Kansai Bakaru3
Kansai Bakaru3
Kansai Bakaru3
Bandung
Saguling Reservoir
インドネシア全土の図
Powerhouse
Development Schedule
Date Event
Feb. 2012 SPC Establishment
Aug. 2013 PPA Signed
Mar. 2014 EPC Contract
Jun. 2014 Financial Close
Aug. 2014 Start Construction
May. 2019 Commercial Operation The Kansai Electric Power Co., Inc.
Strictly Confidential
1. Outline(1) 4
Poko Dam
Garugu Dam
EL.615m
(H=335m)
EL.271m
Bakaru1 PH
Bakaru2 PH (Gross Head=169m)
EL.102m
Bakaru3 PH
Mamasa River
Garugu Dam(Existing)
Bakaru 3
Bakaru 1 PS (Existing)
Bakaru 2 PS (Planned)
The Kansai Electric Power Co., Inc.
Strictly Confidential
1. Outline(2) 5
No.1
Bakaru 3
Bakaru 1 PS (EL.286m) Type Run of river
Qmax 70~90 m3/s
Headrace
Total Head 169m
Effective Head 161m
Weir (small dam)
Crest level : EL.271m Pmax 99~128MW
Dam height : 10~25m
Desilting basin Bakaru 3 passed DPT process in 2021.
~2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
COD
Pre-Feasibility Study
Now
2. Hydrology
・Water level measurement (Silei village)
・Discharge measurement (Silei village) Water level and discharge measurement → Continued in 2023
・Water sampling (Intake area) Water sampling
3. Site survey
including meeting with PLN parepare and
PLN Bakaru 1
Mapping area
The Kansai Electric Power Co., Inc.
Strictly Confidential
4. Survey Plan in 2023 8
2023 2024
5 6 7 8 9 10 11 12 1 2 3
1. Hydrology
・Water level measurement (Silei village)
・Discharge measurement (Silei village)
・Water sampling (Intake area)
2. Geology To be decided
・Boreholes etc. (Another letter will be issued when geological survey is planed to be carried out)
3. Site survey
including meeting with PLN parepare and To be decided
PLN Bakaru 1
Warer level and discharge measurement Water sampling
Silei Bakaru 1 PS
Garugu dam
Bakaru 3