Construction Management Course File
Construction Management Course File
Contents:
Sl. No. Content Page No.
1. Syllabus Copy WBSCT & VE & SD 1
2. Vision of The Department 2
3. Missions of the Department 2
4. POs and PSOs 3
5. Course Objectives 4
6. Course Outcomes (COs) 4
7. Articulation of COs and Bloom’s Taxonomy 11
Correlation
8. Question Paper Scheme with Question papers 11
9. Academic Calendar 18
10. Class Time Table 18
11. Individual Time Table 19
12. CO-PO-PSO Mapping 19
13. Lecture Schedule with Teaching Methodology 20
& ILOs
14. Prerequisites 24
15. References, Journals 24
16. Course End Survey 25
17. CO-PO-PSO Attainment 34
18. List of Students 36
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
Bar charts and linked Bar charts, Network analysis and Critical Path
Method(CPM), PERT(Program Evaluation and Review Technique),
Advantages and disadvantages of CPM & PERT
7 Unit7: Cost Management 06
Control estimate. Direct cost, Indirect cost.
Unit8: Quality Management and Safety 04
8
Importance of quality – Elements of quality – Quality assurance
techniques (inspection, testing, sampling) Importance of safety –
Causes of accidents – Role of various parties (designer / employer /
worker) in safety management – Benefits – Approaches to improve
safety in construction.
9 Part B. DISASTER MANAGEMENT 12
Unit-9
9.1 Introduction – Disasters due to natural calamities such as Earthquake,
Rain, Flood, Hurricane, Cyclonesetc – Man made Disasters – Crisis due to
fires, accidents, strikes etc – Loss of property and life.
9.2 Disaster Mitigation measures – Causes for major disasters – Risk
Identification – Hazard Zones – Selection of sites for Industries and
residential buildings – Minimum distances from Sea – Orientation of
Buildings – Stability of Structures – Fire escapes in buildings - Cyclone
shelters – Warning systems.
9.3 Disaster Management
Total 36
1
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
M3: To arrange for a team of faculties that excels and specializes in the field
of Civil Engineering.
M4: To develop the students with high ethical values for taking
responsibilities and leadership roles in professional career to serve the society
and nation.
2
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
PSO-2: - Apply modern techniques, equipment, software and management tools to attain a
cost effective and sustainable solutions to all kind of problems in the field of Civil
Engineering.
PSO-3: - To work with latest testing equipment and creating opportunities to design Civil
Engineering projects to meet current safety standards and least environmental impact.
6. Course Outcomes:
After completion of Concrete Technology (Theory) course, the students will be able to:
CO1: To know about benefit of construction management.
CO2: To learn planning and control the resources with help of resource management.
1 Part A. CONSTRUCTION 1.1 Develop the TLO1.1 Explain CDM .1: To know
MANAGEMENT basic ideas about basic principle about benefit of
Construction about the construction
Unit1:Introduction management Construction management.
and its benefit. management.
Definition of
(U/Ck)
Construction
1.2 Develop the TLO1.2 Explain
Management (CM) CDM.2: To learn
knowledge the various
and its system; about role and planning and control
stakeholder in
Benefits of CM; responsibility of the resources with
a construction
Roles, a project help of resource
project and
responsibilities manager.(U/CK) management.
3
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
TLO2.3
Develop the
knowledge
about
resource
planning.
4
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
knowledge about
advantage and
disadvantage of
various techniques.
(U/ Pk)
5
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
6
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
Total 100
9. Question Paper Scheme:
Question Paper: Internal Assessment 01:
A. Marks Division:
COs Question Number Full Marks Bloom’s Taxonomy
Correlated
CO1 1.(a),1(b), 1(c), 2(a) 9 L1, L2,
CO2 2(b), 2(c ), 3(a), 3(b), 11 L1, L2,
3(c )
7
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
QUEST RELA
MARK BT/
ION QUESTIONS TED
S CL
NO. COs
B. Marks Division:
COs Question Number Full Marks Bloom’s Taxonomy
Correlated
CO3 1.(a), 1.(b), 1.(c) , 2(a), 10 L1, L2,
CO4 2(b), 3(a), 3(b) 10 L1, L2,
C. Assignment Question:
8
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
CO2 3 3 3 - 2 - 1 1 2 1
9
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
CO3 3 3 3 - 2 - 1 1 2 1
CO4 3 3 3 - 2 1 1 3 1
10
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
11
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
(U/Ck) expository
strategy
15 References:
Construction project management –theory and practice, Kumar Neeraj Jha, Pearson
Construction Management, anga Reddy. S, Kumaran Publications, Coimbatore
Construction Engineering & Management,Seetharaman. S, Umesh Publications
16.
12
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
CO Target PO1 PO2 PO3 PO4 PO5 PO6 PO7 PSO1 PSO2 PSO3
CO1 2.10 3 3 3 0 2 0 1 1 2 1
CO2 2.10 3 3 3 0 2 0 1 1 2 1
CO3 2.10 3 3 3 0 2 0 1 1 2 1
CO4 2.10 3 3 3 0 2 0 1 1 3 1
CO5 2.10
PO Attainment 2.10 2.10 2.10 0.00 2.10 0.00 2.10 2.10 2.10 2.10
TARGET ATTAINED
CO1 2.10
CO2 2.10
CO3 2.10
CO4 2.10
13
Course File: CONSTRUCTION AND DISASTER MANAGEMENT _2020-21
PROGRAMME OUTCOME
TARGE ATTAINE
T D
PO1 2.1
PO2 2.1
PO3 2.1
PO4 0.00
PO5 2.1
PO6 0.00
PO7 2.1
TARGET ATTAINED
PSO1 2.1
PSO2 2.1
PSO3 2.1
14