Item

No Qty Rate Amount (ZMW)

SUBSTRUCTURE EARTHWORKS.

EXCAVATIONS.

Keeping Excavations free from Water

Allow for keeping the excavations free from


a storm, surface water and mud by pumping and
baling.
Item 500.00
Pumping subterranean water using pump of not
exceeding 300 litres per hour capacity from a
depth of not exceeding
b 4 metres.
Item 500.00

Excavation including maintaining and supporting


sides and keeping excavations free from water,
mud and fallen materials

Excavate trench for foundations trenches


commencing at formation level
c 1.5 metres deep.
m3 80 25.00 2,000.00

Extra on all excavations.

Extra over excavation in pickable material for


d excavation in hard pickable material or soft
rock.
m3 1 350.00 350.00

e Ditto for excavation in hard rock.


m3 1 - -

Disposal.

Redig from spoil heap, return, fill and compact


f selected excavated material around foundations,
to 95% MOD AASHO.
m3 75 - -

g Redig from spoil heap and remove off-site.


m3 5 25.00 125.00
Carried forward ZMW 3,475.00

Brought forward ZMW 3,475.00

Anti-termite treatment

Chemical anti-termite treatment executed by an


a approved specialist under a ten-year guarantee to
surfaces hardcore, etc.
m2 40 - -

Chemical anti-termite treatment executed by an


b approved specialist under a ten-year guarantee to
sides and bottoms of excavations
m2 56 - -

Plain concrete 1:4:8

Blinding under foundations thickness


c .50 mm
m2 21 35.00 735.00

Vibrated reinforced concrete class 25 in

d In strip foundations
m3 6 1,350.00 8,100.00

Concrete surface bed slab, size


e . 150mm thick
m2 40 320.00 12,800.00

Sawn formwork including making good exposed


surfaces after removal, as described to

Sides of slab, thickness


f . 150 mm
m 26 110.00 2,860.00
Carried forward ZMW 27,970.00

Brought forward ZMW 27,970.00

REINFORCEMENT

Reinforcement (all provisional)


Mild steel bar reinforcement to B.S. 4449

a 8 mm Diameter bars
Kg 65 14.50 942.50

High yield deformed steel bar reinforcement to

b 12 mm Diameter bars
Kg 175 14.50 2,537.50

Hollow concrete blockwork filled solid with


mortar 1:4 mix in cement mortar

Solid blockwork walling in foundations, overall


thickness
d . 200 mm
m2 47 135.00 6,345.00

26 Gauge mild steel "Brickforce" reinforcement


laid horizontally in mortar joint

To walling, thickness
e . 200 mm
m 195 3.50 682.50

Sand blinding

f 50 mm Bed of sand blinding to top of surfaces of


hardcore.
m2 40 24.00 960.00

Imported Filling

Laterite compacted to 95% MOD AASHO


g . 200 mm
m2 40 5.00 200.00
Carried forward ZMW 39,637.50

Brought forward ZMW 39,637.50

Damp-proof membranes

1000 Gauge Heavy Duty polythene laid on 150mm


a Hardcore
m2 40 4.00 160.00

Steel mesh fabric reinforcement to B.S. 4483

Layer of mesh fabric reinforcement laid on top


and bottom in slab or bed with 150mm side and end
laps (measured nett-no allowance made for laps)
b . Conforce 86 weighing 0.86 Kg per square
metre
m2 40 15.00 600.00

TESTING

Allow for carrying out slump tests when directed


c as described.
Item 500.00
SUBSTRUCTURE (PROVISIONAL) to section summary ZMW 40,897.50

Item
Qty Rate Amount(ZMW)
No.
REINFORCED CONCRETE SUPERSTRUCTURE

Vibrated reinforced concrete class 40 in

a Lintels
m3 1 1,350.00 1,350.00

b Ring beam
m3 1 1,350.00 1,350.00

Sawn formwork including making good exposed


surfaces after removal, as described to

c Sides and soffits of lintols and ring beam


m 78 7.50 585.00

REINFORCEMENT (all provisional)

Mild steel bar reinforcement to B.S. 4449

d 8 mm Diameter bars
Kg 75 9.50 712.50

High yield deformed steel bar reinforcement to

e 12 mm Diameter bars -
Kg 120 9.50 1,140.00
REINFORCED CONCRETE SUPERSTRUCTURE to section
summary ZMW 5,137.50

item Qty Rate Amount(ZMW)

WALLING AND DEMOUNTABLE PARTITIONING

Hollow concrete block B.S.2028 in cement mortar


(1:4)

a Walling, thickness
. 200 mm
m2 144 135.00 19,440.00

b Walling in parapet wall, thickness


. 200 mm
m2 23 135.00 3,105.00

26 Gauge mild steel "Brickforce" reinforcement


laid horizontally in mortar joint to every second
course

c . 200mm width
m 195 3.50 682.50

Damp proof course

Damp proof course one layer of three ply


bituminous felt sheeting well lapped at joint
sand junctions (measured nett)to
d . 200mm walls
m 39 6.00 234.00

Window cills including fixing to walls in cement


sand morar 1:3 mix as before descrided ###
###
Bull nose brick on edge as cill embedded in
mortar as described, size
a . 190 x 90 x 90mm
m 5 36.00 180.00
WALLING AND DEMOUNTABLE PARTITIONING to Section
Summary ZMW 23,641.50

Item
No Qty Rate Amount(ZMW)

ROOFING AND RAINWATER DISPOSAL

ROOF COVERING

Grass Roof thatching by specialist

Grass Roof Thatching including tying and fixing to


gumpole purlins to the specifications and approval of
a the Engineer
m2 54 250.00 13,500.00

Creosote treated gum poles as described

50mm diameter treated gum pole Rafters includin


tying down to brickwork with tie wire and fixing
c all to architect's specification
m 126 90.00 11,340.00

50mm diameter treated gum pole purlins including


tying down to gumpole rafters with tie wire and
fixing all to architect's specification

Provide for additional roofing a provisonal sum


d of Zambian Kwacha Tive Thousand Only Item 5,000.00

Fire proofing to specialist details

Allow for general fire proofing thutch a


provisional sum of Zambian Kwacha Ten Thousand
Only Item 10,000.00
ROOFING AND RAIN WATER DISPOSAL to section
summary ZMW 39,840.00

Item
No Qty Rate Amount (ZMW)

EXTERNAL FINISHINGS

Plaster cement and sand(1:4)of thickness


exceeding 40mm as described

a Plastered walls externally


m2 78 26.00 2,028.00

c Small widths and reveals


m 12 10.00 120.00

Prepare, one coat universal undercoat, three


coats ' Plascon' acrylic polvin (Zanaco
Beige)colour 820-2 Zucchin paint to

e Plastered walls externally


m2 78 25.00 1,950.00

g Small widths and reveals


m 12 10.00 120.00

Waterproofing paint to manufacturers


specification in 3 coats to Plinth of
surface bed slab

h Rendered plinths of surface bed


m2 23 32.00
### 736.00
EXTERNAL FINISHING to section summary ZMW 4,954.00

Item Qty Rate Amount(ZMW)


No
INTERNAL FINISHINGS

Cement and sand (1:4) screed

Steel trowelled to floors, thickness


a . 38 mm
m2 40 27.80 1,112.00

Plaster cement and sand(1:4)as described

b 13 mm render to Plastered walls internally


m2 78 22.50 1,755.00

Porcelain tile paving in clients approved


finishing color; to regular pattern

600 x 600 x 10 mm porcelain coloured non skid


floor tiles as Castel 'Altaire' (Light Supplier)
of Italyor or other equal and approved tiles
fixed with approved adhesive and pointed in
lighter grout to joints, to the approval and
c satisfaction of the Architect
m2 72 190.00 13,680.00

Skirting

Ceramic tile skirting fixed to floor and wall


with approved adhesive, size
e . 100 x 25 mm
m 26 72.00 1,872.00
carried forward 18,419.00

brought forward 18,419.00

Prepare, one coat universal undercoat, three


coats ' Plascon' washable PVA paint colour 820-2
Zucchin paint

a To rendered walls internally


m2 78 19.00 1,482.00

To small widths and reveals


b . 100 to 200 mm girth
m 12 10.00 120.00

Mirrors

1350 x 450 x 4 mm thick silver float glass


mirror; silver leaded backing; polished edges; to
plastered and painted background; fixed with
chromium plated dome-headed cup screws; beveled
c edges; at all wash basins
no. 2 500.00 1,000.00
INTERNAL FINISHING to section summary ZMW 21,021.00

Item
Qty Rate Amount (ZMW)
No.
DOORS

Notes on Doors

All sizes and specifications of items in this


section should be confirmed and approved by the
a project architect prior to order Item

Supply and fix the following Hardwood Doors -

Supply and fix 44mm hardwood panellled Mukwa


double doors as supplied by Mukatasha Investments
Limited or other equal and approved as detailed
on Architects drawing -
c . 1800 x 1960 mm -
no. 2 2,500.00 5,000.00
-

Ironmongery - supply and fix with matching screws

Three lever Mortice lock as Union reference No


e 2277-78,radius CZ692 union lever handle furniture
no. 2 185.00 370.00

Standard rubber door stop as union reference No.


AL8730AS, plugged and screwed to concrete floor
f and concrete blockwall screwed to floor or wall
no. 2 10.00 20.00
carried forward ZMW 5,390.00

brought forward ZMW 5,390.00

Door Frames -
-

14 Gauge pressed steel door frames complete with


fixing lugs, temporary supports and 3 No. 100mm
long steel butt hinges per door leaf, fixed to
jambs -
-
-
Frame of 1M profile , single rebate for single
doors, size -
a . 1800 x 2000 mm -
-
no. 1 450.00 450.00
-
Frame of 1M profile , single rebate for single
doors, size -
b . 800 x 2000 mm -
no. 1 320.00 320.00
-
Prepare, touch up primer, one universal
undercoat, and two coats 'plascon' non - drip low
gloss enamel finish to all door frames -
-
Surfaces -
c . 100 - 200 mm girth -
m 15 10.00 150.00
-
-
Prepare and apply two coats polyurethane varnish
as described to -
-
e General Surfaces of hardwood doors -
m2 18 24.00 432.00
-

DOORS to Section Summary ZMW 6,742.00

Item Qty Rate Amount(ZMW)


No
WINDOWS

Notes to tenderers

All windows are measured complete with associated


glazing, locking devices and all associated
fittings and fitments. No extra claim will be
entertained for non compliance of this item.

Wooden windows to architects design and approval

treated wood in position all as required complete


with glazing and all assoctaed fixtures to the
satisfaction and approval of the Architect,
overall size -
a . 1800 x 1100 mm -
no. 1 3,500.00 3,500.00
-
Ditto, over size
. 600 x 600 mm
no. 1 1,500.00 1,500.00
WINDOWS to Section Summary ZMW 5,000.00

Item Qty Rate Amount(ZMW)


FITTINGS

General Fittings

Provide for supply and installation of fittings a


provisional sum of Zambian Kwacha Ten Thousand
c only Item 10,000.00
FITTINGS to Section Summary ZMW 10,000.00

Item Qty Rate Amount(ZMW)


No
PLUMBING INSTALLATION

Notes

Notes to Plumbing Installation

All Hot and Cold water pipework inside the


building to be hard drawn thin walled GI to BS
2871 Part '1' Table 'X' with capillary soldered
a fittings Item

Connection of water pipework to geysers shall be


by means of proprietary couplings/adaptors to
b prevent electrolytic action Item

The plumbing contractor to provide all necessary


steelwork to form support brackets for pipework.
Water heaters, either wall mounted or in ceiling
void or other position specified by the design
c engineer Item

Fittings to pipes under 20mm diameter shall be


deemed to be included in the pipe runs measured.
Sockets of all diameters shall be deemed to be
d included in the pipe runs in which they occur Item

Sanitary plumbing
Provide for Plumbing installations a provisional
e sum of Zambian Kwacha Five Thousand Only Item 5,000.00

PLUMBING INSTALLATIONS to Section Summary ZMW 5,000.00

Item Qty Rate Amount(ZMW)

ELECTRICAL INSTALLATION

Provide for Electrical installation a Provisional


a Sum of Zambian Kwacha Ten Thousand Only Item 10,000.00

-
-

-
TOTAL ELECTRICAL INSTALLATIONS to section Summary ZMW 10,000.00

SUMMARY
DESCRIPTION PAGE

1 SUBSTRUCTURE 40,897.50

2 REINFORCED CONCRETE SUPERSTRUCTURE 5,137.50

3 WALLING 23,641.50

4 ROOFING AND RAINWATER 39,840.00

5 EXTERNAL FINISHINGS 4,954.00

6 INTERNAL FINISHINGS 21,021.00

7 DOORS 6,742.00

8 WINDOWS 5,000.00

9 FITTINGS 10,000.00

10 PLUMBING INSTALLATIONS 5,000.00

11 ELECTRICAL INSTALLATIONS 10,000.00


TOTAL CARRIED TO MAIN SUMMARY ZMW 172,233.50
MSL WALL FENCE CONSTRUCTION/ASSOCIATED EXTERNAL WORKS
BILL OF QUANTITIES (BOQs)
Item Description Qty Rate Amount
No.
SPECIFICATIONS FOR SCOPE OF WORK AND
ESTIMATED QUANTITIES

The specifications for the expected scope of


work for the project is as detailed below

DEMOLITIONS

General preambles

Notes on demolitions

All contractors to note that the given


quantities are approximate quantities and
should therefore follow detailed drawings in
the works pricing as the drawings take
precedence over the quntities in the
a approximate Bill of Quantities Item

The contractor shall take all due care to


provide shoring, needling, strutting and all
temporary works necessary for supporting to
any existing structures and/or services not
to be demolished in the course of
demolitions and construction until it
b becomes self supporting Item

All materials designed for reuse on site


shall be cleaned and carefully set aside and
protected until need for reuse. Other
reusable materials from demolitions shall be
the property of the employer and shall be
bundled and handed over to the employer on
c site Item

The contractor shall allow for all necessary


watering and/or environmental protection
techniques to avert all dust, noise and
other environmental hazards arsing from the
d demolitions measured herein Item

Hand over to the client shall mean


transportation of all recovered materials to
Medical Stores Limited in Lusaka and the
contractor shall allow for all
e transportation and handling costs Item

All debris arising from demolitions shall


f promptly be removed from site Item

19
No extra claims in this section shall be
g entertained Item

20
The contractor shall allow for temporal
security hoarding and provide for adequate
access control into the site prior to new
h wall fence construction Item

DEMOLITIONS

Demolish existing wall fence and grab out


concrete foundation footings and get out
from site approximately 485 meters long,
including careful removal existing electric
fence and to re-erect on the newly
g constructed wall. Item

All other necessary demolition works along


the entire perimeter and making good all
trades distributed. (Landscaping and
h electric fence etc). Item

DEMOLITIONS to maun summary

Item Description Qty Rate Amount


No.
NEW WALL FENCE

Construct a new 200mm thick concrete block


wall fence minimum 2200mm high from existing
ground level with intermediate reinforced
concrete columns at 6.60 meter centers, with
and including concrete copings and
plastering both walls to wood float finish.
Top most block course to be filled with
grade 10 MPA concrete. The wall fences are
to be painted both internally and
externally; Iv . Bonding Method Statement:
Wall to be built first with recesses on the
adjoining face, with steel ties to first
anchor onto the column reinforcement with
and including 50mm concrete nibs into block
work at 200mm intervals.

EXCAVATIONS.

Keeping Excavations free from Water

Allow for keeping the excavations free from


storm, surface water and mud by pumping and
a baling.
Item
Pumping subterranean water using pump of not
exceeding 300 litres per hour capacity from
a depth of not exceeding
b 4 metres.
Item

21
Excavation including maintaining and
supporting sides and keeping excavations
free from water, mud and fallen materials

Excavate trench for foundations commencing


at formation level
c not exceeding 1,5 metres deep.
m3 188

d ditto for columns


m3 9
Extra on all excavations.

Extra over excavation in pickable material


for excavation in hard pickable material or
e soft rock.
m3 10
f Ditto for excavation in hard rock.
m3 4
Disposal.

Redig from spoil heap, return, fill and


compact selected excavated material around
g foundations, to 95% MOD AASHO.
m3 96

h Redig from spoil heap and remove off-site.


m3 101

j Anti-termite treatment

carried forward USD

brought forward USD

Chemical anti-termite treatment executed by


an approved specialist under a ten-year
guarantee to sides and bottoms of
a excavations
m2 933
Vibrated reinforced concrete class 25

b In strip foundations
m3 59

c ditto in column base


m3 5

Vibrated reinforced concrete class 25 in

d 600 x 600mm Concrete columns (Full height)


m3 71

Sawn formwork including making good exposed


surfaces after removal, as described to

22
e Sides concrete columns
m2 475
REINFORCEMENT (all provisional)

Mild steel bar reinforcement to B.S. 4449

f 8 mm Diameter bars
Kg 1039
High yield deformed steel bar reinforcement to

g 12 mm Diameter bars
Kg 1542

Walling

Hollow concrete blockwork filled solid with


concrete to B.S 2028 in cement mortar (1:4)

Walling, thickness
h . 200mm
m2 195

Reinforcement to Walling

86 Gauge mild steel "Brickforce"


reinforcement laid horizontally in mortar
joint to every second course

j . 200mm width

SUBSTRUCTURE (NEW WALL FENCE) TOTAL TO


SECTION SUMMARY USD

Item Description Qty Rate Amount


No.
SUPERSTRUCTURE

Vibrated reinforced concrete class 25

WALLING

Hollow concrete blockwork to B.S 2028 in


cement mortar (1:4)

Walling, thickness
e 200mm
m2 1069

Coping.

Pre-cast Vibrated reinforced concrete (Mix


g 25MN/m2 - 20 mm stone) in

Square coping on piers, size

23
650mm x 650 mm
no. 82

h Coping , size

24
300 mm x 150mm
m 486

Concrete/ Wall ties to engineers


specifications

j Concrete wall ties


no. 494

WALL FINISHES

Fine tyrolean Plaster cement and sand(1:4)as


described

b 19mm coat to walls internally


m2 1069

c 19mm coat to square piers


m2 395

d 19mm coat to walls externally


m2 1069

Prepare one coat universal undercoat, two


coats ' Plascon' external quality PVA paint
to - client approved colour

e Plastered walls externally and internally


m2 1078

SUPERSTRUCTURE (NEW WALL FENCE) to section


summary USD

Item Description Qty Rate Amount


No.
SUNDRY WORKS

Construction and erection of new gate (to


match existing) to the proposed delivery
driveway, including new concrete curvet and
concrete apron from the main road to the new
gate Item

Relocate existing fuel depot facility and


set to work to a position near the proposed
new delivery gate, including design and
construction of concrete hand standing
a driveway to service the fuel depot Item

25
Design, construction and maintenance
(up to issuance of the final
certificate of whole works) of new
concrete pavers from the existing
fuel depot to junction with driveway
to existing delivery driveway,
including removal of existing tarmac
paving, scarification and compaction
of existing sub-base. Existing storm
water drainages adjoining the
proposed paved areas unblocking and
cleanup. Paver layout design is to
match existing pattern for the
b parking to the new offices Item
Provide and lay concrete pavers
walkway including sub-base
preparation, along the eastern
boundary wall fence, between the new
wall fence and open storm water
c drainage Item

Allow for full height Kariba stone cladding


to the two (2) inward wall fence panels to
d main gate entrance Item

Allow for removal of damaged storm water,


drainage walls and bases and rebuild with
reinforced concrete drains to match
existing, with and including construction of
road apron (conforming to RDA/GRZ standard
Road Construction specifications) between
existing main tarmac road and re-instated
e drains along Mukwa Road. Item

SUNDRY WORKS to section summary USD


DESCRIPTION

1 DEMOLITIONS
2 SUBSTRUTURE (NEW WALL FENCE)
3 SUPERSTRUCTURE (NEW WALL FENCE)
4 SUNDRY WORKS

MEASURED WORKS TO MAIN SUMMARY USD

26
Item Description Qty Rate Amount
No.

ROADS, PARKING AND WALKWAYS

WALKWAYS AND FOOTPATHS

Surface treatment

scrarifying existing driveways

Scrarify existing asphalt road


works prepare surfaces for new
a works
m2 1297 1.00 1,297.00

Compact and stabilize existing


b sub-base with 3 percent cement
m2 1297 11.20 14,526.40

ROADWAYS

Road surfacing

Supply and install asphalt to


engineers details and
c specifications thickness
. 40 mm
m2 1,297 40.00 51,880.00

DRIVEWAY AND CARPARK TO


SECTION SUMMARY USD -
Rates from
Item Description Qty Rate Amount Original Bill
No.

EXTERNAL PAINTING PAINTING

Prepare, one coat universal


undercoat, two coats ' Plascon'
Double velvet PVA paint to
internal walls (to client's
approved colour range)

a To rendered walls externally


m2 400 3.50 1,400.00 yes

DPAINTING TO SECTION SUMMARY USD -


Remeasured Rates from
Item Qty Rate Amount Original Bill
No
EXCAVATIONS.

Keeping Excavations free from


Water

Allow for keeping the excavations


free from storm, surface water
a and mud by pumping and bailing. Item

Pumping subterranean water using


pump of not less than 10,000
litres per hour capacity from a
b depth of not exceeding Item
4 metres.

Excavation including maintaining


and supporting sides and keeping
excavations free from water, mud
and fallen materials

Excavate to remove top soil,


c average depth not exceeng 150mm
m2 85.00 1.50 127.50 Yes
-

Excavate trenches for foundation


comencing at formation level,
d depth not exceeding 1.5m deep -
m3 73.00 3.50 255.50 Yes
-
-
Extra on all excavations. -
-
carried forward 383.00

brought forward 383.00

Extra over excavation in pickable


material for excavation in soft
a rock. -
m3 - 15.00 -
-
Ditto for excavation in hard
b rock. -
m3 - 50.00 -

Chemical anti-termite treatment


executed by an approved
specialist under a ten-year
guarantee to sides and bottoms of
d excavations -
m2 - 1.50 -
Disposal. -
-

Redig from spoil heap, return,


fill and compact selected
excavated material around
foundations, to 93% H.C.E
e density. -
m3 20 1.50 30.00 Yes
-
Redig from spoil heap and remove
f off-site. -
m3 102 10.00 1,020.00 Yes
1,433.00

1,433.00
Plain concrete 1:4:8 -
-
Blinding under foundations and
a column bases, thickness -
50 mm -
m2 51.00 7.50 382.50 Yes
-
Vibrated reinforced concrete Mix
25MN/m2 - 20 mm stone in -
-
b Foundation base -
m3 15.00 135.00 2,025.00 Yes
-
-
REINFORCEMENT -

Reinforcement (all provisional) -

bar reinforcement to B.S. 4449 -


-
-
12 mm Deformed steel
c Reinforcement -
kg 1,222.00 1.50 1,833.00 Yes
-
Hollow concrete blockwork filled
solid with mortar 1:4 mix in
cement mortar -
-

Solid blockwork walling in


foundations, overall thickness -
d . 200 mm -
m2 170.00 20.00 3,400.00 Yes
-

Allow for carrying out slump


e tests when directed as described. -
Item 200.00

100mm washed aggregate stone


layed around 200mm perforated
pipe neasure separately -
m3 34.00 25.00 850.00 No USD20/m3 Supply
Transport and
USD2/m3 Labour
200mm Perforated pipe - USD3/m3 Profit/Overheads
m 85.00 35.00 2,975.00 USD25/m3
-
RETAINING WALL USD 13,098.50
-
Item Description Qty Rate Amount Rates from Original Bill
No.

SCISSOR LIFT

Supply and installation of scissor


lift to engineers details and
specifications

a Scissor lift
no. 1 22,094.60 22,094.60 No 20,178.00 Supply

Installation and
1,916.60 Overhead costs
Additional roller shutter overall
b size 22,094.60
. 3000 x 600mm
no. 3 896.67 2,690.00

SCISSOR LIFT TO SECTION SUMMARY USD 24,784.60


Item Description Qty Rate Amount Rates from Original Bill
No.

ROADS, PARKING AND WALKWAYS

WALKWAYS AND FOOTPATHS

Vibrated reinforced concrete Mix


30MN/m2 - 20 mm stone in
a
Driveway slab, thickness
.200mm
m2 330 29.00 9,570.00 Yes
b
Drainage cover
.100mm
m2 182 29.00 5,278.00 Yes

REINFORCEMENT

Reinforcement (all provisional)

bar reinforcement to B.S. 4449

c 257 mesh double layer


m2 330.00 1.50 495.00 Yes

Powerfloating to concrete finish

Powerfloat concrete slab to


d architects approval
m2 330 1.00 330.00 Yes

Precast concrete kerbs and


channels to B.S 340

150 x 254 mm Precast concrete


grade 25 bull nosed kerbs,
rounded on one corner set on and
including concrete grade 15 base
size 225 x 100 mm haunched up
behind, jointed pointed in cement
mortar 1:4 including all necessary
excavations, backfilling, formwork
and disposal of surplus excavated
e material
m 220 8.50 1,870.00 Yes
130 x 254 mm Kerb ditto but curved
f on plan to various radii
m 0 8.50 -

DRIVEWAY AND CARPARK TO SECTION


SUMMARY USD 17,543.00
QUOTAITON FOR ADDITIONAL WORK

Item Description Qty unit Rate($) Amount($)

replace the existing transparent


roofing sheets

move and fix the existing steel


A 112 m2 6 672.00
roofing sheets

replace the transparent sheets


B 56 m2 25 1,392.50
with steel roofing sheets

C roof insulation 56 m2 25 1,392.50

internal wall plastering

A Skim walls with rihnolite


3mm thick 545 m2 1 545.00

paint the glue mix with cement to


A
the existing painted wall

cement and sand(1:4);powerfloated 545 m2 1.5 817.50

Prepare, apply one coat universal


B undercoat, three coats ' Plascon'
acrylic polvin to client approved
colour to walls
545 m2 3 1,635.00

Amount USD 6,454.50


Section 3a: Schedule of Requirements and Technical Specifications
MAIN SUMMARY

SECTION DESCRIPTION PAGE AMOUNT

Bill No. 1 MEASURED WORKS

Sub-Total USD

Add: Preliminaries and General Items

TOTAL AMOUNT OF TENDER USD

TOTAL AMOUNT OF TENDER IN WORDS:

Date

Name of Contractor :

Adress :
______________________________________________
______________________________________________
______________________________________________

Signature : ______________________________________________
Date :