Snubbing Unit

Download as pdf or txt
Download as pdf or txt
You are on page 1of 41

WELL INTERVENTION CERTIFICATION

COURSE

SNUBBING

1
SNUBBING
Snubbin: “Process of tripping pipe into well under pressure –
pipe light mode”
Strippin: “Moving pipe through
through rubber
rubber element to contain
contain well
pressure”
ADVANTAGE
ADVANT AGE OVER CT:
• S$all vertical #ootprint
APPLICATION:
• Sand Was!in • (i! drillin)$illin
drillin)$illin
 rotation
tor*ue
• Well "nloadin
• Was!in Per#orations • (i! pressure + , psi
• Acidisin • (ori.ontal 'ell
• Ce$entin
• Drillin or %illin
• Fis!in
• &lo' Control
IWCF Well Intervention Accreditation Course /
SNUBBING
Snubbin: “Process of tripping pipe into well under pressure –
pipe light mode”
Strippin: “Moving pipe through
through rubber
rubber element to contain
contain well
pressure”
ADVANTAGE
ADVANT AGE OVER CT:
• S$all vertical #ootprint
APPLICATION:
• Sand Was!in • (i! drillin)$illin
drillin)$illin
 rotation
tor*ue
• Well "nloadin
• Was!in Per#orations • (i! pressure + , psi
• Acidisin • (ori.ontal 'ell
• Ce$entin
• Drillin or %illin
• Fis!in
• &lo' Control
IWCF Well Intervention Accreditation Course /
SNUBBING EQUIPMENT 4

6
1 (draulic 2a
2ac As
Asse$bl
11. Hos
Hoses
es
/ 3uide 4ube
12. Equalizing Loop 1 2
5 Access Windo'
13. Bleed-Off Line
6 4rave
veli
lin
n Sli
lip
ps)
s)Sn
Snu
ubb
bbe
ers
14. Strippers
, Stati
tio
onar Sli
Slip
ps)Snubbers
15. ir!u
ir!ulatin
lating
g S"
S"ste#
ste# 5
7 Wor &aset
3
8 Po'er S'
S'ivel)4ons 14

9 Control Panel
13
 Po'er Pac
12
10 &;P Sste$
10

IWCF Well Intervention Accreditation Course 5


Hd!"uli# $"#%
An asse$bl o# !draulic clinders <
slip bo'ls '!ic! enables t!e pipe to
to
be $oved in or out o# t!e 'ell
Situated at t!e top o# t!e &;P stac=
;n t!e top o# t!e clinders is t!e
travelin !ead '!ic! carries
travelin slip
& $eans o# valves= t!e !draulic
circuits can be set up to provide
di>erent speeds < !ence po'ers #or
t!e travelin !ead
4!e stroe
stroe o# a ?ac depends
depends on t!e
$ae= but $ost !ave a 10 #t 'orin
stroe

Guide Tube
It restrain t!e pipe and stop it bein
bucled out o# t!e side

Spline Tube
IWCFIt is Intervention
Well used to Accreditation
trans$it tor*ue-reaction
Course 6
ACCESS WINDOW
• It is a lare < !eavil constructed asse$bl=
'!ic! basicall consists out o# / base-plates
< 6 steel les spacin t!e$ apart 4!e
asse$bl is rated to #ull load capacit o# t!e
unit

• 4!e 'indo' is used to enable lare ;D


ite$s o# &(A or co$pletions= etc= to be
installed < run= 'it!out !avin to pass t!e$
t!rou! restricted ID slip < bo'ls 4!is 'ill
eli$inated usin oversi.ed= lare ;D=
e*uip$ent above t!e 'indo'

• Windo's are usuall tted 'it! tubin-


uides to prevent buclin '!ile snubbin

• Since t!e 'orin space is restricted= pre-


plannin is re*uired to select t!e re*uired
di$ension o# t!e 'indo'-asse$bl

IWCF Well Intervention Accreditation Course ,


SLIPS & SNUBBERS
• 4ravelin slips are $ounted onto rotar
table !ead < co$$onl consist o# one
bo'l #or pipe !eav < one bo'l #or pipe
li!t '!en in snubbin $ode
• Al$ost al'as !draulicall operated=
t!e t'o bo'ls are t!e sa$e 'it! t!e pipe
li!t bo'l #acin do'n
• Si$ilarl= t!e stationar slips are
$ounted in t!e 'or 'indo'= at t!e
botto$ o# t!e ?ac= but do not $ove
• In !i! pressure 'ells= it is nor$al to use
an eBtra set o# stationar snubbers #or
sa#et

IWCF Well Intervention Accreditation Course 7


SNUBBING STRIPPERS
4!e stripper asse$bl is a special device '!ic! is
used #or t!e #ollo'in:
• Pri$ar barrier 'it! lo' 'ell!ead pressure 'or
• Pipe cleanin on pullin out
• Prevents droppin o# debris do'n t!e 'ellbore
'!ilst trippin
Stripper bo'ls are available 'it! bot! sinle
ele$ents < dual ele$ents
Strippers ele$ent can be redressed durin
operation Wear on t!e ele$ent is a>ected b:
• Well!ead pressure
• ubrication at t!e rubber
• EBternal pipe rou!ness
• In dual ele$ent stripper= pressure e*ual to !al#
t!e 'ell!ead pressure is ept bet'een t!e
rubbers b a s$all pu$p < reservoir 4!is is to
!alve t!e pressure on eac! rubber < t!us eep
'it!in its 'orin rane
• 4!e sinle ele$ent stripper bo'l is e>ectivel
!al# o# a dual stripper bo'l

IWCF Well Intervention Accreditation Course 8


SNUBBING PROCESS

IWCF Well Intervention Accreditation Course 9


SNUBBING PROCESS

IWCF Well Intervention Accreditation Course 


SNUBBING PROCESS

IWCF Well Intervention Accreditation Course 10


SNUBBING PROCESS

IWCF Well Intervention Accreditation Course 11


SNUBBING FORCE
500
8”
) 7”
0
0 400
0, 4”
1(
S
B 300
L
,
E
C 200
R
O 3”
F
G 100
NI 2!”
B
B
U 50
N 2"”
S

0 1 2 3 4 5 6 7 8 # 10 11 12 13 14 15

WELLHEAD
IWCF Well Intervention Accreditation Course PRESSURE, PSI (1,000) 1/
ANNULAR BOP
• 4!e annular &;P is identical to a standard annular ba-
tpe &;P used in drillin operations alt!ou! nor$all o# a
s$aller si.e 4!e pressure ratin is specied accordin to
t!e 'ell!ead pressure

• 4!e annular &;P is used '!en t!e nor$al ra$-tpe &;Ps


cannot seal around so$et!in due to its enlared si.e=
suc! as a side pocet $andrel= blast ?oint= slip ?oint= etc

• W!en used #or snubbin operations= its nor$al practice to


!ave a s$all= 1 allon= accu$ulator bottle in t!e closin
line !draulic circuit= situated close to t!e preventer 4!is
allo's t!e set-up o# t!e tools to be stripped t!rou! '!ilst
$aintainin a stead !draulic closin pressure

IWCF Well Intervention Accreditation Course 15


ANNULAR BOP

IWCF Well Intervention Accreditation Course 16


RAM T'PE BOP
1 Strippin &;P
Stripping BO$ is a standard ra#-t"pe BO$ used in
drilling % &or'o(er operations &it) spe!ial
ele#ents* a#eron* to ena+le t)e# to seal on
#o(ing,stripping pipe.

/ Sa#et PipeG
t is nor#al Ra$
pra!ti!e ort)e
to )a(e &lind <ra#s
+otto# S!ear
in t)eRa$ or Hariable
BO$ sta!' dressed forRa$
t)e
pipe size used as &or'string and t)e top pipe ra#s of t)e BO$ sta!' dressed &it)
(aria+le ra#s sin!e t)ere is no &a" to redress t)e ra#s during t)e o+.

/)e #iddle ra#s &ill +e dressed &it) s)ear,+lind ra#s /)is BO$ sta!' is often
!alled t)e safet" BO$* se!ondar" !ontrol* t)e" are nor#all" onl" used &)en
!)anging ele#ents in t)e stripping ra#s* annular or stripper +o&l* or &)en t)e
pipe is stationar" for a period of ti#e. BO$ !an +e dressed &it) slip ra#s* 4 1,10
sized BO$* or (aria+le +ore ra#s as per o+ require#ents.

IWCF Well Intervention Accreditation Course 1,


$/ &+ U* S+** R-.
(C/)

E-/
-/ (O)

F: O* -*-;/ B/ O>> F: O* -*-;/


C<= -/ (C/) C<=

S-9*
S/
E-/
L
L?* S+** R-.
(O) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION

OPERA$ION %1A
U* S->+@ R-.
(O)
•$OOL &OIN$ LOWERED
$O UPPER S$RIPPER RA'

L?* S->+@ R-.


(O)

IWCF Well Intervention Accreditation Course 17


$/ &+ U* S+** R-.
(C/)

E-/
-/ (O)

F: O* -*-;/ B/ O>> F: O* -*-;/


C<= -/ (C/) C<=

S-9*
S/
E-/
L
L?* S+** R-.
(C/) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION

OPERA$ION %1B
U* S->+@ R-.
(O)
•LOWER S$RIPPER RA'S CLOSED

L?* S->+@ R-.


(O)

IWCF Well Intervention Accreditation Course 18


$/ &+ U* S+** R-.
(C/)

E-/
-/ (C/)

F: O* -*-;/ B/ O>> F: O* -*-;/


C<= -/ (O) C<=

S-9*
S/
E-/
L
L?* S+** R-.
(C/) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION

OPERA$ION %1C
U* S->+@ R-. • EUALISING LOOP CLOSED
(O)
• BLEEDOFF LINE OPENED

L?* S->+@ R-.


(O)

IWCF Well Intervention Accreditation Course 19


U* S+** R-.
(O)

E-/
-/ (C/)

F: O* -*-;/ B/ O>> F: O* -*-;/


C<= -/ (O) C<=

E-/
L
L?* S+** R-.
(C/)
SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
U* S->+@ R-.
OPERA$ION %1D
(O)
•UPPER S$RIPPER RA'S OPENED
$OOL&OIN$ LOWERED

BE$WEEN RA'S
L?* S->+@ R-.
(O)

IWCF Well Intervention Accreditation Course 1


U* S+** R-.
(C/)

E-/
-/ (C/)

F: O* -*-;/ B/ O>> F: O* -*-;/


C<= -/ (O) C<=

E-/
L
L?* S+** R-.
(C/)
SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
U* S->+@ R-.
OPERA$ION %2A
(O)
•UPPER S$RIPPER RA'S CLOSED

L?* S->+@ R-.


(O)

IWCF Well Intervention Accreditation Course /0


U* S+** R-.
(C/)
E-/
-/ (O)

F: O* -*-;/ B/ O>> F: O* -*-;/


C<= -/ (C/) C<=

S-9*
S/
E-/
L
L?* S+** R-.
(C/) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION

OPERA$ION %2B
U* S->+@ R-.
(O)
• BLEEDOFF LINE CLOSED
• EUALISING LOOP OPENED

L?* S->+@ R-.


(O)

IWCF Well Intervention Accreditation Course /1


U* S+** R-.
(C/)
E-/
-/ (O)

F: O* -*-;/ B/ O>> F: O* -*-;/


C<= -/ (C/) C<=

S-9*
S/
E-/
L
L?* S+** R-.
(O) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION

OPERA$ION %2C
U* S->+@ R-. •LOWER S$RIPPER RA'S OPENED
(O)

L?* S->+@ R-.


(O)

IWCF Well Intervention Accreditation Course //


U* S+** R-.
(C/)
E-/
-/ (O)

F: O* -*-;/ B/ O>> F: O* -*-;/


C<= -/ (C/) C<=

S-9*
S/
E-/
L
L?* S+** R-.
(O) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION

OPERA$ION %2D
U* S->+@ R-.
(O)
• $OOL &OIN$ LOWERED
IN$O $HE WELL

L?* S->+@ R-.


(O)

IWCF Well Intervention Accreditation Course /5


SHEAR & SEAL BOP
• Its ver o#ten !draulicall boosted &;P to enable t!e$ to
cut 'orstrin etc < t!en seal o> t!e 'ell bore

• Its placed i$$ediatel above t!e 'ell!ead but belo' an


riser on o>s!ore installations #or so$e reulator bodies

• W!ere separate blind < s!ear ra$s are used= t!e c!oice o#
'!ic! to place belo' '!ic!= is o#ten dictated b 'ell
conditions or operator pre#erence For $ost snubbin ?obs
t!e s!ear is co$$onl placed belo' t!e blind since t!e
pipe $a ver 'ell be trin to pus! out o# t!e 'ell bore at
t!e ti$e it is re*uired to be cut

• Conventional s!ear ra$s $a not al'as cut t!e 'or


strin co$pletel #or eBa$ple i# it is re*uired to cut a &(A
'it! a s! insideG < it $a be necessar to RI( one or t'o
?oints be#ore operatin nor$al s!ear ra$s in t!is case
IWCF Well Intervention Accreditation Course /6
H'DRIL BOP
Connector Ri ng #roo$es

Ram ssem!ly

Bonnet Bolts

Load Hinges
Manual Locking Scre"
Fluids Hinges

Fluid Connections and


Hydraulic Passages

Side Outlets for Choke Kill


Bonnet Bolts
Piston Rod Mud Seal
Replace Cylinder Liner

IWCF Well Intervention Accreditation Course /,


SHAFFER SHEAR RAMS
U* B/9= U* R;;* L?* R;;* L?* B/9=

U* H/* L?* B/- L?* H/*

IWCF Well Intervention Accreditation Course /7


VARIABLE RAMS

IWCF Well Intervention Accreditation Course /8


BLIND(SHEAR RAMS

1 Lo&er Bod" sse#+l"


2 Side $a!'er
3 pper a# Bod" 5
4 pper a# sse#+l"
5 /op Seal
0 Blade $a!'er
3

0
2

1
IWCF Well Intervention Accreditation Course /9
SNUBBING BOP ARRANGEMENT
05=  WP
O P S ONL

OPERA$ING FEA$URES U* S+** R-. B/ O>>

f S lea's E-/ L


• lose LS % S 6Double
Barrier7
L?* S+** R-. $ P. L

f LS lea's S->+@ R-.


• lose Bot) S
S->+@ R-.
2 /ree (al(es #ust +e !losed
&)en stripping BH* t)erefore
spa!ing out to a!!o##odate
BH is !ru!ial. C<=
8E9E use S for stripping
unless e#ergen!". .- $*
8o tertiar" +arrier s"ste#. The wellhead must have a
minimum of at least two
blind BOPs, gate valves or
IWCF Well Intervention Accreditation Course a combination of both.
/
SNUBBING
5=  10=  WP
BOP ARRANGEMENT
O P S ONL U* S+** R-. B/ O>>
OPERA$ING FEA$URES
E-/ L
f S lea's

L?*
lose LS % S 6Double Barrier7 S+** R-. $ P. L

f LS lea's S->+@ R-.


• lose Bot) S
B/ R-.
2 /ree (al(es or !o#+ination of tree (al(es %
C<= 
B #ust +e !losed &)en stripping BH* C<=
// L
t)erefore spa!ing out to a!!o##odate
BH is !ru!ial. S<-* R-.

:)en S % B are !losed* flo&-line % S->+@ R-.


!)o'es !an +e used.
8E9E use S for stripping unless
e#ergen!".
:it) pipe in )ole* !)ange B to S %
re!ipro!ate pipe t)ru upper ra#s % 2 The wellhead must have a
.- $*
ra#s reser(e. minimum of at least two
o#+ination of s)ear % +lind pro(ide ulti#ate
blind BOPs, gate valves or
safet" if se!ondar" +arrier fail.
IWCF Well Intervention Accreditation Course
a combination of both.
50
SNUBBING BOP ARRANGEMENT
' 10  WP U* S+** R-. B/ O>>
O P S ONL
E-/ L
OPERA$ING FEA$URES
L?* S+** R-. $ P. L
f S lea's
• lose LS % S 6Double Barrier7 S->+@ R-.

f LS lea's B/ R-.


• lose Bot) S
C<=  // L C<=
2 /ree (al(es or !o#+ination of tree (al(es %
S<-* R-.
B #ust +e !losed &)en stripping BH*
t)erefore spa!ing out to a!!o##odate S->+@ R-.
BH is !ru!ial.
S->+@ R-.
:)en S % B are !losed* flo&-line %
!)o'es !an +e used.
8E9E use S for stripping unless
e#ergen!".
o#+ination of s)ear % +lind pro(ide ulti#ate
safet" if se!ondar" +arrier fail. .- $* The wellhead must have a
minimum of at least two
blind BOPs, gate valves or
IWCF Well Intervention Accreditation Course a combination of both.
51
AD)USTABLE CHO*E

IWCF Well Intervention Accreditation Course 5/


FI+ED CHO*E

IWCF Well Intervention Accreditation Course 55


SPACER SPOOL

IWCF Well Intervention Accreditation Course 56


SNUBBING TUBING HANGER

IWCF Well Intervention Accreditation Course 5,


INTERNAL BARRIER

4!ere are t'o $ain tpes '!ic! are co$$onl used:


• C!ec valves
• Pu$p do'n plu and landin nipple

C,e#% V"l-e:
/ c!ec valves at botto$ o# 'or strin= above t!e specialist tool ball <
apperG

4o $ini$i.e ris o# scale < debris pluin &PH:


• Inspect < rattled tubin i$$ediatel prior ?ob
• Durin llin up t!e strin t!e valves are pu$ped to ensure t!e open
< dear out build-up o# debris

Pu.p D/0n Plu1 & L"ndin1 Nipple:


2obs involvin lare pu$pin is co$$on #or bot! &PH to be 'as!ed out A
landin nipple is placed above &PH i# &PH leas

Wide variet o# &(A devices can be used as internal pri$ar 'ell control
includin:
• Pu$p out plus or pu$p out &PH
SlidinAccreditation
IWCF Well Intervention Sleeves coupled
Course 'it! positive plus 4!is is $ostl to allo' 57
INTERNAL BARRIER

IWCF Well Intervention Accreditation Course 58


SNUBBING b,"
 G  G  G  G  G
R #
K IN R #
K IN R IN R IN R IN
O '(
R
O R
R O '(
R
O R
R O R O R O R
W& $ W& $ W $ W$ W $
% SS % SS S S S
    
R G R G R G R G R G
A E A E A E A E A E
D IN L D IN L D IN L D IN L D IN L
N D P N D P N D P N D P N D P
N P
I N P
I N P
I N P
I N P
I
O A O A O A O A O A
C N C N C N C N C N
E L E L E L E L E L
S S S S S

$ $
 E
C 7 IN IN
E L O O
H A & &
C 7 E E
L L
G G
$ N
I N
I $
N
I S S N
I
O O
& &
E E
L  E  E L
G C 7 C 7 G
IN E L E L IN
S $ H A H A S
N C 7 C 7
 I
R O
&
A E
I' L
R G $
P IN $ N
I
S  N  O $
R I R & U
 E O O
 7
C 7 A & A E
E L '
I P '
I L P P
H A R U R G 'B
C 7 P P P IN U
 S P
R
A
I'
R
P  E  E  E  E
C 7 C 7 C 7 C 7
E L E L E L E L
H A H A H A H A
C 7 C 7 C 7 C 7

A A A A
H H H H
B B B B

IWCF Well Intervention Accreditation Course 59


OTHER BARRIER
As 'ell as t!ese ite$s on t!e botto$ o# t!e strin= t!ere are al'as
s!ould be available in t!e 'or baset A Jell sa#et valve or an
inside &;P '!ic! can be used in t!e event o# a tubin)&(A brea
or lea in t!e tubin strin

IWCF Well Intervention Accreditation Course 5


Wor Windo'

Snubbin1 B"!!ie! Snubbin Stripper

Jell Sa#et Halve


Fill ines IN4 SEC;NDARK &ARRIER

Annular &;P

Stripper &;P Wor Strin

E@4 PRI%ARK &ARRIER


Stripper &;P

Nipple
4ravellin Slip Sa#et &;P IN4 SEC;NDARK &ARRIER
E@4 SEC;NDARK &ARRIER
Wor &aset
Sa#et &;P

Jill ines
1 2t o# 4ubin

Sa#et &;P
(draulic 2ac
E@4 SEC;NDARK &ARRIER
Sa#et &;P C!ec Halve

IN4 PRI%ARK &ARRIER


Riser
C!ec Halve

S!ear < Seal &;P 4ER4IARK &ARRIER


Stationar Slip

Specialist 4ool

@$as 4ree

IWCF Well Intervention Accreditation Course 60

You might also like