0% found this document useful (0 votes)
25 views1 page

Bidp SDH 2022 Ar 118 DTCMC

This document provides a site plan showing an existing two-story building with parking spaces and a driveway on one side. The building has 8 parking slots and a driveway along one edge at ground level, with the second floor of the building above.

Uploaded by

Jeff
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Bidp SDH 2022 Ar 118 DTCMC

This document provides a site plan showing an existing two-story building with parking spaces and a driveway on one side. The building has 8 parking slots and a driveway along one edge at ground level, with the second floor of the building above.

Uploaded by

Jeff
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DN

2ND FLOOR

2ND FLOOR

DR E
LIN
IVE
WA
Y
2ND FLOOR
8 PARKING

EL. +1514.90 M
SLOTS
DRIVEWAY 5 6
LINE

3 4 7 8
2
BUS
PARKING
(2
SLOTS)
1
2 1
20 19 18 17 16 4 3
15 14 13 12 11 10 9 8 7 6 5

20 OFF-SITE PWD PWD


PARKING PARKING PARKING

KEYPLAN
LEGENDS
FLOOR PLAN
ROOM NAME
FLOOR FINISH
TL CP STF
WALL FINISH

CEILING FINISH

REFLECTED CEILING PLAN

ROOM NAME
PORTION OF CEILING FINISH
MOUNTAIN CLUB CL-01 2400
CEILING HEIGHT

MOUNTAIN CLUB LVL


SCHEDULE OF FINISHES
EL. +1510.40 M ACF ARCHITECTURAL CONCRETE FINISH
UPPER GROUND ACF-1 SMOOTH-FORMED CONCRETE, RUBBED FINISH
EL. +1509.90 M ACF-2 CONCRETE TOPPING, SMOOTH TRO EL FINISH

STF STRAIGHT-TO-FINISH BARE CONCRETE


MOUNTAIN CLUB
1 ENLARGED SECTION B MOUNTAIN CLUB - POLYCARB + ACP MOUNTAIN CLUB - ACP
FT FLOOR TREATMENT

H HARDENER
A-1106B SCALE 1 : 50 2 CANOPY DETAILED SECTION 3 CANOPY DETAILED SECTION WF WALL FINISH
A-1106B SCALE 1 : 10 A-1106B SCALE 1 : 10
F-01 PLASTER & PAINT DAR GRAY

F-02 HARDIFLE SENEPA BOARD IN OOD PAINT FINISH

F-03 BASALT-ASHLAR STONE CLADDING


FRAMELESS REFLECTIVE INDO ALL
F-04
GLAZING SYSTEM GRAND STAIR
F-05 TE TURED ALL FINISH

F-06 CLEAR TRANSOM INDO ITH DAR GRAY MULLIONS

F-07 TRANSOM INDO ITH OOD BRO N MULLIONS

F-08 TE TURED PRE-CAST PANELS


CLEAR INDO ALL GLAZING SYSTEM ITH
F-09
DAR GRAY MULLIONS
F-10 ALUMINUM METAL TUBULAR SYSTEM

PT PAINT
PT-1 ACRYLIC PAINT DAR GRAY
PT-2A SEMI GLOSS LATE PAINT HITE GLOVE

PT-2B FLAT LATE PAINT OFF- HITE

PT-3 AL YD TRAFFIC PAINT 1.5 M HIGH

PT-11 EPO Y FLOOR TREATMENT GRAY

FLOOR / WALL
MOUNTAIN CLUB TL-1A 600 600MM HOMOGENOUS TILE, NON S ID
4 SPOT DETAIL MOUNTAIN CLUB TL-1B 600 600MM HOMOGENOUS TILE

A-1106B SCALE 1 : 5 5 SPOT DETAIL TL-1C 300 600MM HOMOGENOUS TILE, NON S ID

A-1106B SCALE 1 : 5 TL-2A 300 300MM VITREOUS TILE, NON-S ID


TL-2C 300 300MM VITREOUS TILE
TL-3 600 600MM HEAVY DUTY TERRA COTTA TILE
CP CEMENT PLASTERED
FT FLOOR TREATMENT
CPV 200 200MM AFFLE TILES CONCRETE PAVER

CL CEILING
CL- 1 GYPSUM BOARD, CEILING-TYPE 12. 7 MM THIC
CL- 2 GYPSUM BOARD, MR- TYPE 12.7 MM THIC
CL- 3 CEMENT BOARD, 6.0 MM TH .
AC-3a LINEAR METAL CEILING C-SHAPED
AC-3 LINEAR METAL CEILING BAFFLE CEILING

RL RAILINGS
RL-01 BALCONY STEEL RAILING IN PO DER-COATED FINISH
BRO N COLOR
RL-02 ALUMINUM HANDRAIL IN PO DER COATED FINISH
BRIDGE
RF ROOF FINISH
RF-01 RC FLAT ROOF DAR GRAY
CONCRETE LEDGE IN SMOOTH, PAINTED PLASTERED
RF-02
FINISH DAR GRAY
RF-03 ALUMINUM PANEL CANOPY IN PO DER COATING FINISH
RF-04 ARTIFICIAL GRASS

WALL TYPES
200MM THK CHB WALL; BOTH FACE
1A PLASTERED
175MM THK CHB WALL; SINGLE FACE
1B PLASTERED
150MM THK CHB WALL; BOTH FACE
2A PLASTERED
125MM THK CHB WALL; SINGLE FACE
2B PLASTERED
2C 100MM THK CHB WALL

100MM THK CHB WALL; SINGLE FACE


2D PLASTERED
3 100MM THK DRYWALL

4 REINFORCED CONCRETE WALL

5 SHEAR WALL

WATERPROOFING
WP-1A CONCRETE INTEGRAL WATERPROOFING
CONCRETE INTEGRAL WATERPROOFING W/
WP-1B
EPOXY TANK-LINING (TOP COAT)
MODIFIED POLYURETHANE
WP-3A
WATERPROOFING
MODIFIED POLYURETHANE
WP-3B
WATERPROOFING WITH ROOT INHIBITOR
POLYMER MODIFIED CEMENT
WP-4
WATERPROOFING
WP-5 TRAFFIC COATING SYSTEM
ALL MEASUREMENTS ARE TO BE VERIFIED
ARCHITECT REG. NO. 0014648 STRUCTURAL MEPF PROJECT OWNER/DEVELOPER DESIGN BY GSB DOCUMENT TYPE SHEET CONTENT ON SITE BY CONTRACTOR. ALL
REVISIONS
SHEET NUMBER
DISCREPANCIES ARE TO BE IMMEDIATELY
REPORTED TO ARCHITECTS & PROJECT
TIN 201-200-655 DRAWN BY CR/MA MANAGERS. NO. DESCRIPTION DATE
ALCANTARA * UBAY * & CO.,INC. MOUNTAIN CLUB CANOPY BLOW-UP CONTRACTORS ARE TO PREPARE & SUBMIT 1a UPDATED LEGENDS - AC-3a AND AC-3b 03/07/2023
CONSTRUCTION

6/7/2022 3:39:21 PM
PTR 8857196 CONSULTANTS
1845
MANILA
PAZ
*
MENDOZA
PLANNERS
GUAZON
*
STREET ,
MANAGERS
PACO , SHERIDAN DRIVE CENTER FILINVEST HOSPITALITY CORPORATION DATE DRAWN 10/01/21
PLAN AND ELEVATIONS
SHOP DRAWINGS TO ARCHITECTS PRIOR
TO COMMENCEMENT OF WORKS.
1b BALCONY STEEL RAILING IN POWDER COATED FINISH
1c SOLID POLYCARB THICKNESS FROM 6MM TO 10MM A-1106B
GAYLORD S. BONGALON ISSUED ON 01-06-2022
TELEPHONE NUMBERS :
313-00-87
563-56-94 * 313-00-86 * 98 V. A. Rufino St. Unit 2312 Herrera Tower
Salcedo Village, Makati City, Philippines 1227
T: 845-1762 F: 845-1641
[email protected] CHECKED BY MB/GSB BULLETIN THIS DRAWING, ACTING AS INSTRUMENT
OF SERVICE, IS THE PROPERTY OF
CASAS+ARCHITECTS, INC. & CANNOT BE
REPRODUCED WITHOUT THEIR WRITTEN
PENTHOUSE, PASEO CENTER, 8757 PASEO DE ROXAS AVENUE, SALCEDO VILLAGE, CONSENT.
ISSUED AT MAKATI CITY 1845 P. MENDOZA GUAZON STREET, PACO, MANILA 98 V.A RUFINO ST. UNIT 2312 HERRERA TOWER SALCEDO VILLAGE, MAKATI CITY SHERIDAN DRIVE, CAMP JOHN HAY, BAGUIO CITY 2600 VECTOR TWO BUILDING, NORTHGATE CYBERZONE, FILINVEST CITY, ALABANG, MUNTINLUPA CITY 1781 DATE PRINTED 03/07/23 SCALE: AS SHOWN - REPUBLIC ACT No. 9266 PROJECT NO.
MAKATI CITY
GENERAL NOTE: DO NOT SCALE FROM DRAWING. USE MARKED DIMENSIONS. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS. THE ARCHITECT TO BE IMMEDIATELY NOTIFIED OF ANY DISCREPANCIES. COPYRIGHT ON THE DRAWING RETAINED BY THE ARCHITECT.