Performance Improvement Project Checklist

The document appears to be an outline for developing and implementing a project plan. It includes sections for organizing a team, identifying problems, prioritizing problems, formulating solutions, establishing goals, developing an action plan, implementing and monitoring the plan, evaluating results, and standardizing processes. Annexes include templates for a problem prioritization matrix, root cause analysis, action plan, and measure profile.

Uploaded by

JeffreyReyes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views10 pages

Performance Improvement Project Checklist

The document appears to be an outline for developing and implementing a project plan. It includes sections for organizing a team, identifying problems, prioritizing problems, formulating solutions, establishing goals, developing an action plan, implementing and monitoring the plan, evaluating results, and standardizing processes. Annexes include templates for a problem prioritization matrix, root cause analysis, action plan, and measure profile.

Uploaded by

JeffreyReyes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Project Name:

Implementation Range:

Developer: Approved by:

Reference Number: Date:

PLAN

1. ☐ Organize the team.

Name

Approver of Decisions:

Resource persons/ experts:

Members of the Team

2. ☐ Problem Identification (use brainstorming)

1. ☐ Prioritize the problem (use prioritization matrix – Annex A)

2. ☐ Select the top 3 highest score

Priority Problem

a.
b.
c.

3. ☐ Describe & quantify the Problem

4. Clarify the problem

☐ Check the current process

1
☐ Do RCA/5whys (Use Root cause analysis form – Annex B)

5. ☐ Formulate solution(s) (Use Brainstorming)

No Solution

a.

b.

c.

d.

e.

f.

g.

6. ☐ Refer Best Practice/ Benchmark (review literatures)

No Literature/Best practice

a.

b.

c.

7. ☐ Establish Goals

2
DO

1. ☐ Establish the action plan. - Include: implementation, education/notification and compliance monitoring plan (use the action plan form – Annex D)

2.
☐ Implement the action plan.

CHECK

1. ☐ Create monitoring tool

2. ☐ Create Measuring tool (use the measure profile – Annex C)

3. ☐ Evaluate the results

Month 1 Month 2 Month 3 Month 4 Goal

Numerator:

Denominator:

Compliance Rate:

Analysis:

4. ☐ Compare the result with the goal

Achieved desired results?

☐ Yes – go to ACT

☐ No – return to PLAN to adjust.

ACT

☐ Sustained?

☐ Yes – go to Standardize

☐ No – return to PLAN to adjust.

☐ Standardize: Policies and Procedures

3
Annex A

Problem Prone/ Poor Important to Customer Staff/Doctor High Cost from Feasibility of Data Regulatory
Opportunity High Risk/ Safety High Volume
Outcome Mission Satisfaction Satisfaction Failure Collection Requirement Score
(weight) (10) (8)
(9) (7) (6) (6) (4) (5) (7)

Criteria Weight Score

1 – Low Risk
High Risk Issue ( Safety to staff and patient) 10 3 – Medium Risk
5 – High Risk

1 – Low Volume
High Volume Issue 8 3 – Medium Volume
5 – High Volume

1 – Low
Problem Prone or Poor Outcome 9 3 – Medium
5 – High

Importance to Mission & Strategic Performance Priorities 7 1 – Low

1
3 – Moderately related
5 – Directly related

1 – Low
Customer Satisfaction 6 3 – Moderate
5 – High

1 – Low
Staff/Doctor Satisfaction 6 3 – Moderate
5 – High

1 – Low
High cost from Failure 4 3 – Medium
5 – High

1 – Not/Barely significant

Regulatory Requirement 7 3 – Moderately significant


5 – Highly significant

1 – Not/ Hardly Feasible

Feasibility of Data collection 5 3 – Moderately Feasible


5 – Highly Feasible

2
Annex B
ROOT CAUSE ANALYSIS TOOL
Project name:

Project owner:

Preference number:

PROBLEM:

Manpower Material

- Proximate cause 1: - Proximate cause 1:

+ why? + why?

+ why? + why?

+ why? + why?

+ why? + why?

+ why? + why?

- Proximate cause 2: - Proximate cause 2:

+ why? + why?

+ why? + why?

+ why? + why?

+ why? + why?

+ why? + why?

Method / process Machinery

- Proximate cause 1: - Proximate cause 1:

+ why? + why?

+ why? + why?

+ why? + why?

+ why? + why?

+ why? + why?

- Proximate cause 2: - Proximate cause 2:

+ why? + why?

+ why? + why?

+ why? + why?

3
+ why? + why?

+ why? + why?

Environment

- Proximate cause 1:

+ why?

+ why?

+ why?

+ why?

+ why?

- Proximate cause 2:

+ why?

+ why?

+ why?

+ why?

+ why?

4
Machinery Manpower Method

Problem:

Environment Material

5
Annex C
MEASURE PROFILE

No. MEASURE ITEMS

1.
Measure Name:

2.
Data collection done by:

3.
Method of Data Collection (Retrospective or Concurrent):

4.
Type of Measurement (Process Measure or Outcome Measure):

5.
Rationale:

Raw Data Collected:

Excluded population:
6.
Data Collection Method Source of Data:

Sampling methods:

Sample Size:

Data to be computed:

Measure Unit:

Data aggregation Schedule:


7.
Data Aggregation and
Anticipated reporting time:
Analysis Plan

Formula:

Numerator:
x 100
Denominator:

8.
Frequency Assessment: weekly

9.
Target/Goal:

10.
Data Aggregation and Analysis Plan Explanation:

11.
Benchmark value (if available, and precise source):

12.
Department or committee responsible:

13.
Departments, services, commitees, or individuals receiving reports/report cycle :

14.
Validation data:

15.
References:

Annex D
PERFORMANCE IMPROVEMENT PROJECT

6
ACTION PLAN
Project’s name:

Project’s owner:

Preference number:

When Estimated Budget Requirements


No What (Tasks) Who
Start End