Chapter 5 - Work Plan
Chapter 5 - Work Plan
PT. Barunadri Engineering Consultant understands that there are several milestones
in the smooth implementation of the Hydrological Survey Work for Engineering
Services for the Jakarta East-West Line (Phase 1) Mass Rapid Transit (MRT) Project
in addition to the achievements shown in the TOR.
Until now, the implementation of the Hydrological Survey for Technical Services for
the Jakarta East-West Line Mass Rapid Transit (MRT) Project (Phase 1) has reached
the stage of data processing and analysis as well as the preparation of a hydrological
model.
The entire implementation of the work starting from the survey stage, survey data
acquisition, data processing and analysis as well as the preparation of the
hydrological model is described in detail in this Interim Report.
The next work program based on the Implementation Schedule is as follows:
1. Calculation and Evaluation
2. Preparation of Draft Final Report
3. Final Report Preparation.
Furthermore, the Implementation Schedule is presented in the table below.
Chapter 5 - 1
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)
Chapter 5 - 2
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)
Chapter 5 - 3
Hydrological Survey Works for Engineering
Services for Jakarta Mass Rapid Transit
(MRT) East-West Line Project (Phase 1)
Each report will be presented in front of service users to get criticism / suggestions
and input.