SUBSTRUCTURE EARTHWORKS.
EXCAVATIONS.
Disposal.
Anti-termite treatment
d In strip foundations
m3 6 1,350.00 8,100.00
REINFORCEMENT
a 8 mm Diameter bars
Kg 65 14.50 942.50
b 12 mm Diameter bars
Kg 175 14.50 2,537.50
To walling, thickness
e . 200 mm
m 195 3.50 682.50
Sand blinding
Imported Filling
Damp-proof membranes
TESTING
Item
Qty Rate Amount(ZMW)
No.
REINFORCED CONCRETE SUPERSTRUCTURE
a Lintels
m3 1 1,350.00 1,350.00
b Ring beam
m3 1 1,350.00 1,350.00
d 8 mm Diameter bars
Kg 75 9.50 712.50
e 12 mm Diameter bars -
Kg 120 9.50 1,140.00
REINFORCED CONCRETE SUPERSTRUCTURE to section
summary ZMW 5,137.50
a Walling, thickness
. 200 mm
m2 144 135.00 19,440.00
c . 200mm width
m 195 3.50 682.50
Item
No Qty Rate Amount(ZMW)
ROOF COVERING
Item
No Qty Rate Amount (ZMW)
EXTERNAL FINISHINGS
Skirting
Mirrors
Item
Qty Rate Amount (ZMW)
No.
DOORS
Notes on Doors
Door Frames -
-
Notes to tenderers
General Fittings
Notes
Sanitary plumbing
Provide for Plumbing installations a provisional
e sum of Zambian Kwacha Five Thousand Only Item 5,000.00
ELECTRICAL INSTALLATION
-
-
-
TOTAL ELECTRICAL INSTALLATIONS to section Summary ZMW 10,000.00
SUMMARY
DESCRIPTION PAGE
1 SUBSTRUCTURE 40,897.50
3 WALLING 23,641.50
7 DOORS 6,742.00
8 WINDOWS 5,000.00
9 FITTINGS 10,000.00
DEMOLITIONS
General preambles
Notes on demolitions
19
No extra claims in this section shall be
g entertained Item
20
The contractor shall allow for temporal
security hoarding and provide for adequate
access control into the site prior to new
h wall fence construction Item
DEMOLITIONS
EXCAVATIONS.
21
Excavation including maintaining and
supporting sides and keeping excavations
free from water, mud and fallen materials
j Anti-termite treatment
b In strip foundations
m3 59
22
e Sides concrete columns
m2 475
REINFORCEMENT (all provisional)
f 8 mm Diameter bars
Kg 1039
High yield deformed steel bar reinforcement to
g 12 mm Diameter bars
Kg 1542
Walling
Walling, thickness
h . 200mm
m2 195
Reinforcement to Walling
j . 200mm width
WALLING
Walling, thickness
e 200mm
m2 1069
Coping.
23
650mm x 650 mm
no. 82
h Coping , size
24
300 mm x 150mm
m 486
WALL FINISHES
25
Design, construction and maintenance
(up to issuance of the final
certificate of whole works) of new
concrete pavers from the existing
fuel depot to junction with driveway
to existing delivery driveway,
including removal of existing tarmac
paving, scarification and compaction
of existing sub-base. Existing storm
water drainages adjoining the
proposed paved areas unblocking and
cleanup. Paver layout design is to
match existing pattern for the
b parking to the new offices Item
Provide and lay concrete pavers
walkway including sub-base
preparation, along the eastern
boundary wall fence, between the new
wall fence and open storm water
c drainage Item
1 DEMOLITIONS
2 SUBSTRUTURE (NEW WALL FENCE)
3 SUPERSTRUCTURE (NEW WALL FENCE)
4 SUNDRY WORKS
26
Item Description Qty Rate Amount
No.
Surface treatment
ROADWAYS
Road surfacing
1,433.00
Plain concrete 1:4:8 -
-
Blinding under foundations and
a column bases, thickness -
50 mm -
m2 51.00 7.50 382.50 Yes
-
Vibrated reinforced concrete Mix
25MN/m2 - 20 mm stone in -
-
b Foundation base -
m3 15.00 135.00 2,025.00 Yes
-
-
REINFORCEMENT -
SCISSOR LIFT
a Scissor lift
no. 1 22,094.60 22,094.60 No 20,178.00 Supply
Installation and
1,916.60 Overhead costs
Additional roller shutter overall
b size 22,094.60
. 3000 x 600mm
no. 3 896.67 2,690.00
REINFORCEMENT
Sub-Total USD
Date
Name of Contractor :
Adress :
______________________________________________
______________________________________________
______________________________________________
Signature : ______________________________________________
Date :