AALIF P
Electrical Engineer
+966568462342
[email protected]
OBJECTIVE
To secure a full-time position in a growing company where I can apply my skills and bring out the best of my
potentials, performing multiple and challenging work to optimize professional and personal growth.
CAREER EXPERIENCE:
➢ Electrical Site Engineer
Company : Associated Plantation Engineering Services
Project : Leela International Five Star Resort Kovalam.
Location : Trivandrum; Kerala; India
Period : January 2015 to March 2017
➢ Position Held : Electrical Site Engineer
Project : Nani Three Star Hotel and Resort
Location : Kollam; Kerala; India
Period : May 2017 to January 2019
➢ Electrical Design Engineer
Company : QMAM ALTASHEED CONTRACTING CO.
Project : AL-BAIRAQ (1000 Villas)
Location : DAMMAM, KSA.
Project : JADAN LIFE (1008 Villas)
Location : AL-AHSA, KSA.
Project : AL-YARMOOK (8 Villas)
Location : AL-AHSA, KSA.
Project : AL-FURSAN. (400Villas)
Location : RIYAD.
Period : 2019-2024.
➢ Electrical Site & QC Engineer
Company : QMAM ALTASHEED CONTRACTING CO.
Project : AL-BAIRAQ (1000 Villas)
Location : DAMMAM, KSA.
Period : 2019-2022.
Project : JADAN LIFE (1008 Villas).
Project : JADAN LIFE.(Sales center & showroom).
Project : AL-YARMOOK (8 Villas)
Location : AL-AHSA, KSA.
Period : 2022-2024.
JOB DESCRIPTIONS:
• To Design, implement and control electrical system and products. Do the work according to
international standards or project specification and client requirements.
• Manage and control the group and complete the work as per the client requirement onallotted time for
the project.
• Review the shop drawing, Coordination drawing, material submittal, method statement, technical
submittal, request for information and etc. for any discrepancies and ambiguities and ensure all in full
compliance with contract specifications.
• To coordinate material handling, installation works, testing, and commissioning to meet contract
program.
• Inspect the site as per comply the drawings and material submittal (MIR&WIR).
• Review and respond the Materials, Drawings technical queries and coordinate with engineering
department on technical Issues.
• Take overall responsibility for the performance and quality control of all Scope of work.
• Participate in the cost review and change order process as it relates to the Scope ofwork. Assists
the Seniors necessary in estimating change orders.
• Coordinate onsite activities, materials procurement, and other related activities withseniors and
Field Staff.
• Participate construction progress meeting, participate final in-house deficiency inspection and
prepare
Snagging list.
• To coordinate with the Electrical Contractor for Execution, Erection & Commissioning.
• To Check Entire Work as per the Approved IFC Drawing& Material Approval.
• As Per Site Condition & Requirement of Client Preparing Red Line Mark Up after Implementation.
• To Prepare and change Shop Drawing according to Site requirements & get it approved from the
consultant.
• Conducting weekly progress meetings and workshop meetings with sub-ordinates and
preparing minutes of meeting.
• Ensures that the required tests and/ or inspections are performed as per the approved ITP, documented, and
reported, and that reports are maintained for present and future reference.
➢ EDUCATION
BACHELOR OF ENGINEERING (ECE)
YCET (YOUNUS COLLEGE OF ENGONEERING AND TECHNOLOGY,
KOLLAM, KERALA 2010-2014
AKM HIGHER SECONDARY SCHOOL, KOLLAM, KERALA 2008-2010
PERSONAL INFORMATION
Citizenship: Indian Permanent Address: PW, Vadakkevila , Kollam
D.O. B : 29-09-1992 Passport No. : M2567177
DECLARATION
I do hereby declare that all the above furnished information and particulars are true to the best of my knowledge
and belief.
AALIF.P