Module 7 Proj Management Software
Module 7 Proj Management Software
1
Project Management Software:
Planning Tool Selection Criteria
• Artemis
• Open Plan
• Primavera
• MS Project
• Scitor PS8
• Micro Planner
• Mac Project
• Harvard Manager
2
Fain’s Third Law of Planning
Gantt Charts:
Introduction to Gantt Charts
3
Gantt Charts:
Some History
Gantt Charts
4
Gantt Charts:
MS Project Gantt Chart
Gantt Charts:
Primavera Gantt Chart
5
Gantt Charts:
Primavera Gantt Chart
Gantt Charts:
Uses of Gantt Charts
6
Gantt Charts:
Example Gantt Chart Symbols
Symbol Meaning
Planned activity schedule
Status of activity
Gantt Charts:
More Example Gantt Chart Symbols
Schedule Completion
Actual Completion
7
Gantt Charts:
Gantt Chart Advantages
Gantt Charts:
Gantt Chart Disadvantages
8
MS Project 2003
Tutorial Dec 28, '97 Jan 11, '98 Jan 25, '98 Feb 8, '98 Feb
ID Task Name T S W S T M F T S W S T M F T
1 Survey and Layout Common Laborers[200%]
2 Clear Site Common Laborers[200%]
3 Rough Grade Common Laborers[200%]
4 Drill Well Common Laborers[400%]
5 Excavate for Elect Man Holes Common Laborers[200%]
6 Excavate for Sewer Common Laborers[400%]
7 Excavate for Tank Found Common Laborers[200%]
8 Ovehead Pole Line Common Laborers[400%]
9 Install Manholes Common Laborers[400%]
10 Install Water Tank Common Laborers[400%]
11 Install Tank Valves Common Laborers[200%]
12 Install Elect Duct Bank Common Laborers[400%]
13 Install Sewer Common Laborers[400
14 Pull In Power Feeder Electrician[50%]
15 Install Well Pump Common Laborers[200%]
16 Install Underground Water Pipe Common Laborers[4
17 Finish Up 2/12
Lesson Objectives
9
Introduction to MS Project
Two People –
• Number who must One Line of Communication
communicate can
drastically affect quality Three People –
Three Lines of Communication
• Most projects involve
shared responsibility for
accomplishing the tasks Four People –
• Conveying information, Six Lines of Communication
monitoring, and
controlling a project are
keys to success
Five People
10 Lines of Communication
.
.
N People
N(N-1)/2 Lines of Communication
Systems Engineering and Engineering Management
10
Class Problem
Immediate Duration
Activity Description Predecessor (cal
days)
1 Software Development - 60
2 PCB Design and Manufacturing - 60
3 Develop Performance and Validation Plan - 45
4 Sub System Testing 1,2,3 15
5 System Testing 4 15
6 Product Documentation 3 45
7 Validate System Performance 6 15
8 Conduct Reliability Testing 5 30
9 New Product Announcement - 0
10 Marketing Campaign 9 135
11 Delivery of Voice System 5 8,10 0
11
Tutorial – Open Project
12
Introduction to MS Project 2003
Tools
Options
Calendar
31 Days/Month
ID Task Name
December January February March April May June July
B M E B M E B M E B M E B M E B M E B M E B M
1 Software Development
2 PCB Design and Manufacturing
3 Develop Perform and Val Plan
4 Sub Sytem Testing
5 System Testing
6 Product Documentation
7 Validate System Performance
8 Conduct Reliability Testing
9 New Product Announcement 1/1
10 Marketing Campaign
11 Delivery of Voice System 5 7/8
13
Introduction to MS Project 2003
Entering Tasks
• Summary Tasks –
contain subtasks and
their related
properties
• Subtasks – Smaller
part of a summary
task
• Reoccurring Tasks -
Summary of subtasks
that reoccur
• Milestones – Tasks
with a duration of 0
Systems Engineering and Engineering Management
14
Tasks Can Be Linked in 4 Ways
Finish to Start
Start to Finish
Finish to Finish
Start to Start
Link Buttons
15
View Projects In Different Forms
Network Diagram
Example Problem 1
16
Example Problem 1
2 B
3 C
4 D
5 E
6 F
7 G
Example Problem 1
3 C
4 D
5 E
6 F
7 G
17
Example Problem 2
Operational
Deficiency/Need
System
System Acceptance
Design Tests
System
System Requirements
Requirements Review/
Review/System
Design
System ReviewReview
Design
Sub-System
Sub-System Integration
Design/ And Product
Requirements Tests
Allocation
Sub-System Requirements
Review/Preliminary Design Review
Development
HW-SW Tests: Unit Level
Design - Functional
Specifications - Performance
Example Problem 2
ID Task Name
Dec 7, '03 Jan 11, '04 Feb 15, '04 Mar 21, '04 Apr 25, '04 May 30, '04 Jul 4, '04 Aug 8, '04 Sep 12, '04 Oct 17, '04 Nov 21, '04
T W T F S S M T W T F S S M T W T F S S M T W T F S
1 Opertional Needs 1/27
2 Conceptional Design
3 System Deisgn
4 Design Review
5 Prelim Design
6 Sub System Desing
7 Prelim Design Review
8 HW-SW Design Specs
9 Critical Design Review
10 Prepare Bid Documents
11 RFP 6/21
12 Bidding Period
13 Review Bids
14 Award Contract 8/16
15 Contracting Period
16 Delivery of Product
18
Assigning Resources
Summary of MS Project
19