Improvement/Construction of Existing Class-5 Road to NH Intermediate ane Specification with Hard Shoulder from Existing Km 76+340 to Km
Name of Project :- 134+940 (Design Chainage from Km 76+300 t Km 133+000) [Total Length 56.700 Km] of NH 505 (Sumdo-Kaza-Gramphoo Road) on EPC mode in the
state of Himachal Pradesh (Package-I)
CLIENT :- Border Roads Organisation
Consultant :- Border Roads Organisation
A- Widening and strengthening of existing road
SPS.No. 2 Period:- Sept & Oct-2023
(1) Sub-grade up to top of the Granular Sub-base
Measurment
DATE OF SPS
S.NO RFI NO DESCRIPTION OF WORK Chainage Length in Sub-Total Remarks.
INSPECTION Side Nos. No.
Km. Qty.