f2209 Tampines ST 95 - 96
f2209 Tampines ST 95 - 96
f2209 Tampines ST 95 - 96
1 Amount (S$)
2 $ -
3 $ -
4
GRAND TOTAL $ -
The Total lump sum for the Quotation shall be in Singapore Dollars: One Hundred Thirty Nine Thousand
One Hundared and Thirty Four and Cents Fifteen Only (S$ 139,134.15)
Terms Of Payment : On Progress Claim
Note
1) Quotation based on our description, any changes or addition will be considered as additional cost.
2) Actual quantity subject to site installation/measurement.
3) The total amount quoted subject to 8% GST.
4) SP Incoming Cable Cost Excluded (TBA by SPPG)
5) Performance Insurance Bond - Excluded
6) Scaffolding by other- Excluded
7) Structure holes opening - By Other
8) All the support brackets - By Other
9) Bus Shelter Notice Board LED illuminated Light Fitting- By Others (wiring Point & Juntion box by Tecly)
10) Npark Lighting System to PCN - Excluded
11) Main Road Opening/Crossing - By Others
We trust the above meets your requirement, kindly sign the acceptance below to acknowledge and confirm
of this quotation.
Yours faithfully.
______________________________ ______________________
Tony Ng (Hp-91003237) Signature & Co's Stamp
Managing Director Name:
encls:
No. 1 YISHUN STREET 23, #07-23 (YS-ONE) , SINGAPORE 768441 UEN:201512423H GST REG.NO: 201512423H
Website: www.tecly.com.sg Email: [email protected] TEL: (65) 6755 4927 FAX: (65) 6754 3774
TECLY ELECTRICAL ENGINEERING PTE LTD
(A) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 96
(B) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 95
(C) CONSTRUCTION OF HIGH COVERED LINKWAY ACROSS TAMPINES ST. 96
PROVISIONAL QUANTITIES
CONTRACT NO : ELECTRICAL SERVICES
ITEM DESCRIPTION
Original Less Discount Nett
Amount (S$) 10% + 5% Amout(S$)
The whole of the felling/removal of affected trees including the uprooting of tree stumps, disposal, reinstatement works, 1.8 3.6 5.40
1.8 regardless of trees girth and height and all other related works as specified and as shown in Specifications and Drawings.
The whole of the implementation of noise and dust monitoring including equipment by Contractor's engaged Specialist. and 1 0 0.00
1.9 all other necessary instrumentation programmes for all the works including provision of all labour, instruments and tools to
carry out the work, submissions of reports, etc. all related works as specified and as shown in Specifications and Drawings.
To engage a Licensed Electrical Worker and Qualified Electrical Professional Engineer to check, comply, design and
submission to all relevant authorities for approval, redesign and carry out, follow up with submission to relevant authorities in
accordance to all their latest requirements/written directives on all aspects of electrical works for the Works including
1.10 installation, testing and commissioning of cables, light fittings, OG boxes, distribution boards, surge protectors, site
surveys,endorsement of plans and certificates, as-built single line diagram, electrical installation plans, as-built electrical
plans in softcopy Autocad format, DVDs, LUX level measurements, etc.and all other related works and as shown and
specified in the Drawings and Specifications. Liability for this particular scope will be ended only after DLP.
CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 96 & ST. 95 & HIGH COVERED LINKWAY ACROSS $ - $ - $ -
2.0 TAMPINES ST. 96
The whole of the survey services by Registered Surveyor for the stop-to-stop distances, measured from the bus stop before $ - $ - $ -
and the next bus stop after, to the new bus stop location measured by Global Positioning System (GPS) in Geographic
2.1 Information System (GIS)coordinates for all shifting or relocating of temporary bus stops, and for the new permanent bus stop
in compliance with the latest requirements from the LTA and LTA's bus operators.
The whole of the construction of SEVEN (7) new bus shelters including provision of aluminium honeycomb roof, fabrication
and installationof steel structure components,relocation of the existing bus pole, bus stop address and number sign
plates,reinforced concrete slab,aluminium seats, information panel with aluminium frame,tempered and laminated glass and
lightings, aluminium flashing with bracket, rain screen (tempered glass fritted with all round frame), painting, flooring, safety
bollards,signages and refuse bin, warranties, and all other related works as specified and as shown in Specifications and
2.2 Drawings and to LTA's latest standards.
The whole of construction of bus bay including the breaking up or removal and disposal of the existing kerbs, sidetable, drop-
inlet chambers, scupper drains, road markings/signs, sidetables, street lighting, and installation of catch-basin, scupper
drains, 200mm wide yellow thermoplastic paint lines at the edge of the slab, any affected temporary hoarding/fencing to be
2.3 relocated and reinstated back upon completion of works and all other related works as specified and as shown in
Specifications and Drawings and to LTA's latest standards.
The whole of the supply and complete installation of LED type lightings for all the permanent bus shelters including
engagement of a PE(E) and LEW for design &submission to all relevant authorities for approval, installation, testing and
commissioning of cables, cable insulation tests, light fittings, OG boxes, distribution boards, conduits / pipes, surge
2.4 protectors, site surveys, endorsement of plans and certificates, as-built single line diagrams, electrical installation plans, as-
built electrical plans in softcopy AutoCAD format, DVDs, LUX level measurements, etc. and all other related works, as
specified and as specified and as shown in Specifications and Drawings and to LTA's latest standards.
$ -
The whole of the supply and complete installation of lightning protection systems for the permanent bus shelters, seats, bus $ - $ - $ -
stop pole, bollards, equipotential bonding to all metal within 2m of the shelters including engagement of a PE(E) for plan
design &submissions to all relevant authorities for approval, installations, testings and commissioning of lightning protection
2.5 systems, air termination horizontal/down conductors, earth electrode, inspection pits, site surveys, endorsement of plans and
certificates, test reports, as-built lightning protection diagrams, as-built lightning plansin softcopy AutoCAD format, DVDs,
etc. and all other related works as specified and as shown in Specifications and Drawings and to LTA's latest standards.
The whole of the construction of 'Type A' temporary bus shelter and the connecting linkway (subjected to S.O Rep's approval)
including subsequent shifting or relocation,removal and reinstatement works to suit the Contractor's sequence of works and
method of construction for the new bus bay and/or bus shelters, LED lightings and lightning protection system, supply of
electrical power for temporary lightings &maintenance throughout the use of the temporary bus shelters, relocation of the
existing bus stop pole, safety bollard, seats, notice board info, 'No Smoking' signs,address plate, traffic markings and signs,
2.6 testing for earth electrode inspection pits,etc, and all other related works as shown in the Drawings and as specified in the
Specifications and in accordance with LTA latest standard and requirements.
a. B01
b. B03
c. B04
d. B05
The whole of the construction of High Covered Linkway including provision of temporary covered linkway (including
subsequent removal, reinstatement works) during construction and all related works as shown in the Specifications and
Drawings including excavation through any stones or other obstructions, as and when required to Contractors's proposal
2.7 including all necessary temporary works and/or provision of any temporary/permanent works, precausionary and safety
measures, working around site constraints due to existing site conditions and subsequently all necessary
reinstatement works.
CONTRACT DE177
TECLY ELECTRICAL ENGINEERING PTE LTD
(A) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 96
(B) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 95
(C) CONSTRUCTION OF HIGH COVERED LINKWAY ACROSS TAMPINES ST. 96
PROVISIONAL QUANTITIES
CONTRACT NO : ELECTRICAL SERVICES
$ - $ - $ -
$ - $ - $ -
The whole of the supply and complete installation of LED type lightings for HIGH covered linkway including engagement of a
PE(E) and LEW for design & submission to all relevant authorities for approval, installation, testing and commissioning of
cables, cable insulation tests, light fittings, OG boxes, distribution boards, conduits /pipes, surge protectors, site surveys,
endorsement of plans and certificates, as-built single line diagrams, electrical installation plans, as-built electrical plans in
2.8
softcopy AutoCAD format, DVDs, LUX level measurements, etc. and all other related works, as specified and as specified
and as shown in Specifications and Drawings and to LTA's latest standards.Provision of temporary power supply prior to
permanent power connection commissioned.
$ - $ - $ -
The whole of the supply and install two (2) nos.100mm diameter UPVC pipes for street lightings at B03 bus shelter including pilot wires $ - $ - $ -
2.9 or nylon strings, PVC cable warning markers, etc. all to LTA's latest standard and all related works as shown and specified in the
Drawings and Specifications.
The whole of the supply and painting of road lines, traffic markings, pavement markings, road markings, cycling path markings, etc.
2.10 with
reflectorised thermoplastic paint complying to latest LTA standard, the kerb face painting in alternate black and white colour with gloss
enamel paint, install raised reflective pavement markers at slip roads, etc. and all related works to LTA's standards.
The whole of relocate, supply, fabrication and installation of road directional (single-sided) signs including confirmation
(single and double-sided) signs and all related works including aluminium sheeting, reflective sheeting, date stickers, support
posts,reinforced concrete footings, anchor bolts, paintings, submitting of Contractor engaged PE's calculation and
2.11 endorsement on the footing supports, Artworks detail plans, warranty, etc. and all related works to LTA standards, and as
shown and as specified in the Drawings and Specifications.
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
CONTRACT DE177
TECLY ELECTRICAL ENGINEERING PTE LTD
(A) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 96
(B) CONSTRUCTION OF BUS SHELTERS ALONG TAMPINES ST. 95
(C) CONSTRUCTION OF HIGH COVERED LINKWAY ACROSS TAMPINES ST. 96
PROVISIONAL QUANTITIES
CONTRACT NO : ELECTRICAL SERVICES
(a) $ - $ - $ -
(b) $ - $ - $ -
(c)
$ - $ - $ -
$ - $ - $ -
(d)
$ - $ - $ -
$ - $ - $ -
5.2.4 By Others
6 $ - $ - $ -
SUMMARY
GRAND TOTAL $ -
CONTRACT DE177
CONTRACT NO : D/07521 - ELECTRICAL SERVICES
Project Title: POB/Linkway with Lift Shaft at Bukit Batok Rd & Tengah Town - Electrical Works
Proposal:
Our Ref : TL/Q/1933/23d Rev-04 Quotation / Tender Breakdown Details for Item 5.2.1-(a) & (b) And 5.2.2-(a) & (b)
Date : 07 Aug 2023
Set Qty Length Unit Rate HDB Total Add % Total TL/Q/1933/22/d Rev
Item Description Total Unit SOR RATE Add Amount REMARKS 04
no no m $ /Supplier Cost Amount $ Amount Tender Sum
2.2 ELECTRICAL WORKS
Supply and installation of electrical distribution system to the following facilities not limiting to
liaising with relevant authorities, application of power's LEW, distribution boards, switches,
5.2.1
circuits, and other accessories as shown in the Drawings and Specifications. Provision of
temporary power supply prior to permanent power connection commissioned.
Pedestrian Overhead Bridge and Lifts (including the engagement of LTA's approved Commuter
Facility Equipment Monitoring Services (CFEMS) to design, supply and install associated
CCTVs and lift CFEMS monitoring systems.)
a) $ 35,233.00 $ 33,202.50
Note: 1) CFEMS System Enquitment & CCTV Monitoring System -Excluded *
2) CFEMS System wiring for LInkway/POB Lighting & Lift DB - Included
As Per CFEMS Request Items (OG Box Monitoring System) c/w 20Pair x 1.0mm Multicore
Cabe in HDUPVC Pipe / Trunking and Connection Accessories.
1
Note : CFEMS System Enquitment & CCTV Monitoring System -Excluded
a. - 2Sets of 20 Pair 1.0mm sq PVC Cable 2 60 120 m $ 28.00 *RATE $ 3,360.00 $ 3,360.00
b. - 50mm x 50mm Metal Trunking For Monitoring System 1 15 15 m $ 17.60 SZ110 $ 264.00 $ 264.00
c. - 100mm dia HD uPVC Pipe for underGround 1 30 30 m $ 20.10 SZ082 $ 603.00 $ 603.00
d. - Double Open/Close or Fault Indicating Auxiliary Contact (Relay)for MCB & Rccb 1 18 18 nos $ 85.00 *RATE $ 1,530.00 $ 1,530.00
e. - Terminal Block To CFEMS RTU 1 18 18 nos $ 8.00 *RATE $ 144.00 $ 144.00
As Per CFEMS Request Items Laying Conduit for CCTV, Tel, 24V DC Power Supply from Lift 1
Closet to Lift 2 Closet (3rows of Conduit - Aprox 40mts each).
2
Note : CCTV, DVR, Tel & all of equipments - Excluded
To supply and install Lift DB, Lift Shaft lighting points and light fittings, SSO, Isolator whenever
3 necessary as per LTA latest ADC requirements (Lift Shaft & Lift Closet) and necessary wiring,
concealed conduit, trunking, control gear, mounting support and accessories, etc.
Set Qty Length Unit Rate HDB Total Add % Total TL/Q/1933/22/d Rev
Item Description Total Unit SOR RATE Add Amount REMARKS 04
no no m $ /Supplier Cost Amount $ Amount Tender Sum
2.2 ELECTRICAL WORKS
a. - 25mm PVC Concealed conduit for Lift Shaft Lighting 2 2 60 120 m $ 3.90 SZ926 $ 468.00 $ 468.00
b. -2 x 2.5mm Fire resistant Cable for Lift Shaft Lighting Points 2 2 65 130 m $ 6.30 SZ301 $ 819.00 $ 819.00
c. -2 x 4mm Fire resistant Cable for Lift Shaft sso 2 2 30 60 m $ 6.90 S0220 $ 414.00 $ 414.00
d. -2 x 2.5mm PVC Cable for Lift Shaft Lighting Points 2 2 40 80 m $ 3.00 SZ046 $ 240.00 $ 240.00
e. -2 x 4mm PVC Cable for Lift Shaft sso 2 2 30 60 m $ 3.50 SZ045 $ 210.00 $ 210.00
f. - 4feet LED Light Fitting c/w Battrey Back for Lift Shaft 2 3 6 nos $ 290.60 Z2183 $ 1,744.00 40% $ 224.00 $ 1,968.00
g. - 15A SSO Metal Clad for Lift Shaft 2 1 2 nos $ 29.90 SZ189 $ 60.00 $ 60.00
h. - 2 Way 1 gang Metal Clad Switch for Lift Shaft 2 2 4 nos $ 22.90 SZ182 $ 92.00 $ 92.00
1.3.4 Supply and Installation of the following for Lift Closets 1, 2 & 3
a. - 25mm dia Gi Conduit 1 1 85 85 m $ 28.50 SZ091 $ 2,422.50 $ 2,423.00
b. - 2 x 2.5mm2 PVC Cable for Lift closet Lighting & Power 1 1 170 170 m $ 3.00 SZ046 $ 510.00 $ 510.00
c. - 2.5mm2 PVC Earth Cable for Lift closet Lighting & Power 1 1 170 170 m $ 1.10 SZ725 $ 187.00 $ 187.00
d. - 3C 2.5mm2 XLPE/SWA/PVC Cable 1 2 30 60 m $ 12.10 S0223 $ 726.00 $ 726.00
e. - 13A SSO Metal Clad for Lift Closet 1 7 7 nos $ 23.80 SZ186 $ 167.00 $ 167.00
f. - 1 Way 1 gang Metal Clad Switch for Lift Shaft 1 7 7 nos $ 21.60 Z0218 $ 151.00 $ 151.00
g. -Supply & Install 7w LED Light for Lift Closets 1 7 7 nos $ 200.00 *RATE $ 1,400.00 $ 1,400.00
h. - 50mm dia HD uPVC Pipe 1 1 30 30 m $ 10.50 *RATE $ 315.00 $ 315.00
b) Covered Linkway connecting pedestrian overhead bridge and bus stops $ 7,758.00 $ 7,652.25
Set Qty Length Unit Rate HDB Total Add % Total TL/Q/1933/22/d Rev
Item Description Total Unit SOR RATE Add Amount REMARKS 04
no no m $ /Supplier Cost Amount $ Amount Tender Sum
2.2 ELECTRICAL WORKS
Supply and installation of lighting distribution system to the following facilities including timers,
switches, and controls as shown in the Drawings and Specifications, This shall also indicate
Contractor's PE/LEW part on endorsing the required shop drawings inclduing lux calculations to
5.2.2
be submitted for LTA's approval.
Note: C/W Intelligent Lighting Detection and Motion Sensor & OG Box (400V/41Kva)
b LEW Liaising with relevant authorites & Turn-On 1 1 Lot $ 1,200.00 *RATE $ 1,200.00 $ 1,200.00
b) Covered Linkway connecting pedestrian overhead bridge and bus stops $ 8,488.00 $ 8,421.75
a. Supply & Install Aztech 7w LED Light Fitting 1 24 24 nos $ 200.00 *RATE $ 4,800.00 $ 4,800.00
c. - 2 x 2.5mm2 PVC Cable Lighting 1 1 680 680 m $ 3.00 SZ046 $ 2,040.00 $ 2,040.00
d. - 2.5mm2 PVC Earth Cable for Lighting 1 1 680 680 m $ 1.10 SZ725 $ 748.00 $ 748.00
e. Testing & Commissioning for POB /Linkway 1 1 Lot $ 900.00 *RATE $ 900.00 $ 900.00
Total Amount for item 5.2.1 -(a) & (b), And 5.2.2 - (a) & (b) $ 92,606.00 $ - $ 90,145.50
CONTRACT NO : D/07521 - ELECTRICAL SERVICES
Project Title:
Proposal: Summary of Breakdown for Item 5.2.1-(a)
Our Ref TL/SOB/-01
:
Date : 07 Aug 2023
Supply and installation of electrical distribution system to the following facilities not limiting to liaising with relevant authorities, application of
5.2.1 power's LEW, distribution boards, switches, circuits, and other accessories as shown in the Drawings and Specifications. Provision of
temporary power supply prior to permanent power connection commissioned.
Pedestrian Overhead Bridge and Lifts (including the engagement of LTA's approved Commuter Facility Equipment Monitoring Services
(CFEMS) to design, supply and install associated CCTVs and lift CFEMS monitoring systems.)
a)
Note: 1) CFEMS System Enquitment & CCTV Monitoring System -Excluded *
2) CFEMS System wiring for LInkway/POB Lighting & Lift DB - Included
As Per CFEMS Request Items (OG Box Monitoring System) c/w 20Pair x 1.0mm Multicore Cabe in HDUPVC Pipe / Trunking and
Connection Accessories.
1
Note : CFEMS System Enquitment & CCTV Monitoring System -Excluded
a. - 2Sets of 20 Pair 1.0mm sq PVC Cable 2 60 120 m $ 28.00 $ 3,360.00
b. - 50mm x 50mm Metal Trunking For Monitoring System 1 15 15 m $ 17.60 $ 264.00
c. - 100mm dia HD uPVC Pipe for underGround 1 30 30 m $ 20.10 $ 603.00
d. - Double Open/Close or Fault Indicating Auxiliary Contact (Relay)for MCB & Rccb 1 18 18 nos $ 85.00 $ 1,530.00
e. - Terminal Block To CFEMS RTU 1 18 18 nos $ 8.00 $ 144.00
As Per CFEMS Request Items Laying Conduit for CCTV, Tel, 24V DC Power Supply from Lift 1 Closet to Lift 2 Closet (3rows of Conduit - Aprox
40mts each).
2
Note : CCTV, DVR, Tel & all of equipments - Excluded
To supply and install Lift DB, Lift Shaft lighting points and light fittings, SSO, Isolator whenever necessary as per LTA latest ADC requirements
3
(Lift Shaft & Lift Closet) and necessary wiring, concealed conduit, trunking, control gear, mounting support and accessories, etc.
1.3.4 Supply and Installation of the following for Lift Closets 1, 2 & 3
a. - 25mm dia Gi Conduit 1 1 85 85 m $ 28.50 $ 2,423.00
b. - 2 x 2.5mm2 + CPC PVC Cable for Lift closet Lighting & Power 1 1 170 170 m $ 4.30 $ 731.00
c. - 3C 2.5mm2 XLPE/SWA/PVC Cable 1 2 30 60 m $ 12.10 $ 726.00
d. - 13A SSO Metal Clad for Lift Closet 1 7 7 nos $ 23.80 $ 167.00
e. - 1 Way 1 gang Metal Clad Switch for Lift Shaft 1 7 7 nos $ 21.60 $ 151.00
g. -Supply & Install 7w LED Light for Lift Closets 1 7 7 nos $ 200.00 $ 1,400.00
f. - 50mm dia HD uPVC Pipe 1 1 30 30 m $ 10.50 $ 315.00
Pedestrian Overhead Bridge and Lifts (including the engagement of LTA's approved Commuter Facility Equipment Monitoring Services
(CFEMS) to design, supply and install associated CCTVs and lift CFEMS monitoring systems.)
a) $ 38,950.00 $ 33,202.50
Note: 1) CFEMS System Enquitment & CCTV Monitoring System -Excluded *
2) CFEMS System wiring for LInkway/POB Lighting & Lift DB - Included
CONTRACT NO : D/07521 - ELECTRICAL SERVICES
Project Title:
Proposal: Summary of Breakdown for Item 5.2.1-(a)
Our Ref TL/SOB/-01
:
Date : 07 Aug 2023
b) Covered Linkway connecting pedestrian overhead bridge and bus stops $ 7,758.00 $ 7,652.25
Supply and installation of lighting distribution system to the following facilities including timers, switches, and controls as shown in the Drawings
and Specifications, This shall also indicate Contractor's PE/LEW part on endorsing the required shop drawings inclduing lux calculations to be
5.2.2 submitted for LTA's approval.
Note: C/W Intelligent Lighting Detection and Motion Sensor & OG Box (400V/41Kva)
Supply and Installation of 415/41KVA (3-Phase) OG boxes with distribution board complete with 2 nos of 100mm dia HD UPVC pipes extended 1m beyond the
a. 1 1 nos $ 10,710.00 $ 10,710.00
Boundary line, and as per LTA latest ADC requirments c/w All neccessary.
b LEW Liaising with relevant authorites & Turn-On 1 1 Lot $ 1,200.00 $ 1,200.00
b) Covered Linkway connecting pedestrian overhead bridge and bus stops $ 8,488.00 $ 8,421.75
a. Supply & Install Aztech 7w LED Light Fitting 1 24 24 nos $ 200.00 $ 4,800.00
c. - 2 x 2.5mm2 PVC Cable Lighting 1 1 680 680 m $ 3.00 $ 2,040.00
d. - 2.5mm2 PVC Earth Cable for Lighting 1 1 680 680 m $ 1.10 $ 748.00
CONTRACT NO : D/07521 - ELECTRICAL SERVICES
Project Title:
Proposal: Summary of Breakdown for Item 5.2.1-(a)
Our Ref TL/SOB/-01
:
Date : 07 Aug 2023
Total Amount for item 5.2.1 -(a) & (b), And 5.2.2 - (a) & (b) $ 57,373.00 $ - $ 90,145.50