Wetar
Wetar
Wetar
Eastern Indonesia -
Maluku Province
Populations is approx
8000.
Mineral
Reserves 93 Kt Cu
Safety
Environment
Spending US$ 3 M to de-risk storm water
management.
Application of environmental engineering design
and closure concepts to new developments and
processes.
• Ore crushed to -18 mm and stacked to heap leach pads using grasshoppers and trucks.
• Irrigated and aerated for + 720 days. Unique sulphide leach generates acid from water irrigation.
• Existing crusher system limited capacity and unreliable. New crusher being commissioned July 19.
• Re-handle of dump leach material and the need to remine and re-install aeration affected 2018 leach
performance.
55,000
2019 Forecast (22-25kt)
- Neutralisation plant expanded
45,000 - New increased crushing capacity
35,000 - Heap pad extensions
25,000
- Lerokis developed, first ore April 19
2016 2017 2018 2019 - Increase 1.6 to 2 Mtpa mine, crush & stack
Actual Actual Actual Forecast - Owner mining fleet
Actual/ Forecast Low End Forecast High End - SX/EW improvement and refurbishment 15
PT Merdeka Copper Gold Tbk.
Operational Performance
Unit 2017 Actual 2018 Actual
7000
Mining
6500
Ore Mined M Tonnes 1,884 1,588 6000
Waste Mined M Tonnes 1,366 1.409 5500
Mined Grade Cu % 2.09 2.98 5000
Contained Metal Cu t 39,384 47,272 4500
4000
Heap Leach
3500
Ore Crushed / Stacked M Tonnes 1,944 1,692
3000
Grade Stacked Cu % 2.00 2.58
Recovered Metal Cu t 23,160 17,071
Financials
Leached Produced
Operating cost US $/ t 29.84 35.35
Cash Costs * US $ / lb cu 1.05 1.49
AISC US $ / lb cu 1.56 1.73
• Leach production improvement
Sales US $ m 153.6 112.3
Q1 2019.
• High fixed costs so production
Operating EBITDA US $ m 73.0 38.3
key to higher margins
EBITDA Margin % 47% 34%
• Plan to commence
production from
Partolang Q3 2020
2019 Guidance