Bakaru 3 Hydropower Project (2023)

The Kansai Electric Power Co.


Strictly Confidential
0. Kansai Electric Power (1) 2
Utilizing our technical expertise and experience cultivated throughout our history, our
business field is expanded not only in in Kansai region but throughout Japan and overseas.

Company Data (Year Ended 31 Mar 2022)


Establishment May 1,1951
Capital USD 4.4 billion (Consolidated)
Total assets USD 78.7 billion (Consolidated)
Kansai’s Total sales volume of Generation facilities Hydropower 8,235MW
electricity across Japan Thermal 14,566MW
(expect in Okinawa)
Nuclear 6,578MW
102.3 billion kWh Renewable energy 110MW
Total 29,489MW
Grid Transmission Line 18,851 km
Distribution Line 132,880 km

Total electricity sales 102 TWh


Total revenue USD 26.0 billion (Consolidated)
Ordinary income USD 1.2 billion (Consolidated)
Net income USD 0.8 billion (Consolidated)

Employees 31,933 (Consolidated) ※2021


※ 1 USD = 110 JPY
The Kansai Electric Power Co., Inc.
Strictly Confidential
0. Kansai Electric Power (2) 3
Rajamandala Hydropower Project (Indonesia)
Project Location West Java Salient Feature
0 25 50 km
Jakarta Item Spec.
Installed Capacity 47MW
Annual Energy Generation 181 GWh
Rajamandala Plant Discharge 168m3/s
Cirata Reservoir Project Site Effective Head 31.7m

Bandung
Saguling Reservoir

インドネシア全土の図
Powerhouse

Development Schedule
Date Event
Feb. 2012 SPC Establishment
Aug. 2013 PPA Signed
Mar. 2014 EPC Contract
Jun. 2014 Financial Close
Aug. 2014 Start Construction
May. 2019 Commercial Operation The Kansai Electric Power Co., Inc.
Strictly Confidential
1. Outline(1) 4
Poko Dam
Garugu Dam
EL.615m

(H=335m)

EL.271m
Bakaru1 PH
Bakaru2 PH (Gross Head=169m)
EL.102m
Bakaru3 PH

Mamasa River

Garugu Dam(Existing)

Bakaru 3
Bakaru 1 PS (Existing)
Bakaru 2 PS (Planned)
The Kansai Electric Power Co., Inc.
Strictly Confidential
1. Outline(2) 5

No.1

Bakaru 3
Bakaru 1 PS (EL.286m) Type Run of river
Qmax 70~90 m3/s

Headrace
Total Head 169m
Effective Head 161m
Weir (small dam)
Crest level : EL.271m Pmax 99~128MW
Dam height : 10~25m
Desilting basin Bakaru 3 passed DPT process in 2021.

The Kansai Electric Power Co., Inc.


Strictly Confidential
2. Overall schedule 6

~2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

COD
Pre-Feasibility Study

Feasibility Study Financing/Contracts Construction


Detailed Design

Now

Schedule may change depending on


progress/result of Feasibility Study

The Kansai Electric Power Co., Inc.


Strictly Confidential
3. Survey in 2022 7
2022 2023
9 10 11 12 1 2 3
1. Topography
・Topographical survey (Intake area) → Completed
・Topographical survey (PH area) Topographical survey

2. Hydrology
・Water level measurement (Silei village)
・Discharge measurement (Silei village) Water level and discharge measurement → Continued in 2023
・Water sampling (Intake area) Water sampling

3. Site survey
including meeting with PLN parepare and
PLN Bakaru 1

Topographic survey In 2022,


• Kansai received the permit from UIKL
Sulawesi.
• In addition, when Kansai or IP planed to visit
Bakaru 1 PS
Bakaru power plant area, we applied to PLN
Bakaru (Mr. Zeth) each time to obtain Permit.

Mapping by UAV Lidar

Mapping area
The Kansai Electric Power Co., Inc.
Strictly Confidential
4. Survey Plan in 2023 8
2023 2024
5 6 7 8 9 10 11 12 1 2 3
1. Hydrology
・Water level measurement (Silei village)
・Discharge measurement (Silei village)
・Water sampling (Intake area)

2. Geology To be decided
・Boreholes etc. (Another letter will be issued when geological survey is planed to be carried out)

3. Site survey
including meeting with PLN parepare and To be decided
PLN Bakaru 1
Warer level and discharge measurement Water sampling

Silei Bakaru 1 PS

8km Water sampling


at suspension bridge
Mamasa river

Garugu dam
Bakaru 3

Bakaru 1 PS The Kansai Electric Power Co., Inc.