Rate Analysis for Hume Pipes
Sl. No. Item Unit Rate
1 Providing & laying NP3 Class 400mm Hume
pipes ( 2.5 M length Type ).
2 a) Cost of Pipe Rmt 2100.00
3 c) Sand filling around pipes Rmt 200.00
4 d) Labour charges for laying & jointing pipes
including cost of jointing material. Rmt 97.50
5 e) Labour charges for sand filling Rmt 133.33
6 Sub Total 2530.83
7 Cost of Socket Joining by Hemp & cemnent mortar. 350.00
8 Sub Total 2880.83
9 i) Add 15% for Overheads & Profit 432.13
Grand Total Says for 1 Meter Rs. 3312.96
Rate Analysis for Hume Pipes
Sl. No. Item Unit
1 Providing & laying NP3 Class 450mm Hume
pipes ( 2.5 M length Type ).
2 a) Cost of Pipe Rmt
3 c) Sand filling around pipes Rmt
4 d) Labour charges for laying & jointing pipes
including cost of jointing material. Rmt
5 e) Labour charges for sand filling Rmt
6 Sub Total
7 Cost of Socket Joining by Hemp & cemnent mortar.
8 Sub Total
9 i) Add 15% for Overheads & Profit
Grand Total Says for 1 Meter Rs.
es
Rate
2200.00
200.00
97.50
133.33
2630.83
400.00
3030.83
454.63
3485.46
Rate Analysis for Hume Pipes
Sl. No. Item Unit
1 Providing & laying NP3 Class 500mm Hume
pipes ( 2.5 M length Type ).
2 a) Cost of Pipe Rmt
3 c) Sand filling around pipes Rmt
4 d) Labour charges for laying & jointing pipes
including cost of jointing material. Rmt
5 e) Labour charges for sand filling Rmt
6 Sub Total
7 Cost of Socket Joining by Hemp & cemnent mortar.
8 Sub Total
9 i) Add 15% for Overheads & Profit
Grand Total Says for 1 Meter Rs.
es
Rate
2500.00
200.00
97.50
133.33
2930.83
450.00
3380.83
507.13
3887.96