1 of 22
1 of 22
1 of 22
MFH
DN100
STEEL MAST
DN100
DN150
BAY 71 BAY 72 BAY 73 36 FH
STEEL MAST
CT-RSC2 CT-RSC2
WATER TANK
ELEVATED
DN150
CT-SS4S
CT-SS2S
BUS
BUS
BUS
PI
CT-RSC2 CT-RSC2
GROUTED ROCKWALL
DN100
VB DN150
STEEL MOST
pump house
VB
GENSET HOUSE
TELECOM FH
ZAMBOANGA L1
DN150 NEW 5m ROADWAY DN150
RAMP UP
COMMUNICATION
DN100 L=41.4M FH GV
RAMP
UP
TOWER
DN100 L=15M
AUXILIARY BUILDING
Steel Tower
Basic Body
Type DD
RAMP UP
CT-RSC
CT-RSC
CT-RSC2 CT-RSC2
CONTROL HOUSE
DN100
DN100 L=30M
RAMP UP
DN150
NO.1
RAMP UP
MRF
FLAGPOLE
MH
EXPANSION
NO.2
EXISTING WAREHOUSE
FUTURE
CT-DS4S CT-DS4S
BLDG.
CTRL.
APPROVED NOTED/INFO/REFERENCE
15kV XLPE CABLE
FH
AWCI RETURNED W/O ACTION
CT-DS4S
50 100
CABLE SUPPORT
FH
VB
CABLE SUPPORT
DN150
CT-RSC2
CT-RSC2
"ILJIN"
"NEW"
PTR 2
PTR 1
GV FH GV SECTION CHECKED DATE REVIEWED DATE
VT
FH ELECTRICAL
DS
RECOMMENDED:
CONTROL BUILDING
PCB
MECHANICAL DESIGN SUPERVISOR
COMMUNICATION
DS MB CT
CT-DS4S
RENE U. ALBAY
CIVIL APPROVED:
ELECTRICAL DESIGN MANAGER
ARCHITECTURAL
DN100 L=35.8M
BUS VT'S
MECHANICAL
BS
CT-SS3S
Approval of the Contractor's drawings shall not be held to relieve the Contractor or any part
DN150
DS
of the Contractor's obligations to meet the requirements of the Specifications nor of the
responsibility for the correctness of the Contractor's drawings.
PCB
FOR APPROVAL
DN150
DS/ES MB CT
CT-SS3S
OWNER:
NATIONAL GRID CORPORATION
FFC
OF THE PHILIPPINES
VT
CONTRACTOR:
DN150 FH
PIPE SLEEVE
NEW NORTHEAST ELECTRIC GROUP HIGH
VOLTAGE SWITCHGEAR CO., LTD.
H-FRAME
H-FRAME
DN100 L=41.6M FH GV
MANUFACTURER:
DN100 L=16M FH NANJING EXCELLENT TECHNOLOGY
GROUTED RIPRAP INTERNATION CORPORATION
PROJECT NAME: MINDANAO SUBSTATION REHABILITATION PROJECT,
STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA SUBSTATIONS)
DN150