JSA For NDT

This document outlines the job safety analysis for non-destructive testing of a condensate pipeline. It details the job steps which include mobilization of equipment, radiographic testing, use of chemicals and demobilization. Potential hazards are identified for each step such as radiation exposure, improper PPE, community interference and chemical exposure. Hazard controls are proposed to mitigate the risks like ensuring trained personnel, proper barricading and signage when radiography is being conducted, having MSDS for all chemicals, and using the same controls for demobilization as mobilization. The document also includes contingency plans and requirements for review after job completion.

Uploaded by

Viron Baxhia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
183 views4 pages

JSA For NDT

This document outlines the job safety analysis for non-destructive testing of a condensate pipeline. It details the job steps which include mobilization of equipment, radiographic testing, use of chemicals and demobilization. Potential hazards are identified for each step such as radiation exposure, improper PPE, community interference and chemical exposure. Hazard controls are proposed to mitigate the risks like ensuring trained personnel, proper barricading and signage when radiography is being conducted, having MSDS for all chemicals, and using the same controls for demobilization as mobilization. The document also includes contingency plans and requirements for review after job completion.

Uploaded by

Viron Baxhia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Part 1: Job Particulars Page 1 of _____

JOB TITLE / AIM: JSA FOR NDT FOR CONDENSATE PIPE LINE (INSPECTEST)
JSA DATE: 27/12/2006 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Abid Naeem SCRIBE: Masood Memon
PARTICIPANTS: Malik Irshad, Ali Ahmed Soomro, Akbar
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
. Attached document for Positioning of crane, Equipment specifications, Checklist, Certificates
Part 2: Job Safety Analysis
Job Steps: 1. Moblization of crane/ Trailor
2. RADIGRAPHIC TESTING
3. Chemicals, Dyes, developers.
4. Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S First aid kit must be present at the area and the Hse personnel is the first response in case of emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices that need to be
captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

Pakistan Asset Team Approved: AHMED HASEEB Part 1: Job Particulars


BHP Billiton Checked: NAJEEB MALIK Attached to: PA-HSEC-02-040-002-P
Originator: SYED FAHEEM Rev: 1 Issue: 13/05/05 Page 1 of 4
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of Equipment and Untrained Persons Ensure that the trained persons shall perform
persons the task.
Unauthorized/ Uninspected Equipment Ensure that are the certification are inplace
before moblization ensure that equipment is
checked / and checklist is available or
demand.
Unfit Workers Persons not fot to work will no be allowed
unless gone thru-DEL Doctor medical
assignment.
Workers Starting Job without JSA Ensure JSA is in place and sign off daily at
backside. TBM must be inplace.
2 RADIGRAPHIC TESTING Radiation Exposure  Ensure lock is in place before entering shot
zone
 Ensure area is cordoned off and watchman is in
place
 Radiation badge to be worn and record kept of
daily reading.
Ensure that signage shall be in place
(Radiography and Danger) Mandatory.
Ensure that signage must show Trefoil and
labelled Radiography testing in progress in
English, Urdu, and Sindhi with Gamma Alarm.
Improper PPE’s . Supervisor shall be responsible for providing and
check the PPE compliance like.

Pakistan Asset Team Part 1: Job Particulars


BHP Billiton Page 2 of 4
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)

Mask, gloves ,goggle shall be worn.


Improper barrication of area where job is Ensure that all workers have been informed when
performed the radiography will be conducted and the
radiation range will be properly lit and barricaded
by a barrier.

Community Interference It is advised that the testing to be conducted at


night or break time hours to minimized the
SIMOPS or personnel interface Ensure sufficient
man power will be designated as watchman to
ensure nobody will enter the radiation zone

Ensure that area should be secured and barricaded


with radiography sign board Danger High
Radiation in place stating the maximum
distance 30 m range the radiation could reach.
Spotter to be in place at all times to prevent
unauthorised access to area,

SIMOPS Ensure that all workers have been informed when


the radiography will be conducted and the
radiation range will be properly lit and barricaded
by a barrier.

Untrained Persons Ensure that workers performing the testing are

Pakistan Asset Team Part 1: Job Particulars


BHP Billiton Page 3 of 4
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
trained.
Unauthorized operator should not operate the
tester
Always refer to manufacturers methodology of
testing

3 Chemicals, Dyes, developers. Chemical exposure  MSDS for all chemicals to be used on site
to be part of JSA training
Chemical disposal to be approved by BHPP /
DEL Waste Management coordinator
4 Demobilization Same Same as mobilization

Pakistan Asset Team Part 1: Job Particulars


BHP Billiton Page 4 of 4