Issued For Construction: Hydrostatic Test Schedule

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:

1. FOR GENERAL INSTRUCTIONS ON TESTING REFER TO


SAUDI ARAMCO ENGINEERING STANDARDS SAES-L-150,
SAES-A-004, SAES-A-007 AND GI.2.102.

2.ALL TEMPORARY FITTINGS, VENT VALVES, BLINDS,


BLIND FLANGES, GASKETS & PLUGS MARKED WITH
ASTERISK (*) SHALL BE REMOVED AFTER
HYDROSTATIC TESTING AND REPLACED WITH
PERMANENTLY ALLOCATED MATERIALS. TEMPORARY
FITTINGS SHALL BE REMOVED AFTER HYDROTEST.

3.WATER SHALL BE DRAINED FROM THE POINTS AS


INSTRUCTED BY SAUDI ARAMCO FIELD
15LE1W01 1LE1W01
REPRESENTATIVE.
1" V
#5 2"x1" 4.ALL IN-LINE VALVES NOT USED AS TEST ISOLATION
VALVE SHALL BE IN A PARTIALLY OPEN POSITION.
2"
2"

5.ALL PERMANENT THREADED CONNECTIONS SHALL

FB18 G18
BE SEAL WELDED PRIOR TO HYDROTEST.
2"-VG-0090-15LE1W01 #5 #7

V 6.REMOVE DISCS & FLAPPERS FROM THE CHECK


1" PZV
#5 2"x1" VALVE AND REMOVE ORIFICE PLATE BEFORE
1004 1"-RL-0091-1SY0W01
#7 HYDROTEST.
2" 2"
2"-W-0093-15LE1W01 EQUALIZING LINE
* 1" 7.ALL VALVES 2" AND LARGER SHALL BE SEAT
2"
2" CSO ¾"x1" & BODY TESTED AS PER SAEL-L-108 PAR.4.7.

1SY0W01
2"x1"

1LE1W01
2"x1" CSO

*
1" D ¾" 8.ALL EQUIPMENT AND TOOLS NECESSARY FOR
#5
1" V 2" TESTING SHALL BE PROVIDED BY THE CONTRACTOR.
(TYP.)
2"-W-0094-15LE1W01 #6 V
XPI #5 #6
PL02 #5 9.ALL SPECTACLE PLATE USED AS BLIND SHALL BE
#5 G17
INT.PE-RT LINED INT.FBE COATED 1036 TURNED TO ITS OPEN POSITION AFTER TESTING.
PI 2" #4 2" ¾"-VG-0092-15SY0W01
CARBON STEEL CARBON STEEL *
1024 FB17 10.SHORT SPOOLS CAN BE SHOP HYDROTESTED TO THE
¾"
¾" ¾" PURGE PI
(TYP.) PRESSURE INDICATED IN THE DRAWING.
#4 1" CSO
CONN 1025
*
FB05 * XPI #5 #6 11.SOFT SEATED VALVES SHALL NOT BE INSTALLED
MOV #4
+ #5 UNTIL THE LINES ARE THOROUGHLY FLUSHED.
#3 #4 #4 #5 2" 1037 2" 2"

*
*
1010
M CSO

*
FROM WIP TRAP AREA 2" 2" 12.COMPONENTS WHICH INTERFERE WITH FILLING
8" WATER INJECTION FLANK WI-2 * 605-L-0003 END
CA-952850.001 FLUSHING, VENTING AND DRAINING SHALL NOT
CLOSURE
( INT.PE-RT LINED C.S ) 8" BE INSTALLED WITH LINE FILLING AND PRESSURE
BARRED BARRED

*
CL1500 2" SC 3" (TYP.) TESTING.
TEE TEE 2"
FB 2"
#2 #5A #2
FB04 G04

UG AG
MIN. 2" 3" FB06

G06
LEGEND

2"-VG-0089-1LE1W01
2"-D-0097-15LE1W01

2"-D-0095-15LE1W01
#4

* D DRAIN
MOV
+
¾"
1008
V VENT

MOV

1020 TEST LIMIT


PDI #1

M
8" #4 #4 #4
2" 1023

M
8"-1500# * TEMPORARY BLIND

*
#1 #1
#2

*
TEMPORARY PLUG
¾"
PI
FB24 G24
* 1031
SPECTACLE PLAT OPEN POSITION
(TYP.) #1
*
SPECTACLE PLAT CLOSED POSITION
¾"
MIN #5A
3"
3"-W-0096-15LE1W01 KICKER LINE

2"

2"x1" PI
#1 #5A
1026
#5A 1" D FB07 G07
*

¾" #2 #2 #7 AG UG #7 REFERENCE DRAWINGS


DWG. CONTROL FOR JO-10-09561-0001 CD-901976
8"-D-0098-15LE1W01 * * EVAPORATION
POND PIPING & INSTRUMENT DIAGRAM CA-902089.001
DRAIN LINE 8" SLOPE MATERIAL TAKE-OFF T/O-903039-001

4" #2
15LE1W01 1LE1W01
2"

#1

ISSUED FOR CONSTRUCTION


14-May-2023
TO DS-15 WATER
INJECTION HEADER
8" 8"-W-0537-15LE1W01
CA-903038.001

SCALE:

REVISION VALIDATION

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

H Y D R O S T A T I C T E S T S C H E D U L E 10-09561-0002-001

STRENGTH TEST TIGHTNESS TEST


TEST NO. LIMITED BY DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
TEST PRESSURE SAFETY VALVE SETTING DURATION TEST PRESSURE SAFETY VALVE SETTING DURATION
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

HBZ MAB ORJ MSK


08/09/21 08/09/21 08/09/21 08/09/21
#1, #4, #5, & #5A INTERNAL FBE COATING 5575 PSIG 38438 KPaG 5854 PSIG 40362 KPaG 2 HRS 5296 PSIG 36515 KPaG 5561 PSIG 38342 KPaG
*
REV.NO. DATE REVISION DESCRIPTION

00 08/09/21 ISSUED FOR CONSTRUCTION

#3 182 GR. F53 ASME LL 5625 PSIG 38783 KPaG 7031 PSIG 48477 KPaG 2 HRS 5344 PSIG 36846 KPaG 5611 PSIG 38686 KPaG 24 HOURS JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
1500 FLANGES 10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED

#6 182 GR. F53 ASME LL 5625 PSIG 38783 KPaG 7031 PSIG 48477 KPaG 2 HRS 5344 PSIG 36846 KPaG 5611 PSIG 38686 KPaG 24 HOURS
SAUDI ARABIAN OIL COMPANY
1500 FLANGES DRAWING TYPE

HYDROSTATIC TEST DIAGRAM HYD


A105N/A182 GR. F53
#7
450 PSIG 3103 KPaG 473 PSIG 3261 KPaG 2 HRS 428 PSIG 2951 KPaG 449 PSIG 3096 KPaG *
WI-2 SCRAPER RECEIVER @ DS-3
ASME CL-150 FLANGES
SOUTH BERRI WELL SITES FACILITIES
* TIGHTNESS TEST PRESSURE SHALL BE MAINTAINED LONG ENOUGH FOR THE INSPECTOR TO EXAMINE ALL EXPOSED JOINTS.
JUBAIL SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

605 A CA-903039 001 00


Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05