0% found this document useful (0 votes)
55 views6 pages

Method Statement-Testing Current Differential Relay

This document provides a method statement for testing current differential relays. It outlines the purpose, scope of work, tools, testing procedures, and safety features for testing the tripping output and functionality of ABB RED 615 current differential relays. The testing procedure involves dismantling tripping output wires, configuring relay parameters, connecting fiber optics, checking for stable current readings, and reconnecting wires if the system is stable.

Uploaded by

ahmad.nazaree
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views6 pages

Method Statement-Testing Current Differential Relay

This document provides a method statement for testing current differential relays. It outlines the purpose, scope of work, tools, testing procedures, and safety features for testing the tripping output and functionality of ABB RED 615 current differential relays. The testing procedure involves dismantling tripping output wires, configuring relay parameters, connecting fiber optics, checking for stable current readings, and reconnecting wires if the system is stable.

Uploaded by

ahmad.nazaree
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

Method of testing current differential relay

Doc. No. : DESB/HKL/MS/E-C8 Rev. No: 0


JOHAWAKI SDN. BHD
Date Issued: 23 / 7 / 2015 Page 1 OF 10

Document description:
M&E Method Statement

Document title :
Method of testing Current Differential Relay

PREPARED BY REVIEWED BY

Signature : Signature :

Name : Rahilmy Bin Rahim Name : Mohd Akashah Yahya

Designation: : Site Engineer Designation: Site Engineer

Date: Date:

Sub. No. : DY/SP/ME/MS/EL/04-Rev.01 1st. Issue For Review & Approval


Method of testing current differential relay

Doc. No. : DESB/HKL/MS/E-C8 Rev. No: 0


JOHAWAKI SDN. BHD
Date Issued: 23 / 7 / 2015 Page 2 OF 10

CONTENTS :

1.0 PURPOSE

2.0 REFERENCES

3.0 SCOPE OF WORKS

4.0 TOOLS AND TESTING EQUIPMENTS

5.0 IMPLEMENTATION / METHODOLOGY PROCEDURES

5.1 Method of testing current differential relay

6.0 TESTING PROCEDURES

7.0 SAFETY FEATURES

8.0 ATTACHMENT

8.1) Attachment 1- Form Test Result

Sub. No. : DY/SP/ME/MS/EL/04-Rev.01 1st. Issue For Review & Approval


Method of testing current differential relay

Doc. No. : DESB/HKL/MS/E-C8 Rev. No: 0


JOHAWAKI SDN. BHD
Date Issued: 23 / 7 / 2015 Page 3 OF 10

1.0 PURPOSE

This method statement provides information the testing procedure during function
test of current differential relay

2.0 REFERENCES

a. Schematic Diagram.

3.0 SCOPE OF WORKS

To testing the tripping output from relay

4.0 TOOLS & TESTING EQUIPMENTS

The tools and testing equipment in provision as required and if necessary:-

a. Current differential analyzer

Sub. No. : DY/SP/ME/MS/EL/04-Rev.01 1st. Issue For Review & Approval


Method of testing current differential relay

Doc. No. : DESB/HKL/MS/E-C8 Rev. No: 0


JOHAWAKI SDN. BHD
Date Issued: 23 / 7 / 2015 Page 4 OF 10

5.0 IMPLEMENTATION / METHODOLOGY PROCEDURES

5.1 Testing procedure for ABB RED 615

5.1.1 Outline of works

The work shall apply to testing the functioning of current differential relay

a. Dismantle all tripping output contact wire from relay

b. Configure relay parameter and logic

c. Connect fibre optic to both relay A and B

d. Check fibre optic healthy signal at relay

e. Check system stable with current (min 5% to 10% load/in)

f. If system stable connect back all tripping output wire

G. If system unstable its polarity

Sub. No. : DY/SP/ME/MS/EL/04-Rev.01 1st. Issue For Review & Approval


Method of testing current differential relay

Doc. No. : DESB/HKL/MS/E-C8 Rev. No: 0


JOHAWAKI SDN. BHD
Date Issued: 23 / 7 / 2015 Page 5 OF 10

7.0 SAFETY FEATURES

All operation during this work will be done in an efficient and safe manner and in
accordance to the Safety Procedures.

However there are issues concerning safety for this work that are to be observed
base on the results of the audit, relevant safety measures shall be proposed and
implemented as follows:-

a. Carry out a Hazard Identification Audit (HIA) before start of work each day
and before the start of a new task.

b. The work shall be monitor by chargeman

Sub. No. : DY/SP/ME/MS/EL/04-Rev.01 1st. Issue For Review & Approval


Method of testing current differential relay

Doc. No. : DESB/HKL/MS/E-C8 Rev. No: 0


JOHAWAKI SDN. BHD
Date Issued: 23 / 7 / 2015 Page 6 OF 10

8.0 ATTACHMENT

Sub. No. : DY/SP/ME/MS/EL/04-Rev.01 1st. Issue For Review & Approval