e= (Mu/Pu) = 2.53*100/20.42
e= 16.259 cm. covering 7.5 cm.
fc' = 280 ksc. Use Re‐bar( DB/RB) = DB 16 mm
cb 24.6735 fy = 4000 ksc.
/* Assume c = 24.674 cm. b = 50 cm.
β1 = 0.85 diameter = 50 cm.
a = β1 c = 20.97 cm. d = 40.800 cm.
εy = 0.0020
Es = 2040000 (1) (2) (3) (4) (5)
Concrete xi εsi fs As T Force Dist from Cc =0.85*fc'b β1 c Moment force Ref (1) X (X i)
Reinforcement Bar (cm) (ksc) (cm²) (kg) Bottom bar (cm) Bottom bar position (kg.‐m)
øP(Ton)
øPo=557.19
Interaction Diagram
Ultimate strength
øPb=126.61
øPc=24.9
8.72 11.429 øM(Ton‐m)
øMo=9.19 øMb=20.59
øPt=2.96
øPt=57.91
5
4.63
Pn
Dc
0.85fc'
cc cc
c cs' cs'
N.A
Ts
Lo = 1500 mm
128 mm , minimum ( 150, 8 x dia of main rebar)
Remark
[ Spiral detail ]