Day4 - R2
Day4 - R2
‐1‐
DAY 4 W A K SUNETH PRIYANKARA
‐2‐
DAY 4 W A K SUNETH PRIYANKARA
‐3‐
DAY 4 W A K SUNETH PRIYANKARA
Notice that the new alignment was placed in the Alignments collection, and did not form Sites. This happened
because you accepted the default <None>Site selection when you were prompted to select a site in step 3
1. In Toolspace, on the Prospector tab, right-click Alignment - (5), Click Move To Site.
2. In the Move To Site dialog box, make sure that the Destination Site is set to <Site 1> .
3. Click OK.
Notice that in Toolspace on the Prospector tab, Alignment - (5) has moved to Site 1 Alignments collection. In the
drawing window, the parcel label and hatching has been removed.
3. In the Parcel Style Display Order list, select Standard and click to move it to the top of the stack.
3. Click Apply.
After the model regenerates, notice that the blue Standard lot lines have overwritten the pink ones for Single-Family lots.
This exercise uses Parcel-3A.dwg with the modifications you made in the previous exercise.
‐4‐
DAY 4 W A K SUNETH PRIYANKARA
5. In the Export Parcel Analysis dialog box, specify the following parameters:
Destination File: Click and navigate to the My folder. Name the file ExportAnalysis.txt.
Analysis Type: Mapcheck Analysis
6. Click OK.
‐5‐