Miscellaneous SP 2
Miscellaneous SP 2
Miscellaneous SP 2
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Miscellaneous Structures
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Top Slab
100
100
100
100
100
Total 400
Base Slab
100
1710
100
9850
100
Total 354
575
1785
9850
95
95
Total 844.4
Total (TS+BS+SW) 1598.4
Curtain Walls
Downstream
2350
Upstream
1850
Total 527.4
Approach Slab
100
100
Total 860.8
Total for Two Approach Slab 1721.6
575
C1 16 125 81 2032 164.592 1.58 260.1
225
304
915
575
C1 16 8 2205 17.64 1.58 27.9
250
555
915
Wing Wall
1350 to
580
100
2450 to
580
100
2450 to
580
200 x 200
3.50 m
180 0.25 m
0.30
m
1500 180
0.30 m 155
1500 480
205
220
400 255
75
Assumptions:
Box Culvert with Internal Cell Size = 1.5 m x 1.5 m Road Width (W)= 10000 mm
Clear Width (a)= 1500 mm Top Slab Central Opening = 0 mm
Clear Height (b)= 1500 mm
Side Wall Thickness (c)= 180 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 180 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 220 mm Depth of Stone Soling= 150 mm
Fillet (f)= 200 x 200 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 17.72 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 0.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 3.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 1.50 m
Width of Rigid Apron at Start, AW-2= 7.50 m Wing Wall Length, U/S= 4.24
Length of Curtain Wall U/S, CWL-1= 9.50 m Wing Wall Length, D/S= 4.24
Length of Curtain Wall D/S, CWL-2= 9.50 m Wing Wall End Length= 1.00
Length of Flexible Apron U/S, GWL-1= 2.00 m Wing Wall Start ht= 3.00
Length of Flexible Apron D/S, GWL-2= 3.00 m Wing Wall End ht= 2.20
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m
Height of Corbel Rectangle= 0.30 m
Height of Corbel Traingle= 0.30 m
Width of Corbel= 0.30 m
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Top Slab
100
100
100
100
100
Total 955.4
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Base Slab
100
3350
100
9850
100
Total 1150.2
1045
2415
9850
95
95
Total 1639.7
Total (TS+BS+SW) 3745.3
Curtain Walls
Downstream
2350
Upstream
1850
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Total 611.4
Approach Slab
100
100
Total 860.8
Total for Two Approach Slab 1721.6
575
C1 16 125 81 2032 164.592 1.58 260.1
225
304
915
575
C1 16 8 2205 17.64 1.58 27.9
250
555
915
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Wing Wall
1400 to
650
100
2500 to
650
100
2500 to
650
300 x 300
3.50 m
250 0.25 m
0.30
m
2000 200
0.30 m 155
3000 480
205
280
400 255
75
Assumptions:
Box Culvert with Internal Cell Size = 3 m x 2 m Road Width (W)= 10000 mm
Clear Width (a)= 3000 mm Top Slab Central Opening = 0 mm
Clear Height (b)= 2000 mm
Side Wall Thickness (c)= 200 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 250 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 280 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 20.80 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 0.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 3.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 3.00 m
Width of Rigid Apron at Start, AW-2= 9.00 m Wing Wall Length, U/S= 4.24
Length of Curtain Wall U/S, CWL-1= 11.00 m Wing Wall Length, D/S= 4.24
Length of Curtain Wall D/S, CWL-2= 11.00 m Wing Wall End Length= 1.00
Length of Flexible Apron U/S, GWL-1= 3.00 m Wing Wall Start ht= 3.50
Length of Flexible Apron D/S, GWL-2= 4.00 m Wing Wall End ht= 2.20
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m
Height of Corbel Rectangle= 0.30 m
Height of Corbel Traingle= 0.30 m
Width of Corbel= 0.30 m
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Top Slab
100
100
100
100
100
Total 565.1
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Base Slab
100
2250
100
9850
100
Total 550
745
2335
9850
95
95
Total 1092.7
Total (TS+BS+SW) 2207.8
Curtain Walls
Downstream
2350
Upstream
1850
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Total 554.2
Approach Slab
100
100
Total 860.8
Total for Two Approach Slab 1721.6
575
C1 16 125 81 2032 164.592 1.58 260.1
225
304
915
575
C1 16 8 2205 17.64 1.58 27.9
250
555
915
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Wing Wall
1400 to
650
100
2500 to
650
100
2500 to
650
200 x 200
3.50 m
200 0.25 m
0.30
m
2000 200
0.30 m 155
2000 480
205
250
400 255
75
Assumptions:
Box Culvert with Internal Cell Size = 2 m x 2 m Road Width (W)= 10000 mm
Clear Width (a)= 2000 mm Top Slab Central Opening = 0 mm
Clear Height (b)= 2000 mm
Side Wall Thickness (c)= 200 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 200 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 250 mm Depth of Stone Soling= 150 mm
Fillet (f)= 200 x 200 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 18.80 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 0.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 3.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 2.00 m
Width of Rigid Apron at Start, AW-2= 8.00 m Wing Wall Length, U/S= 4.24
Length of Curtain Wall U/S, CWL-1= 10.00 m Wing Wall Length, D/S= 4.24
Length of Curtain Wall D/S, CWL-2= 10.00 m Wing Wall End Length= 1.00
Length of Flexible Apron U/S, GWL-1= 2.00 m Wing Wall Start ht= 3.50
Length of Flexible Apron D/S, GWL-2= 3.00 m Wing Wall End ht= 2.20
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m
Height of Corbel Rectangle= 0.30 m
Height of Corbel Traingle= 0.30 m
Width of Corbel= 0.30 m
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Top Slab
100
100
100
100
100
Total 1785.9
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Base Slab
100
5570
100
9850
100
Total 1852.5
1725
2665
9850
95
95
Total 2424.4
Total (TS+BS+SW) 6062.8
Curtain Walls
Downstream
2350
Upstream
1850
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Total 943.5
Approach Slab
100
100
Total 860.8
Total for Two Approach Slab 1721.6
575
C1 16 125 81 2032 164.592 1.58 260.1
225
304
915
575
C1 16 8 2205 17.64 1.58 27.9
250
555
915
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Wing Wall
1400 to
650
100
2500 to
650
100
2500 to
650
300 x 300
3.50 m
360 0.25 m
0.30
m
2000 280
0.30 m 155
5000 480
205
420
400 255
75
Assumptions:
Box Culvert with Internal Cell Size = 5 m x 2 m Road Width (W)= 10000 mm
Clear Width (a)= 5000 mm Top Slab Central Opening = 0 mm
Clear Height (b)= 2000 mm
Side Wall Thickness (c)= 280 mm Depth of PCC on Bottom Slab= 100 mm
Top Slab Thickness (d)= 360 mm Depth of PCC on Other Components= 75 mm
Bottom Slab Thickness (e)= 420 mm Depth of Stone Soling= 150 mm
Fillet (f)= 300 x 300 mm Depth of Flexible Apron= 1.00 m
Length of Crash Barrier, CB-1= 25.12 m Width of Curtain Wall Stem= 0.25 m
Length of Crash Barrier, CB-2= 0.00 m Depth of Curtain Wall Stem, U/S= 1.60 m
Length of Crash Barrier, CB-3= 0.00 m Depth of Curtain Wall Stem, D/S= 2.10 m
Length of Crash Barrier, CB-4= 0.00 m Width of Curtain Wall Footing= 1.00 m
Length of Rigid Apron, AL= 5.00 m Depth of Curtain Wall Footing= 0.40 m
Width of Rigid Apron at Start, AW-1= 5.00 m
Width of Rigid Apron at Start, AW-2= 15.00 m Wing Wall Length, U/S= 7.07
Length of Curtain Wall U/S, CWL-1= 17.00 m Wing Wall Length, D/S= 7.07
Length of Curtain Wall D/S, CWL-2= 17.00 m Wing Wall End Length= 1.00
Length of Flexible Apron U/S, GWL-1= 4.00 m Wing Wall Start ht= 3.50
Length of Flexible Apron D/S, GWL-2= 6.00 m Wing Wall End ht= 2.20
Length of Aproach Slab= 3.50 m
Depth of Aproach Slab= 0.25 m
Height of Corbel Rectangle= 0.30 m
Height of Corbel Traingle= 0.30 m
Width of Corbel= 0.30 m
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
1 10.00 10.00 Rm
1 10.00 10.00 Rm
Name of Works and Location: Upgrading Kakarbhitta-Laukahi (Ch 45+000~85+000) Section of EWH
Ladder on the embankment
For 1 m Length
S. No. Description of works Unit No Length Width Height Quantity Remarks
1 Excavation for Structures Foundation Earth work in
excavation of foundation of structures in all types of
soil, including construction of shoring and bracing,
removal of stumps and other deleterious matter and
backfilling with approved Material, all complete as per
design drawings, technical specification and to the
satisfaction of Engineer. [SS/SP 900]
Cum 1 1.5 0.3 0.450
Additional quantity 40 10 400.000
2 Providing and laying of Stone Soling/Pitching/Packing
Works for levelling in line and level, all complete as
per design drawings, technical specification and to the
satisfaction of Engineer. [SS/SP 2600]
Cum 1 1.5 0.15 0.225
Additional quantity 40 5 200.000
3 Providing and placing machine mixed Cement
Concrete in M15/40 for PCC works including form
works, compaction, curing, testing, all complete, as per
specification, drawing and instruction of Engineer. (SS-
2000)
Cum 1 1.5 0.15 0.225
1.5 0.021 0.032
Total PCC 0.257
Additional Quantity 40 5 200.000
4 Providing and laying Brick Masonry Work in 1:4
Cement mortar in structure complete, all complete as per
design drawings, technical specification and to the
satisfaction of Engineer. [SS/SP 2500]
Cum 40 25 1000.000