Republic of the Philippines

Department of Education
CARAGA REGION
SCHOOLS DIVISION OFFICE OF BAYUGAN CITY
BAYUGAN CITY SENIOR HIGH SCHOOL

Accomplishment Report: Minor Repair of Floor in the Classroom and


Pathways

Executive Summary:

In response to the need for infrastructure improvements at Bayugan


City Senior High School, the Minor Repair of Floor in the Classroom and
Pathways project was undertaken. The primary goal was to enhance the
overall learning environment by addressing safety concerns and ensuring
the longevity of the school's infrastructure.

Project Objectives:

Floor Repair in Classrooms:

 To address safety concerns related to damaged floors in selected classrooms.


 To enhance the overall learning environment for students and teachers.

Pathway Repair:

 To improve the accessibility and safety of pathways within the school


premises.
 To contribute to the aesthetics of the school environment.

Project Activities:

Assessment and Planning:

 A thorough assessment of the damaged floors in classrooms and pathways


was conducted.
 A comprehensive plan for repair, considering materials, budget, and timeline,
was developed.

Resource Mobilization:

 Necessary materials and resources for the repair work were procured.
 Collaboration with local suppliers ensured cost-effectiveness.
Implementation:

 The repair of classroom floors addressed identified issues such as cracks and
uneven surfaces.
 Pathways were repaired, ensuring a smooth and safe passage for students and
staff.

Quality Control:

 The repair process was monitored to ensure the use of high-quality materials
and workmanship.
 Inspections at various stages were conducted to address any unforeseen
challenges promptly.

Achievements:

Improved Safety:

 The successful resolution of safety concerns related to damaged floors created


a secure environment for students and teachers.

Enhanced Aesthetics:

 The repaired pathways contributed to the overall aesthetics of the school


premises.

Longevity of Infrastructure:

 The repair work conducted is expected to extend the lifespan of the floors and
pathways, reducing the need for frequent maintenance.

Future Recommendations:

 Implement a regular maintenance schedule to prevent similar issues in the


future.
 Explore additional projects to further enhance the overall infrastructure of
Bayugan City Senior High School.

Conclusion:

The Minor Repair of Floor in the Classroom and Pathways project at


Bayugan City Senior High School has been successfully completed,
achieving its objectives of improving safety, enhancing aesthetics, and
ensuring the longevity of school infrastructure. The dedication of the
implementing team and the support of stakeholders played a crucial role in
the project's success.
Prepared by: Noted:

MARK JESON C. NOVAL ELMER A. AUTOR MT-1


SDRRM Coordinator School Head