Snubbing Unit
Snubbing Unit
Snubbing Unit
COURSE
SNUBBING
1
SNUBBING
Snubbin: “Process of tripping pipe into well under pressure –
pipe light mode”
Strippin: “Moving pipe through
through rubber
rubber element to contain
contain well
pressure”
ADVANTAGE
ADVANT AGE OVER CT:
• S$all vertical #ootprint
APPLICATION:
• Sand Was!in • (i! drillin)$illin
drillin)$illin
rotation
tor*ue
• Well "nloadin
• Was!in Per#orations • (i! pressure + , psi
• Acidisin • (ori.ontal 'ell
• Ce$entin
• Drillin or %illin
• Fis!in
• &lo' Control
IWCF Well Intervention Accreditation Course /
SNUBBING
Snubbin: “Process of tripping pipe into well under pressure –
pipe light mode”
Strippin: “Moving pipe through
through rubber
rubber element to contain
contain well
pressure”
ADVANTAGE
ADVANT AGE OVER CT:
• S$all vertical #ootprint
APPLICATION:
• Sand Was!in • (i! drillin)$illin
drillin)$illin
rotation
tor*ue
• Well "nloadin
• Was!in Per#orations • (i! pressure + , psi
• Acidisin • (ori.ontal 'ell
• Ce$entin
• Drillin or %illin
• Fis!in
• &lo' Control
IWCF Well Intervention Accreditation Course /
SNUBBING EQUIPMENT 4
6
1 (draulic 2a
2ac As
Asse$bl
11. Hos
Hoses
es
/ 3uide 4ube
12. Equalizing Loop 1 2
5 Access Windo'
13. Bleed-Off Line
6 4rave
veli
lin
n Sli
lip
ps)
s)Sn
Snu
ubb
bbe
ers
14. Strippers
, Stati
tio
onar Sli
Slip
ps)Snubbers
15. ir!u
ir!ulatin
lating
g S"
S"ste#
ste# 5
7 Wor &aset
3
8 Po'er S'
S'ivel)4ons 14
9 Control Panel
13
Po'er Pac
12
10 &;P Sste$
10
Guide Tube
It restrain t!e pipe and stop it bein
bucled out o# t!e side
Spline Tube
IWCFIt is Intervention
Well used to Accreditation
trans$it tor*ue-reaction
Course 6
ACCESS WINDOW
• It is a lare < !eavil constructed asse$bl=
'!ic! basicall consists out o# / base-plates
< 6 steel les spacin t!e$ apart 4!e
asse$bl is rated to #ull load capacit o# t!e
unit
0 1 2 3 4 5 6 7 8 # 10 11 12 13 14 15
WELLHEAD
IWCF Well Intervention Accreditation Course PRESSURE, PSI (1,000) 1/
ANNULAR BOP
• 4!e annular &;P is identical to a standard annular ba-
tpe &;P used in drillin operations alt!ou! nor$all o# a
s$aller si.e 4!e pressure ratin is specied accordin to
t!e 'ell!ead pressure
/ Sa#et PipeG
t is nor#al Ra$
pra!ti!e ort)e
to )a(e &lind <ra#s
+otto# S!ear
in t)eRa$ or Hariable
BO$ sta!' dressed forRa$
t)e
pipe size used as &or'string and t)e top pipe ra#s of t)e BO$ sta!' dressed &it)
(aria+le ra#s sin!e t)ere is no &a" to redress t)e ra#s during t)e o+.
/)e #iddle ra#s &ill +e dressed &it) s)ear,+lind ra#s /)is BO$ sta!' is often
!alled t)e safet" BO$* se!ondar" !ontrol* t)e" are nor#all" onl" used &)en
!)anging ele#ents in t)e stripping ra#s* annular or stripper +o&l* or &)en t)e
pipe is stationar" for a period of ti#e. BO$ !an +e dressed &it) slip ra#s* 4 1,10
sized BO$* or (aria+le +ore ra#s as per o+ require#ents.
E-/
-/ (O)
S-9*
S/
E-/
L
L?* S+** R-.
(O) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
OPERA$ION %1A
U* S->+@ R-.
(O)
•$OOL &OIN$ LOWERED
$O UPPER S$RIPPER RA'
E-/
-/ (O)
S-9*
S/
E-/
L
L?* S+** R-.
(C/) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
OPERA$ION %1B
U* S->+@ R-.
(O)
•LOWER S$RIPPER RA'S CLOSED
E-/
-/ (C/)
S-9*
S/
E-/
L
L?* S+** R-.
(C/) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
OPERA$ION %1C
U* S->+@ R-. • EUALISING LOOP CLOSED
(O)
• BLEEDOFF LINE OPENED
E-/
-/ (C/)
E-/
L
L?* S+** R-.
(C/)
SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
U* S->+@ R-.
OPERA$ION %1D
(O)
•UPPER S$RIPPER RA'S OPENED
$OOL&OIN$ LOWERED
•
BE$WEEN RA'S
L?* S->+@ R-.
(O)
E-/
-/ (C/)
E-/
L
L?* S+** R-.
(C/)
SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
U* S->+@ R-.
OPERA$ION %2A
(O)
•UPPER S$RIPPER RA'S CLOSED
S-9*
S/
E-/
L
L?* S+** R-.
(C/) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
OPERA$ION %2B
U* S->+@ R-.
(O)
• BLEEDOFF LINE CLOSED
• EUALISING LOOP OPENED
S-9*
S/
E-/
L
L?* S+** R-.
(O) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
OPERA$ION %2C
U* S->+@ R-. •LOWER S$RIPPER RA'S OPENED
(O)
S-9*
S/
E-/
L
L?* S+** R-.
(O) SNUBBING UNI$ BOP
PRINCIPLE OF OPERA$ION
OPERA$ION %2D
U* S->+@ R-.
(O)
• $OOL &OIN$ LOWERED
IN$O $HE WELL
• W!ere separate blind < s!ear ra$s are used= t!e c!oice o#
'!ic! to place belo' '!ic!= is o#ten dictated b 'ell
conditions or operator pre#erence For $ost snubbin ?obs
t!e s!ear is co$$onl placed belo' t!e blind since t!e
pipe $a ver 'ell be trin to pus! out o# t!e 'ell bore at
t!e ti$e it is re*uired to be cut
Ram ssem!ly
Bonnet Bolts
Load Hinges
Manual Locking Scre"
Fluids Hinges
0
2
1
IWCF Well Intervention Accreditation Course /9
SNUBBING BOP ARRANGEMENT
05= WP
O P S ONL
C,e#% V"l-e:
/ c!ec valves at botto$ o# 'or strin= above t!e specialist tool ball <
apperG
Wide variet o# &(A devices can be used as internal pri$ar 'ell control
includin:
• Pu$p out plus or pu$p out &PH
SlidinAccreditation
IWCF Well Intervention Sleeves coupled
Course 'it! positive plus 4!is is $ostl to allo' 57
INTERNAL BARRIER
$ $
E
C 7 IN IN
E L O O
H A & &
C 7 E E
L L
G G
$ N
I N
I $
N
I S S N
I
O O
& &
E E
L E E L
G C 7 C 7 G
IN E L E L IN
S $ H A H A S
N C 7 C 7
I
R O
&
A E
I' L
R G $
P IN $ N
I
S N O $
R I R & U
E O O
7
C 7 A & A E
E L '
I P '
I L P P
H A R U R G 'B
C 7 P P P IN U
S P
R
A
I'
R
P E E E E
C 7 C 7 C 7 C 7
E L E L E L E L
H A H A H A H A
C 7 C 7 C 7 C 7
A A A A
H H H H
B B B B
Annular &;P
Nipple
4ravellin Slip Sa#et &;P IN4 SEC;NDARK &ARRIER
E@4 SEC;NDARK &ARRIER
Wor &aset
Sa#et &;P
Jill ines
1 2t o# 4ubin
Sa#et &;P
(draulic 2ac
E@4 SEC;NDARK &ARRIER
Sa#et &;P C!ec Halve
Specialist 4ool
@$as 4ree