Project Closeout Checklist Template
Project Closeout Checklist Template
Station
Project Last Revision
Project Number Contract Number
2. Required Testing
Section Title Description Form Procedure Comments
This section should be completed from the Project Specific Construction Specifications. Below are examples.
1430-1.1.A Test Erection Perform test erection on portion of building structure. Transmitted previously in submittal #____
5120-3.2.C Structural Steel Inspect or test shop bolted connections in accord with AISC.
5120-3.2.D.3 Structural Steel Test 25% of non full penetration shop welded connections.
5120-3.2.D.4 Structural Steel Test 100% of full penetration shop welded connections.
5120-3.2.F.3 Structural Steel Test 25% of non full penetration field welded connections.
14410-3.2.A Personnel Lift Three hour operational test.
15010-3.1B Basic Mech Sys Soil & waste water. Test w/ water to top of vent. No leaks, 2 hr.
15325-3.1.K Sprinkler Systems Hydrostatically test entire system as per NFPA 13 and 72.
" Refer to specific RPSC SOP for fire sprinkler testing.
" 1. Two hour 200 PSI hydro test.
" 2. Twenty-four hour 40 PSI air test.
" 3. Air supervisory & flow alarm switch operational tests.
" 4. Pressure tank switch & FACP interface tests.
" 5. Water flow tests.
" 6. Preaction valve automatic & manual tests
3. Warranties / Guarantees
Section Title Description Duration Start Date Comments
This section should be completed from the Project Specific Construction Specifications. Below are examples.
4. Certificates
Section Title Description Status Form Comments
This section should be completed from the Project Specific Construction Specifications. Below are examples.
5. Final Submittal
Section Title Description Tab Form Comments
This section should be completed from the Project Specific Construction Specifications. Below are examples.