Instructions For Tenderer139.1
Instructions For Tenderer139.1
Instructions For Tenderer139.1
: GRC031-612004
Instructions for submissions of quote
On the behalf of International Federation of Red Cross and Red Crescent Societies and
Bangladesh Red Crecent Society, the German Red Cross (GRC) is inviting quotations for the
provision of construction to extend BDRCS-GRC office building number 4. The tenderers are
requested to read carefully and ensure compliance with all instructions herein. Non-
compliance with instructions in this document may disqualify the bidders from the tender
exercise.
1. Procurement Procedure
The procurement is handled via Open tender method.
6. Financial offer
• Tenderer must quote by items and – if applicable – by lot.
• Item price, inspection charges and transport charges are itemized separately
in the financial offer. Transport costs must be stated per lot if applicable.
• All prices are in BDT.
• Any changes of BOQ will lead to disqualify the quotes.
2) Tenderers must raise questions in written 2 days prior to deadline for submission
of quote, otherwise the extension of the deadline is not feasible anymore.
3) GRC reserves the right to continue the further communication after submission of
quotes via a combination of media (e.g. post, e-mail, phone).
• Technical (50%)
✓ Experience (Submit work experience document with your proposal):
Point allocation on experience:
➢ 5 Points: By submitting minimum 5 individual work experience
document, Minimum 2 with Red Cross Red Crescent (RCRC)
Organization and 3 with INGO/NGO’s including RCRC).
➢ 4 Points: By submitting a minimum of 4 individual work experience
documents, Minimum 1 with Red Cross Red Crescent (RCRC)
Organization and 3 with INGO/NGO’s including RCRC).
➢ 3 Points: By submitting a minimum of 3 individual work experience
documents with INGO/NGO’s including RCRC.
➢ 2 Points: By submitting a minimum of 2 individual work experience
documents with INGO/NGO’s including RCRC.
➢ 1 Points: Anything below of above points criteria 2-5 will be
considered as point 1.
5) GRC remains the authority to order partial work or reduction of some work
from the BOQ upon of GRC requirement.
6) GRC remain the authority to change the layout or drawing that given, the
changes or adjustment will be settle as per unit prices of material.
10) Self-Declaration
The signee of the attached “Declaration of Conformity” (Ref. Annex) assures that
1) no reasons for exclusion as mentioned per EU guideline 2014/24/EU,
Art. 57, Paragraph 1 exists,
2) the tenderer fulfills GRC’s claim on good governance, environmental and social
responsibility,
3) the tenderer agrees on participation in checks and audits as described.