This checklist outlines the steps for installing medium voltage distribution boards (MDBs), including verifying equipment specifications, installation according to approved drawings, proper cable and electrical connections, safety precautions such as barricades and personal protective equipment, and ensuring calibrated instruments and authorized personnel are used. The checklist is to be completed by the subcontractor, contractor, and consultant representative to confirm all installation and safety steps were followed.

Uploaded by

Naing Win Tun
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
368 views

Check List For MDB Installation

This checklist outlines the steps for installing medium voltage distribution boards (MDBs), including verifying equipment specifications, installation according to approved drawings, proper cable and electrical connections, safety precautions such as barricades and personal protective equipment, and ensuring calibrated instruments and authorized personnel are used. The checklist is to be completed by the subcontractor, contractor, and consultant representative to confirm all installation and safety steps were followed.

Uploaded by

Naing Win Tun
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT NAME & DETAILS

CHECK LIST FOR: Form No:


INSTALLATION OF MDB Rev. No : 01
Page : 1 of 2
SUBCONTRACTOR X CONTRACTOR

SECTION OF WORK: Electrical LOCATION:


LEVEL: WIR No.:
STAGE ITEM Checked by Checked by Date

S/C CONT CONS.

SETTING Check Layout


OUT Check Level, Check level depth.
Check for Services Clearances, and the same
MEP/CIVIL approved by company site team (civil)
1. Check if the panel boards are as per
specification and approved material submittal.
2. Check if there are any discrepancies, damage
etc., found with the equipment’s to be installed.
3. Check if the working area is clean, safe and
hazard free to undertake the installation
activities.
4. Check if all panel boards with related
voltmeters, ammeters and energy meters of a
Installation of the MDB’s

type are supplied and meet with ADDC


requirements.
5. Check if the installations are done as per
approved shop drawing submittals.
6. Check if proper connection for cable trays with
MDB is done rigidly with proper supports and in
exact positions.
7. Check if heights shall be maintained as per
approved shop drawings so that easy access for
termination of cables and other maintenance
works can be carried
8. Check if the termination of wires and cables are
done with proper glanding and lugs fixing
without sharp edges and unused knock outs left.
9. Check if all cable entries are closed and sealed
in a proper way.
10. Check if provided with proper earthing
connections as per approved shop drawings
and correct size.
11. Check if the metering devices shall be provided
to monitor status of voltage, current, and fault
conditions.
For S/C QA/QC: Date: FOR CONTRACTOR Date: For Consultant Rep.: Date:
QA/QC:

Name: Sign: Name: Sign: Name: Sign:


PROJECT NAME & DETAILS

CHECK LIST FOR: Form No:


INSTALLATION OF MDB Rev. No : 01
Page : 2 of 2
SUBCONTRACTOR X CONTRACTOR

SECTION OF WORK: Electrical LOCATION:


LEVEL: WIR No.:
STAGE ITEM Checked by Checked by Date

S/C CONT CONS.

1. Adequate lights are provided in the Work


Area prior to installation.
2. Ensure only trained/ Authorised & licensed
persons only shall operate the power tools.
3. Ensure that barricade & warning boards on
the area are available prior to installation.
SAFETY PRECAUTIONS

4. Ensure that Temporary live cable


management plan shall develop and
implemented.
5. Ensure all electrical tools to be used in the
installation are not damage.
6. Ensure that Necessary PPE to be worn while
working in energized circuits
7. Check that LOTO procedure implemented
and followed.
8. Ensure PTW to be applied and obtained to
start work on the required area.
9. Emergency response plan & procedure shall
be developed and established as per the site
condition during the execution of activity

10. Calibrated Instruments only to be used.

For S/C QA/QC: Date: FOR CONTRACTOR Date: For Consultant Date:
QA/QC: Rep.:

Name: Sign: Name: Sign: Name: Sign: