Ans: A document showing the various methods through which a particular work is
accomplished. It also provides a section for the safety measures for these activities.
Ans: WMS describes the method by which a particular job is to be done. This can
give complete awareness to the working crew. A JSA can be prepared based on the
WMS. In fact, it helps to finish the job safely.
Ans: Job Safety Analysis (JSA) is part of many existing accident prevention programs.
In general, JSA breaks a job into basic steps and identifies the hazards associated
with each step. It also prescribes controls for each hazard. The JSA has to be
reviewed during the investigation if it has been conducted for the job involved in an
accident. If one is not available, it has to be performed as part of the investigation
to determine the events and conditions that led to the accident.
Ans: Any area not normally occupied by personnel, having limited means of access
and egress, and which could be subject to the hazards of Oxygen deficiency or the
accumulation of toxic or flammable gases or dust.
Ans: If the gas test is done and the result is favorable. Experience & trained working
crew.
Trained Entry watch with Entry Log Sheet. Effective Emergency Evacuation plan.
Ans: The trained person who stands outside the entrance of the confined space with
the log sheet and records the details of the entrants. He always keeps in
communication with the entrants. In an emergency, he calls for assistance.
Ans:
1
Elaborado. Por: Andre Nzinga
Ans: Stay outside the entrance of the confined space. Record the details of the
entrants such as name, trade, ID #, time going in, time coming out, etc. Keep
communication with the entrants. Call for rescue in case of an emergency.
Ans: Tanks, Vessels, Column, Silos, Pits, Excavation, Boiler, Sub-marine Pipelines Re-
actors, etc.
Ans: A person, who has qualifications and experience in a specific job, and has the
necessary skill to perform the stated duties is called a competent person.
• NON-REPORTABLE ACCIDENT:
A person may receive a minor physical or bodily injury while working as the outcome
of an accident. After such an injury, if he resumes his duties within 48 hours then
such an accident is called a non-reportable accident. Many times a person may
resume his work someday after receiving first aid.
the workplace, the accident is called a reportable or lost time accident. As per
statutory requirements, such incidents are to be reported to the government
authorities in a prescribed form. The injury in such a case is called a major or
disabling injury.
Ans: Until now nothing happened, but if not controlled an accident can happen.
2
Elaborado. Por: Andre Nzinga
Ans: The collection, segregation, and disposal of various waste materials according
to the rules and regulations of the authorities.
Ans: Material safety data sheet. It is issued by the manufacturer about hazardous
substances along with the material. It shows all details regarding that material,
including related to health hazards and their precautions.
Ans: Two or more forms of the same element having the same atomic numbers but
different atomic weights.
Ans: Valid documents for the source, certified radiographer, trained crew,
barricading, and signboards placed, properly using radiation monitors, and the area
evacuated.
Ans: Authorized and trained crew, proper PPEs, use of radiation monitors including
film-badge, barricading, signboards, warning lights, and monitoring the observed
area.
Ans: An area cordoned and posted prior to exposing a sealed source or starting up
an X-Ray machine, where at the periphery the pre-calculated radiation dose shall
not exceed 0.75 mR averages over any one hour.
3
Elaborado. Por: Andre Nzinga
Ans: After exposure, can be analyzed to find the amount of radiation to which the
person is exposed.
Ans: The chart shows the rate of decomposition of a radioactive element over a
period of time.
Ans: Valid third-party certification, SWL marked on the side and tag-line
Ans: Valid documents including third-party certificate of the crane, certified rigger,
inspected rigging gears, barricading the required area as per radius, signboards,
lifting permit, lifting plan, JSA, STA, proper PPEs for workers, and favorable climatic
conditions.
Ans: The distance from the center pin of the crane to the center of gravity of the
load.
Ans: The document describing the plan for safe lifting. It shows the details of the
crane to be used, lifting tackles (gears) to be used, details of the load, details of crane
set-up, lifting steps, etc.
Ans: Any work is done by breaking the surface of the earth by using hand tools or
by machines. A trench is an excavation, where the depth is greater than the width,
but not greater than 15 feet at the base.
Ans: The safety measure adopted to avoid cave-ins by providing wooden planks or
metal sheets (plates) at the side of the excavation with hydraulic or screw jacks.
Q 35: WHAT ARE THE CLASSES OF FIRE AND WHAT TYPES OF EXTINGUISHERS ARE
USED FOR THEM?
4
Elaborado. Por: Andre Nzinga
Ans: A-class for ordinary combustible materials like wood, cloth, etc. B-class for
flammable liquids or gases like petrol, thinner, etc
C-class for an electrical fire. DCP extinguishers are used for A, B, and C. DCP and
Carbon dioxide extinguishers are used for C-class fire.
Ans: Wear a red visible vest, stay alert at the job area, identify any fire hazard,
inspect, and arrange firefighting equipment properly and know how to use them in
an emergency, if any unsafe conditions arise, stop the job.
Ans: All tools and equipment are inspected periodically by concerned competent
persons and color-coded accordingly.
Ans: 20 meters.
Ans: Tang is applied on scaffoldings. They are of three colors, RED, YELLOW, and
GREEN. Red means do not use the scaffolding. Yellow means the scaffolding is not
complete but can be used with adequate fall protection. Green means the
scaffolding is complete and safe for work.
Ans: Location, date of erection, request No., SWL, name, and signature of the
inspected scaffolding supervisor and columns for future inspection. Inspection is
done by the scaffolding supervisor/inspector.
Ans: Guard rail system consists of the top rail, mid-rail, and toe board.
Ans: The plank or metal sheet is kept vertical to the platform at a minimum height
of 4 inches in order to avoid materials falling down and to protect personnel.
Q 44: WHAT IS THE HEIGHT OF THE TOP RAIL FROM THE PLATFORM?
5
Elaborado. Por: Andre Nzinga
Ans: The base of the ladder is fixed to firm ground, the ladder fix in a ratio of 4:1 (75
degrees), the ladder must not be damaged or painted and the top of the ladder
should extend a minimum of 3 feet above the landing platform.
Ans: Wherever no other fall arrest systems are feasible, lifelines can be provided
with wire ropes. The lifelines should be able to support a minimum of 5000 pounds
per person hooking.
Ans: A communication session between the work supervisor and his crew regarding
the work activities that they have to perform in order to help in completing the work
in a safe manner.
Ans: The pressure test is done in pipelines, vessels, etc, by filling with water and
giving pressure in order to find any defects related to leakage.
The test is done in cables by giving high voltage in order to check the voltage holding
capacity of the cable.
Q 51: What are the safety requirements for doing hot work?
Ans: Work permit, fire extinguishers, housekeeping, proper PPEs, inspected tools
and equipment, barricading and signboards, grounding of the power equipment,
GFCI, use of fire blankets, and a trained fire watch.
Ans: It makes it possible to analyze the accidents/incidents and help in finding the
root cause, develop remedial measures and implement them.
6
Elaborado. Por: Andre Nzinga
Ans: The document prepared before starting the job for assessing the risks involved
in the various steps of a particular job and to find the necessary remedial measures.
Ans: Stop all activities, shut down all equipment, move out of the working area in an
orderly way, check the direction of the windsock and move a cross windway to the
nearest assembly point and wait there until headcount is done and further
instructions are given.
Ans: After evacuating to the Assembly Area, the supervisors will make a count for
their employees according to that day’s attendance register. It helps to find if
anybody is missing.
Ans: Ω: RIGGER I is required for lifts over 40 tons and must approve all lift plans.
Ω: RIGGER II cannot rig a load over 40 tons. Ω: RIGGER III cannot rig a load over 10
tons.
Ans: Lifting will be stopped if the wind speed is 32 km/ph, 20 miles per hour, and
8.998 meters per second.
Ans:
• Moral
• Legal
• Financial
• Happier Workforce
• More productive workforce
• Creates a good reputation.
• Reduces the likelihood of fines.
• Reduces personal injury claims.
Q 61: List three factors which are to be balanced against the benefits of risk
control when reducing risk ‘so far as is reasonably practicable.
Ans:
•Time
•Effort
•Money
•Inconvenience
Q 62: List three types of work-related accidents and incidents that are
reportable to the enforcing authority.
7
Elaborado. Por: Andre Nzinga
Ans:
•Death
•Major injury
•Injuries that lead to more than three days’ absence from work
•Injuries that lead to someone being unable to do normal work duties for more
than three days Certain dangerous occurrences.
Q 63: To prove negligence, what are the three things the claimant must show?
Ans:
Ans:
• Physiological
• Emotional
• Behavioral
Q 65: List the three types of evidence used for auditing management systems.
Ans:
• Documentation
• Interviews
• Observation
Q 66: List three key benefits of investigating accidents and incidents.
Ans:
Ans:
8
Elaborado. Por: Andre Nzinga
Q 68: List three benefits to you and your organization of carrying out a risk
assessment.
Ans: