0% found this document useful (0 votes)
364 views4 pages

Engineering Project Execution Plan

This engineering project execution plan outlines the tasks, timeline, resources, and status for a project with an overall progress of 15%. Key tasks include agreeing on objectives, developing technical requirements, developing the database, API, and UI client. Task assignments have been made and the plan tracks start and end dates from September through the planned launch date of October 10th.

Uploaded by

mahrad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
364 views4 pages

Engineering Project Execution Plan

This engineering project execution plan outlines the tasks, timeline, resources, and status for a project with an overall progress of 15%. Key tasks include agreeing on objectives, developing technical requirements, developing the database, API, and UI client. Task assignments have been made and the plan tracks start and end dates from September through the planned launch date of October 10th.

Uploaded by

mahrad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

ENGINEERING PROJECT EXECUTION PLAN TEMPLATE

PROJECT NAME PROJECT MANAGER

PROJECT DELIVERABLE START DATE

00/00/0000

SCOPE STATEMENT END DATE

00/00/0000

OVERALL PROGRESS

15%

START END DURATION


TASK NAME ASSIGNED TO STATUS COMMENTS
DATE DATE in days

Set Kickoff Meeting Alex B. 09/02 09/03 2 Complete

Agree on Objectives Frank C. 09/03 09/07 5 In Progress

Detailed Requirements Jacob S. 09/07 09/12 6 Overdue

Hardware Requirements Jacob S. 09/09 09/11 3 Not Started

Final Resource Plan Jacob S. 09/11 09/15 5 On Hold

Staffing Alex B. 09/16 09/17 2 Needs Review

Technical Requirements Frank C. 09/17 09/21 5

DB Development Shari W. 09/22 09/24 3

API Development Shari W. 09/23 09/27 5

UI Client Alex B. 09/25 09/29 5

Testing Kennedy K. 09/24 10/02 9


Development Complete Jacob S. 10/02 10/05 4

Hardware Configuration Alex B. 10/05 10/07 3

System Testing Kennedy K. 10/06 10/09 4

Launch 10/10 10/10 1


ENGINEERING PROJECT EXECUTION PLAN
PROJECT NAME PROJECT MANAGER

PROJECT DELIVERABLE START DATE

SCOPE STATEMENT

START END DURATION


TASK NAME ASSIGNED TO STATUS COMMENTS
DATE DATE in days