TTP-1-KSO-SU-5130-M-019-AC Method Statement of Control (Local and Remote) SAT Procedure

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

To:

Sociedade Nacional de Transporte de Energia


S.T.E CC:
GOPA - International Energy
(SNTE) Consultants GmbH
Av. Zedequias Manganhela No. 267, JAT Justus-von-Liebig-Str. 1, 61352
Building, JAT IV, 6th floor, Maputo, Mozambique Bad Homburg, Germany

DOCUMENT TRANSMITTAL SHEET Date: December 5, 2023


Attn: Gilles Allard
No.004-M-2023-CET

Design, Supply and Installation of 400 kV Air Insulated Substations (AIS) for Temane Transmission Project
(TTP) Lot 1
Contract no.: 05/TREP/LOT 1/2019

For information only For comments / approval √ Approved documents

The following documents are attached:


Sheet.
No Title and details Document number(CSD) Rev. Status Date
no
Method Statement Of Control (local and remote) For
1 TTP-1-KSO-SU-5130-M-019-AC 9 AC 05-12-2023
SAT Procedure Approval

Legend for Revision: CAT1: Reviewed, CAT2: Reviewed as amended, CAT3: Returned for correction, CAT4: For information

Contractor
China Electric Power
Equipment and Technology
√ EDM
Co., Ltd. (CET)
INH

INS
KHO
Stamp
√ KHS

Name:Yu Yang
Comment Sheet

Project: Temane Transmission Project (TTP) - LOT 1


Contract: 05/TREP/LOT 1/2019
Lot: 1
Release date: 20.11.2023
Received on: 01.11.2023 23:00:00
Document title: Method Statement of Control (local and remote) SAT Procedure
CSD no.: TTP-1-KSO-SU-5130-M-019-02
Document status: Approved

1. Engineer’s Comments

S/ Contractor
File/chapter Comments Status*
N reply

1 Document is approved CAT1 Understand

GENERAL REVIEW COMMENTS As per Contract, the


Contractor shall execute the basic design and detailed
design and the engineering work in compliance with the
provisions of the Contract, or where not specified, in
accordance with good engineering practice. The
2 CAT 4 Understand
Contractor is responsible for the accuracy of the input
data and correctness of the calculated values. Approval
of a Document shall not relieve the Contractor of any
responsibility or liability imposed upon him by any
provision of the Contract.

Legend for Revision: CAT1: Reviewed, CAT2: Reviewed as amended, CAT3: Returned for Correction, CAT4: For information

Engineer: Dan Volintiru

Note: This document does not relieve the Contractor of any of its Contractual obligations and does not relieve the
Contractor from responsibility for defective work resulting from errors or omissions of any kind on the approved
documents

2. Employer’s Comments

S/
File/chapter Comments Status*
N

Engineer: Cirilo Fabiao

Design, Supply and Installation of 400 kV Air Insulated Substations (AIS) for Temane Transmission Project
(TTP) Lot 1 P a g e | 1 of 2
[Document Title]
Method Statement Of Control (local and remote) SAT Procedure

3 Fourth Submission [05-12-2023]

2 Third Submission [02-11-2023]

1 Second Submission [09-10-2023]

0 Initial Submission [26-09-2023]

CLIENT:

SOCIEDADE NACIONAL DE TRANSPORT DE ENERGIA (STE)

CONSULTANT:

GOPA-INTERNATIONAL ENERGY CONSULTANTS GMBH, GERMANY

CONTRACTOR:

China Electric Power Equipment and Technology Co., Ltd. (CET)

PROJECT:

Design, Supply and Installation of 400 kV Air Insulated Substations (AIS) for Temane Transmission Project (TTP) Lot 1

Contract no.: 05/TREP/LOT 1/2019


TITLE:

[Document title]Method Statement Of Control (local and remote) SAT Procedure

Nhico N/A SH. No. / TOTAL SHTS. [8/8]


PREPARED BY SIZE
Tamele
DESIGNED BY SCALE N/A Contractor Doc. No. & Date:

CHECKED BY YuYang DATE 05, 12,2023 004-M-2023-CET[05,12,2023]

CSD/Doc. No.: T T P - 1 - K S O - S U - 5 1 3 0 - M - 0 1 9 - A C REV No. [AC]


CET-PRO-STE-001
Method Statement of Control Issue Date:05 December
(local and remote)SAT Procedure 2023
Revision: AC

METHOD STATEMENT OF CONTROL (LOCAL


AND REMOTE) SAT PRODURE

CLIENT :

SOCIEDADE NACIONAL DE TRANSPORTE DE ENERGIA


(SNTE)-MOZAMBIQUE

CONSULTANT :
GOPA-INTERNATIONAL ENERGY CONSULTANTS GMBH-
GERMANY

CONTRACTOR :
CHINA ELECTRIC POWER EQUIPMENT AND TECHNOLOGY CO.,
LTD,

Design, Supply and Site test of 400 kV Air Insulated Substation


PROJECT :
(AIS) for Temane Transmission Project (TTP), Lot 1

Contract No. 05/TREP/LOT1/2019

05 December 2023
CET-PRO-STE-001
Method Statement of Control Issue Date:05 December
(local and remote)SAT Procedure 2023
Revision: AC

CET-PRO-STE-001
CSD code:

T T P - 1 - K S O - S U - 5 1 3 0 - M - 0 1 9 - A C

METHOD STATEMENT OF
Document Title
CONTROL (LOCAL AND REMOTE)SAT PRODURE
Revision Number AC
Document
Number CET-PRO-STE-001
Language English

Document
IFU - Issued for Use Next Review Date 05/12/2023
Status

This Revision

Author: Liu Tan 05/12/2023

Document Control
Hu kuan ming
Review: 06/12/2023

Authorized
Yu Yang 06/12/2023
Approver:

Revision History
Revision Revision
Author Reviewer Approver Status Description
Number Date

For 26/09/2023
Liu Tan Hu kuan ming YuYang Rev.00
Approval
For 09/10/2023
Liu Tan Hu kuan ming YuYang Rev.01
Approval
For 02/11/2023
Liu Tan Hu kuan ming YuYang Rev.02
Approval
For 65/12/2023
Liu Tan Hu kuan ming YuYang Rev.AC
Approval
CET-PRO-STE-001
Method Statement of Control Issue Date:05 December
(local and remote)SAT Procedure 2023
Revision: AC

Contents

1.Monitoring Background Window Check .......................................................................................... 2


2.Remote control information check ...................................................................................................3
3.Appendixes .......................................................................................................................................4
3.1 Appendix I Certificate of tester ........................................................................................................ 5
3.2 Appendix II Site test report .............................................................................................................. 7
3.3Appendix III Checklist .......................................................................................................................8
3.4 Appendix IV Request For Inspection ...............................................................................................9
CET-PRO-STE-001
Method Statement of Control Issue Date:05 December
(local and remote)SAT Procedure 2023
Revision: AC

CONTROL
(LOCAL AND
REMOTE)SAT
PRODURE

1
CET-PRO-STE-001
Method Statement of Control Issue Date:05 December
(local and remote)SAT Procedure 2023
Revision: AC

1.Monitoring Background Window Check


1.1 Test Standard: IEC 60870

1.2 Test procedure

1.2.1 Check whether the substation primary wiring diagram, voltage hierarchy diagram, DC system

diagram, station power system status diagram, and system operating condition diagram are correct

and can be called;

1.2.2 The system should be able to respond quickly and correctly when calling various monitoring

screens;

1.2.3 The system should be able to correctly call, view all kinds of reports and control operation

records;

1.3 Test precautions

1.3.1 Before work, carefully check whether the drawing corresponds to the actual situation on site;

1.3.2 Take appropriate measures to prevent a large amount of invalid information from being sent to

dispatch at all levels during work, which will interfere with the monitoring and judgment of

dispatch/centralized control personnel on duty.

2
CET-PRO-STE-001
Method Statement of Control Issue Date:05 December
(local and remote)SAT Procedure 2023
Revision: AC

2.Remote control information check


2.1Test Standard: IEC 60870

2.2 Test procedure:

Carry out remote control operation on all controllable equipment in the whole station, Testing all

Telecontrol functionality including point-to-point testing to Control Centre,and check whether the

remote control function meets the following requirements: The remote control process failure or

error has corresponding information; Only one object can be remotely controlled at a time; Fast

response speed; Success rate 100%.

2.3 Test precautions:

2.3.1 Before work, carefully check whether the drawing corresponds to the actual situation on site;

2.3.2 Take appropriate measures to prevent a large amount of invalid information from being sent to

dispatch at all levels during work, which will interfere with the monitoring and judgment of

dispatch/centralized control personnel on duty;

2.3.3 During remote control operation, there should be monitored on site;

3
CET-PRO-STE-001
Method Statement of Control Issue Date:05 December
(local and remote)SAT Procedure 2023
Revision: AC

3.APPENDICES

Appendix I: Certificate of tester

Appendix II: Site test report

Appendix III: Checklist

Appendix IV: Request For Inspection

4
People Republic of China special operation certificate

A43000042321023821
File Encoding

T420684198712080075
隗政 电⼯作业

男 继电保护作业

2018-07-16 2021-06-29 ⾄ 2027-06-28

2024-06-28前 湖南省应急管理厅

Note: This certificate should be reviewed before 2024-06-28


备注: 本证书应于2024-06-28前进行复审
ID:T420684198712080075
Name:Wei zheng Work type: People Republic of China
Electrician work
Gender:M Specialty: Special Operation Certificate
Relay protection
Validity period:2021-06-29-2027-06-28 Produced by the Ministry of Emergency Management of
Review Date:2024-06-28 thePeople Republic of China www.men.gov.cn
Issuing Agency:Hunan Provincial
Department of Emergency Management
This electronic certificate and physical certificate have the same legal effect

5
People Republic of China special operation certificate

A43000043322013968
File Encoding

T430103197711181538
彭澄 电⼯作业

男 继电保护作业

2022-08-30 2022-08-30 ⾄ 2028-08-29

2025-08-29前 湖南省应急管理厅

Note: This certificate should be reviewed before 2025-08-29


备注: 本证书应于2025-08-29前进行复审
ID:T430103197711181538
Name:Peng cheng Work type: People Republic of China
Electrician work
Gender:M Specialty: Special Operation Certificate
Relay protection
Validity period:2022-08-30-2028-08-29 Produced by the Ministry of Emergency Management of
Review Date:2028-08-29 thePeople Republic of China www.men.gov.cn
Issuing Agency:Hunan Provincial
Department of Emergency Management

This electronic certificate and physical certificate have the same legal effect

6
Test Record of Control(local and remote)
遥控试验报告
Substation Name
变电站名称
Temperature Humidity Test Date
温度 湿度 试验日期
Conclusion 结论
Device type Signal description
NO. local Remote
设备类型 信号描述
后台 远动
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Test Witness 试验见证人


Position Company Signature Date
Owner STE
Consult INTEC
Subcontractor CET

7
CHECK LIST FOR CONTROL (LOCAL AND REMOTE)SAT PRODURE

Check List No CET/TTP-E-001 Date of Inspection

Owner Sociedade Nacional De Transporte De Energia, Mozambique

(SNTE)

Consultant GOPA International Energy Consultants

Project Temane Substation Project Lot 1

Contract Title

Substation Name Section

Location MS number

Check Description Yes No Remarks

Monitoring Background Window Check

Remote control information check

Signed Name Date

Sub-Contractor

Contractor

Consultant /

Employer

Engineer's use: Not


Approved Approved Subject to
Inspected and are Approved

Comments:

Inspection Date / Time:

8
China Electric Power Equipment And Technology Co.Lda
Mozambique-Maputo, Rua de Micaia, Bairro Triunfo

CET-RFI-MPT-001
Request For Inspection
Project Name: Design, Supply and Installation of 400 kV Air Insulated Substations (AIS) for Temane
Tramsmission Project (TTP) Lot-1
Contract No:05/TREP/LOT1/2019

To, GOPA International Energy Consultant (Intec) CET Serial No.


Sociedade Nacional De Transporte De Energia (STE) Date

Dear Sir / Madam,

Inspection Date Inspection Time

Inspection Level Hold Inspection Witness Surveillance

Works Include Civil Mechanical Electrical

Related Documents: CET/TTP-A0034; QC-PE01-2022

Contract Specification N/A


Approved Drawings
Approved Method Statement

Name of the Substation

Section & Location

Description of Works
Requested By
SITE MANAGER/ ENGINEER
CET Name Designation

Received By ENGINEER
Client / Consultant Name Designation
Inspected By ENGINEER
Client / Consultant Name Designation

Inspected &
Approved Approved Except Noted Rejected
Comments are
Description of Comments:

Remark