PAINTING INSPECTION REPORT
CUSTOMER
CLIENT ORPIC SOHAR REPORT No
REF NO
CONTRACT
LOCATION DATE 03.04.2015
ORPIC SOHAR REF No
PAINTING PAINT ABRASIVE OMAN
DOHAT AL KHALEEJ LLC HEMPEL
CONTRACTOR SUPPLIER SUPPLIER ABRASIVE
PAINTS METHOD OF
AREA TREATED SURFACE PREPARATION WFT DFT
APPLIED APPLICATION
TYPE
WET BULB RELATIVE STEEL
TIME DRY BULB TEMP DEW POINT OF
TEMP HUM TEMP
WORK
No. OF MEN ON
WEATHER MILD BREEZE, DRY, CLOUDY
SITE-12
COMMENTS
ALL BLASTING SAFETY IN ACCORDANCE WITH IGE SR 21. SALTS
CONTAMINATION TEST CARRIED OUT USING BRESLE PATCH KIT, NO CONTAMINATION DETECTED.(Report
No:-278676)BLAST PRESSURE RECORDED 93 psi. VAPOUR TRAP CHECKED (OPEN).SCAFFOLDING CHECKED
BY Mr.Willy Trustitt(scaffolding Supervisor)PRIOR TO COMMENCEMENT OF WORK.WORK PERMIT ISSUED (No:-
7252/24554/JSD/CB 20) ALL DEMARCATION CHECKED AND ACCEPTABLE.
ENGINEER
INSPECTOR NAME:- SAM N. SPECTOR I.L. CHECKLITT
NAME
ENGINEER
INSPECTOR SIGNED
SIGNED
coating
APPLICATION system
Temperature max. 120ºC, 1
equipment,piping,ladders,construction etc.
jackets 7
Electric motors 8
Inside-9
Portable water tanks for CS
Outside-1
Heli decks 14
SS items not to be coated:- Unistrut , tubing , cabletrays,engine exhausts,SS items on mechanical equipment such as
OPTIONAL
COATING SYSTEM NEW CONSTRUCTTION in DFT Minimum DFT(µ)
g , cabletrays,engine exhausts,SS items on mechanical equipment such as pumpheads from positive displacements pumps.
OPTIONAL
coating
Alternative
system
11
12
13
8
Inside-9
Outside-1
14
equipment,piping,ladders,construction etc.
jackets 7
Electric motors 8
Inside-9
Portable water tanks for CS
Outside-1
Heli decks 14
SS items not to be coated:- Unistrut , tubing , cabletrays,engine exhausts,SS items on mechanical equipment such as
OPTIONAL
COATING SYSTEM NEW CONSTRUCTTION in DFT Minimum DFT(µ)
g , cabletrays,engine exhausts,SS items on mechanical equipment such as pumpheads from positive displacements pumps.
OPTIONAL
coating
Alternative
system
11
12
13
8
Inside-9
Outside-1
14
INSIDE-Epoxy primer-(40-60µ)
Inside-9 Epoxy coating Solvent free -(300-500) -
Portable water tanks for CS Outside- kiwa approved. OUTSIDE:- Epoxy primer( 40- 450 µ
1 60µ) High solid epoxy
coating ( 2X 100- 250µ )
Portable water tanks of SS 316 NO COATING INSIDE TANK
coating Minimum
APPLICATION COATING SYSTEM MAINTENANCE
system DFT(µ)
6 L1 Tank Liner
8 Lifts/HOT/EOT etc
LAN FOR EQUIPMENT GROUP
Surface Preparation Painting System Total DFT in µm
Max. Total
Surface
SL No Equipment Group Operating Painting system DFT in Remarks
preparation
Temp. ºC µm
EXTERNAL PAINTING 80 Blast Cleaning
Tank shell , tank roof One coat of P1 + One coat of U1 + 2 coat s of F1
1 For un- insulated tanks Manual cleaning One coat of P2 +One coat of U1 +2 coats of F1
For insulated Tanks Blast Cleaning Two coats H3
staire Case , railing gratings etc, for both 80-250 Manual cleaning One coat of P1 + One coat of U1 + 2 coat s of F1 280
2 insulated as well as un insulated tanks Manual cleaning One coat of P2 +One coat of U1 +2 coats of F1
Gratings One coat of P2 + Two coats of B1
3 Manual cleaning 280
4
5
6
7
8
9
10
11
12
13
14
ORPIC
STANDARD CONSTRUCTION SPECIFICATION
FOR
PAINTING WORKS
DOC. NO : J151/ORPIC/2015
JOB NO : 6235
CONTENTS
Pages
1. 0 General……………………………………………………………………………. 2
1.1 Scope……………………………………………………………………………… 2
1.2 Specific job requirement……………………………………………………………. 3
1.3 Codes and standards…………………………………………………………….. 3
1.4 Definition………………………………………………………………………….. 3
1.5 Qualification…………………………………………………………………………. 4
2. 0 Painting Surfaces………………………………………………………………… 4
2.1 Surface to be painted…………………………………………………………… 4
2.2 Surface not to be painted ……………………………………………………….. 5
30 Painting Scheme………………………………………………………………. 6
3.1 Painting system for equipment , piping and steel structure……………….. 6
4 .0 Painting Procedure……………………………………………………………… 8
4.1 Treatment prior to surface preparation…………………………………………….. 8
4.2 Surface preparation……………………………………………………………….. 9
4.3 Treatment after surface preparation…………………………………………….. 10
4.4 Painting………………………………………………………………………….. 11
5 .0 Field safety and hygiene……………………………………………………….. 12
6 .0 Field storage and control of paint…………………………………………………. 13
6.1 Storage…………………………………………………………………………….. 13
7 .0 Inspection………………………………………………………………………….. 14
7.1 Inspection of surface preparation…………………………………………………. 14
7.2 Acceptance…………………………………………………………………………. 15
8 .0 Transportation…………………………………………………………………….. 15
9 .0 Records………………………………………………………………………….. 15
Attachements
1. Annexure-I Table for surface Preparation 17
2. Annexure-II Painting System 19
3. Annexure-III Painting colour codes 28
4. Annexure-IV Approved Manufacturers 33
1. 0 GENERAL
1.1 Scope
1.1.1 This Construction specification covers the requirements for painting of all
Vadodara ,Gujarat, M/s IOCL have appointed Toyo Engineering India Ltd as
1.1.2 This specification shall be applied to painting work for this project. The
Contractor shall complete the work in all respect with the best quality of
material and workmanship and in accordance with the best engineering practice
and instructions from PMC
1.1.3 This standard specification shall not apply to the following painting work.
1.3.1 The applicable codes and standards reference in this specification shall be as
follows:
(1) (a) ASTM : American Standard Test Methods for Paints and
. coating.
(b) ASA.A 13.1- 1981 : Scheme for identification of piping
system
If there is conflict between the requirement of the above mentioned codes and
1.3.2 standards and this specification , the requirement of this Specification shall
prevail. All conflicts shall be referred to PMC for resolution before proceeding
with the work.
1.4 Definitions
For the purpose of this standard specification, the following definitions shall be
applied.
TEIL
STANDARD CONSTRUCTION SPECIFICATION O-301-A
TOYO INDIA
TOYO ENGINEERING INDIA LTD. PAINTING WORKS
ISSUED : 20.07.2006 IRUP PROJECT PAGE 4 OF 15
1.5 Qualification
Persons who are engaged in painting work shall be fully trained and shall have the
qualification of employer. Certificate , or qualification issued by Authorities are
desirable.
2 .0 PAINTING SURFACES
2.1.2 Surfaces of rotating machinery and the like , except for rotating and sliding
contact surfaces.
2.1.3 Part or entire surfaces of items, requiring rust and corrosion protection.
2.1.4 External surfaces of stainless steel equipment , storage tanks , piping etc.
to be covered with hot insulation materials ,of which operating
temperature is upto 500°C.
2.2.5 Interior wall surfaces of furnaces , boilers ,etc, heating tubes and portions
with heat resistant treatment.
2.2.6 Materials with high resistance to corrosion , such as stainless steel and
anti weathering steel , except the stainless steel surfaces of the equipment
, storage tanks , piping etc. to be covered with hot insulation materials , of
which operating temp. is upto 500ºC.
2.2.9
All imported equipments shall be duly final painted before depatch to site ,
incase of any damage touch up will be carried out at site as per painting
procedure. In case of indigenous , equipment shall be applied primer at
shop and final paint at site as per painting specification enclosed.
3. 0 PAINTING SCHEMES
3.1.1 Painting system for equipment , piping and steel structure are listed in
annexture II.
annexture II.
TEIL
STANDARD CONSTRUCTION SPECIFICATION O-301-A
TOYO INDIA
TOYO ENGINEERING INDIA LTD. PAINTING WORKS
ISSUED : 20.07.2006 PAGE 7 OF 15
3.1.3 The final colour shall be as per colour code given in annexure III. Ground
colour shall be applied through out the length of pipes , and on metal
cladded insulated lines , minimum 2M long portion should be painted.
Colour bands shall be applied in the following points.
TEIL
STANDARD CONSTRUCTION SPECIFICATION O-301-A
TOYO INDIA
TOYO ENGINEERING INDIA LTD. PAINTING WORKS
Sizes shall be :
4. 0 PAINTING PROCEDURE
4.1 Treatment prior to surface preparation
4.1.1 remove slag , flux and spatter adhered to weld and steel surfaces
DAK
STANDARD CONSTRUCTION SPECIFICATION J-151
DOHAT AL KHALEEJ
DOHAT AL KHALEEJ LLC PAINTING WORKS
ISSUED : 14-42015 ORPIC SOHAR PAGE 9 OF 15
4.1.2 Where substances such as grease and machine oil are found on the surface
, remove them with cleaning solvent or other appropriate methods.
4.2.1 Surface Preparation shall be carried out by appropriate methods that will
ensure the required grade of finish. Procedure and degree of surface
preparation are shown in Annexture 1 " Classification of steel surface
preparation".
(a) In case of rain or bad weather , surface preparation shall not be carried out
out doors.
(b) When the surface substrata is wet , preparation shall not be carried out.
(c) When the relative humidity is 89% or higher , surface preparation shall not ,
in principle , be carried out.
(d) When surface preparation is carried out during the night or in dark locations
( inside of tanks ,etc ) ,proper lighting arrangements shall be made to check
the extent of rust removal from the surface.
TEIL
STANDARD CONSTRUCTION SPECIFICATION O-301-A
TOYO INDIA
TOYO ENGINEERING INDIA LTD. PAINTING WORKS
ISSUED : 20.07.2006 IRUP PROJECT PAGE 10 OF 15
4.2.3 Surface shall be air blast cleaned by using A 1203 particles , chilled cast
iron or maleable iron , by sand blasting where grit blasting is not possible.
After the completion of surface preparation , the surfaces are to checked for
the following prior to commencement of painting.
4.3.2 The painting surface shall be fully cleaned of mill scale , rust and loose dust
accumulated on the surface , due to the surface preparation work.
4.3.3 The painting surfaces ( cleaning of which has already been completed )
shall be kept clean in such a way as to prevent the adherence of grease ,
oil , dust, and other detrimental materials until the painting work is stated.
STANDARD CONSTRUCTION SPECIFICATION
TEIL
TOYO INDIA O-301 A
TOYO
ENGINEERING INDIA LTD.
PAINTING WORK
ISSUED: 20.07.2006 IRUP PROJECT PAGE 11OF 15
4.4 Painting
4.4.1 Protection
Contractor shall fully all equipments , piping , walls floors and other
surfaces from damage and contamination , and shall provide the necessary
protection required to fully protect all surfaces from dust , paint dropping,
paint mist, other contaminants during the process of painting work. Care
shall be taken to protect all stainless steel surfaces from zinc paint.
4.4.3 Application
(c) Each coat shall be painted in the order specified in the painting
system. During painting , the overcoat intervals and film
thickness specified , shall be maintained as manufacturers
recommendations and according to the properties and
performance of the paints.
Each coat shall be painted in the order specified in the painting
system. During painting , the overcoat intervals and film
thickness specified , shall be maintained as manufacturers
recommendations and according to the properties and
performance of the paints.
(d) Where each coat is applied successively , such continuous painting work
shall be carried out after the lapse of specified drying time and dry of
previous film has be confirmed.
4.4.4 Restrictions
Unless special measures are taken, painting shall not be carried out under
the following conditions
(a) When the painting surfaces are moist or likely to become moist due to rain ,
snow , dew or frost.
When the temperature during painting is 4.4ºC or lower and is not suitable
(b) for drying and hardening of paint.
(d) When the temperature of painting surfaces is high and defects such as air
bubbles may occur in the paint film.
(e) When a strong wind is blowing and foreign materials such as sand may
adhere to the paint film.
5.1 Industrial hygiene and safe working practice in connection with the painting
work shall be strictly followed to avoid potential hazards to health and of
fire.
Special care shall be taken with regard to the following matters:
5.1.1 When surfaces are to be prepared by blast cleaning or with use of power
tools , protectors such as goggles , mask etc. shall be used.
5.1.2 When painting work is to be carried out using organic solvent in an almost
airtight environment , appropriate ventilating and lighting equipments shall
be provided. Additionally , appropriate protectors such as gas masks etc.
l shallbe worn.
5.1.3 Monitor for any fire around the work loaction and extinguish the fire prior to
work , if observed.
6.1 Storage
6.1.1 As a rule, paint shall be stored in well ventilated room , constructed to the
appropriate standard of fire resistance.
6.1.2 All paint and thinner shall be stored in such a way that the manufacturers
labels can be readily identified.
6.1.3 Paint stocks shall be controlled so that thay can be used within their
effective period of use.
6.1.4 For storage area , provide prescribed protective measure and signs. Paint
exceeding the prescribed quantity shall not be stored.
6.1.5 Care shall be taken while storing and handling to avoid breakage or marked
deformation of containers.
6.1.6 When paint is stored outdoors, it shall be protected by using platic/tin
sheets or other appropriate measures, in order to prevent damage to
containers or changes in the quality of paints.
STANDARD CONSTRUCTION SPECIFICATION
TEIL
TOYO INDIA
O-301 A
TOYO
ENGINEERING INDIA LTD.
ISSUED: 20.07.2006 IRUP PAINTING
PROJECT WORK PAGE 14 OF 15
6.1.7 When paint is temporarily stored in working area , the amount equivalent to one day's
use or less shall be stored.Paint shall be protected from rain ,snow etc using
plastic/tin sheets.
7 .0 INSPECTION
The prepared surfaces shall be compared with the standard photographs of SIS, IS or
SSPC. Where the prepared surfaces are found to be equivalent to those indicated in
the above standard photographs, they shall be deemed acceptable.