A conceptual process model does not typically describe how each process task
should be implemented. Depending on its nature, a task may not easily be
implemented automatically or it may not be possible to implement it at all via a
BPMS. Accordingly, the principle driving this first step is that not all processes
can be automated. Based on this principle, we start by identifying which parts of
our process can be coordinated by the BPMS and which parts cannot. To do so,
we distinguish three types of tasks, in line with the BPMN language: automated,
manual, and user tasks. Automated tasks are performed by the BPMS itself or by an
external service. Manual tasks are performed by process participants without the aid
of any software. User tasks sit between automated and manual tasks. A user task is
a task that is performed by a participant with the assistance of the worklist handler
of the BPMS or an external task list manager.
The differentiation between automated, manual, and user tasks is important:
Automated and user tasks can easily be coordinated by a BPMS, while manual tasks
cannot. Therefore, we first have to identify the type of each task. In the next step,
we review the manual tasks and assess whether we can find a way to hook them up
to the BPMS. If this is not possible, we will have to consider whether or not it is
convenient to automate the rest of the process without these manual tasks.
Let us consider again the order-to-cash process model that we created in
Chapter 3. It is shown in Figure 10.1 for convenience (for the moment, please
discard the markers). Let us assume that we obtain this model from a process
analyst. Our job is to automate it from the seller’s viewpoint. As such, we need
to focus on the process in the seller pool and discard the rest. The first task, “Check
stock availability”, belongs to the ERP lane. This means that it was already identified
as an automated task at the conceptual level. ERP systems provide modules to
manage inventories, which automatically check the stock levels of a product against
a warehouse database. This task is highly repetitive since it is performed for each
purchase order received. Performing it manually would be inefficient, because it
would keep a process participant busy with a trivial yet time-consuming task.
Similar observations can be made for “Check raw materials availability”, which
is also an automated task. Another example is the “Manufacture product” task. This
is performed by the manufacturing plant, which exposes its functionality via an IT
service interface. From the perspective of a BPMS, it is also an automated task.
Continuing with our example, there are other tasks, such as “Request raw
materials from Supplier 1(2)” and “Get shipping address”, that are devoted to
sending and receiving messages. These are examples of automated tasks, too. They
can be implemented via an automatic email exchange or a Web service invocation.
Note that BPMSs typically provide these capabilities. So far, these tasks are not
explicitly modeled inside a system lane. Recall that we are looking at a conceptual
process model, where it may not be relevant to model all existing systems (in this
case an email service or a Web service) via lanes.
10.1 Identify the Automation Boundaries 373
Other tasks like “Retrieve product from warehouse”, “Obtain raw materials from
Supplier 1(2)”, and “Ship product” are manual. For example, “Retrieve product from
warehouse” requires a warehouse worker to physically pick up the product from the
shelf for shipping. In the presence of a manual task we have two options: (i) we
isolate the task and focus on the automation of the process before and after it, or
(ii) we find a way for the BPMS to be notified when the manual task has started or
completed. We will get back to this point in the second step. For now, all we need
to do is identify these manual tasks.
“Confirm order” is an example of a user task: it requires somebody in sales
(e.g., an order clerk) to verify the purchase order and then confirm that the order
is correct. User tasks are typically managed by the worklist handler of the BPMS.
In our example, an electronic form of the purchase order will be rendered on screen
for the order clerk, who will verify that the order is in good state, confirm the order,
and submit the form back to the execution engine.
The distinction between automated, manual, and user tasks is captured in BPMN
via specific markers on the top-left corner of the task box. Manual tasks are marked
with a hand, while user tasks are marked with a user icon. Automated tasks are
further classified into the following subtypes in BPMN:
• Script (script marker), if the task executes some code (the script) internally to
the BPMS. This task can be used when the functionality is simple and does not
require access to an external application, e.g., opening a file or selecting the best
quote from a number of suppliers.
• Service (gears marker), if the task is executed by an external application, which
exposes its functionality via a service interface, e.g., “Check stock availability”
in our example.
• Business rule (table marker), if the task triggers a business rule to be executed by
a rules engine external to the BPMS, e.g., the rule for approving a loan.
• Send (filled envelope marker), if the task sends a message to an external service,
e.g., “Request raw materials from Supplier 1”.
• Receive (empty envelope marker), if the task waits for a message from an external
service, e.g., “Get shipping address”.
These markers apply to tasks only. They cannot be used on sub-processes, since
a sub-process may contain tasks of different types. The relevant markers for our
example are shown in Figure 10.1.
Exercise 10.1 Assume you have to automate the loan assessment process model
of Solution 3.8 (page 111) for the loan provider. Start by classifying the tasks of
this process into manual, automated, and user tasks. Then, represent them with
appropriate task markers.
10.2 Review Manual Tasks 375
Once we have identified the type of each task, in the second step of our method we
need to check whether we can link the manual tasks with the BPMS. The principle
driving this step is: if the task cannot be seen by the BPMS, it does not exist. So, we
either find a way to support manual tasks via technology or, alternatively, we need
to isolate these tasks and automate the rest of the process. There are two ways of
linking a manual task to a BPMS: we implement it either via a user task or via an
automated task.
Implement as User Task: If the participant involved in the manual task can notify
the BPMS of the task completion using the worklist handler of the BPMS, then
the manual task can be turned into a user task. For example, the warehouse
worker performing task “Retrieve product from warehouse” could check out a
work item from the worklist to indicate that the task is being worked on, manually
retrieve the product from the shelf, and then check in the work item back into the
BPMS engine. Alternatively, check-out and check-in can be combined in a single
step, by which the worker notifies the worklist handler of the completion of the
task.
Implement as Automated Task: In some cases, a process participant may use
technology that is integrated with the BPMS to notify the engine of a work item
completion. For example, the warehouse worker could use a device such as a
barcode scanner to scan the barcode of the raw materials that are picked up. If the
device is connected to the BPMS, scanning the barcode will automatically signal
the completion of task “Obtain raw materials from Supplier 1(2)”. In this case,
the manual task can be implemented as a receive task, which will be awaiting
the notification from the scanner, or as a user task handled by a worklist handler,
which in turn is connected to the scanner. If we use a receive task, the BPMS will
only be aware of the work item’s completion: informing the warehouse worker
that a new work item is available will be outside the scope of the BPMS. If we use
a user task, the worker will be notified of the new work item by the BPMS and
will use the scanner to signal the work item’s completion to the BPMS engine.
Similar considerations hold for task “Ship order”. Since each manual task of our
example can be linked with a BPMS, this process can be entirely automated.
Exercise 10.2 Consider the loan assessment model that you analyzed in Exer-
cise 10.1. Review the manual tasks of this model in order to link them to a BPMS.
There are cases in which it is not convenient to link manual tasks to a BPMS.
Example 10.1 Let us consider the university admission process described in Exer-
cise 1.1 (see page 5), with the improvements discussed in Solution 1.5 (page 29).
The process can be automated until the point where the application is batched for
the admission committee (shown in Figure 10.2a). Once all the applications have
been batched, the committee will meet and examine all of them at once. However,
this part of the process (shown in Figure 10.2b) is outside the scope of a BPMS.
376
a
application test
Check Verify Batch
complete valid
application English application
for language to admissions
Application completeness application test test committee Application
submitted incomplete invalid batched
electronically
Notify Reject
applicant application
Application Application
updated rejected
b
for all batched
applications
Assess
application
Meeting Meeting
day completed
until all
applications
assessed
application degrees
Update pre-approved Ask applicant valid
Post Receive Update Accept
student to post documents results from student application
record documents
Application Documents to agency agency record Application
Degrees Degrees accepted
result received degrees
available by post validity validity invalid
verification verified
required
application
rejected
Reject
application
Application
the assessment by the committee (b) is a manual process outside the scope of the BPMS
rejected
Fig. 10.2 Admission process: the initial (a) and final (c) assessments can be automated in a BPMS;
10 Process Implementation with Executable Models
10.2 Review Manual Tasks 377
The tasks required for assessing applications cannot be automated, because they
involve various human participants who interact on an ad hoc basis. It would not be
convenient to synchronize all these tasks with the BPMS. Eventually, the committee
will decide on a list of accepted candidates and transfer it to the admissions office.
Then, a clerk at the admissions office will update the various student records, at
which time the rest of the process can proceed within the scope of the BPMS (shown
in Figure 10.2c).
In this example, we cannot automate the whole process. So, we need to isolate
the task “Assess application”, an ad hoc task containing various manual tasks, and
automate the process before and after this task. An option is to split the model
into three fragments as shown in Figure 10.2 and only automate the first and the
third fragment. Another option is to keep one model and simply remove the ad hoc
task. Some BPMSs are tolerant to the presence of manual tasks and ad hoc tasks in
executable models, and will discard them at deployment time (like comments in a
programming language). If this is the case, we can keep these elements in.
Observe the use of the untyped event to start the third process model fragment
in Figure 10.2. In BPMN, a process that starts with an untyped event indicates
that instances of this process are explicitly started by a BPMS user, in our case a
clerk at the admissions office. This process initiation is called explicit instantiation.
Implicit instantiation refers to the situation where process instances are triggered
automatically by the event type indicated in the start event, e.g., an incoming
message or a timer.
Exercise 10.3 Consider the final part of the prescription fulfillment process
described in Exercise 1.6 (page 30):
Once the prescription passes the insurance check, it is assigned to a technician who collects
the drugs from the shelves and puts them in a bag with the prescription stapled to it. After
the technician has filled a given prescription, the bag is passed to the pharmacist who
double-checks that the prescription has been filled correctly. After this quality check, the
pharmacist seals the bag and puts it in the pick-up area. When a customer arrives to pick
up a prescription, a technician retrieves thise prescription and asks the customer for the co-
payment or for the full payment in case the drugs in the prescription are not covered by the
customer’s insurance policy.
One way of modeling this fragment is by defining the following tasks: “Check
insurance”, “Collect drugs from shelves”, “Check quality”, “Collect payment”
(triggered by the arrival of the customer), and finally “Retrieve prescription
bag”. Assume the pharmacy system automates the prescription fulfillment process.
Identify the type of each task and if there are any manual tasks, specify how these
can be linked to the pharmacy system.
There are other modeling elements besides manual tasks that are relevant at a
conceptual level but cannot be interpreted by a BPMS. These are physical data
objects and data stores, messages bearing physical objects, and text annotations.
Pools and lanes are only meaningful at the conceptual level, too. In fact, as we have
seen, pools and lanes are often used to capture coarse-grained resource assignments,
e.g., task “Confirm order” is done within the sales department. When it comes
378 10 Process Implementation with Executable Models
to execution, we need to define resource assignments for each task and capturing
this information via dedicated lanes (potentially one for each task) would make
the model too cluttered. Electronic data stores are also not directly interpreted by
a BPMS, since the BPMS assumes the existence of dedicated services that can
access these data stores, e.g., an inventory information service that can access the
warehouse database. So, the BPMS will interface with these services rather than
directly with the data stores. Also, the state of a data object indicated in the object’s
label, e.g., “Purchase order [confirmed]”, cannot be interpreted as such by a BPMS.
Later, we will show how to explicitly represent object states so that they can be
interpreted by a BPMS.
Some BPMSs tolerate the presence of non-executable elements in their modeling
tool. If this is the case, it is good practice to leave these elements in. Especially
pools, lanes, message flows bearing electronic objects, electronic data stores, and
annotations will guide us in the specification of some execution properties. For
example, the Sales lane in the order-to-cash model indicates that the participant
who is to be assigned the “Confirm order” task has to be from the sales department.
Other BPMSs do not support these elements, so it is not possible to represent them
in the process model.
Exercise 10.4 Consider the loan assessment model that you obtained in Exer-
cise 10.2 (page 375). Identify the modeling elements that cannot be interpreted by a
BPMS.
Once we have established the automation boundaries of the process and reviewed
the manual tasks, we need to check that our process model is complete. Two
principles underlie this step: (i) exceptions are the rule and (ii) no data implies no
decisions and no task handoff. Often, conceptual process models neglect certain
information; because modelers deem it as irrelevant for the specific modeling
purpose, they assume it is common knowledge, or they are simply not aware of
it. Depending on the application scenario, it may be fine to neglect this information
in a conceptual model. However, information that is not relevant in a conceptual
model may be highly relevant for a process model to be executed.
A typical example is when the process model focuses on the “sunny-day”
scenario and neglects all negative situations that may arise during the execution
of the process, working under the assumption that everything will work well. As
we saw in Chapter 4, there are various exceptions that can occur in the order-to-
cash process. For example, this process may be aborted if the materials required
to manufacture the product are not available at the suppliers or if the customer
cancels the order. So, based on the first principle above, we need to make sure that
all exceptions are handled using appropriate exception handlers. For example, if the
order cancelation is received after the product has been shipped or after the payment
10.3 Complete the Process Model 379
has been received, then we also have to compensate for these tasks by returning
the product and reimbursing the customer. Another exception that is commonly
neglected is the situation when a task cannot complete correctly. What happens if the
customer’s address is never received? Or if the ERP module for checking the stock
availability does not respond? We cannot assume that the other party will always
respond or that a system will always be functional. Similarly, we cannot assume
that tasks always lead to a positive outcome. For example, an order may not always
be confirmed.
You may be surprised about how rarely exceptions are captured in a conceptual
process model in practice. Thus, in the majority of cases, such a model will require
to be completed with these aspects before being executed.
Looking at the second principle, in this step we also need to specify all electronic
data objects that are required as input and output by the tasks of our process.
For instance, in Figure 10.1 (see page 373) there is no input data object to task
“Request raw materials from Supplier 1(2)”, though this task does need the list of
raw materials to be ordered. Another example is task “Check stock availability”.
This task uses the purchase order as input (to obtain the code of the product to be
looked up in the Warehouse DB), but does not produce any output data to store the
results of the search. However, without this information, the subsequent XOR-split
cannot determine which branch to take (we can now better grasp why this is called a
data-based XOR-split). If you have not noticed the absence of these data objects so
far, it is probably because you assumed their existence. This is fine in a conceptual
model where only aspects relevant to the specific modeling purpose are documented,
but not in an executable model, where a software engine has to run the model. So,
make sure each task has the required input and output electronic data objects. The
point is that every data object needed by the BPMS engine to pass control between
tasks and to take decisions must be modeled.
The completed order-to-cash example, including exception handlers and data
objects that are relevant for execution, is shown in Figure 10.3.1
Exercise 10.5 Take the loan assessment model that you obtained in Exercise 10.1
(page 374) after incorporating the revisions from Exercise 10.2 (page 375). Com-
plete this model with control-flow and data-flow aspects relevant for automation.
For the sake of simplicity, you may disregard the modeling elements that are not
interpretable by a BPMS.
1 Thecontent of the sub-processes and some of the elements that cannot be interpreted by a BPMS
have been omitted for simplicity.
380 10 Process Implementation with Executable Models
Fig. 10.3 The order-to-cash model of Figure 10.1, completed with control-flow and data-flow
aspects relevant for automation
10.4 Bring the Process Model to an Adequate Granularity Level 381
Tasks in a conceptual model may not be at the right level of granularity for
implementation. They may be either too abstract, in which case we need to
decompose them, or too detailed, in which case they should be aggregated. For
example, two consecutive tasks assigned to the same resource are candidates for
aggregation. In a similar way, if a task requires more than one resource to be
performed, then it is too coarse-grained. We should then decompose it into finer-
grained tasks such that these can be assigned to different resources. The principle
driving these examples is that a BPMS adds value if it coordinates handoffs of work
between resources. Indeed, we should keep in mind that a BPMS is intended to
coordinate and manage handoffs of work between multiple resources (human or
non-human). If this were not the case, the BPMS would not add value between
tasks.
A special case are ad hoc sub-processes, which are difficult to define in terms of
the order of tasks within the sub-process. These sub-processes may be implemented
using the Case Management Model and Notation (CMMN), a language complemen-
tary to BPMN.
from a potential client. The client is then sent information about the available
services. A response by the client is awaited to arrive via either email or postal
mail. When the response is received, the next action is decided upon. Either an
appointment can be made with the client to discuss the service options in person or
the application is accepted. It could also be rejected right away. If the application is
accepted, an offer is sent to the client and at the same time the application is filed. If
it is rejected, the client is sent a thank-you note. If an appointment has to be made,
this is done and, at the time of the appointment, the application is discussed with
the client. Then, the process continues as if the application had been accepted right
away.
1. Identify the type of each task and find ways of linking the manual tasks to a
BPMS.
2. Remove elements that cannot be interpreted by a BPMS.
3. Complete the model by adding the control-flow and data aspects required for
execution.
4. Bring the resulting model to a granularity level that is adequate for execution.
Acknowledgement: This exercise is adapted from a similar exercise developed by
Remco Dijkman, Eindhoven University of Technology.
Unordered tasks, such as those within an ad hoc sub-process (see Section 4.1.2),
are often difficult to implement using a BPMS based on the BPMN language. Take,
for example, the model in Figure 4.6 (page 122). This model, which captures the
order-to-cash process from the perspective of the customer, has three tasks within
an ad hoc sub-process: “Check order status”, “Update details”, and “Cancel order”.
These tasks can hardly be coordinated by a BPMS based on BPMN, since there is
no strict order for their execution. Also, each of these may potentially be repeated
multiple times. As a rule of thumb, a (sub-)process whose tasks are performed in an
ad hoc manner, without any predictable order, is not suitable for automation via a
BPMN-based BPMS. In this case, a case management system or an ad hoc workflow
system is more appropriate.
Several BPMSs, such as Camunda, do not only support the BPMN language,
but also the Case Management Model and Notation (CMMN) language. This is
another standard by OMG, available in version 1.1. BPMN and CMMN differ
in the way they describe processes. BPMN builds on the explicit specification of
those execution sequences that are allowed. Thereby, it forbids any other order of
processing. CMMN defines which tasks have to be executed, although potentially
restricted by certain conditions. In this way, it remains underspecified how the case
is to be handled, except for those tasks that are bound to conditions. Therefore,
CMMN is often considered as a more flexible way to describe what has to be
achieved in a process instead of how to achieve it. Often, CMMN will be used as a
10.4 Bring the Process Model to an Adequate Granularity Level 383
Fig. 10.5 Excerpt of an order-to-cash process model (from out-of-stock product to product
provided) captured in CMMN
type of sub-process in a BPMN model, but also vice versa: tasks in a CMMN model
can have BPMN sub-processes.
CMMN offers a set of elements for describing processes. This set includes
tasks and events with the same graphical symbols as we know them from BPMN.
Figure 10.5 shows a simple example including the most important elements. The
model was created by a process analyst who felt that the the order-to-cash process
within their company was difficult to model in BPMN from the point where the
product is out-of-stock to the provisioning of the product. In a CMMN model,
everything is organized in a case, depicted as a large box with a tab to make it
look like a folder. For example, consider the “Provide product” case in our example.
A case contains a stage, tasks, milestones, sentries, and connections. The stage is a
large octagon, which can be used to group other elements. Here, it is used to describe
how raw materials are checked for availability as a task, how this contributes to
arriving at the milestone of compiling a list of missing raw materials, and how this
milestone must occur before raw materials can be requested from Supplier 1 or
2. This condition is expressed using a sentry, which is a small, diamond-shaped
symbol on the entry-side of elements. The reason why the process analyst decided
to use CMMN is the fact that those requests do not exactly match deliveries. First,
the suppliers deliver standard materials on a regular basis, even without an explicit
request. Second, it often happens that one request is served by several separate
384 10 Process Implementation with Executable Models
deliveries. In other to express the fact that deliveries can happen at any time, the
two “Receive delivery” tasks do not have any sentries. There is another milestone in
the lower part of the model, which is called “Enough raw materials available”. If this
is reached, the product can be manufactured. This leads to a successful completion
of the case, as indicated by the black diamond element on the border of the case
container. Our example model also includes another option to provide the product,
i.e., by purchasing it from a partner.
Tasks on a conceptual level can also be too fine-grained. For example, a sequence
of user tasks “Enter customer name”, “Enter customer policy number”, and “Enter
damage details” should be aggregated into a single user task “Enter claim” if they are
all supposed to be performed by the same claims handler. Otherwise, all the BPMS
would do would be to interfere with the work of the claims handler. Accordingly,
two or more consecutive tasks assigned to the same resource are candidates for
aggregation.
There are some cases, though, where we may actually need to keep consecutive
tasks separate, despite that they are performed by the same resource. For example,
in Figure 10.2c we have three user tasks within the sub-process “Verify degrees
validity”: “Post documents to agency”, “Receive results from agency”, and “Update
student record”. While these may be performed by the same admin clerk, we want
to keep track of when each task has been completed for the sake of monitoring
the progress of the application and managing potential exceptions. For example, if
the results are not received within a given timeframe, we can handle this delay by
adding an exception handler to the “Receive results from agency” task.
Exercise 10.7 Are there tasks that can be aggregated in the model as obtained in
Exercise 10.5 (page 379)?
Hint: candidate tasks for aggregation may not necessarily be consecutive due to
a sub-optimal order of tasks in the conceptual model. In this case, you need to
resequence the tasks first.
At the end of the fourth step, we obtain a to-be-executed process model, i.e., a
process model that contains the right elements and is at the right level of granularity
to be automated with a BPMS. However, this model is still technology-agnostic.
That is to say, it is independent of the specific BPMS technology we will choose for
automation. As such, software engineers may be supported by process analysts in
the incremental transformation of a conceptual model into a to-be-executed model.
10.5 Specify Execution Properties 385
To make the model fully executable, we need to specify in the last step how each
model element is effectively implemented by our BPMS of choice. For example,
take the first service task of our revised order-to-cash example: “Check stock
availability”. Saying that this task requires the purchase order as input to contact
the warehouse ERP system is not enough. We need to specify which specific service
provided by the ERP system is to be used to check the stock levels, the location of its
interface in the network, the format of its input object (the purchase order), and the
format of its output object (the stock availability). These implementation details are
called execution properties. They are required to obtain a fully-executable process
model. More specifically, these properties are:
• Variables, messages, signals, errors, and their data types,
• Data mappings,
• Service details for service, send and receive tasks, and for message and signal
events,
• Code snippets for script tasks,
• Participant assignment rules and user interface structure for user tasks,
• Task, event, and sequence flow expressions, and
• Other BPMS-specific properties.
The BPMN language provides the means to specify most of these properties.
However, in practice, BPMS vendors often diverge from the standard way of
specifying these properties and rather offer alternative, sometimes proprietary,
mechanisms. This may be because of legacy reasons or to gain a competitive
advantage. In the rest of this section, we will focus on how the above properties
can be defined according to the standard BPMN specification and point out to some
alternatives, where available.
Execution properties do not have a graphical representation in a BPMN model,
but are stored in the BPMN interchange format. The BPMN interchange format
is a textual representation of a BPMN model in XML format. It is intended to
support the interchange of BPMN models between tools and also serves as input
to a BPMN execution engine. BPMN modeling tools provide a visual interface
to edit most of these non-graphical properties. So, most of the times you will not
need to write XML directly. Still, you will need to at least understand standard Web
technology and be familiar with the notion of Web service to be able to implement
an executable process model. This section assumes that you have a basic knowledge
of technologies such as XML and XML Schema (XSD). We provide pointers to
further readings on these technologies at the end of this chapter.
Figure 10.6 shows the structure of the BPMN exchange format. It consists of a
list of elements, where some are optional (those with a dashed border) and others
are mandatory (those with solid borders). The process element is mandatory. It
consists of data objects, events, tasks, and flows. The elements outside the process
are reusable components needed by the various process elements, such as message
definitions and service interfaces that are used by service, send, and receive tasks,
and by message and signal events. With reference to this structure, let us now go
through each of the execution properties listed above.
386 10 Process Implementation with Executable Models
Data types
Messages
Signals
Errors
Service interfaces
Service operaons
Resource classes
Process
Data objects
Events
Tasks
Flows
Process variables are managed by the BPMS engine to allow data exchange between
process elements. Each electronic data object, e.g., the purchase order in the order-
to-cash process, is represented by a process variable. Each of the variables we
want to use in the process has to be explicitly defined by assigning a data type
to it. In BPMN, the type of each variable is specified as an XSD type. However,
some BPMSs may use different languages or proprietary definitions. With reference
to XSD, the type of a variable can be simple or complex. The complex types
can be either defined directly in the BPMN model or imported from an external
document (see Figure 10.6). Simple types are strings, integers, doubles (numbers
containing decimals), booleans, dates, times, etc.. These are already defined in the
XSD specification. For example, the object “Stock availability” can be represented
as a variable of type integer (capturing the number of available units of a product).
Complex types are hierarchical compositions of other types. A complex type can be
used to represent, for example, a business document, such as a purchase order or an
invoice. Figure 10.7a shows the possible format of a purchase order, captured as a
complex type called “purchaseOrderType”. Figure 10.7b is the XML representation
of a particular instance of this purchase order at runtime. From the type definition
we can see that a purchase order contains a sequence of two elements:
• “order” to store the order information (order number, order date, status, currency,
product code and quantity), and
10.5 Specify Execution Properties 387
Fig. 10.7 The XSD describing the purchase order (a) and one of its instances (b)
“purchase order”, then they will obviously take the same type “purchaseOrderType”.
If message flows are not modeled, we can look at the send, receive, and service
tasks, as well at the message events present in the model in order to understand
what messages to define.
For signals and errors we have to look at the signal and error events that we have
defined in the diagram. While for a signal the data type describes the content of
the signal being broadcasted or listened to, for an error the data type defines what
information is carried with the error. For example, if it is a system error, then we can
use this to specify the error message returned by the system. In addition, we need to
assign an error code to each error. This code uniquely identifies an error, so that a
catching error event can be related to a throwing error event.
Besides the above data elements, we need to define the internal variables of
each task, which are called data inputs and data outputs in BPMN. Data inputs and
outputs act as interfaces between a task and the task’s input and output data objects.
They also need to refer to an XSD type that defines their structure, but, differently
from process variables, they are only visible within the task (or sub-process) in
which they are defined. Data inputs capture data that is required by the task to be
executed. Data outputs capture data that is produced by the task upon completion.
Data inputs are populated with the content of input data objects while data outputs
are used to populate the content of output data objects. For example, we need a
data input for task “Check stock availability” to store the content of the purchase
order. Thus, the type of this data input must match that of the input object, i.e.,
“purchaseOrderType”. Similarly, the data output must be of type integer to store
the number of items in stock, so that this information can be copied into the output
object stock availability upon task completion.
Similarly to tasks, events that transmit or receive data, i.e., message, signal and
error events, also have internal variables. Specifically, the catching version of these
events has one data output only, which is used to store the content of the event being
caught (e.g., an incoming message). The throwing version has one data input only,
which is there to store the content of the event being thrown (e.g., an error). Thus,
we also need to assign to these data inputs and outputs a type that has to match
that of the message, signal, or error associated with the event. For example, the start
catching message event “Purchase order received” in the order-to-cash example uses
a data output to store the purchase order message once this has been received. So,
this data output must match the type of the incoming message, which is precisely
“purchaseOrderType”. In turn, the output object must have the same type as the
output data to contain the purchase order.
In BPMN, data is manipulated and processed inside tasks and events. The mapping
between data objects and task (event) data inputs or outputs is defined via the
task data associations. Data associations can also be used to define complex data
10.5 Specify Execution Properties 389
Once we have defined the types of all data elements and mapped task and event
data inputs and outputs to these types, we have to specify how tasks and events
have to be implemented. For service tasks, we need to specify how to communicate
with the external application that will execute the task. Be it a complex system or a
simple application, all that the BPMS needs to know is its service interface that the
service task can use. A service interface contains one or more service operations,
each of which describes a particular way of interacting with a given service. For
example, a service for retrieving inventory information provides two operations:
one to check the current stock levels and one to check the stock forecast for a
given product (based on product code or name). An operation can be either in-out
or in-only. In an in-out operation (also called synchronous operation), the service
expects a request message, then replies with a response message once the operation
has been completed or, optionally, provides an error message if something goes
wrong. For example, the service invoked by task “Check raw materials availability”
receives stock availability information as input message and replies with a list of raw
materials to be ordered as output message. Alternatively, if the service experiences
an exception (e.g., the suppliers catalog is unreachable), it replies with an error
message. The message triggers the boundary error event of this task, such that the
related exception handler can be executed.2 Conversely, in an in-only operation (also
called asynchronous operation), the service expects a request message but will not
2 Note that there is no throwing end error event inside “Check raw materials availability” since the
catching error event is triggered by the receipt of an error message by the service task. The ability
to link error messages with error events is a common feature of BPMSs.
390 10 Process Implementation with Executable Models
reply with a response message. For example, the task “Archive order” notifies an
archival service for the purchase order; however, the process does not wait for an
archival confirmation.
Each message of a service operation needs to reference a message in the
BPMN model, so that it can be assigned a data type. For instance, the request
and the response messages to interact with the inventory service have the data
type “purchaseOrderType” and XSD integer, respectively. For each interface, we
also need to specify how this is concretely implemented, i.e., what communication
protocols are used by the service and where the service is located in the network. The
BPMN specification recommends the use of Web service technology to implement
service interfaces. It relies on WSDL 2.0 to specify this information. In practice, this
corresponds to defining one or more external WSDL documents (which specify the
interface of the service to be accessed) and importing them into our BPMN model.
Once again, other implementations are possible, e.g., one could implement a service
interface via a Java remote procedure call or plain XML over HTTP.
Contemporary BPMSs allow the use of Web services designed according to the
Representational State Transfer (REST) architectural style, a style that is supported
by WSDL 2.0. A RESTful service is viewed as a resource or as a source of
specific information (data and functionality) and identified with a Uniform Resource
Identifier (URI). A service task accesses a RESTful service using the URI and a
fixed set of operations. The service returns a representation of the resource. The
latter typically takes the form of an XML or JavaScript Object Notation (JSON) file,
which is transmitted over HTTP. When HTTP is used as the transport protocol, the
operations that can be performed are the creation, retrieval, updating, and deletion
of resources. BPMSs such as Camunda or Bonita offer the possibility for service
tasks to invoke RESTful services. Additionally, these BPMSs expose their own
functionality (e.g., the ability to create new cases of a process or to check the status
of a case) via a REST Application Programming Interface (API).
After defining the service interfaces for our process, we need to associate each
service task with a service operation as defined in a service interface. Based on
the type of the operation (in-out or in-only), we then need to define a single data
input that must match the type of the request message in the referenced service
operation and, optionally, a single data output that must match the type of the
response message in the operation. The BPMS engine will correctly bind the data
input of the task to the request message and send it out to the service. Once the
response message has been received, it will bind the content of this message to the
data output of the task.
Send and receive tasks work similarly to service tasks. A send task is a special case
of the service task: it sends a message to an external service using its data input,
without expecting a reply. An example is the “Notify unavailability to customer”
10.5 Specify Execution Properties 391
task. A receive task waits for an incoming message and uses its data output to
store the message content. The “Get shipping address” task is an example of this.
Both task types need to reference an in-only service operation where the message
is defined. For the receive, the message being received is seen as a request coming
from an external service requester. So, in this case, the process itself acts as the
service provider.
A receive task can also be used to receive the response of an asynchronous
service, which has previously been invoked with a send task. This is the case for the
“Request shipping address” and “Get shipping address” tasks. The asynchronous
service is provided by the customer. Accordingly, in the send task the seller’s
process acts as the service requester sending a request message to the customer.
In the receive task, the roles are swapped: the seller acts as the service provider
to receive the response message from the customer. This pattern is used for long-
running interactions, where the response may arrive after a while. The drawback of
using a synchronous service task instead of a pair of send-receive task is that the
service task blocks the execution of the process (or the execution of the branch of
the process where it is located) until a response is received. This is not the case in
Figure 10.3 (page 380). Here, the send and receive tasks are in parallel to “Emit
invoice”, which may well be performed between these tasks.
Message and signal events work exactly as send and receive tasks. Signal events
should be used when the service being consumed has publish-subscribe capabilities,
e.g., a Web service for subscribing to RSS feeds. In all other cases, we should either
use message events or send and receive tasks.
For script tasks, we need to provide the snippet of code that will be executed by the
BPMS. This code can be written in a scripting or programming language, such as
JavaScript or Python. BPMN does not prescribe the use of a specific language, so
the choice depends on the BPMS to be used and any organizational preferences. The
task’s data inputs store the parameters for invoking the script while its data outputs
store the results of executing the script. For example, for the “Determine cancelation
penalty” task we can define a script that extracts the order date and the cancelation
request date from two data inputs. These are mapped to the input objects purchase
order and cancelation request. The information is then used to compute a penalty of
e 15 for each day past the order date, which is then copied to the data output.
For each user task, we need to specify the rules for allocating work items to process
participants at runtime, the technology for communicating with process participants,
392 10 Process Implementation with Executable Models
and the details of the user interface to use. Moreover, like for any other task, we need
to define data inputs to pass information to the participant, as well as the data outputs
to receive the results.
Process participants that can be assigned user tasks are called potential owners
in BPMN. A potential owner is a member of a resource class. In the context of
user tasks, a resource class identifies a static list of participants sharing certain
characteristics, e.g., holding the same role or belonging to the same department
or unit. An example of a resource class for the order-to-cash process is order clerk,
which groups all participants holding this role within the sales department of the
seller organization. Note that these resource classes are unrelated to pools and lanes,
which are only notational elements in a conceptual process model. A resource class
can be further characterized by one or more resource parameters, where a parameter
has a name and a data type. For example, we can define two parameters product and
region of type string to indicate the particular products an order clerk works with,
and the region he or she works in.
Once we have defined all required resource classes and, optionally, their param-
eters, we can assign each user task to one or more resource classes based on an
expression. For example, we can express that work items of the “Confirm order”
task must be assigned to all participants of type “Order clerk” who deal with the
particular product being ordered and work in the same region as the customer. For
this, we can define an XPATH expression that selects all members of the order clerk
resource class who are responsible for the country specified in the purchase order.
Finally, we need to specify the implementation technology used to offer the work
item to the selected participant(s). This entails aspects such as how to reach the
participant (e.g., via email or worklist notification), how to render the content of
the task data inputs on screen (e.g., via one or more Web forms organized through a
particular screenflow), and the strategy to assign the work item to a single participant
out of those satisfying the assignment expression (e.g., assign it to the order clerk
with the shortest queue). Different allocation strategies for assigning work items
to process participants are discussed in the box “Task allocation strategies”. The
configuration of all these aspects, as well as the association of participants to
resource classes is dependent on the specific BPMS being used.
(continued)
10.5 Specify Execution Properties 393
Finally, we need to write expressions for the various attributes of tasks and events,
as well as for the sequence flows with conditions. For instance, in a loop task we
need to write a boolean expression that implements the text annotation indicating
the loop condition (e.g., “until response approved”). This boolean expression will
determine if the loop task is repeated. This expression can be defined over data
elements, e.g., it can be an XPATH expression that extracts the value of the boolean
element “approved” from the response object. We can also use instance attributes
inside these expressions. These are variables that vary by instance at runtime. An
example is loop count, which counts the number of iterations for a loop task. For
the timer event we need to specify an expression to capture the temporal event
informally expressed by its label (e.g., “Friday afternoon”). Here, we have three
options: we can either provide a temporal expression in the form of a precise date or
time, a relative duration, or a repeating interval. Once again, these expressions can
be linked to data elements and instance properties so as to be resolved dynamically
at runtime. For example, we can set an order confirmation timeout based on the
number of line items in an order.
Finally, we need to write a boolean expression to capture the condition attached to
each sequence flow following an (X)OR-split. For example, the condition “product
in stock” after the first XOR-split in the order-to-cash example can be implemented
as an XPATH expression that checks whether the value of variable stock availability
is at least equal to the product quantity contained in the purchase order. There is
no need to assign an expression to a default sequence flow, since it is taken by the
BPMS engine if the expressions assigned to all other arcs emanating from the same
(X)OR-split evaluate to false.
Sometimes, the conditions that allow a process instance to be routed towards one
or another path in the model can be quite complex. The reason is that the business
rules underpinning these conditions are inherently complex, such as the rules for
assessing the credit risk of a loan applicant. Business rules may also happen to
change over time, for example when a request is approved or an application is
accepted. It would be convenient if in such a case only the rules were to be changed,
not the whole process model. For these reasons, OMG has developed the Decision
Model and Notation (DMN) standard, which at the time of writing is available in
version 1.1. Instead of defining complex expressions in the outgoing arcs of (X)OR-
splits, DMN allows us to define business rules separately and link these with BPMN
business rule tasks or conditional events. Specifically, the rule is defined at design
time and evaluated at runtime by a DMN rules engine. This engine is invoked by
a business rule task or conditional event whenever an instance of such elements is
10.5 Specify Execution Properties 395
reached during process execution. Note, however, that the link between BPMN and
DMN has not been standardized by OMG yet. Hence, each BPMS vendor offers a
proprietary mechanism to link BPMN elements to DMN rules.
In essence, DMN provides three parts for the specification of business rules:
the Decision Requirements Graph (DRG) that describes how data is propagated
between different decisions, the Simple Expression Language (S-FEEL) to define
how values are extracted from variables, and Decision Tables (DMN tables). Here,
we briefly introduce DMN tables.
Figure 10.8 shows a DMN table that captures the rules for grading loan
applications. The figure provides explanations of the various components of a DMN
table. Each table has a name, indicators of hit, completeness and priority, input and
output attributes with corresponding entries, facets, and, most importantly, rules.
Each row represents a rule and the columns its respective inputs and outputs.
Columns have a type (e.g. string, integer, or date) or specifically defined ranges
called facets. In our example, a facet is defined with values V G (very good), G
(good), F (fair), and P (poor). For a particular combination of input attributes,
like AnnualIncome = 500 and LoanSize = 4230, we have to find the row that
matches in order to identify the output value. The given values match row B and
yield the Grade = G.
DMN tables have different indicators. The hit indicator specifies whether one or
many rows are allowed to match a given input. The most prominent hit indicator
is U, which indicates that any combination of input values should yield a unique
output. If there is more than one match, the priority indicator defines which row
to choose. In our example, A, B, C, D define an alphabetical order of priority. It is
also possible to specify, for example, that the minimum or maximum value should
be chosen. The completeness indicator specifies whether there must be at least one
row for each possible input configuration, or if also no matches are allowed. The
most prominent one is C indicating that the table should be complete, meaning that
any combination of input values should map to an output. It is a good practice that
DMN tables have unique hits and a complete set of rules.
396 10 Process Implementation with Executable Models
Analysts can make mistakes when creating DMN tables. For example, it is a
mistake to specify overlapping rules when the hit indicator does not allow it. In this
case, there is an input configuration that matches several rows. It is also a mistake
to have missing rules when the completeness indicator does not allow it. If a rule is
missing, there is no row that matches a particular configuration.
Example 10.2 Let us check if the decision table of Figure 10.8 has overlapping and
missing rules. Two rules are overlapping if their values on all input columns overlap.
We observe the following overlaps for the first column of annual income: A and B,
A and C, and B and C. For the column loan size, we observe: B and C, A and C, and
A and D. This means that there is an overlap for the values where A and C overlap.
This is an annual income between 500 and 1,000 together with a loan size between
500 and 1,000. This means that A and C are overlapping rules.
In order to find missing rules, we have to find values that are not covered by either
column. We observe that there are missing rules for an annual income between 1,500
and 2,000, as well as for incomes greater than 2,500. There are also missing rules
for a loan size between 3,000 and 4,000, and greater than 5,000.
Exercise 10.8 Consider the DMN table in Figure 10.9. Identify overlapping and
missing rules.
A [0..2000] [0..3000]
B [1000..3000] [2000..5000]
C [4000..6000] [7000..9000]
10.5 Specify Execution Properties 397
assessment process sends an application for review to this service, then the service
presents this information to the applicant via the loan provider’s website.
Further, the loan assessment process interacts with an internal service for
assessing loan risks. This service determines a risk weight, which is proportional
to the credit assessment contained in the credit history report, on the basis of
the applicable risk rules. The risk assessment service returns a risk assessment
containing an identifier (freshly generated), a reference to the loan application and
one to the credit history report (both extracted from the credit history report), and
the risk weight.
Based on the above information, we can specify the execution properties for the
elements of this process model. It is neither required to define the actual XSD type of
each data element, nor to specify the actual Groovy scripts or XPATH expressions.
Instead, we identify what properties have to be specified, i.e., what data inputs
and outputs, service interfaces, operations, messages, and errors are required, and
determine their data type in relation to that of process variables. For example, a data
input may map to a process variable or to a data field within this. For scripts, we
define via task inputs and outputs what data is required by the script, what data is
produced, and how the input data is transformed into the output one. For example,
based on the value of a data field in a process variable, a script may write a particular
value in the data field of another process variable. Similarly, for each user task, we
identify what information is presented to the task performer and how the data output
is obtained. Finally, we explain how each expression can be evaluated on the basis of
data fields within process variables (e.g., to implement the condition of a sequence
flow) or constant values like a date (e.g., to implement a timer event).
Now that you have become familiar with what is required to turn a process
model into an executable one, the last step for you is to take a process model
and implement it using the BPMS of your choice (e.g., Activiti, Bonita, Bizagi,
Camunda, IBM, Oracle, YAWL). The landscape of BPMSs and their specificities
evolve continuously. We can identify three categories of BPMSs with respect to
their support for BPMN:
1. Pure BPMN: These systems have been designed from the ground up to support
BPMN natively. They follow the specification “to the letter” though they might
not fully support it. Examples are Activiti and Camunda.
2. Adapted BPMN: These tools use a BPMN skin but rely on an internal
representation to execute the process model. They can import and often also
export BPMN. They typically predate BPMN and evolved from previous versions
to support the specification. Examples are Bizagi and Bonita.
400 10 Process Implementation with Executable Models
3. Non BPMN: There is, lastly, a general category of BPMSs that use their own
proprietary language and semantics. These systems do not support BPMN. An
example of such a system is YAWL.
Note that a BPMS may not fully cover all aspects of the BPMN specification
that are relevant for execution. For example, some systems may not support
compensation events or non-interrupting events. In this case, we need to give up
on one or more of these elements depending of the BPMS that we adopt.
This section illustrated how to design executable BPMN models in a vendor-
independent manner. The book’s website3 provides tutorial notes showing how to
perform the last step of our method (the specification of execution properties) for
various concrete BPMSs.
Exercise 10.10 Based on the execution properties that you specified in Exer-
cise 10.9, implement the loan assessment process using a BPMS of your choice.
10.7 Recap
3 http://fundamentals-of-bpm.org.
Applicant
Loan Loan Loan application Loan application Acceptance Home Repayment Loan application Loan application
application application [checked] [rejected] pack insurance agreement [canceled] [approved]
quote
Loan Officer
Receive Return
updated application
application back to
applicant
Loan
10.8 Solutions to Exercises
Loan Officer
eligible
Check if
Prepare home Verify
acceptance insurance Send repayment
acceptance pack Repayment Loan Loan
Loan pack quote is agreement application
application always agreement application
requested [assessed] [approved] loan
application
home completed
insurance
quote
requested
Acceptance applicant
Credit pack agrees Approve Notify
history Risk application approval
report assessment
Risk rules
DB
Financial Officer
Loan
application Property Appraiser
[checked]
Appraise Property
property appraisal
Property Appraiser
Insurance Sales Rep.
Send home
insurance quote
Insurance
Sales Rep.
401
402 10 Process Implementation with Executable Models
Solution 10.2 All five manual tasks of this process, namely “Appraise property”,
“Prepare acceptance pack”, “Send acceptance pack”, “Send home insurance quote”
and “Verify repayment agreement”, can be implemented as user tasks. In “Appraise
property”, the property appraiser is notified through the worklist that a new property
has to be appraised. The information on the property is carried by the work item
of this task (e.g., property type and address). The property appraiser physically
goes to the property address for an inspection and checks the value of surrounding
properties. Once done, he or she prepares the appraisal on an electronic form and
submits it to the BPMS engine via the worklist handler. “Prepare acceptance pack”,
“Send acceptance pack”, “Send home insurance quote” can be implemented as user
tasks in a similar way.
“Verify repayment agreement” appears in the loan officer’s worklist as soon
as the acceptance pack and, optionally, the insurance quote have been sent to the
applicant. The officer checks out this work item once the repayment agreement is
received from the applicant by post. He or she manually verifies the agreement,
digitizes it and attaches it as a file to the agreement summary—an electronic form
associated with this work item and pre-populated with information extracted from
the loan application. If the applicant accepted all loan conditions and agreed with
the repayment schedule, the officer ticks the respective checkboxes in the agreement
summary and submits this to the BPMS engine.
Solution 10.3 Task “Check insurance” can be automated through a service that
determines the amount of the co-payment based on the details of the prescription
and on the customer’s insurance policy.
Tasks “Collect drugs from shelves” and “Check quality” are manual tasks. These
tasks can be implemented as user tasks in the automated process. To do so, the
pharmacy technician who collects the drugs, and the pharmacist who quality-checks
the prescription and seals the bag, should have a convenient mechanism to signal the
completion of these tasks to the BPMS. This could be achieved by putting in place
a system based on barcode scans to track prescriptions. For example, the technician
would see a list of prescriptions to be filled from the worklist. He or she would then
pick up one of the prescriptions and the system would associate the prescription to
a new barcode which is printed on an adhesive label. The technician would then
attach the label to a bag, collect the drugs and put them in a bag, and when done,
he or she would scan the barcode from the label to record that the prescription has
been fulfilled. This signals the completion of task “Collect drugs from shelves” to
the pharmacy system. In turn, it generates a new work item of task “Check quality”
in the pharmacist’s worklist. The pharmacist can then quality-check the prescription
and scan the barcode again.
Task “Collect payment” is also a manual task. This task could be implemented
as a service task whereby the pharmacy system would push the task of collecting
the payment for a prescription to a Point-of-Sale (POS) system and expect the POS
system to indicate that the payment has been collected. The pharmacy technician
would interact with the POS system once the customer arrives, but this interaction
10.8 Solutions to Exercises 403
Pharmacist
Pharmacist
Perform Ok
Check
thorough
quality
check
Not ok
Technician
Technician
Pharmacy
Enter
Collect drugs Collect
prescription
from shelves payment
details
Every hour Prescription
fulfilled
Pharmacy system
Alarms
Pharmacy system
No
Perform alarms Check
DUR insurance
is outside the scope of the pharmacy system. The pharmacy system merely pushes
work to the POS system and waits for completion.
The description of the process implicitly refers to a manual task whereby the
pharmacist seals the bag and puts it into the pick-up area. However, this “Seal bag”
task is not included in the executable process model. Instead, this task is integrated
into the “Check quality” task. In other words, at the end of the quality check, the
pharmacist is expected to seal the bag if the prescription is ready and drop the bag
in the pick-up area. Task “Retrieve prescription bag” is also manual but there is no
value in automating it in any way. So this task is left out of the executable process
model, which completes once the payment has been made. The executable model of
the entire prescription fulfillment process is illustrated in Figure 10.11.
Solution 10.4 It makes sense for tasks “Prepare acceptance pack” and “Send
acceptance pack” to be performed by the same loan officer. However, task “Check
if home insurance quote is requested” is meant to be executed between these two
tasks. Since there is no temporal dependency between “Check if home insurance
is requested” and the other two tasks, we can postpone the former to after “Send
acceptance pack” or parallelize it with the other two tasks. This way we can
aggregate the two consecutive tasks into “Prepare and send acceptance pack”.
Solution 10.5
• Physical data objects: Acceptance pack (this is the loan offer on paper), Repay-
ment agreement (this is signed by the applicant on paper and has been replaced by
the Agreement summary, an electronic document containing a link to a digitized
copy of the repayment agreement plus a reference to the loan application). We
404 10 Process Implementation with Executable Models
assume all other communications between applicant and loan provider to occur
via email
• Messages carrying physical objects: Acceptance pack, Repayment agreement,
Home insurance quote (the quote is sent on paper)
• Data stores: Risk Rules DB
• States of data objects
• Pools and lanes.
Solution 10.6 A possible solution is given in Figure 10.12. Note that in this solu-
tion, a work item of task “Verify repayment agreement” automatically disappears
from the loan officer’s worklist if the officer does not start it within 2 weeks. This
happens if the officer has not received the repayment agreement by post within that
timeframe.
Loan Officer
Return
Receive
application
updated
back to
application
applicant
5 days Loan
application
10.8 Solutions to Exercises
Loan Officer
canceled
eligible Check if
Prepare home always Verify
Send repayment
acceptance insurance Agreement Loan Loan
Loan Loan quote is acceptance pack agreement
pack summary application application
application application requested
quote
requested 2 weeks applicant
agrees
Approve Notify
Credit application approval
Risk
history
assessment Loan
report
Loan application
Loan Provider
application approved
canceled
Financial Officer
Risk rules
DB
Financial Officer
Loan
application Property Appraiser
Appraise Property
property appraisal
Property Appraiser
Insurance Sales Rep.
Insurance
Sales Rep.
405
406 10 Process Implementation with Executable Models
Fig. 10.13 The model for the sales process of a B2B service provider, completed with missing
control-flow and data relevant for execution
10.8 Solutions to Exercises 407
provider. The former interface contains one in-only operation for the loan provider
to receive the initial loan application. The latter interface contains the following four
operations for the website service:
• an in-out operation to receive the assessed loan application (containing change
requests), and to respond with the revised loan application (where changes have
been made)
• an in-only operation to receive the rejected loan application
• an in-only operation to receive the approved or canceled loan application.
The four operations above require five messages in total, all of the same data type
as the loan application’s. These operations are assigned to the start message event,
the four send tasks and the receive task of the process, which need to have suitable
data inputs and outputs to contain the loan application. The mapping of these data
inputs and outputs to data objects is straightforward, except for the send task “Reject
application”, which needs to modify the status of the loan application to “rejected”
while copying this input data object into the task data input.
A third service interface is required to interact with the service for assessing
loan risks in task “Assess loan risk”. This interface has an in-out operation with
two messages: an input message to contain the credit history report and an output
message for the risk assessment.
The script for task “Check application form completeness” takes a loan appli-
cation as input and checks that all required information is present. Depending on
the outcome of the check it changes the application status to either “complete”
or “incomplete”, assigns a fresh application identifier to the application if empty,
writes the submission or revision date and time and, if applicable, fills out the status
comments section with pointers to incomplete data fields. The script task “Check if
home insurance quote is requested” is actually not needed. While in a conceptual
model it is important to explicitly capture each decision with a task as we have
illustrated in Chapter 3, in an executable model this can be directly embedded in the
conditions of the outgoing arcs of an (X)OR-split if the outcome of the decision can
easily be verified. In fact, our example just needs to check the value of a boolean
field in the application, which can be achieved with an XPATH expression directly
on the arc labeled “quote requested”.
All user tasks of this process are implemented via the worklist handler of the
loan provider and offered to participants having the required role (e.g., task “Assess
eligibility” is offered to a participant with role loan officer). This implementation
depends on the BPMS adopted. The mapping between data objects and data inputs
and outputs for these tasks is straightforward. In the case of task “Assess eligibility”,
at runtime the loan officer will see an electronic form for the loan application
(editable), and two more forms for the risk assessment and for the property appraisal
(non-editable). The officer is required to edit the loan application by entering the
identifier, specifying whether or not the applicant is eligible for the loan and adding
status comments in case of ineligibility. The other user tasks work similarly.
We have already discussed how to implement the condition of arc “quote
requested”. The conditions on the other sequence flows can be implemented with an
408 10 Process Implementation with Executable Models
expression that extracts data from a data object in a similar way. The expression for
the arc labeled “always” is simply “true” as this arc is always taken. The temporal
expression for the two timer events is a relative duration (5 days and 2 weeks).
Solution 10.10 The book’s companion website4 provides tutorials showing how
to automate the loan application process in several BPMSs, including Bizagi,
Camunda, IBM BPM, and Oracle.
Exercise 10.11 Identify the type of the tasks in Figure 4.13 (page 148), and
represent them using appropriate BPMN markers.
Exercise 10.12 Consider the following business processes. Identify which of these
models can be automated and justify your choice.
1. Recruiting a new soldier.
2. Organizing a court hearing.
3. Buying an item at an auction on eBay.
4. Managing inventory assets disposition.
5. Booking a trip online.
6. Handling an IT-system maintenance job.
7. Servicing a used car at a mechanic.
8. Making online trade customs declarations.
9. Processing employee payrolls.
10. Synchronizing data servers in a distributed environment.
Exercise 10.13 Figure 10.14 shows the process model that FixComp follows when
a client files a complaint. Upon receipt of a new complaint from a client, the
process starts by sending an automatic reply to the client in order to reassure it that
FixComp is following up on its request. A complaints representative then takes the
complaint for discussion with people in the department the complaint refers to. Next,
the complaints representative sends a personal letter of apology to the client and
proposes a solution. The client can either accept or reject the solution. If the client
accepts the solution, the solution is executed by the relevant department. If the client
rejects the solution, the client is called by phone to discuss possible alternatives
by the complaints representative. If one of these alternatives is promising, it is
discussed with the department and the process continues. If no agreement can be
reached, the case is brought to court.
The company wants to automate this process to deal with complaints in a more
efficient manner. Your task is to prepare this model for execution.
4 http://fundamentals-of-bpm.org/supplementary-material.
10.9 Further Exercises 409
Execute
solution
Positive Complaint
response addressed
Send received
automatic Discuss Send Propose
reply solution apology solution
Complaint to customer
No alternative
received Evaluate solutions
acceptable Go to court
alterantive
Negative Complaint
response not addressed
received
Alternative
solution exists
Claim Claim
decision
Advise
claimant
all cases
insured
Determine liable
Assess
likelihood of
the claim claim
New claim decision Claim
received insured is positive closed
not liable
Initiate
payment
Case
closed
Hofstede et al. [67]. Weske also extensively discusses the implementation aspects
of executable business processes in his book [193]. A classic book on how process
execution works inside the process engine is Leymann & Roller [89].
A gentle introduction to XML, XML Schema, and XPath can be found in Møller
& Schwartzbach’s book [116]. Web services are covered in depth by Erl et al. [45].
This latter book also includes a discussion of WSDL 2.0, the default technology for
implementing service interfaces in BPMN 2.0. There are also books on RESTful
Web Services, including the one by Richardson & Ruby [141]. A good discussion
of technical concerns, but from a technology-independent perspective, is included
in the book on workflow patterns [155]. This book also discusses various strategies
of allocating work to resources.