PROJECT Name : Saudi Aramco WSD JSA # : 005 Revision : 002 Date : 12 Sept 2021
Department/Section Originating JSA: HSE Annual Revision Date : 11 Sept 2022 Location:
MMS HSE
Manager/ Representative
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
Stop Work Authority /Stop Work Trigger- All personnel, whether Saudi Aramco employee or contractors, without any fear of retaliation, empowered and accountable to STOP WORK .
If you observe; any defective equipment, machinery, hazardous condition or unsafe work practice, and immediately report the hazardous condition or work practice to your supervisor. No
further activity shall be conducted until a safe working environment exists.
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
5.5 Improper hose coupling 5.5.1 Place drip tray to avoid spillage of oil.
and clamps, Oil Spillage 5.5.2 Ensure all hoses and couplers are regularly inspected and in good order.
Foreman
STOP WORK TRIGGER IF THERE IS OIL LEAKAGE
6.1.1 Approved extended work permit to be obtained prior to start of work.
6.1 Unauthorized 6.1.2 Close supervision required.
extended work 6.1.3 Welfare facilities, Transport facilities, HSE coverage to be available. Foreman
STOP WORK TRIGGER IF UNAUTHORIZED EXTENDED WORK.
6.2 Poor visibility due to 6.2.1. Wear clear Safety glasses
Extended work if inadequate lighting 6.2.2. Dedicated electrician, maintenance personnel to be available
6 required at night.
6.2.3 Proper lighting in all work areas, access areas, lighting
preparation to be done prior to start of work.
6.2.4. No equipment moving in poor illuminated area.
STOP WORK TRIGGER IF THE LIGHTING S NOT ADEQUATE.
7.1 Slip, Trip, Fall 7.1.1. Watch your steps
7.1.2 Keep all materials in designated place Foreman
Closing the work STOP WORK TRIGGER IF THERE ARE MATERIALS SCATTERED
7 7.2 Poor Housekeeping 7.2.1 Do the housekeeping before leaving the work place.
STOP WORK TRIGGER IF THERE IS POOR HOUSEKEEPING.
8 Housekeeping 8.1 Health Hazard 8.1.1 Drinking containers must be in good sanitary, tightly capped, and clearly marked Admin
Condition for use and cup dispenser must be provided.
8.1.2 Dust control shall be performed to control the dust in the area
STOP WORK TRIGGER IF DUST CONTROL IS NOT PERFORMED ON A REGULAR BASIS
8.2 Environmental Pollution 8.2.1 Regular disposal of waste, debris and scrap materials shall be carried out
8.2.2 Trash bin for waste, used paper cups, scrap and debris must be provided
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.
Job Safety Analysis For
Suction Excavation
All work activities shall comply with the requirements of applicable SA GIs Standards and Procedures. Contractor ensures that all work is in full compliance with the requirement of SA CSM and with the
provision of Saudi Aramco applicable certification. Emergency Procedures: Stop Work, Switch off all equipment, Supervisor In-charges must direct all personnel to the nearest Emergency Exit and Assembly
point.