E-1901 ELECTRICAL OUTLET FOR SIGNAGE - Ah
E-1901 ELECTRICAL OUTLET FOR SIGNAGE - Ah
E-1901 ELECTRICAL OUTLET FOR SIGNAGE - Ah
CLIENT NAME:
MR.SALEH EL-SEIF
MATCH LINE-PART 01
MATCH LINE-PART 02
MATCH LINE-PART 02
MATCH LINE-PART 03
CLIENT ADDRESS:
RIYADH - KSA
PROJECT NAME:
Y1 Y1' Y2 A B C D E E' F G H J K K' L M N P Q Q' R' R S' S T U' U V Y3 EL SEIF MALL
172040
PROJECT LOCATION:
4800 3650 7050 7900 8000 8000 7915 170 7915 7900 S-02
A-3103
6200 7900 7915 170 7915 8000 8000 8000 7915 1702135 5780 4850 3050 6800 4000 3300 10200 6440
RIYADH - KSA
B
KEY PLAN:
X1 h1
ACCESS CONTROL
T2
C TO DB-EX-B1
W.P
h1
h1 W.P h1
W.P h1 W.P h1
W.P
h1
W.P
h1
W.P h1 W.P X1
STORAGE E.O
FOR EX.F-01 S.S.L -6.00 T
C3 TO DB-EX-B1
S.S.L -6.00
T
C4 TO DB-EX-B1
ACCESS CONTROL T
C(14,16,18) TO DB-EX-B1
9450
9450
h1
FOR EX.F-01
STORAGE E.O
GAS TANKS
FOR EX.F-01 PART 01 PART 02 PART 03
S.S.L -6.00
T
C(20,22,23)TO DB-EX-B1
STAIR ARTIFICIAL GREEN WALL
LOBBY
h1
GARBAGE
ROOM
SUMP-01 SUMP-01
9600
9600
ARTIFICIAL PLANTER BASIN
T1
C TO DB-EX-B1
S-01 S-01
SLOPE
S-01 S-01
SCECO
FOR SUMPERSIBLE-PUMP01
A-3101 FOR SUMPERSIBLE-PUMP01 A-3101
PART 06 PART 05 PART 04
33000
18%
02 02
SL 8%
SLOPE EXIT
10200
10200
15%
S.S.L -6.00 S.S.L -6.00 S.S.L -6.00
T
C7 TO DB-EX-B1 Kingdom of Saudi Arabia
h1 T27
C TO DB-EX-B2 T
C5 TO DB-EX-B1 Al-Riyadh Branch
FOR MFACP at height
Al Ollaya area
h1 h1 h1 ACCESS CONTROL
1.6m A.F.F.L
FOR PARKING SYSTEM LIFT ELEVATOR
FOR FCU-01
ACCESS CONTROL T
C28 F.F.L
TO -5.90 ELEVATOR
DB-EX-B2
S.S.L -6.00 LIFT ELEVATOR
T
C29 TO DB-EX-B2
LIFT T LIFT
C30 TO DB-EX-B2
ELEVATOR F.F.L -5.90
58350
at height 1.6m A.F.F.L
FOR NVR LOBBY 01 LOBBY 02 LOBBY 03 LOBBY 04 S.S.L -6.00 E.O P.O. BOX 301176
FOR NOVEC PANEL
03 at height 1.6m A.F.F.L
E.O E.O E.O h1
E.O
FOR PUBLIC ADDRESS
FOR FCU-01 FOR FCU-01 FOR FCU-01
03 Al Riyadh 11372
3750
3750
RACK
SECURITY
W.P
FOR DATA RACK E.O E.O
WS-02
Egypt Branch Tel : +966 1 216 1061
h1
at height 1.6m A.F.F.L E.O A-3204
MATCH LINE-PART 01 ROOM T
C32 TO DB-EX-B1 ACCESS CONTROL MATCH LINE-PART 03
C
T
C9 TO DB-EX-B1
WS-01 h1
W.P
h1
W.P
h1
W.P
h1
W.P
h1
W.P
h1
W.P
h1
W.P h1 h1 W.P ACCESS CONTROLACCESS CONTROLACCESS CONTROLACCESS CONTROLACCESS CONTROL Cairo ,1st Settlement. Fax: +966 1 216 0487
MATCH LINE-PART 06 X2 FOR SPU-01
X2 MATCH LINE-PART 04
MDP
DB-EX-B1 DB-EX-B2 DB-EX-L1 DB-EX-L2
A-3202 T
C35 TO DB-EX-B2
FOR
h1
SPU-01
T
C41 TO DB-EX-B2
2nd Floor Cloud 9 Building. Web: www.Qdesign.net
T
C8 TO DB-EX-B1
W.P
E.O E.O E.O E.O E.O MEP ROOM
T
C10 TO DB-EX-B1 h1 h1
h1 h1 h1
h1 h1 E.O
h1
Tel : +20 1099664265 Email: info @Qdesign.net
LOBBY STC ROOM
FOR SPU-01
FOR SPU-01 FOR SPU-01 FOR SPU-01 FOR SPU-01
8200
FOR SPU-01 FOR SPU-01
T
C25 TO DB-EX-B1
LADIES C30S-03
C31 TO DB-EX-B1 T
T TO DB-EX-B1 T
C29 TO DB-EX-B1 T
STORE C28STORE T
C27 TO DB-EX-B1
TO DB-EX-B1 STORE STORE DRIVER
S.S.L -6.00 PRAYER S-03
T
C26 TO DB-EX-B1 T6TO DB-EX-B1
C
h1
h1
ROOM
A-3103
ROOM ROOM ROOM ROOM
W.P
W.P
POWER LEGEND
04 TYPE DESCRIPTION
8575
h
(W.P = WEATHER PROOF ) & [h = HEIGHT (h1= 30 cm, h2=120 cm, h3=160cm) ]
POSTER WALL 05 20A, 400V, 3 PHASE POWER SOCKET OUTLET, GROUNDING TYPE
(W.P = WEATHER PROOF ) & [h = HEIGHT (h1= 30 cm, h2=120 cm, h3=160cm) ]
FOR IRRIGATION PUMP
8575
FOR SUMPERSIBLE-PUMP05 DISTRIBUTION BOARD
1-CONTRACTOR TO CO-ORDINATE AT SITE FOR TRANSFORMER, MDB AND PANEL BOARDS LOCATIONS AND TO
PROVIDE FULL DETAILS FOR ALL REQUIREMENTS.
D S-03
2-MCC FOR FIRE PUMPS & WATER BOOSTER PUMPS WILL BE PROVIDED BY THE SUPPLIER.
S-02 3- FIRE PUMPS AND WATER PUMPS WILL BE FED BY MDP (GENERAL SERVICE PANEL)
A-3103
4800 3650 7050 7900 8000 8000 7915 170 7915 7900 A-3103
6200 7900 7915 170 7915 8000 8000 8000 7915 1702135 5780 7900 6800 4000 3300 10200 4-EXACT LOCATIONS OF FIRE PUMP ROOM & WATER TANK ROOM WILL BE DETERMINED ON THE SITE.
6440 5-FINAL LOCATION OF LCP, DB-EX, MFACP AND SERVICE PANEL TO BE AT THE SERVICE ROOM DETERMINED ON
SHOP-DRAWINGS SUBMITTED BY THE CONTRACTOR AND COORDINATE WITH FINAL SCECO ROOMS APPROVED
172040 LAYOUT.
MATCH LINE-PART 05
MATCH LINE-PART 04
A-3103 04 ---- ----
03 ---- ----
S-02
A-3103 02 ---- ----