JOB TITLE / AIM: JSA FOR NDT FOR CONDENSATE PIPE LINE (INSPECTEST)
JSA DATE: 27/12/2006 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Abid Naeem SCRIBE: Masood Memon
PARTICIPANTS: Malik Irshad, Ali Ahmed Soomro, Akbar
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
. Attached document for Positioning of crane, Equipment specifications, Checklist, Certificates
Part 2: Job Safety Analysis
Job Steps: 1. Moblization of crane/ Trailor
2. RADIGRAPHIC TESTING
3. Chemicals, Dyes, developers.
4. Demobilization
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S First aid kit must be present at the area and the Hse personnel is the first response in case of emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices that need to be
captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
3 Chemicals, Dyes, developers. Chemical exposure MSDS for all chemicals to be used on site
to be part of JSA training
Chemical disposal to be approved by BHPP /
DEL Waste Management coordinator
4 Demobilization Same Same as mobilization