opened again a couple of months later in 1999; the cuts were completely closed in 2001. In
1997 EGIS (now CEGIS) undertook an Environmental Impact Assessment (EIA) and a Social Impact
Assessment (SIA) on the two proposed regulators of the BWDB, this followed the wishes of the local
population. But with the cut of the embankment of Beel Bhaina the EIA/SIA study shifted to the tidal
basin and concluded that resistance to the proposed regulators was growing. Furthermore a tidal

10
Khaled Khaleduzzaman, Water expert Dutch Embassy Dhaka, 03-02-2015, Dhaka
11
Andrew Jenkins, Head of the BRAC Research and Evaluation Division, 04-02-2015, Dhaka
12
Alamgir Choudhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka
13
Shorab Hossain, Blue Gold, Community Organization Expert, 05-02-2015, Dhaka

21
basin in Beel Kedaria could be much smaller with 400ha instead of 1700 ha which was proposed by
Haskoning. After more public consultation and workshops, the decisions to start tidal basin
management in the river Hari was taken in 1998 (EGIS II, 2001), this was the first time TRM was used
within a government project14&15&16.

Related to Scott

When only the official documentation of the KJDRP is considered it looks like a logical next step
compared with the CEP, Master Water Plan and the FAP. It is more inclusive of local ideas, and
actively calls for the involvement of local representatives in the creation of the specific plans for the
project (Euroconsult, 1997). It was a project funded by the ADB, not the state, although the
institutions used for the implementation were all government departments. The original
interventions proposed by the BWDB fit within the high modernity thinking, large regulators to
control the water flow. However during the project TRM was used which is not an high modernity
project, indicating a change in strategy. With only the official documentation it can be seen as a
notable change for the water sector in Bangladesh. Although it still favours engineering options, it is
no longer the only ideology. Therefore the four elements that James Scott identifies are not
applicable to the KJDRP. There is some high modernity planning used but it is not forced upon the
local people. The use and collection of data is comparable with the proper use of scientific
knowledge in planning that Scott identified as positive.

Other reports, interviews and evaluation reports show however a different picture. The TRM was
first not accepted and was only officially implemented when the local farmers cut their own
embankment. After that moment it was adapted into the KJDRP plan17, and TRM was used in official
planning documents (EGIS II, 2001). There is an inconsistency in the documentation of the plans, the
first plans that were published were also based on the wishes of the local people in the KDJRP area.
The local people expressed a strong wish for the BWDB original plan of the construction of large scale
regulators to control the flow of water, the people did not come forward with their own option
(Euroconsult, 1997). A year before the report was published the people in Beel Bhaina cut their own
embankment to allow the free flow of tidal water. The fact that nothing about that event is written in
the 1997 report shows that there are large inconsistencies between the data presented in the report
and the actual situation on the ground. Although social mobilisation and participation was
emphasized in the project it did not deserve a lot of attention and care. The official evaluation report
reflects that the process of social mobilisation was started to late, did not get the proper attention
and was not sustainable (ADB, 2007). There was disinterest and lack of attention by the
implementing agencies towards the social aspect and the demands of the local people in the KJDRP
area. This has been recorded in official documentation and reports (ADB, 2007) (Islam & Kibria, 2006)
(Nowreen, et al., 2013), it was also often mentioned by some of the experts interviewed 18&19. These
findings raise questions on the trustworthiness of official documentation. If these large
inconsistencies can exist within the KJDRP they could also exist in other projects.

14
Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka
15
Maminul Haque Sarker, CEGIS, Deputy executive director development, 15-02-2015, Dhaka
16
IWM employee, worked on TRM research of IWM, 26-02-2015, Dhaka
17
Giasuddin Chowdhury, Deputy team leader BDP2100, 23-02-2015, Dhaka
18
Alamgir Chowdhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka
19
Shahidul Islam, Uttaran, Development activist expert, 22-03-2015, Dhaka

22
Compared with the actual situation the elements of Scott are more applicable to the KJDRP. The
engineers that implemented the scheme paid no attention to the local knowledge until they were
forced to. Only big structural measures were proposed that were based on a high modernity ideology
and needed an administrative ordering to implement and maintain. However, although the ideas of
Scott can be retraced in the KJDRP. They are not the only factor that steered this project, to say it all
depends on the elements identified by Scott is not a correct representation of the actual situation.
Bad management, lack of good governance and bad financial motives also influenced the choices
that were made. The implementing agency has a strong high modernity ideology, it does however
not fully dictate their actions, it is not completely black and white.

The KJDRP is the next step after the FAP, it ended farther away from high modernity than the
previous projects, it did however take a lot of local action to change the project from the starting
position that fitted well with the first three elements Scott described. The protests and actions of the
local people can be seen as the opposite of the unable or unwilling population needed for the fourth
element, and the lack of the fourth element made it impossible to continue the project as it was. The
KJDRP made progress in the end but it was is not the start of a new focus within the water
management sector in Bangladesh.

23
2.6 CEIP
The Coastal Embankment Improvement Project (CEIP) is a new project that will soon start its
implementation phase, the project is funded by the World Bank (World Bank, 2013). The CEIP will
also partly deal with the South West of Bangladesh and with the polders located there, that is why it
will be discussed in this paper. As with the previous projects discussed an analysis will be made of its
goals and focus points, and how it will try to achieve its goals.

In 2007 Bangladesh already experienced riverine flooding that affected over 13 million people, when
on 15 November 2007, cyclone Sidr made landfall across the south coast of Bangladesh. Sidr caused
1.6$ billion in damages, destroyed crops and resulted in 2,400 fatalities. Briefly after Sidr, cyclone
Aila reached the south west of Bangladesh in May 2009, causing 3-6 meter storm surges, 0.5$ billion
in damages and 179 deaths (World Bank, 2013). In both cases it was fortunate that the cyclone
reached Bangladesh during low tide20. The embankments created during the CEP are designed on the
tidal flow, not on cyclone surge levels, they have a 1 in 20 year return period21. Spurred by these
events and the danger the present to Bangladesh the government together with the World Bank
proposed the CEIP project in 2013. With a main long term objective of increasing the resilience of the
coastal population to tidal flooding and natural disasters (World Bank, 2013).

The CEIP has just started and is an enormous project, to reach the main objective the existing 6000
km of embankments in and around 139 polders need to be repaired and upgraded. Because this is a
huge undertaking, the project has a multi-phased approach over a period of 15 to 20 years, CEIP-I is
the first phase of the project. Like previous projects in Bangladesh this project is also divided in
multiple components, four out of the five total components are related with the polder
improvement, the fifth is about governance (World Bank, 2013).

According to the proposal CEIP-I document from the World Bank (2013) the components are as
follows:

A. Rehabilitation and Improvement of Polders (US$286 million)


B. Implementation of Social and Environmental Management Framework and Plans (US$56
million)
C. Construction Supervision, Project Monitoring and Evaluation, and Coastal Zone Monitoring
(US$32 million)
D. Project Management, Technical Assistance, Training and Strategic Studies (US$21 million)
E. Contingent Emergency Response (funds on request after disaster)

A total amount of US$400 million has been made available for this project, slightly more compared
with the budgeted amounts for the different components. Because this project has just begun the
proposed budget will be studied as an indication of what the priorities and work method of this
project are. This does give an indication on if and how the concept of high modernity is used in the
CEIP-I it will be difficult to compare it with the previous projects like the KJDRP, since it is not possible
to look at the result and what the actual methods of the project were. However the proposed budget
and the concept document is sufficient to discuss the use of high modernity ideas and concepts
within the CEIP-I.

20
Andrew Jenkins, Head of the BRAC Research and Evaluation Division, 04-02-2015, Dhaka
21
Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka

24
Of the overall budget US$56 million has been made available for component B, which will establish
WMO’s, create resettlement action plans, fund land acquisition, and prepare environmental impact
assessments. For a full overview of the budget and the proposals see World Bank proposal document
(2013). Component B of the project deals with the social aspects. Component A will finance the main
aspect of the project and for the repair and upgrading of all the embankments and polders. For this
of course more money is needed, but component B was indicated as a very import aspect with a
comparatively high budget22.

Related to Scott

The budget of the CEIP and interviews with the World Bank and the project leader of the CEIP will be
used to compare it with the elements from Scott (the administrative ordering, high-modernity, an
authoritarian state, a weak civil society). The program has just begun and there are no result yet to
evaluate, furthermore it is again not funded by the state but another institution, in this case the
World Bank. The planning show a more inclusive approach then was used with the previous projects.
In total 14% of the funds have been intended for the social aspect of the project, this is a relatively
large amount according to the World Bank22. Also there are no large scale plans and for every polder
that the CEIP will improve there will be an individual study to determine the best approach, be it
technical or social. This information is available in the proposal documents (World Bank, 2013), and
was reiterated in an interview with the project leader of the CEIP-I23.

The review of the KJDRP showed that for a multitude of reasons the actual plans and
implementations of the KJDRP differed greatly with what the proposal promised. Since the CEIP is
also only in its first stage it is difficult to say what will actually happen, so far it can be said that the
proposal does not fit at all within the elements that Scott describes. Whether that stays is unclear
until the project can be evaluated, however it is very likely that the slow progress that can be seen
between the different projects and policies discussed in this thesis will continue with the CEIP, in
what matter will be unclear until the end of the project.

22
Swarna Kazi, World Bank, Disaster Risk Management Specialist, 01-03-2015, Dhaka
23
Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka

25
2.7 BDP2100
After initial consultation about the necessity of a delta project in Bangladesh, the Delta Preparatory
Team (DPT) started assessing if a possible delta plan in Bangladesh was something that would be
accepted. The aims of the DPT were to learn whether there was enough commitment and a robust
demand for a long term integrated and holistic planning for a Bangladesh Delta Plan. If this would be
applicable to Bangladesh the second aim was to outline the contours of such a plan (Chowdhury, et
al., 2012).

The Delta Preparatory Team published a report in 2013 that identified a strong need for a holistic and
long term plan according to the official documentation of the BDP2100. According to the report
Bangladesh already has multiple projects and policies in place that deal with the water management.
The country is however lacking in an holistic plan with a timeframe of up to 100 years. Such a plan is
needed to deal with the current and future problems that Bangladesh faces. Examples of future
problems could be an increase in population, and climate change, these will have an impact on the
country. A integrated and coordinated plan can be used to manage the natural resources and have
integrative water resource management. Good governance is probably the most important factor to
improve the livelihood and the safety of the people and the economy of Bangladesh.

Building on the work of the DPT and Memorandum of Understanding formally signed between
Bangladesh and the Netherlands in May 2012, the Government of Bangladesh requested the
formulation of a Bangladesh Delta Plan 2100. An interdisciplinary team of national and international
experts would assist the GoB in the creation of the BDP2100, the project is led by the General
Economic Division (GED) which is responsible for the holistic long term planning in Bangladesh on a
national level. In their inception report of the BDP2100 (GED, 2014) they call for an integrative,
holistic adaptive strategic plan that is long term (50 to 100 years). The overall goal of the entire
project is do develop a strategy for the integrative development in Bangladesh. This strategy will
contribute to disaster risk reduction, climate change resilience and adaptation, food security, water
safety, environmental safety and economic development (Planning Commission, General Economics
Division, 2014). Their specific objectives are stated below:

a) To support an enabling socio-political climate for BDP 2100 formulation and implementation
process.
b) To create a common and inclusive and documented knowledge base.
c) To develop a Delta Framework and prepare a draft act for the establishment of a Delta
Framework.
d) To create together with main stakeholders a delta vision, delta goals and measures.
e) To facilitate entrepreneurship of the private sector.
f) To promote regional and sectorial developments on the short term for future governance of
water, land and related resources and spatial planning in Bangladesh delta.

In contrast with the often mentioned Dutch delta plan where a detailed plan was created, the BDP
will be a strategy guide for the already existing policies and future plans that will be constructed for
Bangladesh. Annex A shows the schedule of the BDP2100 as it was determined in its project
document (Planning Commission, General Economics Division, 2014).

26
Related to Scott

The BDP2100 is a continuation of other projects and policies that already exist in Bangladesh; the
people who worked on those now contribute directly or indirectly to the BDP2100. Compared with
the previous projects the BDP2100 is a logical next step in how it approaches the issues it is
confronted with. Similarly with the CEIP the goals and the specific objectives of the BDP2100, differ
from the elements that Scott identifies (the administrative ordering, high-modernity, an
authoritarian state, a weak civil society). Also similar with the CEIP, it is not a project that is fully
controlled by the Bangladeshi state, it is controlled by the GoB but the GoN is a large contributor to
the project.

The call for an integrative and holistic approach does not comply with the elements from Scott and
the overall goals are a far cry from a call for a large scale high modernity project. On aspect that is
similar is the focus on scientific data that Scott describes as a good method as long as it does not
control every aspect of a project. The inception document talks of an integrative approach so it
envisions a more broad approach. However as with previous projects, the concept of a project does
not have to comply with the actual practise of the project. A further comparison of the BDP2100 and
the elements of Scott can be made based on the perceptions of TRM and the water sector in
Bangladesh by experts who are working on the BDP2100. These perceptions and others will be
discussed in the fourth chapter.

Conclusion to chapter 2

Multiple project and policies have been reviewed in this chapter in order to create an understanding
of the recent history of the water management sector in Bangladesh. Significant changes have been
recorded, from the native water management method of “Ostomasi badh”, to the more recent
projects like CEIP and the BDP2100. All the official projects and policies have been compared with the
ideas of James Scott. In the recent years there already has been large changes in direction, and the
newer projects have been further away from the elements of Scott compared with the old. Before
the comparison can be made between the water sector in Bangladesh and its perception of TRM, the
concept of TRM needs to be discussed. Chapter three will do this by focussing on the history of TRM
projects in the South West of Bangladesh, and on the new proposed project and its problems.

27
Chapter 3 Tidal River Management

Introduction

The previous chapter reviewed the recent history of water policies and projects in Bangladesh, and
the change in methods and perceptions in the water management sector have been discussed. There
have been large shifts in the how and why projects are implemented, however some aspects have
remained similar with the first large projects and policies like the CEP and Master Water Plan. There
is still a focus on engineering projects with a strong high modernity thinking and planning; it is no
longer the only approach in new projects but it is still an important factor. An in-depth study of a
specific water management concept can help to further identify what the changes have been in the
water management sector in Bangladesh. This chapter will therefore concern itself with Tidal River
Management, it will be more in-depth and use the data collected in the interviews that were done
for this thesis study. The data collected from the in-depth interviews will also be used to identify the
perceptions of TRM of people working on a national and regional level. First four TRM projects will be
analysed from a technical as well as a social perspective.

3.1 Beginning of TRM


Tidal River Management is not a formally defined concept, there are many different ideas and
perceptions on what the water management concepts is, what it does, and how it should be done.
Often TRM is identified as allowing free tidal flow into tidal basins in order to let sedimentation occur
which will decrease the water logging problems. At the same time the water flow will erode the river
bed increasing the drainage capacity (Shampa & Pramanik, 2012), (Paul, et al., 2013),- (Khadim, et
al., 2013). This concept of TRM is also used by many of the people and institutions interviewed for
this report24&25&26 and it is also how TRM is perceived in this thesis. Most of the local farmers
interviewed identified TRM as a water logging issue solving method, the other effects of TRM were
acknowledged but not often emphasized by them (local interviews 1.6 and 1.8).

The time in which TRM was first practised is debated, It could be linked back to the indigenous water
management concepts of Ostomasi badh (embankment for eight months. Another possible starting
point of TRM is the first official use during the KJDRP, when it was researched and scientifically
tested. The basics effects and problems of TRM will be studied by looking at four different TRM
projects that were done during and after the KJDRP. The four projects start with the Beel Bhaina
project, proceed to Beel Kedaria and Beel Khuksia, and end with the proposed Beel Kapalia project.
This report will not look into the cut in the embankment of Beel Dakatia. Although the cut was on
some aspects similar with the cut in Beel Bhaina, the size of Beel Dakatia changes the effects the cut
could have and it was not controlled. It was free tidal flow in a polder area, but it is not considered an
example of TRM by most. Figure 1.2 shows the area of the TRM projects. Since the map is from 2010
Beel Khuksia is indicated as an active TRM project, Beel Kepalia is located between Beel Khuksia and
Beel Kedaria. Ranai located just below Beel Bhaina is a point where many measurements were taken
by CEGIS during the study of the effects of TRM.

24
Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka
25
IWM, worked on TRM research of IWM, 26-02-2015, Dhaka
26
Maminul Haque Sarker, CEGIS, Deputy executive director development, 15-02-2015, Dhaka

28
The method of TRM will not be applicable in most other areas, the region of SW Bangladesh is unique
and suitable for a TRM project but this is because of its current situation. Within the region of SW
Bangladesh TRM is not needed everywhere or would succeed everywhere, it needs to be practiced in
the region upstream where the tidal flow ends and the sedimentation takes place27&28. At the point
where the sedimentation takes place the water logging issues are caused by the siltated rivers and
low lying polder areas. Downstream the water will always be in motion so siltation is not as much of
an issue. The siltation of upstream location versus downstream locations is presented in annex B.
Furthermore upstream of a TRM location there will be no scouring of the river, this will only happen
downstream of the TRM area when the water retreats during low tide. This process indicates that a
TRM project with a schedule of sequenced TRM project area’s should move from downstream
polders to upstream polders, within the area where there is sedimentation (Khadim, et al., 2013).
This was not done in the TRM projects so far with first Beel Kedaria and after that Beel Khuksia.
However there were many social issues complicating and delaying the TRM that it did not matter, the
rivers were silted up between the different TRM projects. If a project is made with sequenced TRM
areas, it should consider the downstream-upstream approach.

27
Alamgir Chowdhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka
28
Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka

29
3.2 Beel Bhaina
The KJDRP area was experiencing water logging issues in 1995, a total of 58 villages were under
water29. The heavy siltation in the rivers caused drainage difficulties for the entire area and the water
logging problem persisted. Local people who already opposed some of the planned interventions of
the KJDRP report, cut the embankment of Beel Bhaina on the 29th October 1997 on two places (van
Minnen, 2013). One of those cuts was closed by the BWDB at the end of 1998 but opened again by
the local people in February 1999, both cuts were closed in 2001 (CEGIS, 2002).

The effects of the cut in the embankment in Beel Bhaina were clear although the study of the hydro
morphological differences was not organized in the beginning, because the cut was public and
unplanned (van Minnen, 2013). Now there have been multiple studies, and although not all data is
readily available, the data that is available show an effect of the tidal basin in Beel Bhaina. There are
decreased sedimentation issues upstream and there is an increase in tidal volume in the Hari river
that supplied Beel Bhaina (CEGIS, 2002) (Arcadis Euroconsult, 1999b). This result was reaffirmed
during the interviews, according to one source who was working with the KJDRP, the diameter of the
river increased from 1 meter, to 6-7 meters30. This statement is partly supported by the research of
CEGIS (2007), which measured a four-folds increase in tidal level and an large increase in total tidal
volume (figure 3.1). The increased tidal volume is caused by the scouring of the river when the water
flows back during low tide, after it deposited its silt upstream in the beel area, this process increased
the depth of the Hari river with 10 meters at some points (figure 3.2). This figure also shows the rapid
sedimentation after TRM ended in Beel Bhaina, in a couple of months the river was almost back to its
original state pre-TRM. The fast sedimentation of the riverbed reaffirms the need of continues TRM.
A longitudinal profile of the Hari river with the effect of TRM in Beel Bhaina that shows similar data is
presented in annex C.

29
Shorab Hossain, Blue Gold, Community Organization Expert, 05-02-2015, Dhaka
30
Andrew Jenkins, Head of the BRAC Research and Evaluation Division, 04-02-2015, Dhaka

30
Figure 3.1 Effect tidal flow Beel Bhaina

Source: (CEGIS, 2007)

31
Figure 3.2 Long profile of Hari river from Bhabadaha regulator

Source: (Khadim, et al., 2013)

The land level increase caused by sedimentation in Beel Bhaina reached at some points 2 meterss as
is presented in figure 3.3 (SMEC 2002). At the location where the cuts were made the sedimentation
reached a total of 1.95m. Figure 3.3 also shows that the sedimentation is much lower in the Beel
Bhaina area further away from the public cut. This indicates the need for proper management of
sedimentation which was also emphasized by Jenkins31.

Figure 3.3 Sedimentation volume in different compartments of Beel Bhaina

Source: (SMEC, 2002)


31
Andrew Jenkins, Head of the BRAC Research and Evaluation Division, 04-02-2015, Dhaka

32
3.3 Beel Kedaria
After Beel Bhaina was closed in 2001, the next TRM beel planned by the KJDRP would be Beel
Kedaria, upstream of Beel Bhaina and north of the Bhabodah regulator (figure 1.2). The area in Beel
Kedaria had been waterlogged since 1998. Because of this the implementing agency decided it would
not be necessary to pay compensation, although the written approval of the local people was needed
(Arcadis Euroconsult, 1999a). Ultimately no compensation was paid similar with the situation in Beel
Bhaina. The farmers had been unable to use their land before the TRM project and therefore did not
suffer a large loss of income because of the embankment cut and the open flow of tidal water. The
BWDB proposal was to make Beel Kedaria a permanent tidal basin in order to relieve the rest of the
area permanently of water logging. According to the official documentation, WMAs (Including WMC
& WMG) should be created to facilitate co-operation on the infrastructure component of the project
(Arcadis Euroconsult, 1999b). An interesting development in the documentation of the KJDRP
planning was that the first reports all referred to TRM as Tidal Basin Management (Arcadis
Euroconsult, 1999a) (Arcadis Euroconsult, 1999b), yet it was not until 2002 that the TRM was
mentioned in official reports (CEGIS, 2002). This may indicated a certain reluctance of officials to use
the local terminology, and instead of this they tried to create a new term, of which they would have
ownership.

There was however not any social mobilisation or participatory planning with the local population
during the construction of this proposal32&33 (Islam & Kibria, 2006). After protest from local people
the concept of rotational tidal basins was adopted instead of the permanent TRM plan, different
beels would be used as tidal basins at different times (de Die, 2013). There were further delays
caused by protest against the construction of embankments in Beel Kedaria, in order to close of the
area that would not be part of the TRM. To resolve his issue an agreement was reached between
local WMA and the BWDB after some open discussions (van Minnen, 2013). After the agreement was
reached between the BWDB and the local population, Beel Kedaria was used as a tidal basin starting
in 2002, the final year of the KJDRP project. This did raise questions on the sustainability of the TRM
concept and whether the practical experience would be used after the KJDRP ended (CEGIS, 2002).

The TRM project in Beel Kedaria differed with the TRM in Beel Bhaina because it was not done with a
cut in the embankment, the tidal flow was directed using regulators. The local people said it would
not work because the tide had to pass the Bhabodah regulator downstream30. Considering the
increase in river depth and drainage the project performed well, the area did not suffer from the
2002 Hari river flood (van Minnen, 2013) and it was not suffering from any water logging issues
during the TRM project (CEGIS, 2007). The sedimentation in the beel was not as expected, this is
partly because of the location of the beel, it only has a 0.2m tidal flow instead of the 2m tidal flow
Beel Bhaina experiences. Furthermore the use of the Bhabodah regulator to regulate the tidal flow
did have a negative impact (de Die, 2013), this had been a concern of the local population (Hossain,
2015). The actual sedimentation in Beel Kedaria during the TRM project is presented in annex D.

The TRM in Beel Kedaria ended in 2004 when local population protested against the loss income and
demanded a compensation for the fourth year of TRM. According to the original agreements TRM
should have ended after three years. The BWDB and the local people could not come to an

32
Andrew Jenkins, Head of the BRAC Research and Evaluation Division, 04-02-2015, Dhaka
33
Shorab Hossain, Blue Gold, Community Organization Expert, 05-02-2015, Dhaka

33
agreement and the TRM was closed in 2004. The new proposed TRM location in Beel Khuksia was not
prepared yet, the absence of a TRM basin resulted in sedimentation problems, by September 2005
17km of the Hari river was completely silted up (CEGIS, 2007). The sedimentation caused drainage
issues which resulted in water logging of an area around 18.100ha in 2006 (Paul, et al., 2013).

34
3.4 Beel Khuksia
In this report when the TRM in Beel Khuksia is discussed it refers only to the eastern part of Beel
Khuksia which was planned and used for the TRM. Beel Khuksia was planned to start in 2005 but
could not be started because of opposition from the local people in the beel. They demanded
compensation for the loss of land and income that would be caused by the TRM project. The closing
of Beel Kedaria and the Bhabodah regulator and the refusal to allow TRM in Beel Khuksia resulted in
the water logging in 2005 (CEGIS, 2007).

The sedimentation issues in the region resulted in the immediate need of a new TRM project. The
BWDB opened the TRM project in Beel Khuksia on 27 April 2006 but this cut was closed by local
people on 15 July 2006 (ADB, 2007). The people were angry that their wishes had not been
considered. An example of this is that only the eastern part of the Khuksia beel was planned for the
TRM project, while the local population want the TRM to be carried out in the entire beel. The only
reason according to the locals that the region was divided into two, was so that the local government
could collect government money for a second time when the other part was used for TRM (local
interviews 1.6 and 1.8). After more consultation between the BWDB and the local population the
issues were resolved and the eastern part of Beel Khuksia was opened for TRM in November 2006.
The BWDB did agree to pay compensation to the landowners of the beel; the compensation issue will
be further discussed in at the end of this chapter.

The TRM project was however still not properly planned. The cut in the embankment was done with
a bypass channel, while the local people demanded the original river would be used, which was in
the beel area. The bypass channel was located in area that was used for agriculture and resulted in
the erosion of agricultural land (CEGIS, 2007). Later a second cut was constructed upstream but this
was partly blockaded by fishing ghers (van Minnen, 2013). Fishing ghers are small embanked fields
where fish is cultivated. There were still a lot of fishing ghers located in the beel that obstructed the
free flow of the water and because of this the sedimentation was uneven. Finally the sedimentation
upstream of the tidal area should have been cleared to also allow free flow upstream of the TRM
area, this was not done and the area remained waterlogged (CEGIS, 2007).

The TRM in Beel Khuksia did have its desired effect within the beel and on the channels although it
was not a complete success. The depth of the sediment deposited at the second cut varied between
approximately 2 and 1.5 meters. The scouring of the river did deepen de Hari river, the change in the
cross section of the Hari river during the TRM project is presented in the (figure 3.4). The
sedimentation deposition did not occur satisfactory according to the local people because of the
fishing ghers obstructing the flow, there was no infrastructure in place to guide the tidal flow deeper
into the beel area. The inflow of water into the beel was also less than expected (CEGIS, 2007). The
TRM in beel Khuksia did have the positive effect that no drainage congestion in the project area, and
no waterlogging within the KJDRP was recorded after the TRM started (IWM, 2012).

The TRM in Beel Khuksia was scheduled to close in 2009, 3 years after the start of the project at
which point Beel Kapalia would be used a new tidal basin. The IWM study on Beel Kapalia was not
finished before October 2008 and because of conflicts with the local population, Beel Kapalia was not
ready. Beel Khuksia remained open after 2009, although the first cut in the south of the beel was
closed in December 2010. This was because the southern part was already saturated with an
average elevation of 1.57m silt (IWM, 2012). The northern cut remained open, during my field

35
research it had been closed. Reports mentioned that it was approximately closed around
January/February 2013 (de Die, 2013). Most likely this is correct since the farmers in Beel Khuksia
that were interviewed for this report talked of an TRM project of roughly 7 years. The delay of the
closing of Beel Khuksia and the start of TRM in Beel Kapalia angered the population of Beel khuksia
(Local interview 1.6). Furthermore it increased the apprehension of residents of Beel Kapalia against
the planned TRM project. That anger together with other reasons that will be discussed in the next
chapter, resulted in delays and protests.

Figure 3.4 Cross section of river Hari at Ranai during TRM Beel Khuksia

Source: (IWM, 2012)

36
3.5 Beel Kapalia
Beel Kapalia was originally planned to start TRM in 2009 but this was delayed, the plans were not
ready and there was no agreement with the local people. When Beel Khuksia was completely closed
in 2012, there was no other active TRM project and the problems of siltation returned. The danger of
siltation in the rivers, waterlogging and the effect TRM could have on these issues were well known
by officials and experts by the time (IWM, 2012). The data collected in interviews with local farmers
and experts presents the same picture; most people knew that the river would silt up, which could
lead to waterlogging if heavy rain occurred (local interviews 2.7; 2.8 and 2.10). The problems that are
discussed in this chapter still persist, and there is no TRM project to this day (July, 2015).

The issue that is mentioned the most in the literature and during the interviews is compensation.
There was no compensation demanded during the TRM in Beel Bhaina or Beel Kedaria, at that point
there was a lot of waterlogging and the farmers took action themselves to solve the water logging
problem with TRM. When the government wanted to establish a system and a rotational schedule,
the local people in the proposed TRM areas demanded compensation. They did this because they
could still use their land at that point, and TRM would limit their income. Compensation was
promised during Beel Khuksia and is also promised for Beel Kapalia. The compensation is only given
to land owners, and a lot of people who depend on the Beel for their livelihood will not receive any
compensation. Those people mobilized and there have been strong protests against the TRM in Beel
Kapalia, the local people did and will not allow a TRM project until the compensation issue has been
resolved34&35&36 (local interviews 1.2 and 1.8). The compensation issue will be further discussed in the
chapter 3.6.

A second issue is that there is little to no trust in the implementing agency and the government who
are working on the implementation issue. The local people consider the government as the main
actor who should work on implementing TRM. However they have little trust in the actual
implementation process and the promises that were made37. The farmers in Beel Kapalia often
referred to what went wrong in the previous TRM areas of Bhaina, Kedaria and especially Khuksia.
Compensation was promised, but only paid partially or not at all (local interviews 1.2; 1.3 and 1.7).
Plans and infrastructure were not finished when TRM started and the fact that the TRM continued in
Khuksia for four more years than originally planned resulted in local people being hesitant to give up
the land36. Especially if they fear that the compensation will not be paid out for the extra years, as
was the case in Beel Khuksia.

Furthermore, at the location where the BWDB engineers proposed the cut in the embankment there
is a small Hindu temple. Understandable there is a strong opposition from the local Hindu population
to destroy the temple when the cut could also be located just above or below that location. The
proposal was completed in 2008 (IWM, 2012), and the plans for the location of the cut are still the
same according to the local farmers (local interview 1.8). This shows a lack in flexibility from the
implementing agency which is expressing a strong tendency to high modernity thinking with little
consideration of the local wishes, the plans are made with only engineering and mathematical
considerations.

34
Khaled Khaleduzzaman, Water expert Dutch Embassy Dhaka, 03-02-2015, Dhaka
35
Nasim al azad Khan, IWM, junior specialist IWM, 26-01-2015, Khulna
36
IRV, Kazi Zaved Khalid Pasha, CEO initiative for Right View, 28-01-2015, Khulna
37
Shahidul Islam, Uttaran, Development activist expert, 22-03-2015, Dhaka

37
Violent protest Beel Kapalia

A group of BWDB officials and representatives of the Bangladeshi government including


the honourable Whip Mr. Sheikh Abdul Wahab (a member of parliament), travelled to Beel Kapalia
on June the 2nd 2012 to visit the proposed TRM project area (IWM, 2012). They were stopped by a
group of locals who were protesting the proposed TRM, and this protest turned violent. The exact
figure of protesters remains unknown and different estimates varied from 5000 protestors to only
100 to 150 protesters (de Die, 2013). In total about 40 people were injured and the BWDB personal
and government representatives had to run away after their cars were burned (figure 3.5).

Figure 3.5 Cars burning after protest in Beel Kapalia

Source: (de Die, 2013)

According to Mr. Sheikh Abdul Wahab the people protesting were local gher owners, land grabbers
and NGO workers (IWM, 2012). People who the government sees as land grabbers could be exactly
that, or just people who do not have landownership papers and for that reason are land grabber in
the opinion of the government. Many of the people in Beel Kapalia do not have these papers, or are
landless and still use the beel for their livelihood.

The identified groups protesting are the same groups with the most complaints about TRM that were
raised in the years before. The many who would be outside the system of the proposed
compensation, and the large landowners that do not want to the TRM. The interviews with some of
the locals of Beel Kapalia give the same information, they will protest the TRM as it is currently
proposed. They do want the TRM system in their beel, but the implementation process and the
conditions have to be improved first (local sources 1.2; 1.6 and 1.8). It is representative of the
enduring social conflict that the cars are still located in the same area where they were burned
(figure 3.6). During my fieldwork I came across these cars, 2.5 years after the initial protest there
where they were destroyed.

The data presented in this TRM chapter shows clearly that technically the concept of TRM is sound,
although there are many social issues that prevent the proper implementation of a new TRM project

38
in Beel Kapalia as is planned. These issues have halted the process of a TRM program in this region
since the 2012 attempted opening of Beel Kapalia and the protests and violence that followed (de
Die, 2013).

Figure 3.6, burned out cars located in Beel Kapalia

Picture taken by Rik Heinen, January 20

39
3.6 Compensation program for TRM projects
Problems with the compensation system were mentioned in almost all the interviews and it was
identified as one of the main reasons why there is no TRM project at this moment (de Die, 2013)
(Paul, et al., 2013). The BWDB used a compensation system for the first time in Beel Khuksia, local
people demanded it as compensation for the loss of income they would suffer during the TRM
project. Beel Bhaina and Beel Kedaria were both mostly waterlogged when the TRM started so there
was no loss of productive farming land, therefore there was no compensation demanded/given. In
Beel Khuksia land owners could receive Tk.128.37 per decimal of land (100 decimal is one acre)
owned (IWM, 2012), per year of TRM. The compensation offered for land owners in Beel Kapalia is
TK.479.79, the higher rate of compensation was determined by the BWDB and government officials
and account for both rice and fish production, this was not done for Beel Khuksia (IWM, 2012).

The proposed compensation did not eliminate the protests against the TRM. The continuing
discussion delayed the opening of Beel Khuksia for years, and is still delaying Beel Kapalia. The
amount of compensation is always a point of discussion but this was not the main issue according to
the local people (local interviews 1.2, 1.8, 2.8). The compensation system is not efficient and very
complicated. People who want the compensation are required to file their paperwork at the office in
Jessore, which can be difficult to reach for local farmers (de Die, 2013). People who want to receive
the compensation must have title to their land, and have to file all their tax papers from 1962 up to
2014 (local interview 1.2). Even when these papers were all collected and accepted, the
compensation was not always paid (local interviews 1.1, 1.3, 1.6), or people had to pay a bribe which
accumulated to the total compensation amount for two years (local interviews 1.2, 1,8).

The titles needed for the application are often not available for the farmers, in some cases the land
used to be so called “enemy land” most often owned by people that left the country. And although
the new owners have cultivated the land for many years they don’t have the ownership papers. In
other cases the ownership papers are registered in the name of a deceased family member and the
family members that currently use the land do not officially own the land. There are a lot of landless
people in the beel that fish or are day labourers, these people will never receive any compensation
because they are not landowners while they do depend on the beel for their livelihood. This group of
people is left out of the current system, and can be easily mobilized by themselves or other actors to
protest against new projects.

Conclusion to chapter 3

The current problems and discussion show that the implementation is the largest problem. The vast
majority of people both local as national are positive towards TRM; the current issues are however
delaying the implementation. The problems with the implementation and the lack of co-operation
between the implementing agency and the local people has resulted in the current situation.
Without the TRM or another proper water management system the region will experience
waterlogging again very soon. In the near future it is very unlikely that the problems regarding Beel
Kapalia will be solved and TRM will start, while it is much more likely that the region will experience
water logging. In that case there will probably be a rushed TRM project (like it was with Beel
Khuksia), which will not solve any of the issues and only increase the trust issues that already exist.

40
The next chapter will focus on the perceptions of TRM, both the perceptions of local people and of
national and international experts are presented. Chapter four is the final chapter before the main
research question is answered.

41
Chapter 4 TRM perceptions

Introduction

Chapter 2 briefly presented different projects and policies in the recent history of the water
management sector in Bangladesh and related these to the ideas of Scott. Chapter 3 discussed TRM,
from its starting phase to the current situation. This chapter will deal with the main questions of this
thesis; how TRM is perceived by the stakeholders, and what relevance it will have within the
BDP2100. This thesis, as already mentioned, will partly elaborate on the work of Leendert de Die
(2013). Most of his work focussed on the local perceptions or institutions like the BWDB that were
actively involved with TRM. The data that is used in this chapter was mostly collected from experts
working on a national level, considering they make most of the decisions that impact the Southwest
region of Bangladesh. The fieldwork to identify the perceptions on a local level is there to “update”
the work of the previous student 2 years ago, and to enhance my own understanding of the TRM
issue.

The perceptions of TRM are ordered in different stakeholder groups in order to present the data in a
comprehensible fashion. It is not a perfect separation of the different stakeholder groups, and a
great deal of the people interviewed can be categorised into multiple groups. Sources used in one
group could also be used in another group if their background and occupation allows it, but they
have been allocated to be a part of the group that fits the best with their professional background
and current work.

Firstly the local stakeholder group will be discussed in this chapter, then the perceptions of
government agencies. The third group consists of experts that work for international organisations or
projects, The fourth group are experts working for NGOs operating in Bangladesh. The final and fifth
group of stakeholder whose perceptions are identified are the experts related to the BDP2100.

42
4.1 Local Perceptions
In his thesis, de Die (2013) identified different perceptions frames for different stakeholder groups on
the issue of TRM. According to his conclusions local people can be categorized into three different
frames. Local farmers identify TRM as a method of raising their land, while having a limited
understanding of the physical and political dynamics surrounding TRM. The farmers in Beel Kedaria
that he interviewed therefore considered TRM a failure, it did not raise the land in the beel. Local
leaders and government officials distinguish TRM as a siltation management system, improving
drainage and as a secondary benefit raising the land in the beels. Finally there is a small minority of
local people that are opposed to TRM, these are mostly landless or shrimp farmers. They are against
it because the compensation system is only for landowners, so a TRM system would have a negative
impact on their economic interests.

The data related to the local perceptions that was collected for this research presents comparatively
the same picture as the data from the work of de Die (2013). There are however some small
differences that can be viewed as representative of the changes over time and the location where
the people were interviewed.

The local people (mostly farmers) that were interviewed in Beel Kapalia identified water logging as
the main threat to their livelihoods and TRM as the solution to that issue (local interviews 1.1,1.2,1.6,
1.7) they did not talk about the increase in soil level for their beel. The increase in land level was
discussed by farmers in Beel Khuksia and Beel Bhaina (local interviews 2.2, 2.4, 2.5, 2.7). In these
areas TRM already has been implemented and practised. In Beel Khuksia and Beel Bhaina
waterlogging was identified as a problem that would return if there was no active TRM project soon
in Beel Kapalia (local interviews 2.7, 2.8, 2.9). One farmer said the following: “In a few years the river
will die and this will result in the villages also dying, the people should think about the future”. The
local people see TRM as a technical solution to the water logging as well as the soil level problems
they face. The larger land owners I spoke to as well as the shrimp farmers, in contrast to de Die
(2013), perceived TRM positively. However they were less enthusiastic to implement it saying they
would lose money, even with a compensation system. They did say that the region needed a new
TRM project to stop the waterlogging (local interviews 1.8, 2.4, 2.5). The shrimp farmers in Beel
Khuksia said that before the TRM it was not possible for them to use their land, but because of the
increase in soil level they could now use their land for fishing and shrimp.

These perceptions do not differ greatly with the perceptions identified by de Die (2013), although the
people interviewed cannot be divided in the groups de Die identified. For the reason that, the
answers the local people gave showed a more complete understanding of the larger situation
compared to the conclusion of de Die. Often farmers would refer to the other beels and the effect it
would have on the overall region if there was no new TRM practice. It could be that in the years since
the research of de Die the understanding of TRM grew among the local people. There has been more
research and more discussion, this may be a reason why there now is a more complete
understanding of the issue.

Similarly as with the data from de Die, there was a small minority that expressed their negative
opinion on TRM (local interview 1.5). according to these people there was no water logging problem,
the TRM project and the compensation scheme was just a ploy of the government in order to collect
their papers, in order to seize their land. In contrast, they did not see the waterlogging as a problem

43
(local interview 1.4), and therefore TRM was not a solution. This opinion is connected to TRM but
also with an embedded distrust in the government. There were also numerous remarks about
compensation as already mentioned in chapter 2. People did not get their reimbursement or
complained about the system, or financial wrongdoings, there was a certain complacency in how
most local people talked about the problems they faced.

The general perceptions of the social issues surrounding TRM did not stop the overall majority of
local people interviewed, to express their wish for TRM. Some farmers in Beel Kapalia did make it
explicit that without a good compensation system and the certainty that TRM would stop after 3
years. They will prevent the TRM from being implemented (local interviews 1.2, 1.6, 1.8), as already
has been blocked before in recent years.

44
4.2 Perceptions governmental agencies
This stakeholder group is the largest and in some aspect the most divers, while all experts
interviewed work for agencies that are a part of the government of Bangladesh. The organisations
BWDB, WARPO, IWM and CEGIS differ greatly in their focus and work method. Perceptions are not
uniform across this stakeholder group but there are similar characteristics that I encountered in the
interviews on their perceptions of the water governance and TRM.

Generally TRM is perceived as a concept that existed before it was used in the KJDRP, most experts
from government agencies identify the concept as something that was already used locally in the
southwest region of Bangladesh38&39&40&41. Maminul Haque Sarker the Deputy executive director
development of CEGIS said of TRM: “TRM practice is not a new innovation, it was always there”.
However is was often said that the organisations (IWM and CEGIS) researched the effects of TRM,
and because of their research it is now usable in official projects41. There was also a suggestion to
rename the concept of TRM to Tidal Plain Management, to focus on the main goal the rising of the
land trough sedimentation38. These statements indicate that the governmental institutions are
expressing a certain ownership over the concept of TRM, since they have now used TRM in official
projects. The need for the government to work closely together with the local people in case of new
projects was also expressed in multiple interviews38&42&43. It shows the focus of the governmental
agencies how they perceived the success of TRM in the KJDRP. IWM engineer Al-azad Khan who
researched the effect during Beel Bhaina said: “The TRM project in KJDRP is successful, before that
TRM was only a theoretical concept and now it is proven that it works”42. He also referred to the
social issues, but saying TRM was successful because it is technically proven, shows a certain
perception.

Similarly in the perception of the local stakeholders compensation was often mentioned as
something that needed to change in order for TRM to succeed. Many people who depend on the
beel for their livelihood are landless day labourers or fishermen. They will not receive compensation
in the current system, until this is fixed TRM will be impossible38&41. Different compared with the
local stakeholders was that local elites were also mentioned as opposing the TRM and using day
labourers and fishermen to protest the TRM38&41. Another interesting insight was that there is an
issue with how the locals in the SW of Bangladesh perceive the government projects. The local
people think that everything the government does should be free, so they are unwilling to support
the BWDB in their projects. This is a mind-set problem and this needs to change in order for a
governmental project to happen according to Maminul Haque Sarker of CEGIS39.

The government agency of the Local Government Engineering Department (LGED) has experience in
combining the technical and the social aspects in their projects. They work in sub-projects below the
BWDB, on topics like flood management, conservation and drainage44. The LGED has experience with
compensation system, in situations where land rights, ownership papers and social conflicts are

38
Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka
39
Maminul Haque Sarker, CEGIS, Deputy executive director development, 15-02-2015, Dhaka
40
Saiful Alam, WARPO, Director at Water Resources Planning Organisation, 05-02-2015, Dhaka
41
IWM, worked on TRM research of IWM, 26-02-2015, Dhaka
42
Nasim al azad Khan, IWM, junior specialist IWM, 26-01-2015, Khulna
43
BWDB, Executive Engineer Office of the Chief Planning, 25-02-2015, Dhaka
44
Mohiudin Ahmed, LGED, Institutional Development Specialist, 17-02-2015, Dhaka

45
issues. I interviewed Mohiudin Ahmed from the LGED, and although the organisation has had no
experience with TRM, their work methods are a possible solution to some of the problems discussed
by the other experts. In their projects they assign local representatives that will assess which of the
land users will lose money during the project. These people will get compensation, land ownership
papers are not always a requirement in these cases45.

In the different interviews done with experts from the governmental agencies it became clear that
they would identify the problems with TRM as social, and when they spoke of how the concept of
TRM worked they only discussed technical aspects. They spoke of the risk of flooding if there was no
new project soon46, or discussed the sedimentation issue and the effect TRM could have on this36.
When the social issues were discussed the only thing frequently said was that the problems needed
to be solved, but no detailed solutions were offered46&47&48.

These different government agencies all perceive themselves as the technical experts in their
particular fields. They see themselves as an agency that can help to improve TRM and to properly
implement it, and given their expertise and history they are partly right in this assumption. They have
made improvements considering TRM plans, and their help is needed to implement TRM. The
sedimentation difficulties are a good example where possible technical improvements can be made.
Saiful Alam the director of WARPO said in his interview that the BWDB does not give a lot of
importance or attention to the local people, they are engineers and concerned with structures, not
with people participation47. The following discussion I had with an BWDB engineer is exemplary of
this issue49; I asked a BWDB engineer if he thought the BWDB was the right agency to implement
TRM considering its social problems, and BWDB being an engineering agency. He said this was indeed
difficult and that they needed to co-operate with other social organisation like NGO’s, however
according to the Bangladesh water development act BWDB governs any activity inside the river, so
they BWDB needs to be included in TRM projects. It was not a question of suitability, but of rules and
regulations.

Related with Scott

The perception of TRM by the governmental institutions is partly similar with the perceptions held by
the local people, there are similarities in how they perceive TRM and each other. They identify TRM
in slightly different ways but the problems and issues are the same. The perceptions of these experts
working for the government are not similar with the elements from Scott (administrative ordering,
high-modernity, an authoritarian state, a weak civil society). They identify issues that would have
been ignored in a high modernity perspective, and look to co-operate with other agencies for an
implementation that is more locally adapted. The actual practice of TRM projects show more
similarities with some of the issues identified by Scott, but the perceptions vary greatly and are far
away from how government agencies operated during projects like the CEP. One aspect where there
is a similarity that is part of the high modernity aspect is the use of scientific data. Multiple experts
described that TRM could only be used once it had been researched by IWM and CEGIS, this shows
their need and use of scientific data that Scott described as a good practice.
45
Mohiudin Ahmed, LGED, Institutional Development Specialist, 17-02-2015, Dhaka
46
IWM, worked on TRM research of IWM, 26-02-2015, Dhaka
47
Saiful Alam, WARPO, Director at Water Resources Planning Organisation, 05-02-2015, Dhaka
48
Maminul Haque Sarker, CEGIS, Deputy executive director development, 15-02-2015, Dhaka
49
BWDB, Executive Engineer Office of the Chief Planning, 25-02-2015, Dhaka

46
4.3 Perceptions NGO’s
Different NGOs have been active concerning TRM, some working with the government to implement
the issue, and other agencies protesting the implementation method or mobilizing the local people
to protest proposed projects. They are perceived by some experts interviewed for this study, as a
voice for the people. Whether this is correct or not, they are often mentioned as part of the solution
or part of the problem. They are therefore an important group for this research, and I have tried to
collect their general perceptions on the issues of TRM and how it relates with the water governance
in Bangladesh. I have spoken with two large NGOs (Uttaran and BRAC) and a smaller local NGO
(Initiative for Right View, IRV) located in the southwest of Bangladesh.

The NGO’s differed in their views, their work methods, and the intensity with which they do their
work. A common perceptions they all share is that TRM was first practised by the local people50, and
the same system was used before the first large governmental projects were implemented in the
region51. Shahidul, the director of Uttaran described TRM as: “a new innovation by the people, it is a
historic innovation”. In contrary with most of the experts from governmental institutions they place a
large part of the ownership of the concept with the local people. One of the NGO experts who shared
this opinion was the director of Initiative for Right View (IRV). This Khulna based NGO states that
ownership of TRM belongs with the people. According to him the people who pay the taxes should
be the owners of the projects that are financed with these taxes. Correspondingly to this he argued
that: “This is similar to the TRM, where it is also a project and an idea from the local people. Just like
they are the main donor through their taxes for the most projects”51. This is an perception that shows
a strong belief in the ownership of TRM by the local people.

They also stated that given the local origin of the concept it was of vital importance that the local
people participated with the implementation of TRM by the government. The local people are the
main “donor” of TRM, government should take note of the ideas and the wishes of the local people51.
According to Shahidul the director of Uttaran; now the government has adopted the concept of TRM,
they need to the local people to implement it properly. Talking about the need of local participation
Shahidul said the following: “The people are from that area, they know how to manage the river” and
“Compare them with a mid-wife, without a mid-wife it is not possible, it is needed!52.

The perceptions on the problems of TRM vary more between the different interviews. All identify
compensation as an issue, some say that there are only problems with the system and land
ownership rules, once these are resolved the compensation will work well51&52. In contradiction with
the focus on the compensation, Jenkins does not see compensation as a solution to the problems. He
would rather focus on changing the livelihoods of the local people who are affected by a TRM
project, so that they themselves can create their income, not depending on a flawed and non-
functioning system50.

In the interviews, there was often frustration present in different levels against some of the
government agencies who are working with TRM. Some of the problems within the KJDRP project
were caused by the BWDB and their focus on technical solutions50. TRM with its social methods and

50
Andrew Jenkins, Head of the BRAC Research and Evaluation Division, 04-02-2015, Dhaka
51
IRV, Kazi Zaved Khalid Pasha, CEO initiative for Right View, 28-01-2015, Khulna
52
Shahidul Islam, Uttaran, Development activist expert, 22-03-2015, Dhaka

47
low financial cost would not be interesting for the implementing agency, Jenkins: “BWDB wants
concrete solutions”. The social and low investment characteristics of TRM were seen by Jenkins as a
positive aspect. “TRM is easily adaptable, it can be changed. With a construction of a concrete sluice
gate you can’t change it after it is constructed, you’re stuck with it.”

Related with Scott

The differences in perception of the issues by the experts of the NGO’s and governmental institutions
differ less then I originally expected. There are some differences in perceptions on the problems and
the solutions, but the roles of the different groups are perceived in the same way. The NGO’s have
not claimed that there is a lack of knowledge with the implementing agencies, citing other reasons
why the implementation failed. There is a problem with the governance and the system but not a
lack of knowledge. The difference in perception of the problems and where the solutions are, is the
main difference between the government experts and the local people. The governmental
institutions are implementing the TRM concepts because they have the knowledge and it their job
according to the law. However the expertise they build upon limits their scope, which creates
problems that are difficult to solve by the technical institutions53&54&55.

The research of TRM by the experts from IWM and CEGIS did result in more credibility for the
concept. There are however frustrations in the perceived lack of use of the local knowledge, while it
is the original source of the TRM concept. The focus of the implementing agencies that the NGO
stakeholder identified is similar with the ideas of Scott (administrative ordering, high-modernity, an
authoritarian state, a weak civil society). In his book he talks of government using high modernity
knowledge and large projects to accomplish their goals. The NGO’s perceive this to be mostly still the
case, with the BWDB as a force for engineering and large scale implementations, with little to no lack
of attention to social/locally based solutions. From chapter 2 it is clear that there still is a preference
for large-scale engineering solutions, although it is no longer the only focus. The data collected from
the interviews with the NGO stakeholders show that they still identify an engineering focus as
present in Bangladesh53&54. In other interviews the expert affirmed this problem, but still identify
other situation where the implementing agencies did not follow a single focus of engineering
solutions55.

53
IRV, Kazi Zaved Khalid Pasha, CEO initiative for Right View, 28-01-2015, Khulna
54
Shahidul Islam, Uttaran, Development activist expert, 22-03-2015, Dhaka
55
Andrew Jenkins, Head of the BRAC Research and Evaluation Division, 04-02-2015, Dhaka

48
4.4 Perception of International experts
This stakeholder group is the most difficult to define compared with the other stakeholder groups of
this study. Whereas the other stakeholder groups all have a distinctive defining trait (NGO personnel,
local people, governmental employees) this group is not as homogenous. The common aspect is that
all experts interviewed and placed in this group, work for an international organisation or for an
international project that is active in Bangladesh. There are still large differences between the
experts. Some are native to Bangladesh and have decades of experience with TRM, others are
foreign experts and have a limited experience with TRM and the issues. They are an important group
because they have a lot of influence on the water sector and water governance. Foreign
governments invest large amounts of funds that have a huge impact on the water governance in
Bangladesh. Examples range from the KRUG report in the late 50’s, to the KJDRP financed by the ADB
and the current Blue Gold Project financed by the GoN. These influences are represented by the
stakeholder group of “international experts”. Their perspective of TRM is distinctly different with
other groups on multiple aspects. Some of these experts have a large role in deciding on future
projects (for example the World Bank). It is important to not let the lack of particular knowledge
present itself as a distinct perspective. The perspective can be related to multiple ideas and beliefs,
but not to a simple lack of knowledge on details of an issue.

Similarly with the previous stakeholder groups, the experts who were knowledgeable on the details,
identified TRM as concept that originated from local people56&57&58. NGO’s were also identified as an
important player in the first conception of TRM during the KJDRP59. The experts from this stakeholder
group were not as concerned with the “ownership” of TRM, in contradiction with the previous
groups.

The process of TRM and its main benefits were perceived in a somewhat different way by the
international experts. Where NGO’s mostly see a technical solution constructed out of a social
process, and government agencies see a technical solution that is researched and proven but has
social issues, the international experts often described TRM as a natural process. It was a solution to
the problem of waterlogging because it worked technically, but it was perceived as a good solution
because the process is natural57&60&61. Marcel Marchand from Deltares said on TRM: “It is a great
example of climate change adaptive management58”. The problems that persist with TRM were
perceived in the same fashion as by previous groups. The one difference is that although
compensation was still often mentioned as an important factor that needed to be implemented
properly, different experts called for more active participation of local people. The implementing
agencies have failed in the continuous implementation of TRM partly because they did not enable
the local people to participate, this should be rectified in future projects56&57&58&59. The experts from
this stakeholder group were more adamant in this statement compared with the experts from
governmental agencies.

56
Manoranjan Mondal, IRRI, collaborative research scientist under the Crop and Environmental Sciences
Division and the Social Sciences Division, 02-02-2015, Dhaka
57
Mofazzal Ahmed, Blue Gold, Deputy Component Leader water resources, 09-02-2015, Dhaka
58
Shorab Hossain, Blue Gold, Community Organization Expert, 05-02-2015, Dhaka
59
Alamgir Chowdhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka
60
Khaled Khaleduzzaman, Water expert Dutch Embassy Dhaka, 03-02-2015, Dhaka
61
Marcel Marchand, Deltares, Coastal and flood risk management expert, 10-02-2015, Dhaka

49
While TRM was discussed in the interviews the process of implementation was a much discussed
topic. There is a dissimilarity between various experts, overall they identify the same problems but
some are more specific in the stated causes of these issues. A shared opinion is that the local people
have a lot of knowledge and this should be used62, however they are also lacking the very specific
technical knowledge63&64. Alamgir Chowdhury from the Blue Gold project: “The local people are not
engineers/experts. But from their experience they definitely have some arguments, they are talking
from their experience and history”63. The perception of the implementing agencies varied widely, as
the different experts had very varied backgrounds. Swarna Kazi from the World Bank said the
following while discussing the BWDB: “They have the people and they have the knowledge to do the
projects65”. Shorab Hossain of the Blue Gold project: “The TRM project right now is implemented by
the BWDB and they have no social mobilisation, the problem now is with management62”. Finally
Sifayet Ullah from the UNDP expressed the following opinion: “The way BWDB is doing TRM is more
a traditional approach towards water management, the participatory is less or not there64”. The
differences in perception may be related to the position of the person evaluating their value. Where
Hossain and Ullah both had local experience, Kazi always reviewed the projects from a national level.
This could cause a difference in perception of the BWDB practices.

One distinctive characteristic of the international experts was how they perceived TRM in a certain
timeframe. Where other experts were mostly discussing current issues and possible solutions to this,
multiple experts from this group identified the maximum duration of TRM as an issue. TRM was
perceived as a solution that would solve the current problems of waterlogging but it would only work
for the next few decades, it is not a long term solution63&66. This perceptions was not the same across
the complete stakeholder group. Mofazzal Ahmed who is working with the Blue Gold project did
describe TRM as a long term plan with a maximal duration of 20-30 years of an individual TRM
project. An opinion that was shared across the stakeholder group was the need for more research
and knowledge especially considering the long term solutions63&65, this opinion was more deeply
expressed in this stakeholder group compared with other groups.

Related to Scott

Compared with the elements of Scott, these perceptions don’t change the conclusion that can
already be drawn from the previous stakeholder groups. Based on these perspectives and how the
experts are working and discussing TRM it cannot be compared with the way Scott identifies large
projects and a dangerous use of the high modernity ideology. TRM is not a concept that fits within a
high modernity ideology, and here it is accepted by many of the people who in Scott’s theory could
cause the massive failures and problems he discusses in his book. The one aspect that is partly similar
between the ideas of Scott and the ideas of the international experts is a certain focus on large scale
projects. TRM was perceived as a positive but relatively small part of a larger possible policy that

62
Shorab Hossain, Blue Gold, Community Organization Expert, 05-02-2015, Dhaka
63
Alamgir Chowdhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka
64
Md. Sifayet Ullah, UNDP, Programme Analyst-Disaster Management, 25-02-2015, Dhaka
65
Swarna Kazi, World Bank, Disaster Risk Management Specialist, 01-03-2015, Dhaka
66
Marcel Marchand, Deltares, Coastal and flood risk management expert, 10-02-2015, Dhaka

50
should be created, there was often a call for a more integrative approach across the water
governance sector in Bangladesh, of which TRM couldform a part67.

With the focus on large-scale projects, which the international experts explored more deeply
compared with the other stakeholder groups comes a focus on the long term projects. These two
methods are clearly visible within this group, especially with the experts who work on the national
level. This can be compared with the element of large scale planning that Scott identifies in his book.
Their perception of TRM is not as positive because it may not be useful as a long term project in their
opinion. A government will always do large scale planning and this is not an issue according to the
theory of Scott. But their perception of TRM as less useful because of its supposed duration shows
that this element of Scott is represented in the group of international experts.

Finally there is a difference in perception of BWDB and large scale projects by the different experts.
Multiple experts share the opinion that BWDB is not successful in getting the local people to
participate in their projects. From interviews with BWDB employees that are discussed in the
previous segment it is clear that their official guidelines call for active participation. The fact that this
is not perceived by some of the international experts shows that there is still work to be done.
Especially the experts who have worked on a more local level shared this negative opinion on the
BWDB implementation practises67&68&69. While an expert who is working on a national level with big
projects, is much more positive on BWDB. Experts who are working on local level see the
implementing agency more negatively compared with people working on a higher level70. This is not
directly related with the elements that Scott describes in his book (administrative ordering, high-
modernity, an authoritarian state, a weak civil society). It is however important in order to
understand the water sector in Bangladesh more fully.

67
Manoranjan Mondal, IRRI, collaborative research scientist under the Crop and Environmental Sciences
Division and the Social Sciences Division, 02-02-2015, Dhaka
68
Shorab Hossain, Blue Gold, Community Organization Expert, 05-02-2015, Dhaka
69
Alamgir Chowdhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka
70
Swarna Kazi, World Bank, Disaster Risk Management Specialist, 01-03-2015, Dhaka

51
4.5 Perceptions from BDP2100
Perceptions by their nature are already difficult to measure and compare, the perception of TRM by
the BDP2100 is even more complicated to measure. As with the CEIP the project is only just starting
so the product cannot be reviewed. It is a project which will try to produce a strategy not an exact
plan with specific projects, although they will share some proposal projects via the upcoming sixth
five-year plan (Planning Commission, General Economics Division, 2014). This makes it difficult
compared with the other stakeholder groups to identify the perception of TRM for the BDP2100. In
order to do this the proposal and inception reports will be used, that have already been discussed in
chapter two. Furthermore the interviews with experts working for the BDP2100, discussed the water
sector in Bangladesh more broadly compared with other interviews. Finally my own experiences
from working at the BDP2100 office for three months will be used. I was working as an independent
researchers at the office and did not do any actual work for the project, with the minor exception of
taking notes during large conventions, which allowed me to attend those conventions. Working at
the BDP2100 office provide me with the opportunity to see how the work was done, and what was
discussed. I could also sit in at meetings and workshops, where TRM was often discussed. The
information collected has been important in the construction of the perception of BDP2100.

Giasuddin Choudhury the deputy team leader of the BDP2100 mentioned the importance of people’s
participation, he worked to improve this during his years with the KJDRP. During this time he also
experienced TRM first hand, he sees it as a good solution although there are large problems. The
concept was an “happy accident” that originated from the local population, and was partly voiced by
the NGO that were active at the same time as the KJDRP. At the moment TRM is problematic as there
is no consensus between the stakeholders on the issue because of the different social characteristics.
Overall TRM could be attempted within the BDP2100 but it remains very unsure.

Jaap de Heer the project leader of the BDP2100 identified the purpose of the delta project as the
creation of a strategy that over time can achieve an optimal level of water safety, while taking care of
the water related aspects of food security and economic development. These three issues he viewed
as a triangle (figure 4.1). At the moment the water safety is done with the CEIP and the dikes that
already exist, which is a “hard” measure approach, that demands constant maintenance and
pumping. He further discussed the singular focus of implementing agencies and called for a better
arranged institutional/national level, this gap is where BDP2100 could make a difference. In relation
to participation the BDP2100 was still facing a challenge, NGO’s cannot fill the gap and the local
government in Bangladesh is not directly elected by the people. Finding proper representation on a
local level remains a goal for the BDP2100. During the writing of this thesis new reports have been
published on the official website of the BDP2100 which mention the participation of local
stakeholders during their field visits and meetings.

TRM could be a possible more natural solution that utilizes a building with nature approach. There
are however large social problems and it calls for modifications so that the acceptance and feasibility
is increased, it needed to be attuned with the local people71. Compensation was a possibility but
certainly not the only solution, a change of livelihoods could also be successful. The implementing
agency still has a mono-disciplinary approach, resulting in no new TRM projects. Jaap de Heer

71
Jaap de Heer, Project Leader BDP2100, 22-03-2015, Dhaka

52
perceived TRM as a possibility within the BDP2100, but emphasized their broader goals and
objectives.

Figure 4.1, BDP2100 strategy triangle according to J. de Heer

Own experiences

The information that Mr Chaudhury and Mr De Heer supplied do not contradict the data collected
from the workshops and meetings that I attended while at the BDP2100 office in Dhaka. During the
three months when I was in Bangladesh the first meetings were done on the topic of possible
projects that the BDP2100 could recommend. It was still early in the process so at that point it was
mentioned that all ideas are good ideas and all proposed projects would be discussed. This resulted
in many different and ambitious proposals that were maybe not realistic, but it did present a good
opportunity to measure the general perceptions of what the BDP2100 could do. It was a good time
for the question of what the perceptions are of the experts working or contributing to the BDP2100.
Before some of the proposed projects are mentioned I want to emphasize that these were discussed
as a brainstorm activity and not as serious already planned proposals.

TRM was often mentioned and highlighted by some as a very good measure that should be used,
other were more critical given the known social issues. The concept was discussed at length and also
presented as a possible solution to rising sea levels and waterlogging during brainstorm sessions. This
was not what was expected with the hypothesis of this research, but the project was seriously
discussed as one of the possible solutions.

Other options that were often mentioned were projects that have already often been implemented
in Bangladesh, projects like dredging and the construction of structures to regulate the water flow.
These plans were proposed for the entirety of the coastal zone, not only the south west. Experts
working for technical engineering agencies often proposed these kinds of implementations, and
overall were very technically focussed in their proposal as can be expected given their expertise. The
first meetings and workshops were not attended by any local representatives or local government
personal, these would be brought into the discussion later in the year during field visits.

53
There was a large variety of ideas proposed during these meetings, overall there was a preference to
large scale engineering projects. This was related with the experts present at those meetings, who
were mostly working for technical organisations. Other type of proposal were also mentioned and
discussed, TRM being an example of this.

Related to Scott

As could be expected the perception of TRM by BDP2100 is similar with the perception of the
previous stakeholder group of international experts, and has similarities with the governmental
experts. As these groups are the contributors to the BDP2100, their perception on TRM is therefore
similar. The experts interviewed see TRM as a possible project, it is perceived as favourable because
of its building with nature approach. However it would always be a small part of a much larger
strategy as the BDP2100 wants to produce. In this aspect the BDP2100 has similarities with the
elements that Scott identified. They see a need for a large scale government project to increase
water safety, food security and economic development, similar with the goals that Scott mentions in
his book as motive for the large scale projects he describes (Scott, 1998). The difference is that there
is no singular focus based on hard scientific data, but call for an integrative approach with room for
different types of projects based on different types of knowledge. How far the BDP2100 will go with
this only the future will tell, but similarities with some of elements from Scott are there. Scott said
that only if all the four elements (administrative ordering, high-modernity, an authoritarian state, a
weak civil society), were combined it could be disastrous. BDP2100 does encompass administrative
ordering and especially high modernity, however not all four elements, what Scott would think of it
would be interesting to know.

summarizing chapter 4

This chapter has presented the main data collected for this thesis. All the interviews have been used
to identify the perception of TRM between the different stakeholder groups. Overall the differences
have been less large than expected, although there are still differences between the groups.
Especially when compared with the ideas of Scott differences are visible. The group of international
experts and the BDP2100 are much closer to the ideas of Scott compared with the NGO stakeholders.
Within the group of governmental experts there are differences between the experts in how much
they relate with Scott. This is to be expected considering the large differences between the
organisations the experts originate from. When the different organisations are compared there are
similarities. For example: the perceptions of the experts from the BWDB generally are closer to the
ideas of Scott compared with the experts who started as local social mobilizers. Overall the
perceptions on TRM have been identified and discussed, only the general conclusion remains in
which the research questions will be answered and summarized. This will be done in chapter 5,
conclusion and discussion.

54
Chapter 5 Conclusion and Discussion

In this chapter the different results of this study will be discussed and some issues that have not been
mentioned so far in this thesis but do have an impact will be mentioned. The first part of this chapter
will be the conclusion of this thesis, the research questions that have been formulated will be
answered. After the conclusion there is a short discussion, in which I will also share my own opinion
on some issues. Before the discussion however there will be a short reflection on the process of the
study and fieldwork.

5.1 Conclusion

The data has been presented and analysed in the previous chapters, now the research questions will
be answered in this conclusion. Firstly a short overview of what this thesis this far has discussed. The
historical context of the water sector in Bangladesh has been presented in chapter 2. It has shown
that there have been changes in how the water sector operates in Bangladesh, and which ideologies
are used. The early policies and projects like CEP are identical with the elements of Scott (the
administrative ordering, high-modernity, an authoritarian state, a weak civil society). The more
recent projects and policies have been much more nuanced and try to be more inclusive and adapted
to the local situation. This was at least according to the proposal documents. The review documents
from (for example) the KJDRP show, that the proposed project can be very different compared with
how the project was done and what was implemented.

Chapter 3 was a short review on how TRM was started and how it is currently used. There have been
successes with the implementation of TRM. Water logging issues were solved and rivers were
deepened after a TRM beel was opened. New social issues are now a problem and the new TRM
projects have been delayed indefinitely, which will result in water logging in the near future. TRM has
proven to be very successful, however there are currently social issues and implementation problems
that prohibited it from being used.

Chapter 4 presented much of the interview data collected for this thesis. Different groups of
stakeholders were identified and their perceptions have been analysed. A difference in perceptions
have been identified between the different groups. Generally it is clear that the current perceptions
do not comply with the elements that Scott identifies. There is no single focus on high modernity and
an administrative ordering, especially with local stakeholders and NGO’s. The other groups are in
varying levels still comparable with the elements from Scott, but are never completely similar. Ideas
and ideologies are now more broad and almost all call for an active participation of different
stakeholders. Still there is a difference between proposals and actual practice, this is also reflected in
the perceptions that the some experts have of the BWDB. Officially they are required to actively use
participation, in practice this sometimes does not take place according to some experts.

Now the main research questions remains: “How is the concept of Tidal River Management perceived
by different stakeholders, and what will its relation be with the Bangladesh Delta Plan 2100?” The
perception of TRM has not been similar with the hypothesis that was constructed before the
fieldwork started. It was expected that there were large differences in how the concept was
perceived, with at national level little to no attention to it. This was not what was found, overall
there was a good understanding of the concept and active attention for it. There were differences in

55
how elements of TRM perceived, but the overall picture was clear and similar across all the people
interviewed. How it will be used within the Bangladesh Delta Plan is a more difficult question to
answer. Within the BDP2100 there is certainly a willingness to adopt concepts like TRM, they want to
be broad and inclusive. Next to large structural projects, TRM is perceived as a welcome change.
Whether it will be actually used and in what manner is less clear. The project is still in an early phase
and no exact plans have been created. There is enough understanding of the concept in order for it
to be used, although there is still a request for more exact data on TRM and its effects. The social
issues are also identified as an aspect that needs to be solved before it can be implemented. Overall
the perceptions have been identified of the different experts and it has been possible to create a
“rough” separation between different stakeholder groups. The perceptions have clarified why and
how TRM was used. They have also shown a change in the overall water sector and its strategies and
projects. The use of a concept like TRM is not much more likely than it was in the sixties or seventies.
The water sector has also changed completely from being similar with the four elements of Scott
(Administrative ordering, high modernity, authoritarian state, weak civil society). The new projects
and policies still have parts of the elements of Scott but no longer a comparison can be made.

Answering the question of the possible relationship between the BDP2100 and TRM it is expected
that TRM or a version like it, will be practised or advised by the BDP2100. Separate from general
knowledge there is little known about the specific of TRM. This while the BDP2100 has already been
running for more than a year. However there are no specifics of any possible implementation yet, so
TRM is not unique in this, it does not indicate a disinterest in such a concept. There is general on the
effects of TRM on water logging and river siltation. Furthermore, because of it climate adaptive and
social aspect, it is received in a positive light. It differs compared to other proposed technical options
and therefore becomes a more attractive option for a project that wants to involve both technical
and social instruments. One major risk to the practice of TRM are its social issues, if these continue
possible implementation will be more difficult or impossible. Although if the affected regions become
waterlogged again, most of the social issues will no longer exist because the land cannot be used. At
that point there will be a new TRM project, comparably to the adoption of the TRM in Beel Khuksia.

56
5.2 Reflection

Before the discussion there needs to be a reflection, especially if I am sharing my own opinion. There
have been some standard limitations to this study that have already been mentioned in chapter 1. I
do not speak the local language and needed an interpreter for some aspects of the research, my
interviews are examples of this. Furthermore, the stakeholder groups that are identified are not
homogeneous. There are multiple experts that do not fit in only one group, but could be placed in
multiple groups. The chosen selection criteria can be questioned but has been done based on their
current workplace and professional experience. The perceptions identified of the different groups
have been logical and differ between the groups, I take this as a validation of my stakeholder
categories.

My presence as a young white European male in Bangladesh also coloured the information I would
be able to collect. These aspects make it impossible to follow “the fly on the wall” principle that a
researcher should not influence their field of study. Although I have never believed that a researcher
can have no influence on the situation he/she is studying, or is able to be 100% objective for that
matter. Being in a certain area already influences it, especially being someone foreign to that area.
And your own original knowledge and viewpoints always colour your own perspective, so complete
objectivity is not possible.

That said, I have been in Bangladesh for a period for three months for fieldwork, and I have carried
out literature studies before and after being in Bangladesh. Because of this I believe that I am now in
a position where I can share my opinion and that it has some value to the situation. However there is
still a huge difference between my knowledge and the knowledge of some of the experts and local
people interviewed, that have lived in the region their entire live. I am still a young researcher with a
lot of theoretical knowledge but little practical experience. Me sharing my opinion can be perceived
as a young European student that thinks he knows a great deal about the situation given his
“superior” educational background. Although I try to avoid this I am not fully able to comprehend my
exact limitations. I do understand how some of the opinions that I have formed in the last few
months can be received, by people who have worked for a much longer time in Bangladesh. That
said, my independent research has still yielded interesting data. Furthermore I have spoken with
many different people from many different organisations, something that is not common since most
people do not have the time for this. Therefore I will still share my own opinions in this discussion,
keeping in mind my own limitations that I have reflected upon.

57
5.3 Discussion

As already mentioned in the conclusion, my original hypothesis with which I arrived in Bangladesh
did not prove to be correct. Differences in perception of TRM are smaller than expected. And there is
no significant difference between the local and national level. My own perception of TRM was
heavily influenced by the previous WUR students that researched the concept two years ago. This
perception did not change much after my own fieldwork and experience in Bangladesh. I perceive is
as a concept that works technically very well, and can still be developed further, especially
concerning siltation management. The social issues concerning it are serious and prevent it from
happening at the moment, but they can be solved in my opinion.

Many of the social issues were not present when TRM was first done in Beel Bhaina. This was mostly
because the land was not useable before, so there was no substantial income loss for anyone. Now
the land can be used there are much larger economic factors at play, and the short term thinking
prevents TRM from happening. The implementation problems that have been present with more
recent TRM projects in Beel Kedaria and Beel Khuksia have also had an impact. In contrast with the
official proposal there was not enough co-operation with the local people. Furthermore the
compensation system is inefficient and difficult to use, the demands for compensation are also to
difficult or impossible for most people working in the area. Finally there is bad governance of the
projects and maintenance and unfortunately there is a high level of corruption present that limits the
effectiveness of the projects. Corruption is very difficult to deal with, as Giasuddin Chowdhury of the
BDP2100 said during the interview; “You can’t really blame the people that accept the money under
the counter if they have a have a need for it to support their family”. Corruption does not disappear
easily, and it is a way of governance and getting things done. Unfortunately it is somewhat of a
constant factor and will limit the possibilities and effectiveness of programs, including TRM.

I have come across opportunities that can solve some of the current issues that face TRM. The UNDP
is working on a new TRM program that is trying to create a framework for implementation. When
they have a successful method of implementation this could be used by the BWDB in larger projects.
Furthermore the LGED is a government agency that has ample of experience with compensation
systems. They have an adaptive system that does not only look at land ownership but also at lost
income, this system would include many people who are now excluded and are protesting the
implementation. The knowledge of the LGED could be used to better implement TRM. Finally based
on multiple interviews I detected an interest to focus on livelihoods instead of compensation,
because the compensation system is difficult to implement. This is something I think that could be a
successful approach to TRM.

Unfortunately these proposed solutions or any other solutions will not be in time to prevent the next
water logging disaster. Multiple experts and local people say that during the next rainy season there
already is a strong possibility of water logging, because the rivers are silted up. Once there is water
logging again the possible yields will go down, defeating the argument that people are losing income
when TRM is practised. It will create a short time opportunity to do TRM, like it was with Beel
Khuksia where water logging also sped up the process. It will however not be beneficial in the long
term if land keeps getting flood and waterlogged. There needs to be a sustainable solutions, but this
is not possible before the next water logging event.

58
Compared with Scott.

The comments of Li (2005) that were discussed in the methodology are applicable in the situation of
Bangladesh. The state has no monopoly on the power, there are other agencies that can implement
projects on the same level. This has become clear with the ADB, World Bank and the GoN all funding
large scale projects in Bangladesh. This does however not mean that these other projects are
completely non comparable with the elements of Scott. Li looks at these projects with the help of the
elements of Scott and goes further in identifying new focusses that are more modern and accepted,
but still have an impact that is similar with what the elements of Scott could have. An example of this
are projects that are bottom up, but local people have to qualify by the standards of the World Bank.
Li writes of this project in her paper (Li, 2005), the method of implementing can be compared with
the examples that Scott gives in his book.

Scott is not subtle in how he frames his ideas in his book. It seems only fitting that I myself reflect on
Scott after I compared it with many projects and policies published by the water sector in
Bangladesh. I wanted to use his ideas because they fitted well with the older projects like the CEP
and I was curious how they would compare with the more recent projects. I still think as I have
mentioned in the methodology that Scott can be simplistic and contributes to much to the
government. There are similarities between his ideas and the projects and policies in Bangladesh. It
could be understood as an indication that some of the problems that Scott identifies in governmental
projects, are present in Bangladesh. I however think this is no longer the case. There are many
problems and issues that still exist in Bangladesh, however they are not comparable with the
elements of Scott and the issues he describes in his book.

From my fieldwork in Bangladesh and the in-depth literature study that was conducted for this
thesis, an overall trend can be identified on the relevancy of Scott’s ideas in relation to the water
sector in Bangladesh. This trend is my own personal assessment in how much the concept of Scott
can be applied to the water sector, in the last roughly 70 years. Starting with the Coastal
Embankment Project, until the present day. The trend visualized in figure 4.2 is based upon the
literature study and my own fieldwork, it is not objective. It does however help to clarify and
visualize the relevancy of the ideas of Scott.

Figure 4.2, Relevancy of the ideas of Scott in relation to the Bangladesh Water
Sector

59
The story of a man and his donkey

At the end of this thesis I want to share a story that was told to me by Andrew Jenkins one of the
people who was kind enough to be interviewed by me during my time in Bangladesh. This old Arabic
tale has a message that I think is very applicable to the current situation in Bangladesh.

Once there was a man living with his wife and their donkey. At one point he and his wife were no
longer happy with their donkey and they decided to sell the donkey. It was an old donkey, who was no
longer hard working and never did what they wanted him to do. The man went with the donkey to
the market and hired a trader that would sell the donkey for him. The trader agreed to do it on the
condition that he would collect 10% of the amount for which the donkey would be sold. The man
agreed to the terms and the trader took the donkey to the middle of the market. He gathered people
around him and started to praise the donkey. “This donkey is hard working, and smart and gentle
with people. It is a great donkey and its new owner would be very happy with this donkey”. The man
was listening to what the trader was saying about his donkey and was suddenly regretting selling
him. He changed his mind and decided to keep the donkey, in order to do so he started bidding on his
own donkey. The price went up between different people but the man ended up paying 100 dinars for
his own donkey. After he gave the confused trader 10 dinars, he got 90 dinars back and went back to
his house with his donkey. The man went back to his wife and when she angrily confronted him with
the fact that he still had the donkey he replied: “It was a bargain, for only 10 dinars I have learned to
appreciate what I already have!”

The moral of this story is to first appreciate and maintain what we already have, before begin with
new things. This idea is applicable to the current situation in Bangladesh. I also hope the BDP2100
will use the lesson, I’m definitely not against new projects but there can be done a lot with the
infrastructure that already is in place.

60
References

Interviews with experts:


Alamgir Choudhury, Deputy team leader Blue Gold Project, 05-02-02, Dhaka

Andrew Jenkins, Head of the BRAC Research and Evaluation Division, 04-02-2015, Dhaka

Catharien Terwisscha van Scheltinga, Researcher/lecturer Alterra Wageningen UR, 12-01-2015,


Dhaka

Giasuddin Chowdhury, Deputy team leader BDP2100, 23-02-2015, Dhaka

Jaap de Heer, Project Leader BDP2100, 22-03-2015, Dhaka

Kazi Zaved Khalid Pasha, CEO initiative for Right View, 28-01-2015, Khulna

Khaled Khaleduzzaman, Water expert Dutch Embassy Dhaka, 03-02-2015, Dhaka

Maminul Haque Sarker, CEGIS, Deputy executive director development, 15-02-2015, Dhaka

Manoranjan Mondal, IRRI, collaborative research scientist under the Crop and Environmental
Sciences Division and the Social Sciences Division, 02-02-2015, Dhaka

Marcel Marchand, Deltares, Coastal and flood risk management expert, 10-02-2015, Dhaka

Mofazzal Ahmed, Blue Gold, Deputy Component Leader water resources, 09-02-2015, Dhaka

Md. Moshiur Rahman, IWM, worked on TRM research of IWM, 26-02-2015, Dhaka (referred to as
IWM in text, according to their wishes)

Md. Sifayet Ullah, UNDP, Programme Analyst-Disaster Management, 25-02-2015, Dhaka

Mohiudin Ahmed, LGED, Institutional Development Specialist, 17-02-2015, Dhaka

Nasim al azad Khan, IWM, junior specialist IWM, 26-01-2015, Khulna

Saiful Alam, WARPO, Director at Water Resources Planning Organisation, 05-02-2015, Dhaka

Saiful Islam, Blue Gold, Civil Engineer Water Infrastructure, 26-01-2015, Khulna

Sarafat Hossain Khan, BWDB, Project Director of CEIP-I, 16-02-2016, Dhaka

BWDB, Executive Engineer Office of the Chief Planning, 25-02-2015, Dhaka

Shorab Hossain, Blue Gold, Community Organization Expert, 05-02-2015, Dhaka

Swarna Kazi, World Bank, Disaster Risk Management Specialist, 01-03-2015, Dhaka

Shahidul Islam, Uttaran, Development activist expert, 22-03-2015, Dhaka

61
Interviews with locals

Each interview has its own identification number, below are the interviews categorized per data and
location. For the data collected please contact Rik Heinen.

Interview Code Date Location


1.1 20-1-2015 Bhabodah Regulator
1.2 20-1-2015 Beel Kapalia
1.3 20-1-2015 Beel Kapalia
1.4 20-1-2015 Beel Kapalia
1.5 20-1-2015 Beel Kapalia
1.6 20-1-2015 Beel Kapalia
1.7 20-1-2015 Beel Kapalia
1.8 20-1-2015 Beel Kapalia (high part)
2.1 28-1-2015 Beel Bhaina
2.2 28-1-2015 Beel Bhaina
2.3 28-1-2015 Beel Bhaina
2.4 28-1-2015 Beel Khuksia
2.5 28-1-2015 Beel Khuksia
2.6 28-1-2015 Beel Khuksia
2.7 28-1-2015 Beel Khuksia
2.8 28-1-2015 Beel Bhaina
2.9 28-1-2015 Beel Bhaina
2.1 28-1-2015 Beel Bhaina

62
Literature
ADB, 2007. Performance Evaluation Report, Bangladesh: Khulna-Jessore Drainage Rehabilitation
Project, s.l.: Asian Development Bank.

Ahmed, A., Yasmeen, A., Koudstaal, R. & Ahmad, M., 2003. Local level institutional Arrangements in
Khulna-Jesore Drainage Area a case study, Dhaka: PDO_ICZMP.

Ali, L., 2002. An Integrated Approach for the Improvement of Flood Control and Drainage Schemes in
the Coastal Belt of Bangladesh. Doctor: Delft.

Amir, M. S. I. I. et al., 2013. Tidal River Sediment Management - A Case Study in Southwestern
Bangladesh. International Journal of Civil, Architectural, Structural and Construction Engineering,
7(3), pp. 183-193.

Arcadis Euroconsult, 1999a. Khulna/Jessore Drainage Regabilitation Project (Component A:


Mobilisation of Beneficiary Participation) Final Report, Dhaka: Government of the people's republic of
Bangladesh, Asian Development Bank.

Arcadis Euroconsult, 1999b. Khulna/Jessore Drainage Rehabilitation Project (Component A:


Mobilisation of Beneficiary Participation) Quarterly Report No 2/3, Jessore: Government of the
People's Republic of Bangladesh, Asian Development Bank.

Auerbach, L. et al., 2015. Flood risk of natural and embanked landscapes on the
Ganges_Brahmaputra tidal delta plain. [Online]
Available at: http://www.nature.com/nclimate/journal/vaop/ncurrent/full/nclimate2472.html
[Accessed 26 January 2015].

Brammer, H., 2010. After the Bangladesh Flood Action Plan: Looking to the Future. Environmental
Hazards, 9(1), pp. 118-130.

BWDB, 2015. Riverine and Rainfall Flood. [Online]


Available at:
http://www.bwdb.gov.bd/index.php?option=com_content&view=article&id=196&Itemid=198
[Accessed 10 7 2015].

CEGIS, 2002. Monitoring and Integration of the Environmental and Socio-economic impact of
implementing the Tidal River Management option to solve the problem of drainage congestion in the
KJDRP area, Annual Monitoring Report 2001, Dhaka: Bangladesh Water Development Board.

CEGIS, 2003. Monitoring and Integration of the Environmental and Socio-economic impact of
implementing the Tidal River Management option to solve the problem of drainage congestion in the
KJDRP area, Final Report Part C: Integrated Water Resource Management Plan, Dhaka: Bangladesh
Water Development Board.

CEGIS, 2007. Environmental and Social Impact Assessment of the Proposed Project “Removal of
Drainage Congestion from the Beels adjacent to Bhabadaha area under Jessore District (Phase-1)”,
Dhaka: Ministery of Water Resources.

63
Chadwick, M. & Datta, A., 2000. Water Resources Management in Bangladesh, Policy Review Paper,
London: DFID.

Chowdhury, G. A. et al., 2012. Preparations for the Bangladesh Delta Plan, Wageningen: Alterra`.

de Die, L., 2013. MSc thesis.Tidal River Management, Temporary depolering to mitigate drainage
congestion in the southwest delta of Bangladesh, s.l.: Water Resources Management Group,
Wageningen University.

Dewan, C., 2012. Review of the historical evolution of policies and institutions of community based
management in Bangladesh, s.l.: IWMI.

Dewulf, A., Francois, G., Pahl-Wostl, C. & Taillieu, T., 2007. A framing Approach to Cross-disciplinary
Research Collaboration: Experiences from a Large-scale Research Project on Adaptive Water
Management. Ecology and Society, 12(2).

EGIS II, 2001. Environmental and Social Management Plan for Khulna-Jessore Rehabilitation Project
(exluding Hari River system), Dhaka: Ministry of Water Resources, Government of Bangladesh.

Euroconsult, 1997. Khulna Jessore Drainage Rehabilitation Project (Component A: Mobilisation of


beneficiary Participation), Technical Report No. 7: (Findings of the beneficiary Consultation on the
Overall Drainage Plans), Khulna: Government of the People's Republic of Bangladesh, Asian
Development Bank.

FAO, 1985. Report on a Tidal Area Study, Dhaka: Food and Agriculture Organisation of the United
Nations.

FAP, 1993. Bangladesh Flood Action Plan, Proceedings of the Third Conference, Dhaka: Ministery of
Irrigation, Water Development and Flood Control / Flood Plan Coordination Organisation (FPCO).

FFP, 2015. Fragile State Index 2015, Washington: FundForPeace.

Firoze, A., 2003. The southwest coastal region: Problems and potentials. The Daily Star, 25 July.

Geschiere, P., 2007. Epilogue: 'Seeing Like a State' in Africa - High Modernism, Legibility and
Community. African Studies, 66(1), pp. 129-134.

Hardin, J., 1963. Flood control of East Pakistan, s.l.: (extracts from a report).

Hughes, R., Adnan, S. & Dalal-Clayton, B., 1994. Floodplains or Flood Plans? A review of approaches to
water management in Bangladesh, Nottingham: Russel Press.

Islam, S. & Kibria, Z., 2006. Unraveling KJDRP, ADB Financed project of Mass Destruction in Southwest
Coastal Region of Bangladesh, Dhaka: Uttaran.

IWM, 2010. Feasibility Study and Detailed Engineering Design for Long Term Schedule of Drainage
Problems in the Bhabodah Area., Dhaka: Government of Bangladesh.

IWM, 2012. Monitoring and Evaluation of the Hydrological & Morphological Conditions of Rivers and
Drainage Problems of Beels in the KJDRP area for the Planning of Drainage Improvement Measures,
Dhaka: (BWDB, Trans.) (Vol. interim report).

64
Karim, M. & Mimura, N., 2008. Impacts of climate change and sea-level rise on cyclonic storm surge
floods in Bangladesh. Global Environmental Change, Volume 18, pp. 490-500.

Khadim, F. et al., 2013. Integrated Water Resources Management (IWRM) Impacts in South West
Coastal Zone of Bangladesh and Fact-Finding on Tidal River Management (TRM). Journal of Water
Resource and Protection, 5(10), pp. 953-961.

Li, T. M., 2005. Beyond "the State" and Failed schemes. American Anthropologist, 107(3), pp. 383-
394.

Mann, M., 1999. Book Reviews. American Journal of Sociology, 104(6), pp. 1813-1815.

Mukerji, C., 2009. Impossible Engineering: Technology and Territoriality on the Canal du Midi.
Princeton: Princeton University Press.

Nowreen, S., jalal, M. R. & Shah Alam, M., 2013. Historical analysis of rationalizing South West coastal
polder of Bangladesh. Water Policy, pp. 1-16.

Paul, A., Nath, B. & Md. Abbas, R., 2013. Tidal River Management (TRM) and its implication in
disaster management: A geospatial study on Hari-Teka river basin, Jessore, Bangladesh. International
Journal of Geomatics and Geosciences, 4(1), pp. 125-135.

Peng, X., 1987. Demographic Consequences of the Great Leap Forward in China's Provinces.
Population and Development Review, 13(4), pp. 639-670.

Planning Commission, General Economics Division, 2014. Inception Report, Bangladesh Delta Plan
2100, Dhaka: General Economics Division.

Pritchard, S. B., 2011. Confluence: The Nature of Technology and the Remaking of the Rhône.
Cambridge: Harvard University Press.

Scott, J., 1998. Seeing like a state: how certain schemes to improve the human condition have failed.
New Haven: Yale University Press.

Shampa, M. & Pramanik, I., 2012. Tidal River Management (TRM) for Selected Coastal Area of
Bangladesh to Mitigate Drainage Congestion. International Journal of Scientific & Technology
Research , 1(5), pp. 1-6.

SMEC, 2002. Submisision of the final project completion report Khulna Jessore drainage rehabilitation
project, Dhaka: Bangladesh Water Development Board.

Thijsse, J., 1964. Report on Hydrology of East Pakistan. (mimeo) ed. East Pakistan: Planning
Department.

van Minnen, J., 2013. Msc Thesis. Sediment transport in tidal basins, South West Delta Bangladesh,
s.l.: Soil Physics and Land Management Group, Wageningen University.

Warner, J., 2010. Integration through compartmentalization? Pitfalls of "Poldering" in Bangladesh.


Nature and Culture, 5(1), pp. 65-83.

Weick, K., 1995. Sensemaking in Organisations. 2 ed. Michigan: SAGE Publications, Inc.

65
Williams, R., 2005. Modernist Civic Space and the Case of Brasília. Journal of Urban History, 32(1), pp.
120-137.

Wood, G., 1999. Contesting water in Bangladesh: Knowledge, rights and governance. Journal of
International Development, 11(5), pp. 731-754.

Wood, G., 1999. Contesting Water in Bangladesh: Knowledge, Rights and Governance. Journal of
International Development, 11(5), pp. 731-754.

World Bank, 1990. Flood Control in Bangladesh, A Plan for Action, Volume 1, Washingto, D.C.: World
Bank.

World Bank, 2005. Project Performance Assessment Report, Bangladesh, Coastal Embankment
Rehabilitation Project, Dhaka: World bank.

World Bank, 2013. Project Appraisal Document for a Coastal Embankment Improvement Project
Phase I, South Asia Region: World Bank.

World Bank, 2015. GDP Growth (Annual %), s.l.: World Bank.

66
Annex

67
Annex A

68
BDP2100 schedule 0-1, (Planning Commission, General Economics Division, 2014)
Annex B

Discharges in the KJDRP river system at Rhaina and downstream, (SMEC, 2002).

69
Annex C

Longitudinal profile of the Hari river (1997-2001), (SMEC, 2002). 70


Annex D

Beel Kedaria sedimentation during TRM IWM 2006, (van Minnen, 2013)

71
Annex E

Question list experts interviews

The interviews that were done with the experts in order to collect the data were semi-
structured. This way the interviews could be in-depth and adapted to the individual that I
was interviewing and his/her specific expertise. The layout below of the questions I asked
only served as a red line through the interview. I used it to check of the specific topics that I
asked everybody, however most interviews were of a conversation type. This is because
perceptions is more easily to identify when people can talk more freely, they will talk about
the topics they think are interesting. This is not the case when it is a structured interview
with determined questions. The question below were used in all experts interviews but only
show the basic questions I asked everyone.

General information

Location:
Date:
Name:
Occupation:

Can you in a couple of sentences describe your job/profession?

How long have you worked in your specific field?

What projects in Bangladesh did you previously worked for?

Questions on TRM

In what way did you first learn/came across tidal river management?

What are the main positive effects and negative effects of TRM.

What in your words is the purpose of TRM?

Does it fulfil this purpose according to you?

Do you consider TRM to be something from the government or from the local people.

Would you consider TRM as a new innovation, or the product of an ongoing process?

In KJDRP a version of TRM was implemented after protest by local population, was the TRM
successful in your opinion?

What do you consider that makes the Blue gold project different compared with previous large
projects like the IPSWAM, the Khulna Jessora Drainage Rehabilitation Project (KJDRP) or LGED’s
small Scale Water Resources Development Sector Project (SSWRDSP) or FAP.

What do you consider the most important lessons learned from these projects that the blue gold
(and if possible BDP2100) will need to adapt to.

72
Questions on BDP2100

Do you have a connection with the Bangladesh Delta Plan (BDP2100)?

Do you see a place within the blue gold/BDP2100 for TRM? Why yes/no

If positive: In what consideration would you like to see TRM within the BDP2100?

73
Annex F

Question list local interviews at field level

In practice is was often not possible to ask all the question, because of time constrains of the
people interviewed. Also the informal setting in the fields and the communication through a
translator limited the precise information I could ask.

Local interview questions:

Beel/location:
Occupation:
Land status:

Have you experienced Tidal River Management on your land / the land on which you work?

If yes:
Were you informed before the TRM began?
Was there an opportunity to give your opinion on the matter?
What happened to your land?
What happened to your average income?
What problems were there before TRM in this beel?
What problems during in this beel?
(if applicable) What problems were there after in this beel?
Do you consider TRM to have had a positive or negative effect on your live and income?

If no:
Do you know the TRM is planned for this area?
Was/is there an opportunity to give your opinion on the matter?
What do you think will happen to your land?
What do you think will happen to your average income?
What problems are there now in this beel?
What problems will there be when TRM will happen in his beel?
Do you think TRM will have a positive or a negative effect on your live and income?