Main Challenges & Approach
RTT Standardization is an opportunity to bring operational efficiencies and reduce dependencies on 3rd parties and control
infrastructure costs.
Main Challenges How are we doing it?
Patternless Fit for Single Purpose RTT structures Cataloged Site Design
Case–by-case site design leads to multiple structure types, variable Well-defined structure selection method creates a unified approach for
heights and custom-made solutions. Irregular statical calculation for the RTT site designs. Design offices to adopt Eurocode compliant
different structures from different Design offices. models and the respective component inventory enabling improved
control over the general site design.

Complex EMF Assessment Standardized structure blocks


EMF calculation process introduces non-uniform pole lengths due to Using standardized blocks with pre-defined/fixed pole lengths for the
the lack of alignment between radio and infrastructure. simulations will optimize the EMF workflow ensuring the radio
requirements are always covered by the standardized site structures.

Steel Ordering Lead Times Established Warehouse stock


Steel order lead times continuously growing are a key blocking point for Customer ready stock for faster site delivery and optimized steel
RTT site rollout process.
replenishment . Bulk orders to get price advantage of economy of scale.

High CW deployment complexity & Roof Diversity Reduce Deployment times & Construction Errors Mitigation
Rooftop sites bring specific challenges making each one a tailored Pre-defined part types and common connections will increase the ease
design/structure created to fulfill the demands of radio and of construction and reduce installation errors. Standard installation
maintenance of the building fabrics. guidelines simplifies handling and maintenance of steel structures.

RTT Standardization is intended to be a “one library fits all” approach thus securing flexibility and adaptability to
different roof types and site configurations.
C2 General 2
C2 General
RTT Standardization – Variables Analysis
1 Process efficiency 2 Ordering 3 Risks

• Every Site has unique items • Long lead times due to • High Quality Risks due to
and need to be handled as a step-by-step ordering site based construction
single case site Solution according Milestones
• Small missing parts can
• 3 rd
Party items cause a • No possible Forecast of cause a site build stop and
longer lead time for Material usage possible. spare parts need to be
Purchase Order and more Dependency on 3rd Party produced site based and
approval stages delivery time cause delay

• Different Milestones e.g. EP • Steel Structures for


/ AP approval , BnetzA Antennae , Equipment and
approval delay the starting electrical Installation are site
point for steel ordering based manufactured (Build
to Suite) long lead time

Presentation Footer Title


C2 General
C2 General
Pole Design Configurations - Structure Catalog Overview
RTT standardized structure library – Distributed Multipoles and Monopoles

Multipoles Monopole
Category 1 Category 2 Category 2b Category 3 Category 4 Category 4b

Height: 2m / 4 m Height: 3m / 6 m Height: 4m / 7m / 10 m Height: 4m / 7m / 10 m Height: 6m / 8m / 10 m Height: 6m / 8m / 10 m

Support: Wall-mounted Support: Flat Roof Support: Flat Roof Support: Flat Roof / Pitched Roof Support: Pitched Roof Support: Pitched Roof

Application: Distributed Wall- Application: Distributed Flat Roof Application: Distributed Flat Roof Application: Centralized Flat Roof Application: Centralized Pitched Application: Centralized Pitched
mounted Roof Roof

Design Exposed Area: Design Exposed Area: Design Exposed Area: Design Exposed Area: Design Exposed Area: Design Exposed Area:
• 4.45m² @ 0.75[kN/m²] • 4.77m² @ 0.75[kN/m²] • 4.77m² @ 0.75[kN/m²] • 9.36m² @ 0.75[kN/m²] • 3.37m² @ 0.75[kN/m²] • 3.37m² @ 0.75[kN/m²]
• 3.34m² @ 1.00[kN/m²] • 3.58m² @ 1.00[kN/m²] • 3.58m² @ 1.00[kN/m²] • 7.02m² @ 1.00[kN/m²] • 2.53m² @ 1.00[kN/m²] • 2.53m² @ 1.00[kN/m²]
• 2.67m² @ 1.25 [kN/m²] • 2.86m² @ 1.25 [kN/m²] • 2.86m² @ 1.25 [kN/m²] • 5.62m² @ 1.25 [kN/m²] • 2.02m² @ 1.25 [kN/m²] • 2.02m² @ 1.25 [kN/m²]

Pieces: 5 Pieces: 17 Pieces: 18 Pieces: 26 Pieces: 20 Pieces: 13


Unique pieces: 5 Unique pieces: 8 Unique pieces: 9 Unique pieces: 10 Unique pieces: 7 Unique pieces: 7
Dep Complexity: Low Dep Complexity: Low - Medium Dep Complexity: Low - Medium Dep Complexity: Medium - High Dep Complexity: High Dep Complexity: High
Status: Developed Status: Developed Status: Developed Status: Developed Status: Developed Status: Developed

C2 General 4
C2 General
Standardized RTT Catalogue Details (1/2)
All standardized structures consolidated in a certified catalog
RTT Structure Categories
Distributed Multipoles Monopole
Cat.1 Cat.2 Cat.2b Cat.3 Cat.4 Cat.4b
General Atributes
Height [m] 2m / 4m 3m / 6m 4m / 7m / 10m 4m / 7m / 10m 6m / 8m / 10m 6m / 8m / 10m
Distribution type Multipole Multipole Multipole Monopole Monopole Monopole
Support type Wall-Mounted Flat Roof Flat Roof Flat Roof Pitched Roof Pitched Roof
Support frame shape N/A L shape L shape X shape N/A N/A
Min: 2.435 x 2.435 Min: 3.850 x 3.850 Min: 5.32 x 5.32 Min: 2.15 x 2.15
Horizontal footprint [m²] 1.00 x 1.00* 1.00 x 1.00**
Max: 5.265 x 5.265 Max: 5.265 x 5.265 Max: 7.41 x 7.41 Max: 7.00 x 7.00

Expected installation complexity low low-medium low-medium medium-high high high


Number of unique pieces 5 8 9 10 7 7

Material steel steel steel steel steel steel


Steel weight [kg] 118 / 191 304 / 537 512 / 804 1029 / 1577 361 / 489 347 / 607
Design Exposed Area [m²]

Wind pressure of 0.75 [kN/m²] 4,45 4,77 4,77 9,36 3,37 3,37
Wind pressure of 1.00 [kN/m²] 3,34 3,58 3,58 7,02 2,53 2,53
Wind pressure of 1.25 [kN/m²] 2,67 2,86 2,86 5,62 2,02 2,02
Material

Maximum Steel Weight [kg] 191 537 804 1,577 489 607

Expected units per site 3 3 3 1 1 1

Total Steel [kg] 573 1,611 2,412 1,577 489 607

*This is the minimum area required for wall-mounted solutions


** This minimum area does not include the wooden beams required for this solution
C2 General 5
C2 General
Structure Categories – Decision Chart
Decision chart to be used as a guideline for structure selection after site acquisition stage

3,37
Pitched Roof Category 4/4b 2,53
2,02

9,36
Category 3 7,02
5,62 Legend:
Flat Wind pressure of 0.75 [kN/m²]
Roof
4,77 Wind pressure of 1.00 [kN/m²]
Category 2/2b 3,58
Wind pressure of 1.25 [kN/m²]
2,86

4,45
Wall Mounted Category 1 3,34
2,67

0 1 2 3 4 5 6 7 8 9 10
Design Exposed Area [m²]

KEY NOTES:
• This chart works as a reference guideline to assist the decision of the structural category to be adopted for a specific site, depending on the Design Exposed
Area and Roof Type
• This chart was defined for a reference values of Wind Pressure value, implying that for different Wind Pressure value, the Category chosen may be altered

C2 General 6
C2 General
Standardized RTT Catalogue Details (1/2)
All standardized structures consolidated in a certified catalog
RTT Technique Frame is
designed to support the
Equipment Installation on a
Rooftop Site .

*This is the minimum area required for wall-mounted solutions


** This minimum area does not include the wooden beams required for this solution
C2 General 7
C2 General
SKU Naming and parts
Unique Part Numbers e.g. P1 , P2 etc.

Modular System

Easy stock handling

C2 General
C2 General
Sample Document

Szenario 1

https://tconglobal.com/wp-content/uploads/2020/03/rethinkingstandardization_blog_image.jpg

C2 General
C2 General
RTT Standardization – Trial Sites Status
Out of 20 Candidates 3 are in the
nearly build phase and the steel
ordering process has started

Next Steps :

- Steel pre-order
- Receive BnetzA approval for site
build

https://tconglobal.com/wp-content/uploads/2020/03/rethinkingstandardization_blog_image.jpg

C2 General
C2 General
Next Steps
1 Trial Sites 2 Processes 3 Documentation

• Implement the new parts for • Final Implement the new • Provide site selection
the Categories into the SKU process into the Acquisition criteria Guide to support
process scope Design Partner for selection

• Trial Site build and • Material order process • Infrastructure Guideline to


acceptance Definition + highlight the difficulties of
implementation implementation . E.g test