NBS Retaining Wall Crack Rectification Completion Report

The document discusses a retaining wall crack rectification project at the National Book Store in SM City San Jose Del Monte that was completed from January 23 to February 02, 2023. Severe water leaks from the retaining wall had impacted store operations since 2019. The repair involved tracing and sealing all cracks, epoxy injection, applying a cementitious waterproofing, and forming a zocalo to prevent future water buildup behind shelves. The goal was to prevent further water leakage issues for the store.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views8 pages

NBS Retaining Wall Crack Rectification Completion Report

The document discusses a retaining wall crack rectification project at the National Book Store in SM City San Jose Del Monte that was completed from January 23 to February 02, 2023. Severe water leaks from the retaining wall had impacted store operations since 2019. The repair involved tracing and sealing all cracks, epoxy injection, applying a cementitious waterproofing, and forming a zocalo to prevent future water buildup behind shelves. The goal was to prevent further water leakage issues for the store.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

SM City San Jose Del Monte

LBI/CAPEX: NBS Retaining Wall Crack


Completion Report
(January 23- February 02, 2023)

Prepared by: Ar. Evangeline A. Endrina


Design Officer SMSJ
NBS WALL CRACK RECTIFICATION COMPLETION REPORT

BACKGROUND: BEFORE PHOTOS:

Severe water leaks incident were Fronting the NBS Hallway during
observed in SM City San Jose del severe water ponding and flooding
Monte’s National Book Store dated
June 24, 2019, during the heavy
downpour experience from evening to
early morning. This caused the water
ponding up to hallway in front of the
shop. It affected the store’s operational
activities and its customers. The leaks
are originated from the cracks in the
retaining wall, which is behind the
shelves of the store.

General Contractor of the mall


(NGCB), DCI (construction
management) and WCY Architects
(mall’s architect of record) together
with mall operations and NBS staffs Rectification by epoxy injection Leaks behind built in shelves of Leaks behind built in shelves of
conducted inspection. NGCB and application by NGCB (Mall National Book Store. The gap National Book Store. A Part of
conducted repair but leaks still reoccur
General Contractor). Leak still where water stocked and retaining wall with damaged
during heavy rains.
reoccur. overflows. membrane waterproofing.
NBS WALL CRACK RECTIFICATION COMPLETION REPORT
BEFORE PHOTOS:

Leak between slab and wall


termination. As per structural
consultant’s report no waterstop
installed to the construction joint

Structural Consultant’s Inspection


Report
Existing debris & metal scraps
NBS WALL CRACK RECTIFICATION COMPLETION REPORT
WHY WHY ANALYSIS FISH BONE DIAGRAM ANALYSIS

PROBLEM: Reoccurrence of leaks since 2019 from heavy rains that affected the • Inadequate process
National Book Store’s operation and customers. of repair due to
WHY 1 limited access for
tracing damaged
Why there is reoccurrence of leaks at National Book Store since 2019? waterproofing and • Insufficiency of
Buildup of water during heavy rains between gap from the retaining wall to the back of cracks that needs Quality control
National Book Store’s built in shelves. restructuring.. monitoring.
WHY 2
METHOD MAN
Why there is buildup of water during heavy rains between the gap of
retaining wall and the back of built in shelves? Due to retaining wall crack and
damaged waterproofing.
Continuing Leak
WHY 3 existence during
Why there are wall cracks and damaged waterproofing in the retaining rainy season at
wall? During first site inspection with general contractor, there are existing debris, metal NBS
studs and punctured nails on the slab. NGCB cleaned the area and rectified the wall with
epoxy injection. Still leak reoccur after the repair. Structural consultant provided
recommendations but was not fully implemented..
MATERIAL
WHY 4 ENVIRONMENT
Why leaks still exist after the repair? Due to limited access in rectification and the • No waterstop
• Tropical Storms
previous injected epoxy sealant worn off. Damaged waterproofing was not treated as at construction
• Typhoons
well.. joints where • Located within
WHY 5 NBS retaining operational
wall is located. tenant (NBS)
Why there is limited access in rectification? The whole side of the retaining wall
within NBS is not inspected totally due to limited movement or access, in effect, tracing • Damaged • Limited access
the visibility of the cracks and damaged waterproofing were challenging. It can only be waterproofing for repairs
reached through openings at built in shelves and ceiling access panel/manhole. and retaining • Existence of
Moreover, the tenant is already operational and would affect their business.. wall cracks. metal studs,
punctured nails
ROOT CAUSE on the slab
NBS WALL CRACK RECTIFICATION COMPLETION REPORT
RECTIFICATION ACTIVITIES:
1. Board up works to conceal working area for retaining wall
crack repair.

2. Dismantling and transferring built-in shelves and clearing of


any debris. Scaffolding works to reach wall to slab termination.
Tracing all cracks of the affected wall.

3. Crack cleaning/chipping of any loose concrete. V-Cutting


opening to all cracks. Removing of all dust and debris
afterwards.

4. Structural epoxy injection in all cracks. Sealer application


afterwards and allow it to cure in a day. Grinding excess
injectors and sealer after curing.

5. Application of cementitious waterproofing. (Three coats)

6. Forming Zocalo (plinth) to create additional barrier behind the


built in shelves and to avoid leakage of stored water between
the gap from retaining wall (if any in the future) to the tenant’s
A area and will direct them only to the existing drain (provided in
previous repair).

Location: National Book Store,


A 7. Clearing and Restoration Works of the affected areas
Unit 09-11, Lower Ground Floor

Note: Awarded Contractor is Green Concept Systems 8. NBS Retaining Wall Crack Rectification completed. (Subject
Philippines Inc.
for testing and turnover)

Note: Conducted coordination meeting with National Book Store’s


admin and technical employees, mall operations, EDD and awarded
LEGEND: contractor for streamlining safety norms, restoration agreements and
• Affected Area
mobilization of works.
• Retaining Wall Coverage of Rectification
NBS WALL CRACK RECTIFICATION COMPLETION REPORT
ONGOING WORKS PHOTOS IN THE AFFECTED AREA:

Work area preparation: Temporary Preparation for crack rectification and


Framing and Board up works sealing.

Zocalo (Plinth) Construction Restoration Works

LEGEND: • Affected Area


NBS WALL CRACK RECTIFICATION COMPLETION REPORT: BEFORE AND AFTER COMPARISON

BEFORE REPAIR

BEFORE BEFORE BEFORE

AFTER AFTER AFTER RESTORED AREA


NBS WALL CRACK RECTIFICATION COMPLETION REPORT

END