For Limu Kosa, Cora Botor & Botor Xolay Cluster
For Limu Kosa, Cora Botor & Botor Xolay Cluster
For Limu Kosa, Cora Botor & Botor Xolay Cluster
Length(km): 1
New Unit
Quantity Amount
Pay Item No Description Unit Rate
A C=A*B
SERIES 2000 SETTING OUT & SITE CLEARANCE
a c-20 M3 13,040.74
b c-25 M3 14,342.08
c c-30 M3 14,352.69
IV Construction of formwork
a Steel Form work M2 1,975.21
DIVISION 7100 Total sum -
Division 7200 Construction of Masonry -
72.01 Dry stone Massonry Walls -
1 (0.4<x <5]km M3 2,115.97
2 (5<x <10]km M3 2,115.97
3 (10 < x <15]km M3 2,115.97
4 (15 < x < 20]km M3 2,115.97
5 (20 < x <25]km M3 2,115.97
6 (25< x <35]km M3 2,115.97
73.01 Excavation for foundation in Soft material less than 1.50m M3 296.22
73.04 Excavation for foundation in hard rock material to any depth M3 727.05