This schematic diagram shows the proposed route of a 5300m long 132kV underground power cable with a triple core design running from the PLDP substation to the Baldia Grid Station. Key aspects include the 132kV XLPE insulated cable buried at a minimum depth of 30m in an open trench, termination points at both substations, and various types of joints, bonding cables, and link boxes used along the route.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views1 page

Approved Schematic Drawing

This schematic diagram shows the proposed route of a 5300m long 132kV underground power cable with a triple core design running from the PLDP substation to the Baldia Grid Station. Key aspects include the 132kV XLPE insulated cable buried at a minimum depth of 30m in an open trench, termination points at both substations, and various types of joints, bonding cables, and link boxes used along the route.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEMATIC DIAGRAM

DOUBLE CIRCUIT (FLAT FORMATION)


FROM PLDP TO BALDIA GRID STATION
132kV 3x1Cx800 XLPE POWER CABLE
CABLE ROUTE LENGTH = 5300M
PROPOSED 132kV PLDP 220/132kV BALDIA GRID STATION
OUTDOOR TERMINATION OUTDOOR TERMINATION
132KV XLPE 2X3X800mm2 (SINGLE
CORE) CORRUGATED ALUMINIUM Inside Open
SHEATH/XLPE POWER CABLE Trench = 30 M

442.00 442.00 442.00 442.00 442.00 442.00 442.00 442.00 442.00 442.00 442.00 412+30

NOTE:
1. All dimensions are in meters.
LEGEND
Approval
SYMBOL DESCRIPTION SYMBOL DESCRIPTION Rev.No Date Comment Letter Category
32 CORE FIBRE OPTIC CABLE (FOC)
EARTHING
DISTRIBUTED TEMPERATURE SENSING CABLE 01 11-11-21
COAXIAL BONDING CABLE COPPER CONDUCTOR (DTS)
400/400MM2 (INCOMING)
00 30-09-21 OMS-PAEC-K2K3-0411-100 03
DTS EQUIPMENT AT GS
COAXIAL BONDING CABLE COPPER CONDUCTOR CLIENT: PAKISTAN ATOMIC ENERGY COMMISSION
400/400MM2 (OUTGOING) FOC JOINT
CONSULTANT: OMS (PRIVATE) LIMITED
132kV OUTDOOR TERMINATION/KIT
FOC MARSHALLING BOX
CPM - JBL (JV)
132kV INSULATED JOINT (JBC) CONTRACTOR:
Joint Venture of CPM & JBL
CROSS BONDING
132kV STRAIGHT JOINT (JBE) Survey, Geotechnical Study, Design, Engineering, Manufacture,
Supply, Laying, Construction, Installation, Erection, Testing,
Commissioning, Energization and Handing over on Turnkey basis
PROJECT: a new 132kV Double Circuit Transmission Line (Overhead +
LINK BOX CROSS BONDING WITH SVL Underground) from K-Electric 220/132kV Baldia GIS Grid Station
TRANSPOSITION to 132 kV gantry of K2/K3 Grid Station (Permanent Arrangement)
LINK BOX DIRECT EARTH FOR JOINT WITHOUT DRAWN BY ADEEL JAWED TITLE:
SVL CHECKED BY SYED HUZAIFA SCHEMATIC DIAGRAM
SHEET
SINGLE CORE BONDING CABLE COPPER CONDUCTOR 400MM2 01 of 01
APPROVED BY WASEEM M
FOR U.G CABLE
LINK BOX DIRECT EARTH FOR TERMINATION
WITH SVL SINGLE CORE EARTH CABLE COPPER CONDUCTOR 400MM2 SCALE N.T.S DWG #: PAEC/OMS/CPM/JBL/B-K2/K3/GS/SD/001